Attachment 2 - Pricing Sheet Bragg.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- DoDEA Daily Commute and Special Needs Student Transportation Services - Fort Bragg, North Carolina
- Solicitation number
- HE1254-20-R-2002
- Issued by
-
Department of Defense Education Activity
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| DoDEA Americas Mid-Atlantic District - Fort Bragg |
| HE1254-20-R-2002 Bragg Daily Commute & Special Needs Transportation Services |
| Summary of Base plus Option Periods |
| Fort Bragg Transportation | Annual Proposed Price $ |
| Base Year | $ - 0 |
| Option Period 1 | $ - 0 |
| Option Period 2 | $ - 0 |
| Option Period 3 | $ - 0 |
| Option Period 4 | $ - 0 |
| Total Estimated Price | $ - 0 |
| Overall Total | Annual Proposed Price |
| Fort Bragg Transportation | $ - 0 |
| FAR 52.217-8 | $ - 0 |
| Total Estimated Price | $ - 0 |
IGE Must also include the following:
A. Preparer: James Calhoun, Transportation Supervisor, james.calhoun@dodea.edu B. Reviewer: Laure Holder laura.holder@dodea.edu C. Signature and Date D. As the preparer, I certify that the Independent Government Estimate is accurate and complete to the best of my knowledge.
E. The IGE is solely based on the elements applicable to and developed from the Performance Work Statement (PWS) for the services to be acquired.
"F. The unit prices for the base period was obtained by reviewing prices on current contracts for the same/similar services. The average price of current vendors who provide the required services within the area was then used to develop the IGE. Quantities on all CLINS exceed the known requirement for purposes of providing maximum ordering flexibility to the customer due to unknown variables such as student enrollment which historically changes the need for additional services. A rate of 2.3% inflation was used to calculate the IGE escalation rate throughout the base and option period. This rate is based on the United States historical and predicted inflation rates published on usinflationcalculator.com with data provided by the U.S Labor Department and the U.S. Bureau of Labor Statistics. Quantities listed reflect contract maximums, not actual requirements, which will be identified by Task Order. Currently known requirements for number of runs was increased by 30% to allow for the possibility of growth and demand within the community.
Supporting Data Historical Contract:: HE1254-15-C-0002. On-line inflation data at: https://www.usinflationcalculator.com/inflation/historical-inflation-rates/.
PRICE SUMMARY
Source Selection Information – see FAR 2.101 and 3.104 Required for all Independent Government Cost Estimates
SUMMARY
Requiring Office: DoDEA -Americas Mid-Atlantic District Period of Performance: From: 1 August 2019 To: 31 July 2024
Source Selection Information – see FAR 2.101 and 3.104
Bragg Base & Options
| DoDEA Americas Mid-Atlantic District - Fort Bragg | |||||
| HE1254-20-R-2002 Bragg Daily Commute & Special Needs Transportation Services | |||||
| Base and Option Periods | |||||
| Fort Bragg Student Transportation | Base Year SY 2020-2021 | ||||
| CLIN | Description | Unit of Issue | Quantity | Unit Price | Total Cost |
| Fort Bragg Student Transportation | |||||
| 0001 | Daily Commute Transportation Service | ||||
| 0001AA | Daily Commute (Total # of Bus Runs) | Run | 18720 | $ - 0 | |
| 0001AB | Safety Attendants (Pre-K~Gr 2 Bus Routes) | Run | 4680 | $ - 0 | |
| 0002 | Special Education (SpEd) Transportation Service | ||||
| 0002AA | SpEd (Total # of Bus Runs) | Run | 7020 | $ - 0 | |
| 0002AB | Safety Aides (SpEd Bus Routes) | Run | 7020 | $ - 0 | |
| 0003 | Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 312 | $ - 0 | |
| 0004 | Co-Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 98 | $ - 0 | |
| 0005 | Activity Bus Transportation Service (1.5 Hrs Service Per Each Trip) | Run | 468 | $ - 0 | |
| 0006 | Extended School Year (ESY) Transportation Service | ||||
| 0006AA | ESY Special Needs Transportation Service (Total # of Bus Runs) | Run | 312 | $ - 0 | |
| 0006AB | Safety Aides (ESY Bus Routes) | Run | 312 | $ - 0 | |
| 0007 | Contractor Manpower Reporting | Task | 1 | NSP | |
| Base Year | TOTAL: | $ - 0 |
| Fort Bragg Student Transportation | Option Period Year 1 SY 2021-2022 | ||||
| CLIN | Description | Unit of Issue | Quantity | Unit Price | Total Cost |
| Fort Bragg Student Transportation | |||||
| 1001 | Daily Commute Transportation Service | ||||
| 1001AA | Daily Commute (Total # of Bus Runs) | Run | 18720 | $ - 0 | |
| 1001AB | Safety Attendants (Pre-K~Gr 2 Bus Routes) | Run | 4680 | $ - 0 | |
| 1002 | Special Education (SpEd) Transportation Service | ||||
| 1002AA | SpEd (Total # of Bus Runs) | Run | 7020 | $ - 0 | |
| 1002AB | Safety Aides (SpEd Bus Routes) | Run | 7020 | $ - 0 | |
| 1003 | Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 312 | $ - 0 | |
| 1004 | Co-Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 98 | $ - 0 | |
| 1005 | Activity Bus Transportation Service (1.5 Hrs Service Per Each Trip) | Run | 468 | $ - 0 | |
| 1006 | Extended School Year (ESY) Transportation Service | ||||
| 1006AA | ESY Special Needs Transportation Service (Total # of Bus Runs) | Run | 312 | $ - 0 | |
| 1006AB | Safety Aides (ESY Bus Routes) | Run | 312 | $ - 0 | |
| 1007 | Contractor Manpower Reporting | Task | 1 | NSP | |
| Option Year 1 | TOTAL: | $ - 0 |
| Fort Bragg Student Transportation | Option Period Year 2 SY 2022-2023 | ||||
| CLIN | Description | Unit of Issue | Quantity | Unit Price | Total Cost |
| Fort Bragg Student Transportation | |||||
| 2001 | Daily Commute Transportation Service | ||||
| 2001AA | Daily Commute (Total # of Bus Runs) | Run | 18720 | $ - 0 | |
| 2001AB | Safety Attendants (Pre-K~Gr 2 Bus Routes) | Run | 4680 | $ - 0 | |
| 2002 | Special Education (SpEd) Transportation Service | ||||
| 2002AA | SpEd (Total # of Bus Runs) | Run | 7020 | $ - 0 | |
| 2002AB | Safety Aides (SpEd Bus Routes) | Run | 7020 | $ - 0 | |
| 2003 | Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 312 | $ - 0 | |
| 2004 | Co-Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 98 | $ - 0 | |
| 2005 | Activity Bus Transportation Service (1.5 Hrs Service Per Each Trip) | Run | 468 | $ - 0 | |
| 2006 | Extended School Year (ESY) Transportation Service | ||||
| 2006AA | ESY Special Needs Transportation Service (Total # of Bus Runs) | Run | 312 | $ - 0 | |
| 2006AB | Safety Aides (ESY Bus Routes) | Run | 312 | $ - 0 | |
| 2007 | Contractor Manpower Reporting | Task | 1 | NSP | |
| Option Year 2 | TOTAL: | $ - 0 |
| Fort Bragg Student Transportation | Option Period Year 3 SY 2023-2024 | ||||
| CLIN | Description | Unit of Issue | Quantity | Unit Price | Total Cost |
| Fort Bragg Student Transportation | |||||
| 3001 | Daily Commute Transportation Service | ||||
| 3001AA | Daily Commute (Total # of Bus Runs) | Run | 18720 | $ - 0 | |
| 3001AB | Safety Attendants (Pre-K~Gr 2 Bus Routes) | Run | 4680 | $ - 0 | |
| 3002 | Special Education (SpEd) Transportation Service | ||||
| 3002AA | SpEd (Total # of Bus Runs) | Run | 7020 | $ - 0 | |
| 3002AB | Safety Aides (SpEd Bus Routes) | Run | 7020 | $ - 0 | |
| 3003 | Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 312 | $ - 0 | |
| 3004 | Co-Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 98 | $ - 0 | |
| 3005 | Activity Bus Transportation Service (1.5 Hrs Service Per Each Trip) | Run | 468 | $ - 0 | |
| 3006 | Extended School Year (ESY) Transportation Service | ||||
| 3006AA | ESY Special Needs Transportation Service (Total # of Bus Runs) | Run | 312 | $ - 0 | |
| 3006AB | Safety Aides (ESY Bus Routes) | Run | 312 | $ - 0 | |
| 3007 | Contractor Manpower Reporting | Task | 1 | NSP | |
| Option Year 3 | TOTAL: | $ - 0 |
| Fort Bragg Student Transportation | Option Period Year 4 SY 2024-2025 | ||||
| CLIN | Description | Unit of Issue | Quantity | Unit Price | Total Cost |
| Fort Bragg Student Transportation | |||||
| 4001 | Daily Commute Transportation Service | ||||
| 4001AA | Daily Commute (Total # of Bus Runs) | Run | 18720 | $ - 0 | |
| 4001AB | Safety Attendants (Pre-K~Gr 2 Bus Routes) | Run | 4680 | $ - 0 | |
| 4002 | Special Education (SpEd) Transportation Service | ||||
| 4002AA | SpEd (Total # of Bus Runs) | Run | 7020 | $ - 0 | |
| 4002AB | Safety Aides (SpEd Bus Routes) | Run | 7020 | $ - 0 | |
| 4003 | Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 312 | $ - 0 | |
| 4004 | Co-Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 98 | $ - 0 | |
| 4005 | Activity Bus Transportation Service (1.5 Hrs Service Per Each Trip) | Run | 468 | $ - 0 | |
| 4006 | Extended School Year (ESY) Transportation Service | ||||
| 4006AA | ESY Special Needs Transportation Service (Total # of Bus Runs) | Run | 312 | $ - 0 | |
| 4006AB | Safety Aides (ESY Bus Routes) | Run | 312 | $ - 0 | |
| 4007 | Contractor Manpower Reporting | Task | 1 | NSP | |
| Option Year 4 | TOTAL: | $ - 0 |
Considering the potential use of FAR 52.217-8, an additional 6 months of service using the prices proposed for Option Period 4 was added to the IGE prices. This additional pricing will be considered in making the award.
| Fort Bragg Student Transportation | FAR 52.217-8 SY 2025 | ||||
| CLIN | Description | Unit of Issue | Quantity | Unit Price | Total Cost |
| Fort Bragg Student Transportation | |||||
| 5001 | Daily Commute Transportation Service | ||||
| 5001AA | Daily Commute (Total # of Bus Runs) | Run | 9360 | $ - 0 | |
| 5001AB | Safety Attendants (Pre-K~Gr 2 Bus Routes) | Run | 2340 | $ - 0 | |
| 5002 | Special Education (SpEd) Transportation Service | ||||
| 5002AA | SpEd (Total # of Bus Runs) | Run | 3510 | $ - 0 | |
| 5002AB | Safety Aides (SpEd Bus Routes) | Run | 3510 | $ - 0 | |
| 5003 | Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 156 | $ - 0 | |
| 5004 | Co-Curricular Transportation Service (6 Hrs Service Per Each Trip) | Run | 49 | $ - 0 | |
| 5005 | Activity Bus Transportation Service (1.5 Hrs Service Per Each Trip) | Run | 234 | $ - 0 | |
| 5006 | Extended School Year (ESY) Transportation Service | ||||
| 5006AA | ESY Special Needs Transportation Service (Total # of Bus Runs) | Run | 156 | $ - 0 | |
| 5006AB | Safety Aides (ESY Bus Routes) | Run | 156 | $ - 0 | |
| 5007 | Contractor Manpower Reporting | Task | 1 | NSP | |
| FAR 52.217-8 | TOTAL: | $ - 0 |
File details come from the government source that posted it. Updated .