Attachment 2 - Pricing Schedule.xlsx
XLSX spreadsheet 138 KB Posted
- Solicitation number
- 1305M324Q0252
About this file
This document is the Pricing Schedule attachment for a federal contract opportunity issued by the National Oceanic and Atmospheric Administration (NOAA) for diving, vessel, and coral reef restoration support services in the U.S. Caribbean and Southeast U.S. The contract is a time and materials type purchase order with an anticipated ceiling value of $6,500,000. The solicitation is a Total Small Business Set-Aside. The pricing schedule details fully-loaded hourly labor rates for various labor categories, as well as vessel charter rates and rental/purchase costs for equipment and supplies. The pricing is provided for a 3-year period with 0% escalation. The document also includes instructions for providing example task pricing as part of the proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1305M324Q0252-0003.pdf | ||
| 1305M324Q0252-0002.pdf | ||
| Attachment 2 - Pricing Schedule-v2.xlsx | XLSX spreadsheet | |
| 1305M324Q0252-0001.pdf | ||
| Attachment 3 - Past Performance Questionnaire.pdf | ||
| Attachment 4 - Wage Determinations-All.pdf | ||
| 1305M324Q0252.pdf | ||
| Attachment 1 - Performance Work Statement.docx | DOCX document | |
| Attachment 5 - Required Provisions to Complete.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor
| Labor Categories | |
| (See PWS for Qualifications) | Year 1 |
Loaded Hourly
| Labor Rate | Year 2 |
| Loaded Hourly Labor Rate | Year 3 |
Loaded Hourly Labor Rate
| Escalation - enter % escalation from previous year's rates | N/A | 0.00% | 0.00% |
| Data Analyst | $0.00 | $0.00 | $0.00 |
| Deckhand | $0.00 | $0.00 | $0.00 |
| Dive Master | $0.00 | $0.00 | $0.00 |
| Diver - Commercial | $0.00 | $0.00 | $0.00 |
| Diver - Safety | $0.00 | $0.00 | $0.00 |
| Diver - Scientific | $0.00 | $0.00 | $0.00 |
| Diver - Support | $0.00 | $0.00 | $0.00 |
| Laboratory Support | $0.00 | $0.00 | $0.00 |
| Project Manager | $0.00 | $0.00 | $0.00 |
| Project Manager - Task Order (Local Coordinator) | $0.00 | $0.00 | $0.00 |
| Scientist - Coastal Restoration / Terrestrial - I | $0.00 | $0.00 | $0.00 |
| Scientist - Coastal Restoration / Terrestrial - II | $0.00 | $0.00 | $0.00 |
| Scientist - Coastal Restoration / Terrestrial - III | $0.00 | $0.00 | $0.00 |
| Scientist - Coastal Restoration / Terrestrial - IV | $0.00 | $0.00 | $0.00 |
| Scientist - Marine - I | $0.00 | $0.00 | $0.00 |
| Scientist - Marine - II | $0.00 | $0.00 | $0.00 |
| Scientist - Marine - III | $0.00 | $0.00 | $0.00 |
| Scientist - Marine - IV | $0.00 | $0.00 | $0.00 |
| Vessel Captain | $0.00 | $0.00 | $0.00 |
Vessels
| Vessel Charter | Services Operational Area | ||||||||||||
| Vessel charter includes: Dive safety, equipment, and all other costs specifically associated with vessel charter. Fuel excluded which will be paid on an actual cost basis per task as an Other Direct Cost (ODC). | Period of Performance | Escalation - Enter % escalation from previous year's rates | Eastern Puerto Rico (PR) | Western PR | Southern PR | Northern PR | Vieques | Culebra | Mona | St. Croix | St. Thomas | St. John | Florida |
| Vessel: Skiff (15'-25') | Rates |
| 1/2 Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Full Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Multi-Day | ||||||||||||||
| (Daily Rate for More than 3 Days of Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Weather Day | ||||||||||||||
| (For Multi-Day Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Vessel: Small Dive Vessel (25' -35') | Rates |
| 1/2 Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Full Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Multi-Day | ||||||||||||||
| (Daily Rate for More than 3 Days of Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Weather Day | ||||||||||||||
| (For Multi-Day Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Vessel: Medium Dive Vessel (35' - 50') | Rates |
| 1/2 Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Full Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Multi-Day | ||||||||||||||
| (Daily Rate for More than 3 Days of Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Weather Day | ||||||||||||||
| (For Multi-Day Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Proposed Vessel: 50' - 60' Dive Vessel | Rates |
| 1/2 Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Full Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Multi-Day | ||||||||||||||
| (Daily Rate for More than 3 Days of Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Weather Day | ||||||||||||||
| (For Multi-Day Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Vessel: Barge w/Crane (70 ton capacity) | Rates |
| 1/2 Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Full Day | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Multi-Day | ||||||||||||||
| (Daily Rate for More than 3 Days of Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Weather Day | ||||||||||||||
| (For Multi-Day Operations) | Year 1 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Year 2 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 3 | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Rental Items & Purchases
| Rental Items and Purchases* | Year 1 | Year 2 | Year 3 |
| Escalation - enter % escalation from previous year's rates | N/A | 0.00% | 0.00% |
| Air Tank Refills | $0.00 | $0.00 | $0.00 |
| Cement Mixer (3.5 - 5 cu. ft.) | $0.00 | $0.00 | $0.00 |
| Corded Drill for Cement Mixing | $0.00 | $0.00 | $0.00 |
| Circular Saw | $0.00 | $0.00 | $0.00 |
| Digital SLR Camera and UW Housing | $0.00 | $0.00 | $0.00 |
| Kayak (single) | $0.00 | $0.00 | $0.00 |
| Kayak (double) | $0.00 | $0.00 | $0.00 |
| Lift bag ~100 lb. capacity | $0.00 | $0.00 | $0.00 |
| Lift bag ~250 lb. capacity | $0.00 | $0.00 | $0.00 |
| Lift bag ~350 lb. capacity | $0.00 | $0.00 | $0.00 |
| Lift bag ~500 lb. capacity | $0.00 | $0.00 | $0.00 |
| Nitrox Tank Refills | $0.00 | $0.00 | $0.00 |
| Nitrox Tank Rental | $0.00 | $0.00 | $0.00 |
| Portable Surface Supplied Air (2 Divers) | $0.00 | $0.00 | $0.00 |
| Small Portable Generator (Capable of Powering Hand Tools) | $0.00 | $0.00 | $0.00 |
| Underwater Pneumatic Drill | $0.00 | $0.00 | $0.00 |
| Underwater Scooter | $0.00 | $0.00 | $0.00 |
| Underwater Video Equipment | $0.00 | $0.00 | $0.00 |
| *Other Direct Costs (ODC) will be reimbursed at cost. The ODCs may include but are not limited to: Bags of sand and cement, epoxy, buckets, rebar, marker bouys, small hand tools, PVC pipe, masonary nails, measuring tapes, limestone boulders, and contruction supplies. |
Example Task Pricing This tab shall include the contractor's cost estimates for Example Projects 1 and 2 as detailed in Section A of the solicitation (Addendum to FAR 52.212-1). The contractor may format their example pricing estimates at their discretion (e.g., in this tab or in a separate PDF or Word Doc within Volume 4), provided: (1) the labor, vessels, rental items/purchases proposed are consistent with the proposed pricing schedule (Tabs A, B and C), (2) the estimate identifies any ODCs which aren't included in the pricing schedule, (3) the total estimated cost is clearly identified. Note that the example task pricing is for evaluation purposes only. The example task pricing will not govern performance post-award.
TOTAL EVALUATED PRICE
| Total Evaluated Price (TEP) | |
| *Note that the total evaluated price is for evaluation purposes only. The TEP will not govern performance post-award. | 52.217-8 Option to Extend Services |
| Labor Categories |
(Derived from Pricing on Tab #1)
| See PWS for Qualifications | Average Hourly | ||||||
| Labor Rate - composite across all years | TEP Hours | Total | 52.217-8 Rate | 52.217-8 Total | |||
| Data Analyst | $ - 0 | 1000 | $ - 0 | $ - 0 | $ - 0 | ||
| Deckhand | $ - 0 | 1500 | $ - 0 | $ - 0 | $ - 0 | ||
| Dive Master | $ - 0 | 450 | $ - 0 | $ - 0 | $ - 0 | ||
| Diver - Commercial | $ - 0 | 250 | $ - 0 | $ - 0 | $ - 0 | ||
| Diver - Safety | $ - 0 | 850 | $ - 0 | $ - 0 | $ - 0 | ||
| Diver - Scientific | $ - 0 | 750 | $ - 0 | $ - 0 | $ - 0 | ||
| Diver - Support | $ - 0 | 850 | $ - 0 | $ - 0 | $ - 0 | ||
| Laboratory Support | $ - 0 | 500 | $ - 0 | $ - 0 | $ - 0 | ||
| Project Manager | $ - 0 | 1500 | $ - 0 | $ - 0 | $ - 0 | ||
| Project Manager - Task Order (Local Coordinator) | $ - 0 | 1250 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Coastal Restoration / Terrestrial - I | $ - 0 | 500 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Coastal Restoration / Terrestrial - II | $ - 0 | 500 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Coastal Restoration / Terrestrial - III | $ - 0 | 250 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Coastal Restoration / Terrestrial - IV | $ - 0 | 250 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Marine - I | $ - 0 | 1250 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Marine - II | $ - 0 | 1250 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Marine - III | $ - 0 | 1200 | $ - 0 | $ - 0 | $ - 0 | ||
| Scientist - Marine - IV | $ - 0 | 1200 | $ - 0 | $ - 0 | $ - 0 | ||
| Vessel Captain | $ - 0 | 1500 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Evaluated Price - Labor | $ - 0 | 52.217-8 Labor Total | $ - 0 | ||||
| Vessel Charter (Derived from Pricing on Tab #2) | Vessel Charter | ||||||
| Vessel charter includes: Dive safety, equipment, and all other costs specifically associated with vessel charter. Fuel excluded which will be paid on an actual cost basis per task as an Other Direct Cost (ODC). | Average Daily Rate - composite across all sites and years | TEP Quantity | Total | 52.217-8 Rate | 52.217-8 Total | ||
| Vessel: Skiff (15'-25') | |||||||
| 1/2 Day | $ - 0 | 22 | $ - 0 | $ - 0 | $ - 0 | ||
| Full Day | $ - 0 | 22 | $ - 0 | $ - 0 | $ - 0 | ||
| Multi-Day (daily rate for more then 3 days of operations) | $ - 0 | 22 | $ - 0 | $ - 0 | $ - 0 | ||
| Weather Day (for multi-day operations) | $ - 0 | 22 | $ - 0 | $ - 0 | $ - 0 | ||
| Vessel: Small Dive Vessel (25' -35') | |||||||
| 1/2 Day | $ - 0 | 44 | $ - 0 | $ - 0 | $ - 0 | ||
| Full Day | $ - 0 | 44 | $ - 0 | $ - 0 | $ - 0 | ||
| Multi-Day (daily rate for more then 3 days of operations) | $ - 0 | 44 | $ - 0 | $ - 0 | $ - 0 | ||
| Weather Day (for multi-day operations) | $ - 0 | 44 | $ - 0 | $ - 0 | $ - 0 | ||
| Vessel: Medium Dive Vessel (35' - 50') | |||||||
| 1/2 Day | $ - 0 | 33 | $ - 0 | $ - 0 | $ - 0 | ||
| Full Day | $ - 0 | 33 | $ - 0 | $ - 0 | $ - 0 | ||
| Multi-Day (daily rate for more then 3 days of operations) | $ - 0 | 33 | $ - 0 | $ - 0 | $ - 0 | ||
| Weather Day (for multi-day operations) | $ - 0 | 33 | $ - 0 | $ - 0 | $ - 0 | ||
| Proposed Vessel: 50' - 60' Dive Vessel | |||||||
| 1/2 Day | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Full Day | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Multi-Day (daily rate for more then 3 days of operations) | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Weather Day (for multi-day operations) | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Vessel: Barge w/Crane (70 ton capacity) | |||||||
| 1/2 Day | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Full Day | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Multi-Day (daily rate for more then 3 days of operations) | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Weather Day (for multi-day operations) | $ - 0 | 11 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Evaluated Price - Vessels | $ - 0 | 52.217-8 Total - Vessels | $ - 0 | ||||
| Rental Items and Purchases - (Derived from Pricing on Tab #3) | Average Daily Rate - composite across all years | TEP Quantity | Total | 52.217-8 Rate (Yr 3) | Total 52.217-8 | ||
| Air Tank Refills | $ - 0 | 6000 | $ - 0 | $ - 0 | $ - 0 | ||
| Cement Mixer (3.5 - 5 cu. ft.) | $ - 0 | 200 | $ - 0 | $ - 0 | $ - 0 | ||
| Corded Drill for Cement Mixing | $ - 0 | 200 | $ - 0 | $ - 0 | $ - 0 | ||
| Circular Saw | $ - 0 | 10 | $ - 0 | $ - 0 | $ - 0 | ||
| Digital SLR Camera and UW Housing | $ - 0 | 200 | $ - 0 | $ - 0 | $ - 0 | ||
| Kayak (single) | $ - 0 | 20 | $ - 0 | $ - 0 | $ - 0 | ||
| Kayak (double) | $ - 0 | 50 | $ - 0 | $ - 0 | $ - 0 | ||
| Lift bag ~100 lb. capacity | $ - 0 | 250 | $ - 0 | $ - 0 | $ - 0 | ||
| Lift bag ~250 lb. capacity | $ - 0 | 100 | $ - 0 | $ - 0 | $ - 0 | ||
| Lift bag ~350 lb. capacity | $ - 0 | 40 | $ - 0 | $ - 0 | $ - 0 | ||
| Lift bag ~500 lb. capacity | $ - 0 | 10 | $ - 0 | $ - 0 | $ - 0 | ||
| Nitrox Tank Refills | $ - 0 | 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Nitrox Tank Rental | $ - 0 | 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Portable Surface Supplied Air (2 Divers) | $ - 0 | 250 | $ - 0 | $ - 0 | $ - 0 | ||
| Small Portable Generator (Capable of Powering Hand Tools) | $ - 0 | 200 | $ - 0 | $ - 0 | $ - 0 | ||
| Underwater Pneumatic Drill | $ - 0 | 100 | $ - 0 | $ - 0 | $ - 0 | ||
| Underwater Scooter | $ - 0 | 25 | $ - 0 | $ - 0 | $ - 0 | ||
| Underwater Video Equipment | $ - 0 | 250 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Evaluated Price - Rental Items and Purchases | $ - 0 | 52.217-8 Total - Rentals | $ - 0 | ||||
| *Other Direct Costs (ODC) will be reimbursed at cost. The ODCs may include but are not limited to: Bags of sand and cement, epoxy, buckets, rebar, marker bouys, small hand tools, PVC pipe, masonary nails, measuring tapes, limestone boulders, and contruction supplies. |
| 52.217-8 Option to Extend Services | $ - 0 |
| Total Evaluated Price | $ - 0 |
1305M323RNFFK0014 Attachment B - Pricing Schedule
File details come from the government source that posted it. Updated .