Attachment 2 - Pricing Schedule.xlsx

XLSX spreadsheet 138 KB Posted

Attached to
NOAA, Office of Habitat Conservation, Diving & Vessel Support
Solicitation number
1305M324Q0252
Issued by

About this file

This document is the Pricing Schedule attachment for a federal contract opportunity issued by the National Oceanic and Atmospheric Administration (NOAA) for diving, vessel, and coral reef restoration support services in the U.S. Caribbean and Southeast U.S. The contract is a time and materials type purchase order with an anticipated ceiling value of $6,500,000. The solicitation is a Total Small Business Set-Aside. The pricing schedule details fully-loaded hourly labor rates for various labor categories, as well as vessel charter rates and rental/purchase costs for equipment and supplies. The pricing is provided for a 3-year period with 0% escalation. The document also includes instructions for providing example task pricing as part of the proposal submission.

View the file

Other files

File Type Posted
1305M324Q0252-0003.pdf PDF
1305M324Q0252-0002.pdf PDF
Attachment 2 - Pricing Schedule-v2.xlsx XLSX spreadsheet
1305M324Q0252-0001.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Attachment 4 - Wage Determinations-All.pdf PDF
1305M324Q0252.pdf PDF
Attachment 1 - Performance Work Statement.docx DOCX document
Attachment 5 - Required Provisions to Complete.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor

Labor Categories
(See PWS for Qualifications)Year 1

Loaded Hourly

Labor RateYear 2
Loaded Hourly Labor RateYear 3

Loaded Hourly Labor Rate

Escalation - enter % escalation from previous year's ratesN/A0.00%0.00%
Data Analyst$0.00$0.00$0.00
Deckhand$0.00$0.00$0.00
Dive Master$0.00$0.00$0.00
Diver - Commercial$0.00$0.00$0.00
Diver - Safety$0.00$0.00$0.00
Diver - Scientific$0.00$0.00$0.00
Diver - Support$0.00$0.00$0.00
Laboratory Support$0.00$0.00$0.00
Project Manager$0.00$0.00$0.00
Project Manager - Task Order (Local Coordinator)$0.00$0.00$0.00
Scientist - Coastal Restoration / Terrestrial - I$0.00$0.00$0.00
Scientist - Coastal Restoration / Terrestrial - II$0.00$0.00$0.00
Scientist - Coastal Restoration / Terrestrial - III$0.00$0.00$0.00
Scientist - Coastal Restoration / Terrestrial - IV$0.00$0.00$0.00
Scientist - Marine - I$0.00$0.00$0.00
Scientist - Marine - II$0.00$0.00$0.00
Scientist - Marine - III$0.00$0.00$0.00
Scientist - Marine - IV$0.00$0.00$0.00
Vessel Captain$0.00$0.00$0.00

Vessels

Vessel CharterServices Operational Area
Vessel charter includes: Dive safety, equipment, and all other costs specifically associated with vessel charter. Fuel excluded which will be paid on an actual cost basis per task as an Other Direct Cost (ODC).Period of PerformanceEscalation - Enter % escalation from previous year's ratesEastern Puerto Rico (PR)Western PRSouthern PRNorthern PRViequesCulebraMonaSt. CroixSt. ThomasSt. JohnFlorida
Vessel: Skiff (15'-25')Rates
1/2 DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Full DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Multi-Day
(Daily Rate for More than 3 Days of Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Weather Day
(For Multi-Day Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Vessel: Small Dive Vessel (25' -35')Rates
1/2 DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Full DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Multi-Day
(Daily Rate for More than 3 Days of Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Weather Day
(For Multi-Day Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Vessel: Medium Dive Vessel (35' - 50')Rates
1/2 DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Full DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Multi-Day
(Daily Rate for More than 3 Days of Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Weather Day
(For Multi-Day Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Proposed Vessel: 50' - 60' Dive VesselRates
1/2 DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Full DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Multi-Day
(Daily Rate for More than 3 Days of Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Weather Day
(For Multi-Day Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Vessel: Barge w/Crane (70 ton capacity)Rates
1/2 DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Full DayYear 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Multi-Day
(Daily Rate for More than 3 Days of Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Weather Day
(For Multi-Day Operations)Year 1N/A$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 20.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Year 30.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Rental Items & Purchases

Rental Items and Purchases*Year 1Year 2Year 3
Escalation - enter % escalation from previous year's ratesN/A0.00%0.00%
Air Tank Refills$0.00$0.00$0.00
Cement Mixer (3.5 - 5 cu. ft.)$0.00$0.00$0.00
Corded Drill for Cement Mixing$0.00$0.00$0.00
Circular Saw$0.00$0.00$0.00
Digital SLR Camera and UW Housing$0.00$0.00$0.00
Kayak (single)$0.00$0.00$0.00
Kayak (double)$0.00$0.00$0.00
Lift bag ~100 lb. capacity$0.00$0.00$0.00
Lift bag ~250 lb. capacity$0.00$0.00$0.00
Lift bag ~350 lb. capacity$0.00$0.00$0.00
Lift bag ~500 lb. capacity$0.00$0.00$0.00
Nitrox Tank Refills$0.00$0.00$0.00
Nitrox Tank Rental$0.00$0.00$0.00
Portable Surface Supplied Air (2 Divers)$0.00$0.00$0.00
Small Portable Generator (Capable of Powering Hand Tools)$0.00$0.00$0.00
Underwater Pneumatic Drill$0.00$0.00$0.00
Underwater Scooter$0.00$0.00$0.00
Underwater Video Equipment$0.00$0.00$0.00
*Other Direct Costs (ODC) will be reimbursed at cost. The ODCs may include but are not limited to: Bags of sand and cement, epoxy, buckets, rebar, marker bouys, small hand tools, PVC pipe, masonary nails, measuring tapes, limestone boulders, and contruction supplies.

Example Task Pricing This tab shall include the contractor's cost estimates for Example Projects 1 and 2 as detailed in Section A of the solicitation (Addendum to FAR 52.212-1). The contractor may format their example pricing estimates at their discretion (e.g., in this tab or in a separate PDF or Word Doc within Volume 4), provided: (1) the labor, vessels, rental items/purchases proposed are consistent with the proposed pricing schedule (Tabs A, B and C), (2) the estimate identifies any ODCs which aren't included in the pricing schedule, (3) the total estimated cost is clearly identified. Note that the example task pricing is for evaluation purposes only. The example task pricing will not govern performance post-award.

TOTAL EVALUATED PRICE

Total Evaluated Price (TEP)
*Note that the total evaluated price is for evaluation purposes only. The TEP will not govern performance post-award.52.217-8 Option to Extend Services
Labor Categories

(Derived from Pricing on Tab #1)

See PWS for QualificationsAverage Hourly
Labor Rate - composite across all yearsTEP HoursTotal52.217-8 Rate52.217-8 Total
Data Analyst$ - 01000$ - 0$ - 0$ - 0
Deckhand$ - 01500$ - 0$ - 0$ - 0
Dive Master$ - 0450$ - 0$ - 0$ - 0
Diver - Commercial$ - 0250$ - 0$ - 0$ - 0
Diver - Safety$ - 0850$ - 0$ - 0$ - 0
Diver - Scientific$ - 0750$ - 0$ - 0$ - 0
Diver - Support$ - 0850$ - 0$ - 0$ - 0
Laboratory Support$ - 0500$ - 0$ - 0$ - 0
Project Manager$ - 01500$ - 0$ - 0$ - 0
Project Manager - Task Order (Local Coordinator)$ - 01250$ - 0$ - 0$ - 0
Scientist - Coastal Restoration / Terrestrial - I$ - 0500$ - 0$ - 0$ - 0
Scientist - Coastal Restoration / Terrestrial - II$ - 0500$ - 0$ - 0$ - 0
Scientist - Coastal Restoration / Terrestrial - III$ - 0250$ - 0$ - 0$ - 0
Scientist - Coastal Restoration / Terrestrial - IV$ - 0250$ - 0$ - 0$ - 0
Scientist - Marine - I$ - 01250$ - 0$ - 0$ - 0
Scientist - Marine - II$ - 01250$ - 0$ - 0$ - 0
Scientist - Marine - III$ - 01200$ - 0$ - 0$ - 0
Scientist - Marine - IV$ - 01200$ - 0$ - 0$ - 0
Vessel Captain$ - 01500$ - 0$ - 0$ - 0
Total Evaluated Price - Labor$ - 052.217-8 Labor Total$ - 0
Vessel Charter (Derived from Pricing on Tab #2)Vessel Charter
Vessel charter includes: Dive safety, equipment, and all other costs specifically associated with vessel charter. Fuel excluded which will be paid on an actual cost basis per task as an Other Direct Cost (ODC).Average Daily Rate - composite across all sites and yearsTEP QuantityTotal52.217-8 Rate52.217-8 Total
Vessel: Skiff (15'-25')
1/2 Day$ - 022$ - 0$ - 0$ - 0
Full Day$ - 022$ - 0$ - 0$ - 0
Multi-Day (daily rate for more then 3 days of operations)$ - 022$ - 0$ - 0$ - 0
Weather Day (for multi-day operations)$ - 022$ - 0$ - 0$ - 0
Vessel: Small Dive Vessel (25' -35')
1/2 Day$ - 044$ - 0$ - 0$ - 0
Full Day$ - 044$ - 0$ - 0$ - 0
Multi-Day (daily rate for more then 3 days of operations)$ - 044$ - 0$ - 0$ - 0
Weather Day (for multi-day operations)$ - 044$ - 0$ - 0$ - 0
Vessel: Medium Dive Vessel (35' - 50')
1/2 Day$ - 033$ - 0$ - 0$ - 0
Full Day$ - 033$ - 0$ - 0$ - 0
Multi-Day (daily rate for more then 3 days of operations)$ - 033$ - 0$ - 0$ - 0
Weather Day (for multi-day operations)$ - 033$ - 0$ - 0$ - 0
Proposed Vessel: 50' - 60' Dive Vessel
1/2 Day$ - 011$ - 0$ - 0$ - 0
Full Day$ - 011$ - 0$ - 0$ - 0
Multi-Day (daily rate for more then 3 days of operations)$ - 011$ - 0$ - 0$ - 0
Weather Day (for multi-day operations)$ - 011$ - 0$ - 0$ - 0
Vessel: Barge w/Crane (70 ton capacity)
1/2 Day$ - 011$ - 0$ - 0$ - 0
Full Day$ - 011$ - 0$ - 0$ - 0
Multi-Day (daily rate for more then 3 days of operations)$ - 011$ - 0$ - 0$ - 0
Weather Day (for multi-day operations)$ - 011$ - 0$ - 0$ - 0
Total Evaluated Price - Vessels$ - 052.217-8 Total - Vessels$ - 0
Rental Items and Purchases - (Derived from Pricing on Tab #3)Average Daily Rate - composite across all yearsTEP QuantityTotal52.217-8 Rate (Yr 3)Total 52.217-8
Air Tank Refills$ - 06000$ - 0$ - 0$ - 0
Cement Mixer (3.5 - 5 cu. ft.)$ - 0200$ - 0$ - 0$ - 0
Corded Drill for Cement Mixing$ - 0200$ - 0$ - 0$ - 0
Circular Saw$ - 010$ - 0$ - 0$ - 0
Digital SLR Camera and UW Housing$ - 0200$ - 0$ - 0$ - 0
Kayak (single)$ - 020$ - 0$ - 0$ - 0
Kayak (double)$ - 050$ - 0$ - 0$ - 0
Lift bag ~100 lb. capacity$ - 0250$ - 0$ - 0$ - 0
Lift bag ~250 lb. capacity$ - 0100$ - 0$ - 0$ - 0
Lift bag ~350 lb. capacity$ - 040$ - 0$ - 0$ - 0
Lift bag ~500 lb. capacity$ - 010$ - 0$ - 0$ - 0
Nitrox Tank Refills$ - 05$ - 0$ - 0$ - 0
Nitrox Tank Rental$ - 05$ - 0$ - 0$ - 0
Portable Surface Supplied Air (2 Divers)$ - 0250$ - 0$ - 0$ - 0
Small Portable Generator (Capable of Powering Hand Tools)$ - 0200$ - 0$ - 0$ - 0
Underwater Pneumatic Drill$ - 0100$ - 0$ - 0$ - 0
Underwater Scooter$ - 025$ - 0$ - 0$ - 0
Underwater Video Equipment$ - 0250$ - 0$ - 0$ - 0
Total Evaluated Price - Rental Items and Purchases$ - 052.217-8 Total - Rentals$ - 0
*Other Direct Costs (ODC) will be reimbursed at cost. The ODCs may include but are not limited to: Bags of sand and cement, epoxy, buckets, rebar, marker bouys, small hand tools, PVC pipe, masonary nails, measuring tapes, limestone boulders, and contruction supplies.
52.217-8 Option to Extend Services$ - 0
Total Evaluated Price$ - 0

1305M323RNFFK0014 Attachment B - Pricing Schedule