Attachment 2 - Pricing Schedule (CLIN Structure).docx

DOCX document 22 KB Posted

Attached to
Refuse Management, Camp Merrill Federal contract opportunity
Solicitation number
W911SF-24-R-0016
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document is an attachment to a federal contract opportunity known as the Refuse Management, Camp Merrill solicitation (W911SF-24-R-0016). The attachment, titled "Pricing Schedule (CLIN Structure)", provides a detailed pricing structure for the required services over a base period and four option periods.

The required services include refuse collection and disposal from various facilities at Camp Merrill, using 8-cubic yard and 20-cubic yard containers. Pricing is provided on a firm-fixed price basis for the base period of June 1, 2024 through May 31, 2025, with four 12-month option periods to follow. The solicitation is set aside for HubZone small businesses, and responses are due by 11:00 AM EST on April 26, 2024. The lowest price-technically acceptable source selection method will be used to award the contract.

View the file

Other files for this federal contract opportunity

Other files attached to Refuse Management, Camp Merrill, newest first.
File Type Posted
Updated Camp Merrill Dumpster Location (10 APR 24).pptx PPTX presentation
Questions and Answers W911SF-24-R-0016 - Camp Merrrill Refuse.docx DOCX document
Attachment 2 - Pricing Schedule (CLIN Structure) - Rev.1.docx DOCX document
Technical Exhibit 1 - CampMerrill_Refuse_Locations.pdf PDF
Attachement 1 - PWS Camp Merrill Refuse.pdf PDF
Attachment 3 - Clauses Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Camp Merrill Refuse Collection W911SF-24-R-0016

Attachment 2 - Pricing Schedule (CLIN Structure) Base Period PoP: 01 June 2024 through 31 May 2025

CLIN
Description
Quantity
Unit
Unit Price
Amount
0001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
0002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
0003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
0004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
0005
Contractor Manpower Report
Each
*NSP
*NSP

Base Period Total =

Option Period One PoP: 01 June 2025 through 31 May 2026

1001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
1002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
1003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
1004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
1005
Contractor Manpower Report
Each
*NSP
*NSP

Option Period One Total =

Option Period Two PoP: 01 June 2026 through 28 May 2027

2001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
2002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
2003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
2004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
2005
Contractor Manpower Report
Each
*NSP
*NSP

Option Period Two Total =

Option Period Three PoP: 01 June 2027 through 31 May 2028

3001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
3002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
3003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
3004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
3005
Contractor Manpower Report
Each
*NSP
*NSP

Option Period Three Total =

Option Period Four PoP: 01 June 2028 through 31 May 2029

4001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
4002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
4003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
4004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
4005
Contractor Manpower Report
Each
*NSP
*NSP

File details come from the government source that posted it. Updated .