Attachment 2 - Pricing Schedule (CLIN Structure).docx

DOCX document 22 KB Posted

Attached to
Refuse Management, Camp Merrill
Solicitation number
W911SF-24-R-0016
Issued by

About this file

This document is an attachment to a federal contract opportunity known as the Refuse Management, Camp Merrill solicitation (W911SF-24-R-0016). The attachment, titled "Pricing Schedule (CLIN Structure)", provides a detailed pricing structure for the required services over a base period and four option periods.

The required services include refuse collection and disposal from various facilities at Camp Merrill, using 8-cubic yard and 20-cubic yard containers. Pricing is provided on a firm-fixed price basis for the base period of June 1, 2024 through May 31, 2025, with four 12-month option periods to follow. The solicitation is set aside for HubZone small businesses, and responses are due by 11:00 AM EST on April 26, 2024. The lowest price-technically acceptable source selection method will be used to award the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Camp Merrill Refuse Collection W911SF-24-R-0016

Attachment 2 - Pricing Schedule (CLIN Structure) Base Period PoP: 01 June 2024 through 31 May 2025

CLIN
Description
Quantity
Unit
Unit Price
Amount
0001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
0002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
0003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
0004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
0005
Contractor Manpower Report
Each
*NSP
*NSP

Base Period Total =

Option Period One PoP: 01 June 2025 through 31 May 2026

1001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
1002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
1003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
1004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
1005
Contractor Manpower Report
Each
*NSP
*NSP

Option Period One Total =

Option Period Two PoP: 01 June 2026 through 28 May 2027

2001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
2002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
2003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
2004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
2005
Contractor Manpower Report
Each
*NSP
*NSP

Option Period Two Total =

Option Period Three PoP: 01 June 2027 through 31 May 2028

3001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
3002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
3003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
3004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
3005
Contractor Manpower Report
Each
*NSP
*NSP

Option Period Three Total =

Option Period Four PoP: 01 June 2028 through 31 May 2029

4001
Refuse Collection

8-Cubic Yard Containers (Firm Fixed-Price)

1,976
Each
4002
Refuse Disposal

Landfill Fee (Firm Fixed-Price)

500
Net Ton
4003
Refuse Collection

20-Cubic Yard Containers (Firm Fixed-Price)

120
Each
4004
Emergency Pickup

As Needed / Incrementally Funded (Firm Fixed Price)

1
Each
4005
Contractor Manpower Report
Each
*NSP
*NSP