Attachment_2_-_Price_Schedule.docx

DOCX document 22 KB Posted

Attached to
BGNDRF - Repair AHU-01 Evaporator Coil
Solicitation number
140R4025Q0022
Issued by

About this file

This is a Price Schedule template for repairs to an AHU-01 Evaporator Coil for the Bureau of Reclamation's BGNDRF facility. The pricing structure is divided into Schedule A (primary work) and Optional Schedule B (R22 refrigerant addition), with Schedule A requiring detailed cost breakdowns for parts, travel, labor, and equipment. Required parts include Trane OEM Evaporator Unit, Thermal Expansion Valves, Filter Dryers, and insulation for outdoor refrigerant lines.

The template requires vendors to provide comprehensive pricing details including labor categories, rates, material costs, and equipment rates under Schedule A Addendum. All taxes and fees must be included in the total amount, and vendors must indicate whether travel is required and if freight charges are included for Trane parts. Offers must be submitted for the complete price schedule, with partial offers not being considered for award. Quotes are to be submitted via email.

View the file

Other files

File Type Posted
Sol_140R4025Q0022_Amd_0001.pdf PDF
Coil_and_other_AHU_pics_0001.pdf PDF
Attachment_3-_WD_NM_2015-5455_dated_12-23-24.pdf PDF
Sol_140R4025Q0022.pdf PDF
Attachment_1_-_SOW_-_AHU-01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

Offers are subject to the terms and conditions of this solicitation.

1. Price Schedule A

CLIN
Supplies or Services
Quantity and Unit
Unit Price
Amount
010
Repair AHU-01 Evaporator Coil
Includes parts, equipment, labor, travel, and taxes in accordance with the Statement of Work.
For the lump sum of
$
Total Price for Schedule A
$

Price Schedule A - Addendum

Parts -Trane OEM

1
Evaporator Unit
1
EA
$
$
2
Thermal Expansion Valve
2
EA
$
$
3
Filter Dryer
2
EA
$
$
4
Insulation – outdoor refrigerant lines
15
ft
$
$
5
Other (specify)
$
$
6
Other (specify)
$
$

Travel

1
Round Trip
Miles
$
$
2
Per Diem
Days
$
$
3
Labor Travel Time
HR
$
$
4
Labor Service Time
HR
$
$

Equipment

1
Recovery Cylinder and Filter Dryer
2
EA
$
$

New R22 Refrigerant

Schedule A Addendum Subtotal
$
Taxes and/or Other Fees
%
$

Schedule A Addendum Total (Same as Total Price for Schedule A)

Optional Schedule B

CLIN
Supplies or Services
Quantity and Unit
Unit Price
Amount
020
R22 Refrigerant addition
For the lump sum of
$
Total Price for Optional Schedule B
$
Total for Price Schedule A and Optional Schedule B
$

END OF SUPPLIES OR SERVICES AND PRICES/COSTS

All applicable taxes and fees must be included in total amount. Please provide quote via email.

Note: There is ONE CLIN for this requirement; however, there is an addendum that includes multiple sublines needing price breakout. Two blank lines are provided under parts; however, they can be left blank if not needed. Indicate whether travel is required and if freight charges are included in pricing for Trane parts.

PROVIDE A DETAILED LISTING FOR EACH TO INCLUDE LABOR CATEGORIES, LABOR RATES, MATERIAL AND EQUIPMENT LISTING AND ASSOCIATED RATES UNDER SCHEDULE A ADDENDUM.

· Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Schedule.

· Offers are subject to the terms and conditions of this request for quote.

File details come from the government source that posted it. Updated .