Attachment 2_ Price Proposal Breakdown.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
Amendment 1 SOLICITATION NOTICE - JTF Storefront Glass Project Federal contract opportunity
Solicitation number
47PC5326Q0014
Issued by
Not on record

About this file

This is a Price Proposal Breakdown template for use in Task Order pricing under an Indefinite Delivery Indefinite Quantity (IDIQ) contract. The template provides standardized instructions and formats for contractors to submit detailed pricing for construction projects organized by CSI MasterFormat divisions. Contractors must break down costs into labor, material, and line item subtotals for each division, including General Requirements (Division 1), Existing Conditions (Division 2), and various construction trades such as Concrete, Masonry, Metals, Woods/Plastics/Composites, Thermal & Moisture Protection, Openings, Finishes, Fire Suppression, Plumbing, HVAC, Electrical, and Communications (Divisions 3-27). The template requires contractors to reference RS Means abbreviations for units of measurement and mandates that unit pricing established at the IDIQ level be utilized when preparing Task Order proposals.

The pricing structure accommodates both General Contractor (GC) organic work and subcontractor costs, with separate columns for material and labor per unit and subtotals for each category. The proposal culminates in a total calculation that includes Division subtotals, GC Overhead (percentage-based), GC Profit (percentage-based), Bonds/Insurance (percentage-based), and a final Total Proposal amount. Task Order requirements not covered by the established unit price line items, particularly Division 01 and 02 requirements, will be negotiated separately at the Task Order RFP level by the Task Order Contracting Officer. This template is designed to ensure consistency and standardization across multiple task orders issued under the master contract vehicle.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 1 SOLICITATION NOTICE - JTF Storefront Glass Project, newest first.
File Type Posted
SF30 47PC5326Q0014.pdf PDF
RFI Responses Storefront.pdf PDF
The Agreement - JTF Storefront Glass.pdf PDF
SF 1442 47PC5326Q0014.pdf PDF
The Solicitation - JTF Storefront Glass.pdf PDF
Attachment 4 Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information.docx DOCX document
Attachment 3 WD NY20260002 01-30-2026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS: HOW TO COMPLETE PRICING SHEETS
1For each line item, provide labor, material, and line item subtotal costs.
2For units of measurement, refer to RS Means abbreviations.
3The Contractor shall be required to utilize the unit pricing accepted at the IDIQ level, when preparing Task Order price proposals. Task Order requirements which are not covered by unit price line items listed here, including Division 01 and 02 requirements, will be negotiated by the Task Order Contracting Officer at the Task Order RFP level.

TO Price Breakdown

Exhibit 13
Task Order Price Sheet

PRICE PROPOSAL CONTRACTOR NAME DATE SUBMITTED PROJECT NO. CONTRACT NO.

PROJECT AND CITYPURPOSE
Project NamePROPOSAL XXXX
Building Name & AddressITEM
City, State & Zip Code
DATE:SHEET NO.OF
XX
CSI MASTERFORMAT NUMBERDESCRIPTION OF WORKQUANTITYMATERIALLABORGC ORGANIC SUBTOTALSSUBCONTRACTOR SUBTOTALS
NO. UNITSUNIT MEAS.PER UNITSUBTOTALSPER UNITSUBTOTALS
1General Requirements
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 1 SUBTOTAL =$ - 0$ - 0
2Existing Conditions
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 2 SUBTOTAL =$ - 0$ - 0
3Concrete
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 3 SUBTOTAL =$ - 0$ - 0
4Masonry
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 4 SUBTOTAL =$ - 0$ - 0
5Metals
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 5 SUBTOTAL =$ - 0$ - 0
6Woods, Plastics, Composites
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 6 SUBTOTAL =$ - 0$ - 0
7Thermal & Moisture Protection
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 7 SUBTOTAL =$ - 0$ - 0
8Openings
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 8 SUBTOTAL =$ - 0$ - 0
9Finishes
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 9 SUBTOTAL =$ - 0$ - 0
21Fire Supression
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 21 SUBTOTAL =$ - 0$ - 0
22Plumbing
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 22 SUBTOTAL =$ - 0$ - 0
23Heating, Ventilating, and Air Conditioning
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 23 SUBTOTAL =$ - 0$ - 0
26Electrical
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 26 SUBTOTAL =$ - 0$ - 0
27Communications
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 27 SUBTOTAL =$ - 0$ - 0
TOTAL DIVISION SUBTOTAL =$ - 0$ - 0
GC Overhead (In House)XX%PCTTOTAL OH =#VALUE!
GC Profit (In House)XX%PCTTOTAL Profit =#VALUE!
SUBTOTAL WITH OH&P =#VALUE!
Bonds/InsuranceXX%PCTTOTAL B&I =#VALUE!
TOTAL PROPOSAL=#VALUE!

ESRI_MAPINFO_SHEET

DO NOT EDIT

For Esri use only

File details come from the government source that posted it. Updated .