This is a Price Proposal Breakdown template for use in Task Order pricing under an Indefinite Delivery Indefinite Quantity (IDIQ) contract. The template provides standardized instructions and formats for contractors to submit detailed pricing for construction projects organized by CSI MasterFormat divisions. Contractors must break down costs into labor, material, and line item subtotals for each division, including General Requirements (Division 1), Existing Conditions (Division 2), and various construction trades such as Concrete, Masonry, Metals, Woods/Plastics/Composites, Thermal & Moisture Protection, Openings, Finishes, Fire Suppression, Plumbing, HVAC, Electrical, and Communications (Divisions 3-27). The template requires contractors to reference RS Means abbreviations for units of measurement and mandates that unit pricing established at the IDIQ level be utilized when preparing Task Order proposals.
The pricing structure accommodates both General Contractor (GC) organic work and subcontractor costs, with separate columns for material and labor per unit and subtotals for each category. The proposal culminates in a total calculation that includes Division subtotals, GC Overhead (percentage-based), GC Profit (percentage-based), Bonds/Insurance (percentage-based), and a final Total Proposal amount. Task Order requirements not covered by the established unit price line items, particularly Division 01 and 02 requirements, will be negotiated separately at the Task Order RFP level by the Task Order Contracting Officer. This template is designed to ensure consistency and standardization across multiple task orders issued under the master contract vehicle.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 47PC5326Q0014.pdf | ||
| RFI Responses Storefront.pdf | ||
| The Agreement - JTF Storefront Glass.pdf | ||
| SF 1442 47PC5326Q0014.pdf | ||
| The Solicitation - JTF Storefront Glass.pdf | ||
| Attachment 4 Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information.docx | DOCX document | |
| Attachment 3 WD NY20260002 01-30-2026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| INSTRUCTIONS: HOW TO COMPLETE PRICING SHEETS | |
| 1 | For each line item, provide labor, material, and line item subtotal costs. |
| 2 | For units of measurement, refer to RS Means abbreviations. |
| 3 | The Contractor shall be required to utilize the unit pricing accepted at the IDIQ level, when preparing Task Order price proposals. Task Order requirements which are not covered by unit price line items listed here, including Division 01 and 02 requirements, will be negotiated by the Task Order Contracting Officer at the Task Order RFP level. |
TO Price Breakdown
| Exhibit 13 |
| Task Order Price Sheet |
PRICE PROPOSAL CONTRACTOR NAME DATE SUBMITTED PROJECT NO. CONTRACT NO.
| PROJECT AND CITY | PURPOSE | |
| Project Name | PROPOSAL XXXX |
| Building Name & Address | ITEM |
| City, State & Zip Code |
| DATE: | SHEET NO. | OF | |
| X | X |
| CSI MASTERFORMAT NUMBER | DESCRIPTION OF WORK | QUANTITY | MATERIAL | LABOR | GC ORGANIC SUBTOTALS | SUBCONTRACTOR SUBTOTALS | |||
| NO. UNITS | UNIT MEAS. | PER UNIT | SUBTOTALS | PER UNIT | SUBTOTALS |
| 1 | General Requirements | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 1 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 2 | Existing Conditions | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 2 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 3 | Concrete | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 3 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 4 | Masonry | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 4 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 5 | Metals | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 5 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 6 | Woods, Plastics, Composites | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 6 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 7 | Thermal & Moisture Protection | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 7 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 8 | Openings | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 8 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 9 | Finishes | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 9 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 21 | Fire Supression | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 21 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 22 | Plumbing | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 22 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 23 | Heating, Ventilating, and Air Conditioning | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 23 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 26 | Electrical | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 26 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| 27 | Communications | |||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| DIVISON 27 SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| TOTAL DIVISION SUBTOTAL = | $ - 0 | $ - 0 | ||||||
| GC Overhead (In House) | XX% | PCT | TOTAL OH = | #VALUE! | ||||
| GC Profit (In House) | XX% | PCT | TOTAL Profit = | #VALUE! | ||||
| SUBTOTAL WITH OH&P = | #VALUE! | |||||||
| Bonds/Insurance | XX% | PCT | TOTAL B&I = | #VALUE! | ||||
| TOTAL PROPOSAL= | #VALUE! |