Attachment 2 - Price List.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
99 CES Heavy Equipment
Solicitation number
FA486124R0012
Issued by

About this file

This document is a Price List for various heavy equipment and HVAC equipment that the 99th Civil Engineering Squadron (99 CES) at Nellis Air Force Base in Nevada is seeking to rent on an as-needed basis. The Price List includes 72 equipment items such as aerial lifts, excavators, compactors, generators, chillers, and HVAC units, along with the corresponding daily, weekly, and monthly rental rates. The equipment is expected to be used for 2-week durations on average. The Price List outlines the terms and conditions for submitting and updating the price lists annually or upon request by the Contracting Officer. It also specifies that prices must be all-inclusive and that the contractor may offer voluntary price reductions without prior approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 Price List

1. Price Lists are subject to the following terms and conditions:

a. Contractor shall submit price lists on company stationery or letterhead signed as original copy.

b. Contractor shall provide a firm price list annually or upon request by the Contracting Officer, whichever is sooner.

c. Contractor is authorized to submit an annual change to the price list. Changes must be submitted to the Contracting Officer no later than thirty (30) calendar days prior to the effective date of the price change. Any price list changes other than the annual request must be submitted with adequate justification for price increase.

d. The contractor may offer voluntary price reductions (VPR) for previously approved items without written approval. These reductions should be shown as “VPR” on the invoice.

e. Prices shall be all inclusive (delivery, pickup, maintenance, etc.)

f. Price lists shall not include any additional items not requested by the Contracting Officer.

2. The price list shall include the following data:

ItemEquipment$ Per Day$ Per Week$ Per MonthEst. Use
1TRK Hi Reach 60 & 74 foot
minimum lift Height2 Weeks
2TRK Hi Reach 75 & 99 foot
minimum lift Height2 Weeks
3Articulating Boom Lift, 40 Foot
Electric Powered2 Weeks
4Air Compressor, Diesel, Trailer- mounted, rated to 750 psi, 400 cfm2 Weeks
5Backhoe Loader, no less than 14
Foot Dig Depth2 Weeks
6Compact Skid Steer Loader, Tracked2 Weeks
7Compact Skid Steer Loader, Wheeled2 Weeks
8Crane, All-Terrain, 60 Ton Capacity2 Weeks
9Dump Truck, Highway-Rated, End-Dump, no less than 20 Ton Capacity - Dont Use Red Dye Fuel2 Weeks
10Excavator, Hydraulic, Tracked, rated at least 5 Ton2 Weeks
11Excavator, Hydraulic, Tracked, rated at least 30 Ton2 Weeks
12Excavator, Hydraulic, Plate tamper, Tracked, rated at least 50 Ton2 Weeks
13Front-End Loader, Wheeled, 4 Cubic Yard Bucket Capacity minimum2 Weeks
14Generator, Diesel, Portable, Trailer-Mounted, mine output 4000 W2 Weeks
15Generator, Diesel, Portable, Trailer-Mounted, min output 6000 W2 Weeks
16Generator, Diesel, Portable, Trailer-Mounted, minimum output 8000 W2 Weeks
17Light Tower, Diesel, Portable, 4 light, 12 Foot minimum tower height2 Weeks
18Light Tower, Diesel, Portable, 4
light, 30 Foot min tower height2 Weeks
19Motor Grader, minimum 14 Foot Blade Width, with rippers2 Weeks
20Pneumatic Roller, 68 inch compaction width minimum, rated at least 25 Tons2 Weeks
21Scissor Lift Work Platform, 12 Foot minimum platform height2 Weeks
22Scissor Lift Work Platform, 25 Foot minimum platform height2 Weeks
23Scissor Lift Work Platform, 30 Foot minimum platform height2 Weeks
24Soil Compactor, Sheepsfoot, 46,000 lb operating weight2 Weeks
25Sweeper Truck, Diesel, Hydraulically operated gutter brooms, - Dont Use Red Dye Fuel2 Weeks
26Tandem Vibratory Roller, 39 inch compaction width minimum, rated at least 5 Tons2 Weeks
27Tracked Dozer, 125hp minimum, 12 foot blade width minimum, rippers included2 Weeks
28Tractor, Highway, 20 ton minimum capacity - Dont Use Red Dye Fuel2 Weeks
29Trailer, Flatbed, 40 foot minimum length2 Weeks
30Trench compactor Roller 33in2 Weeks
31Water Truck, Highway-Rated, minimum capacity 2500 gallons -
Dont Use Red Dye Fuel2 Weeks
323-5 tons double drum smooth
roller2 Weeks
3361-70" vib double drum smooth
roller2 Weeks
3430 ton crane - rough terrain2 Weeks
3560 ton crane - rough terrain2 Weeks
36Vac-con w/jetter, 2500 gal debris
tank w/1500 gal min fresh water supply2 Weeks
37Brake away 60-90 ton lowboy trailer2 Weeks
3840 foot sky trak telescoping fork
lift, or equal2 Weeks
3950 foot sky trak telescoping fork
lift, or equal2 Weeks
4060 foot sky trak telescoping fork
lift, or equal2 Weeks
4180 foot sky trak telescoping fork lift, or equal2 Weeks
42D3 dozer w/6 way blade2 Weeks
43Aerial boom lift, telescopic boom, 50 foot minimum lift height2 Weeks
44Aerial boom lift, telescopic boom, 125 foot minimum lift height2 Weeks
45Asphalt paver, wheeled, 8 foot minimum paving width, 15.5
Foot maximum paving width2 Weeks
46200-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase2 Weeks
47100-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase2 Weeks
4860-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase2 Weeks
4930-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase2 Weeks
50100-Ton Chiller, Packaged Portable, Built In Circulating Pump, 208/220 Volts/3 Phase2 Weeks
5160-Ton Chiller, Packaged Portable, Built In Circulating Pump, 208/220 Volts/3 Phase2 Weeks
5230-Ton Chiller, Packaged Portable, Built In Circulating Pump, 208/220 Volts/3 Phase2 Weeks
5320-Ton Packaged AC Unit, Heat
Pump, 460 Volts/3 Phase2 Weeks
545-Ton Packaged AC Unit, Heat Pump, 208-230/1 Phase2 Weeks
555-Ton Packaged AC Unit, Heat Pump, 208-230/3 Phase2 Weeks
5610-Ton Packaged AC Unit, Heat Pump, 460 Volts/3 Phase2 Weeks
5720-Ton Packaged AC Unit, Heat Pump, 208-230 Volts/3 Phase2 Weeks
5810-Ton Packaged AC Unit, Heat Pump, 208-230 Volts/3 Phase2 Weeks
5940-Ton Packaged AC Unit, Heat Pump, 460 Volts/3 Phase2 Weeks
6040-Ton Packaged AC Unit, Heat Pump, 208-230 Volts/3 Phase2 Weeks
6150-Ton Packaged AC Unit, Heat
Pump, 460 Volts/3 Phase2 Weeks
6250-Ton Packaged AC Unit, Heat
Pump, 208-230 Volts/3 Phase2 Weeks
631-MBTU/HR Output Rating
Natural Gas Boiler2 Weeks
64600,000-BTU/HR Output Rating
Natural Gas Boiler2 Weeks
65400,000-BTU/HR Output Rating Natural Gas Boiler2 Weeks
66200,000-BTU/HR Output Rating Natural Gas Boiler2 Weeks
6784" Single Drum Ride-On Roller Smooth2 Weeks
681.5-2 Ton Mini-Excavator2 Weeks
693-3.5 Ton Mini-Excavator2 Weeks
70Track Loader, Small 2-3 K lbs2 Weeks
71Compact Track/Skid steer loader w/bucket attachment2 Weeks
7290 Ton Crane RT – No operator2 Weeks

File details come from the government source that posted it. Updated .