Attachment 2 - Price List.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- 99 CES Heavy Equipment
- Solicitation number
- FA486124R0012
About this file
This document is a Price List for various heavy equipment and HVAC equipment that the 99th Civil Engineering Squadron (99 CES) at Nellis Air Force Base in Nevada is seeking to rent on an as-needed basis. The Price List includes 72 equipment items such as aerial lifts, excavators, compactors, generators, chillers, and HVAC units, along with the corresponding daily, weekly, and monthly rental rates. The equipment is expected to be used for 2-week durations on average. The Price List outlines the terms and conditions for submitting and updating the price lists annually or upon request by the Contracting Officer. It also specifies that prices must be all-inclusive and that the contractor may offer voluntary price reductions without prior approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Price List
1. Price Lists are subject to the following terms and conditions:
a. Contractor shall submit price lists on company stationery or letterhead signed as original copy.
b. Contractor shall provide a firm price list annually or upon request by the Contracting Officer, whichever is sooner.
c. Contractor is authorized to submit an annual change to the price list. Changes must be submitted to the Contracting Officer no later than thirty (30) calendar days prior to the effective date of the price change. Any price list changes other than the annual request must be submitted with adequate justification for price increase.
d. The contractor may offer voluntary price reductions (VPR) for previously approved items without written approval. These reductions should be shown as “VPR” on the invoice.
e. Prices shall be all inclusive (delivery, pickup, maintenance, etc.)
f. Price lists shall not include any additional items not requested by the Contracting Officer.
2. The price list shall include the following data:
| Item | Equipment | $ Per Day | $ Per Week | $ Per Month | Est. Use | |
| 1 | TRK Hi Reach 60 & 74 foot | |||||
| minimum lift Height | 2 Weeks | |||||
| 2 | TRK Hi Reach 75 & 99 foot | |||||
| minimum lift Height | 2 Weeks | |||||
| 3 | Articulating Boom Lift, 40 Foot | |||||
| Electric Powered | 2 Weeks | |||||
| 4 | Air Compressor, Diesel, Trailer- mounted, rated to 750 psi, 400 cfm | 2 Weeks | ||||
| 5 | Backhoe Loader, no less than 14 | |||||
| Foot Dig Depth | 2 Weeks | |||||
| 6 | Compact Skid Steer Loader, Tracked | 2 Weeks | ||||
| 7 | Compact Skid Steer Loader, Wheeled | 2 Weeks | ||||
| 8 | Crane, All-Terrain, 60 Ton Capacity | 2 Weeks | ||||
| 9 | Dump Truck, Highway-Rated, End-Dump, no less than 20 Ton Capacity - Dont Use Red Dye Fuel | 2 Weeks | ||||
| 10 | Excavator, Hydraulic, Tracked, rated at least 5 Ton | 2 Weeks | ||||
| 11 | Excavator, Hydraulic, Tracked, rated at least 30 Ton | 2 Weeks | ||||
| 12 | Excavator, Hydraulic, Plate tamper, Tracked, rated at least 50 Ton | 2 Weeks | ||||
| 13 | Front-End Loader, Wheeled, 4 Cubic Yard Bucket Capacity minimum | 2 Weeks | ||||
| 14 | Generator, Diesel, Portable, Trailer-Mounted, mine output 4000 W | 2 Weeks | ||||
| 15 | Generator, Diesel, Portable, Trailer-Mounted, min output 6000 W | 2 Weeks | ||||
| 16 | Generator, Diesel, Portable, Trailer-Mounted, minimum output 8000 W | 2 Weeks | ||||
| 17 | Light Tower, Diesel, Portable, 4 light, 12 Foot minimum tower height | 2 Weeks | ||||
| 18 | Light Tower, Diesel, Portable, 4 | |||||
| light, 30 Foot min tower height | 2 Weeks | |||||
| 19 | Motor Grader, minimum 14 Foot Blade Width, with rippers | 2 Weeks | ||||
| 20 | Pneumatic Roller, 68 inch compaction width minimum, rated at least 25 Tons | 2 Weeks | ||||
| 21 | Scissor Lift Work Platform, 12 Foot minimum platform height | 2 Weeks | ||||
| 22 | Scissor Lift Work Platform, 25 Foot minimum platform height | 2 Weeks | ||||
| 23 | Scissor Lift Work Platform, 30 Foot minimum platform height | 2 Weeks | ||||
| 24 | Soil Compactor, Sheepsfoot, 46,000 lb operating weight | 2 Weeks | ||||
| 25 | Sweeper Truck, Diesel, Hydraulically operated gutter brooms, - Dont Use Red Dye Fuel | 2 Weeks | ||||
| 26 | Tandem Vibratory Roller, 39 inch compaction width minimum, rated at least 5 Tons | 2 Weeks | ||||
| 27 | Tracked Dozer, 125hp minimum, 12 foot blade width minimum, rippers included | 2 Weeks | ||||
| 28 | Tractor, Highway, 20 ton minimum capacity - Dont Use Red Dye Fuel | 2 Weeks | ||||
| 29 | Trailer, Flatbed, 40 foot minimum length | 2 Weeks | ||||
| 30 | Trench compactor Roller 33in | 2 Weeks | ||||
| 31 | Water Truck, Highway-Rated, minimum capacity 2500 gallons - | |||||
| Dont Use Red Dye Fuel | 2 Weeks | |||||
| 32 | 3-5 tons double drum smooth | |||||
| roller | 2 Weeks | |||||
| 33 | 61-70" vib double drum smooth | |||||
| roller | 2 Weeks | |||||
| 34 | 30 ton crane - rough terrain | 2 Weeks | ||||
| 35 | 60 ton crane - rough terrain | 2 Weeks | ||||
| 36 | Vac-con w/jetter, 2500 gal debris | |||||
| tank w/1500 gal min fresh water supply | 2 Weeks | |||||
| 37 | Brake away 60-90 ton lowboy trailer | 2 Weeks | ||||
| 38 | 40 foot sky trak telescoping fork | |||||
| lift, or equal | 2 Weeks | |||||
| 39 | 50 foot sky trak telescoping fork | |||||
| lift, or equal | 2 Weeks | |||||
| 40 | 60 foot sky trak telescoping fork | |||||
| lift, or equal | 2 Weeks | |||||
| 41 | 80 foot sky trak telescoping fork lift, or equal | 2 Weeks | ||||
| 42 | D3 dozer w/6 way blade | 2 Weeks | ||||
| 43 | Aerial boom lift, telescopic boom, 50 foot minimum lift height | 2 Weeks | ||||
| 44 | Aerial boom lift, telescopic boom, 125 foot minimum lift height | 2 Weeks | ||||
| 45 | Asphalt paver, wheeled, 8 foot minimum paving width, 15.5 | |||||
| Foot maximum paving width | 2 Weeks | |||||
| 46 | 200-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase | 2 Weeks | ||||
| 47 | 100-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase | 2 Weeks | ||||
| 48 | 60-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase | 2 Weeks | ||||
| 49 | 30-Ton Chiller, Packaged Portable, Built In Circulating Pump, 460 Volts/3 Phase | 2 Weeks | ||||
| 50 | 100-Ton Chiller, Packaged Portable, Built In Circulating Pump, 208/220 Volts/3 Phase | 2 Weeks | ||||
| 51 | 60-Ton Chiller, Packaged Portable, Built In Circulating Pump, 208/220 Volts/3 Phase | 2 Weeks | ||||
| 52 | 30-Ton Chiller, Packaged Portable, Built In Circulating Pump, 208/220 Volts/3 Phase | 2 Weeks | ||||
| 53 | 20-Ton Packaged AC Unit, Heat | |||||
| Pump, 460 Volts/3 Phase | 2 Weeks | |||||
| 54 | 5-Ton Packaged AC Unit, Heat Pump, 208-230/1 Phase | 2 Weeks | ||||
| 55 | 5-Ton Packaged AC Unit, Heat Pump, 208-230/3 Phase | 2 Weeks | ||||
| 56 | 10-Ton Packaged AC Unit, Heat Pump, 460 Volts/3 Phase | 2 Weeks | ||||
| 57 | 20-Ton Packaged AC Unit, Heat Pump, 208-230 Volts/3 Phase | 2 Weeks | ||||
| 58 | 10-Ton Packaged AC Unit, Heat Pump, 208-230 Volts/3 Phase | 2 Weeks | ||||
| 59 | 40-Ton Packaged AC Unit, Heat Pump, 460 Volts/3 Phase | 2 Weeks | ||||
| 60 | 40-Ton Packaged AC Unit, Heat Pump, 208-230 Volts/3 Phase | 2 Weeks | ||||
| 61 | 50-Ton Packaged AC Unit, Heat | |||||
| Pump, 460 Volts/3 Phase | 2 Weeks | |||||
| 62 | 50-Ton Packaged AC Unit, Heat | |||||
| Pump, 208-230 Volts/3 Phase | 2 Weeks | |||||
| 63 | 1-MBTU/HR Output Rating | |||||
| Natural Gas Boiler | 2 Weeks | |||||
| 64 | 600,000-BTU/HR Output Rating | |||||
| Natural Gas Boiler | 2 Weeks | |||||
| 65 | 400,000-BTU/HR Output Rating Natural Gas Boiler | 2 Weeks | ||||
| 66 | 200,000-BTU/HR Output Rating Natural Gas Boiler | 2 Weeks | ||||
| 67 | 84" Single Drum Ride-On Roller Smooth | 2 Weeks | ||||
| 68 | 1.5-2 Ton Mini-Excavator | 2 Weeks | ||||
| 69 | 3-3.5 Ton Mini-Excavator | 2 Weeks | ||||
| 70 | Track Loader, Small 2-3 K lbs | 2 Weeks | ||||
| 71 | Compact Track/Skid steer loader w/bucket attachment | 2 Weeks | ||||
| 72 | 90 Ton Crane RT – No operator | 2 Weeks |
File details come from the government source that posted it. Updated .