Attachment 2 PERFORMANCE WORK STATEMENT TCC.pdf

PDF 104 KB Posted

Attached to
Timber Management TCC Federal contract opportunity
Solicitation number
FA670323Q0014
Issued by
Department of the Air Force Reserve Command

About this file

This performance work statement outlines tree removal and stump grinding services required at Dobbins Training Certification Center Site 1 within Dobbins Air Reserve Base. The contractor shall cut down and remove 17 marked trees with the possibility of removing an additional 10 marked trees. Stumps must be completely ground to a minimum depth of 8 inches below grade within three workdays of tree removal. All tree and debris removal must be completed during the 45 calendar day period of performance beginning upon notice of award. Work shall be performed according to ANSI tree care standards and contract specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Timber Management TCC, newest first.
File Type Posted
Copy of FA670323Q0014 Questons Answers.pdf PDF
Site Visit Sign in Roster.pdf PDF
Attachment 1 Tree Combined Synopsis Solicitation.pdf PDF
Attachment 3 Price Schedule.pdf PDF
Attachment 4 Wage Determination.pdf PDF
Attachment 5 Site Visit Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA670323Q0014

ATTACHMENT 2

31 AUG 2023

PERFORMANCE WORK STATEMENT (PWS)

FOR

Dobbins Training Certification Center (TCC), Site 1

25 August 2023

31 AUG 2023

PERFORMANCE WORK STATEMENT (PWS)

Task Title: Dobbins Timber Management TCC

1.0 SCOPE OF SERVICES

The contractor shall provide equipment and crew to cut down and remove 17 trees with the possibility of removing an additional 10 trees on Dobbins ARB. Service shall include stump and perimeter roots removal by completely cutting and grinding all growth to a minimum of 8 inches below grade. Stumps shall be ground within three (3) workdays of tree removal date.

Trees and all stump-grinding debris shall not be allowed to accumulate and be completely removed from the base when tree removal work is completed. The contractor shall backfill with topsoil, compact, and match existing grades.

1.1 STANDARDS OF WORK

The contractor shall perform all tree work in accordance with contract specifications and the following tree care standards, latest edition, unless otherwise directed by the Contracting Officer.

ANSI A300 - Standard Practices for Tree Care Operations including referenced Combined Federal Regulations (Utility Pruning and Emergency Service Restoration)

ANSI A300 (Part 1) – Tree Pruning

ANSI A300 (Part 3) – Tree Support Systems (Cabling, Bracing, and Guying) ANSI Z60.1 – American Standards for Nursery Stock

ANSI Z133.1 – Safety Requirements for Tree Care Operations

1.2 DESCRIPTION OF SERVICES

Trees to be cut are at TCC Site 1 within Dobbins ARB property boundary. The 17 trees (CLIN 1) to be cut are marked with a color X, while the 10 additional trees (CLIN 2), that may or may not be included in this contract, are marked with another color X.

2.0 PERIOD OF PERFORMANCE

31 AUG 2023

Period of Performance for this PWS will be 45 calendar days. Performance Period begins upon Written Notice of Award.