Attachment 2 - Performance Work Statement.pdf

PDF 193 KB Posted

Attached to
Dorm Dryer Duct Cleaning
Solicitation number
FA4528-26-Q-TB-02
Issued by

About this file

This is a Performance Work Statement for dryer vent cleaning services at Minot Air Force Base, North Dakota. The contractor shall provide all personnel, equipment, tools, materials, and labor to perform comprehensive dryer vent cleaning across 12 dormitories containing a total of 282 vents. Specific dorm assignments are: Dorm 122 (4 vents), Dorm 123 (4 vents), Dorm 130 (4 vents), Dorm 205 (3 vents), Dorm 207 (3 vents), Dorm 210 (5 vents), Dorm 211 (6 vents), Dorm 214 (42 vents), Dorm 216 (42 vents), Dorm 218 (42 vents), Dorm 221 (42 vents), and Dorm 276 (28 vents). The contractor must clean and relocate washer and dryer units as necessary and determine appropriate cleaning methods based on site conditions, including navigating multiple floors with no outside stairwell access and limited maneuverability with no loading docks available.

Work shall be performed Monday through Friday, 7:00 a.m. to 4:00 p.m., excluding weekends, legal holidays, and base down days, with all areas cleaned daily by 4:00 p.m. The contractor must comply with OSHA and National Electrical Code (NFPA 70) and National Life Safety Code (NFPA 101) requirements. Critically, the contractor must be a Certified Dryer Exhaust Technician (C-DET) through the Chimney Safety Institute of America (CSIA), with all employees required to maintain current certificates of registration available for review. The contractor bears full responsibility for hazardous waste disposal in accordance with federal and state regulations, material removal and recycling, property protection during work, and all damages caused to government property. Base access requires entry through South Gate for commercial vehicles with vehicle and personnel inspections; contractor passes must be requested within 10 days of contract award through the Contracting Officer. Inspection and acceptance is performed by Dorm Management, with a post-service walkthrough, punch list documentation, and final acceptance checklist (Attachment 1) required before invoice submission via the Wide Area Workflow system (WAWF).

View the file

Other files

File Type Posted
QA Document.pdf PDF
Attachment 1 - Combo Dryer Duct Cleaning A-01.pdf PDF
Attachment 1 - Combo Dryer Duct Cleaning.pdf PDF
Attachment 3 - Quote Sheet.xlsx XLSX spreadsheet
Attachment 4 - SCA WD 2015-6025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Performance Work Statement 5 CES Dorm Dryer Vent Cleaning

Minot AFB, ND 58705

GENERAL INFORMATION:

1.1.1 SCOPE OF WORK: The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform all work required for the Dryer Vent Cleaning in all Minot AFB Dorms: Dorm 122, 4 vents. Dorm 123, 4 vents. Dorm 130, 4 vents. Dorm 205, 3 vents. Dorm 207, 3 vents. Dorm 210, 5 vents. Dorm 211, 6 vents.

Dorm 214, 42 vents. Dorm 216, 42 vents. Dorm 218, 42 vents. Dorm 221, 42 vents. Dorm 276, 28 vents. The workplace will be cleaned before the end of the day, every day by 1600/4:00 pm.

1.2 CONTRACT PERSONNEL:

1.2.1 CONTRACTOR EMPLOYEES: The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

1.2.2 SECURITY REQUIREMENTS: Personnel clearance and access shall be coordinated with the Contracting Officer.

1.3. GOVERNMENT INSPECTION: All work performed by the Contractor is subject to inspection and acceptance by Dorm Management before payment. Room access will be coordinated with Dorm Management.

1.4 HOURS OF OPERATIONS: The contractor shall perform the services required under this contract during the hours of 7:00 a.m. to 4:00 p.m., Monday through Friday, excluding Saturdays, Sundays, legal holidays, and down days. Work shall be performed in a manner to create minimum disturbance and inconvenience to the base transportation system.

Contractor personnel will be limited to work areas and escorted at all times.

1.5 DISPOSITION OF MATERIALS: All materials, to include packing materials, shall be removed from the site and disposed of by the Contractor. The work site shall be maintained clean and free of debris at all times and shall be clean at the completion of work each day. It is the Contractor’s responsibility to set up disposal and removal to an off base location and a dumpster will not be provided to the contractor.

1.6 DAMAGE TO GOVERNMENT PROPERTY: The Contractor shall immediately notify the Dorm Facility Manager and Contracting Officer when damage to government property is discovered. The Contractor shall provide a proposal for repair. Accidents, abuse, misuse, i.e., are examples of damage to be identified.

1.7 HAZARDOUS WASTE: Any hazardous waste or material used or generated by the

Contractor shall become the property of the Contractor. The use, generation, and disposal of all hazardous waste or material will be the responsibility of the Contractor and shall be handled in accordance with all federal and state hazardous waste and toxic substances control regulations.

1.8 SAFETY REQUIREMENTS: The Contractor will comply with all OSHA and NEC requirements. The contractor shall be a Certified Dryer Exhaust Technician (C-DET) through the Chimney Safety Institute of America (CSIA). In order to perform the required task outlined in Section 1 of the performance of work statement. The contractor shall ensure employees have a current certificate of registration for dryer exhaust cleaning available for review while work is being performed.

DRYER VENT CLEANING SERVICES:

2. The Contractor shall furnish all tools, materials, and labor to perform dryer vent cleaning services. This includes moving, and restarting washer and dryers. Multiple dorms have vents spread over three floors, no outside stairwell access, and limited maneuverability.

Contractor shall be responsible for determination of the appropriate cleaning method, based on site conditions to include the non-existence of loading docks and equipment at any given location. Special circumstances may be identified by and negotiated with the Contracting Officer.

2.1 Work shall comply with applicable building standards and codes, specifically: National

Electrical Code (National Fire Protection Association (NFPA 70) and National Life Safety Code (NFPA 101).

2.2 The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.

2.3 The contractor shall maintain accountability and control of any keys provided and shall return them to the Government Acceptor upon completion of work. Duplication of keys or other means of access is not authorized.

2.4 The contractor shall prevent its personnel from entering any area other than the designated work area.

2.5 The contractor shall maintain a means of egress within all designated work areas to comply with fire codes.

2.6 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.

2.7 During installation the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such type material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes but will be responsible to pay for damages. The government will make repairs and back charge the installation contractor.

2.8 All trash removed from the worksite shall be disposed of in accordance with state laws, and packaging and other recyclable materials shall be recycled where ever possible.

2.9 The contractor shall be a Certified Dryer Exhaust Technician (C-DET) through the Chimney Safety Institute of America (CSIA). In order to perform the required task outlined in Section 1 of the performance of work statement. The contractor shall ensure employees have a current certificate of registration for dryer exhaust cleaning available for review while work is being performed.

3. INSPECTION/ACCEPTANCE CHECKLIST: Validation between the contractor and the

Government Acceptor that all services have been performed to the satisfaction of the Government Acceptor and/or Government Project Manager.

3.1 A post-service walkthrough shall be coordinated with the contractor’s authorized representative and Government Acceptor and/or Government Project Manager.

3.2 All areas requiring correction shall be documented in a punch list by the contractor and provided to the authorized government representative upon completion of a joint walk through by the contractor and authorized government representative.

3.3 A final walk through will be performed with the contractor and the Government Acceptor and/or Government Project Manager to ensure all punch list items have been addressed to the satisfaction of the Government Acceptor.

3.4 Upon completion of all contract requirements, the contractor will submit to the Government Acceptor the Inspection/Acceptance Checklist (Attachment 1 to this PWS) and documentation of completed punch list items. The Government Acceptor will complete the Inspection/Acceptance Checklist and return it to the contractor. The Contractor may then submit a final invoice in the Wide Area Workflow system (WAWF) (https://wawf.eb.mil/) and will attach an electronic copy of the signed Inspection/Acceptance Checklist to the invoice submission.

4. SITE CONDITIONS: Standard site conditions shall be considered those that include:

4.1 Free and clear hard surface access to installation location during regular working hours.

4.2 Parking and off-loading area suitable for access by a semi-trailer combination or truck

4.3 Threat condition level of the base is Bravo. This requires dealer personnel to get base access in order to complete the service

4.4 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials.

4.5 Includes electric power, working lights, heating and air conditioning.

4.6 A building ready for the service (i.e. other tasks such as painting and flooring are complete/will not to cause any delays in performance).

4.7 Contractor shall notify the Contracting Officer of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price.

5. VOLUNTARY PROTECTION PROGRAM (VPP)/SAFETY:

5.1 Voluntary Protection Program: The Air Force is part of the AOSHA VPP. All contractors are required to familiarize themselves with the requirements of the VPP.

Information on VPP can be accessed at http://www.osha.gov/desp/vpp/index.html.

6. BASE/INSTALLATION SPECIFICS:

6.1 All commercial trucks must enter through South Gate which just off US Highway-83, for inspection. In accordance with the Installation this includes construction, food, supply, FedEx, and UPS deliveries, as well as contractors entering with company trucks. If utilizing a POV or a rental vehicle, main gate is accessible to Contractors once a pass is obtained. Hours of operation for the main gate are 24/7. The Contractor shall be responsible for obtaining all necessary passes, or other items required for access to the areas in which work will be performed. The Contractor shall request contractor passes through the CO by providing the full name, social security number, date of birth, work phone, home phone, and driver’s license state/number of employees requiring passes no later than 10 days after contract award. Personnel must adhere to the REAL ID Act of 2005 to ensure access to base is granted. Pass requests will be forwarded by the CO to the 5th Security Forces Squadron Visitor’s Control Center for approval and issuance. Upon completion or termination of the contract, or an individual’s release from employment, the Contractor shall retrieve the identification issued above and surrender it to the 5th Security Forces Squadron Pass and Registration Section located in the Visitor Control Center.

6.2 Gate Procedures:

6.2.1 Once at the South Gate, be prepared to exit the vehicle and allow for vehicle inspection. At this time you may ask for directions to your final destination.

6.2.2 If the final destination requires the driver to leave the South Gate, and re-enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.

6.2.3 Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.

6.2.4 This procedure will occur each time a commercial truck requests access to the base.

6.3 Personnel should bring the following items when entering an installation:

6.3.1 Current Registration for all vehicles.

6.3.2 Current Proof of Insurance for all vehicles.

6.3.3 Valid driver’s license for each driver.

6.3.4 Valid driver’s license or other state identification for each passenger.

6.3.5 Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at Pass & ID, at building 547.

6.3.6 The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with their government http://www.osha.gov/desp/vpp/index.html

POC prior to their arrival so as to coordinate the arrival time accordingly.

Sponsors may request that a pass be applicable for multiple days if needed.

6.4 To sponsor 10 or more people, a typed list of those people must be submitted by the Government Acceptor in Word or Excel format, stating LAST NAME then FIRST NAME of each person. The sponsor must submit that list to Pass & ID, building 547.

No fewer than three days prior to the anticipated arrival. Names listed must be complete names, (no nicknames), and correspond to the names on the state ID for each person.

6.5 Prohibitions: Firearms may not be brought on base under any circumstances.

Individuals with criminal records are not allowed on base. Contractor personnel are prohibited from sponsoring guests onto the installation.