Attachment-2_Performance Requirements Summary (PRS)_W911RX-21-Q-0026.pdf
PDF 123 KB Posted
- Attached to
- 1ID Agricultural Disinfection of Equipment
- Solicitation number
- W911RX-21-Q-0026
About this file
This performance requirements summary outlines the key service requirements for a federal contract to provide agricultural disinfection of military equipment at Fort Riley, Kansas. The contractor must correctly measure and log Virkon-S disinfectant solution concentrations, apply the 1% solution to all external equipment surfaces and allow a minimum 10-minute drying time. All hazardous and nonhazardous waste must be contained, collected, and disposed of in compliance with federal, state and local environmental laws. Performance is subject to 100% surveillance with non-compliance resulting in a 3% deduction from the applicable line item cost.
The related solicitation seeks bids for the agricultural disinfection of equipment for the 1st Infantry Division. Interested small businesses should review all attachments and exhibits to the solicitation and submit any questions by April 1, 2021. Bids are due in response to solicitation number W911RX-21-Q-0026 issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. The requirement is set aside for small businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment-2
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Paragraph Number
Standard Acceptable Quality Level
(AQL)
Method of Surveillance
Proportion of Service to Contract
Price The Contractor shall perform verification that correct measurements Virkon-S is followed and a log is kept for random inspection
5.10 1% Solution No deviation from standard is acceptable
100% surveillance
3% of line item cost if inspection results in failed ratio.
Apply Virkon-S 1% solution on equipment
5.11.1 All external
surfaces of equipment
No deviation from standard is acceptable inspections results in failed inspection.
Contractor shall Allow 10 minute drying time immediately following the application of Vikron-S Solution
5.11 10 minute dry time No deviation from standard is acceptable allotted dry time is < 10 minutes.
Contractor shall contain, collect and dispose of hazardous and nonhazardous waste and residues
5.12 Federal, Kansas, local & Fort Riley Environmental laws and regulations.
Clean Water Act
No deviation from standard is acceptable inspections results in shut down by Environmental Professionals.
File details come from the government source that posted it. Updated .