Attachment 2 - Performance Requirements Summary.pdf

PDF 126 KB Posted

Attached to
Towed Array Integrated Product Team (TAIPT) Telemetry and Engineering Services Follow On
Solicitation number
N6660425R0381
Issued by

About this file

The Performance Requirements Summary Table is a detailed document specifying performance objectives, standards, and monitoring methods for a Towed Array Integrated Product Team (TAIPT) Telemetry and Engineering Services contract. The table covers three primary task areas: Configuration Management Support, Engineering Services, and Repair, Overhaul, and Upgrade, with specific requirements for each task. Most performance standards require 98-99% compliance, with monitoring conducted through government review of deliverable documents, customer feedback, and Contracting Officer's Representative (COR) assessment.

Key performance requirements include monthly submission of baseline changes, timely submission of engineering change proposals (within 30 business days), product data sheet updates, meeting attendance, failure analysis reporting, and telemetry component repair/upgrade. The contract focuses on supporting the Naval Array Technical Support Center (NATSC) and involves activities related to towed array system engineering, maintenance, and technical support for surveillance, surface, and submarine towed array components. The document is version 1.3 from January 2023 and provides a comprehensive framework for measuring contractor performance across multiple technical and administrative tasks.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 v1.3_JANUARY2023

Performance Requirements Summary Table

Requirement (Task number and title from SOW/PWS)

CDRL

(if applicable)

Performance Objective

Performance Standard

Acceptable Quality Level

(AQL)

Monitoring Method

Task A: TAIPT Configuration Management Support, 4.1.1

A003 Submission of recommended baseline changes

Submission by COB 1st of every month

Standard met 99% of the time

Government review of deliverable documents;

COR review

Task A: TAIPT Configuration Management Support, 4.1.2

A007

Submission of changes to Test Specifications and Factory

Acceptance Test Procedures

Submission within 30 days of change to specifications or procedures

Standard met 98% of the time

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task A: TAIPT Configuration Management Support, 4.1.3

A004 Submission of

Pre-Engineering Change Proposal

Submissions within 30 business days after requirement identification

Standard met 98% of the time

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task A: TAIPT Configuration Management Support, 4.1.3

A005 Submission of Engineering

Change Proposal

Submissions within 30 business days after requirement identification

Standard met 98% of the time

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task A: TAIPT Configuration Management Support, 4.1.3

A007 Submission of

Notice of Revision

Submissions within 30 business days after requirement identification

Standard met 98% of the time

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task A: TAIPT Configuration Management Support, 4.1.3

A006 Submission of Requests for

Variance

Submissions 5 days prior to product acceptance

Standard met 98% of the time

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task A: TAIPT Configuration Management Support, 4.1.3

A006 Submission of Specification

Change Notice

Submissions within 30 business days after requirement identification

Standard met 98% of the time

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task B:

Engineering

Services, 4.2.1 A008

Submission of recommendations for improvements to TAIPT products

Submissions within 20 business days after requirement identification

Standard met 98% of the time.

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task B:

Engineering

Services, 4.2.2 A009

Submission of New or Updated

Product Data Sheets

Submissions by COB each

Monday after reporting period.

Standard met 98% of the time.

Government review of deliverable documents;

COR assessment

Task B:

Engineering

Services, 4.2.3 A008

Submission of recommended

TAIPT

replacement parts, components, and upgrades

Submissions within 20 business days after requirement identification

Standard met 98% of the time.

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task B:

Engineering

Services, 4.2.4 A008

Submission of TAIPT failure analysis reports

Submissions within 20 business days after requirement identification

Standard met 98% of the time.

Government review of deliverable documents;

Feedback from customers;

COR assessment

Task B:

Engineering

Services, 4.2.5 A001

Submission of Array TAIPT Test Reports

Submissions within 10 days after receipts of

GFI and/or provided in program schedules

(GFI)

Standard met 98% of the time.

Government review of deliverable documents;

COR assessment

Task B:

Engineering

Services, 4.2.6 A009

Submission of New or Updated

Product Data Sheets

Submissions by COB each

Monday after reporting period.

Standard met 98% of the time.

Government review of deliverable documents;

COR assessment

Task B:

Engineering

Services, 4.2.7 N/A

Attend meetings and present status and findings associated with

TAIPT telemetry engineering services.

Attend meetings provided in program schedules

(GFI)

Standard met 99% of the time.

COR assessment

Task B:

Engineering

Services, 4.2.7 A002

Submissions of Meeting Minutes

Submissions within 5 business days after each meeting.

Standard met 98% of the time.

Government review of deliverable documents;

COR assessment

Task C: TAIPT Repair, Overhaul, and Upgrade, 4.3.1

A00E

Repair, overhaul, or upgrade telemetry components based on failure analysis

Repair, overhaul, or upgrade telemetry components

Standard met 95% of the time.

Government review of deliverable documents;

COR assessment

Progress Reports, 5.0

A00D

Prepare a Status Report that indicates the progress of work, status of the program(s), and

Deliver Contract Status

Reports in same timeframe as

Standard met 98% of the time.

Government review of deliverable documents;

COR assessment existing or potential problem areas the monthly invoice

File details come from the government source that posted it. Updated .