Attachment 2- Past Performance Questionnaire.pdf

PDF 203 KB Posted

Attached to
Land Port of Entry Facility Expansion and Modernization Trout River, New York
Solicitation number
47PC0324R0010
Issued by

About this file

This document is a Past Performance Questionnaire (PBS Attachment 2) designed to collect detailed performance evaluation information about a contractor's previous work. The form provides a comprehensive template for clients to rate a contractor's performance across multiple dimensions including quality, schedule/timeliness, customer satisfaction, management/personnel, cost/financial management, safety/security, and general performance. The questionnaire uses a standardized rating scale ranging from Exceptional (E) to Unsatisfactory (U), with definitions for each rating level, allowing a nuanced and structured assessment of a contractor's past performance. Key evaluation areas include technical data preparation, compliance with contract schedules, responsiveness to customer needs, management effectiveness, workforce quality, financial management, safety adherence, and overall project execution.

View the file

Other files

File Type Posted
47PC0324R0010 Amendment 0015.pdf PDF
Updated Wage Det NY20260035 Franklin County Heavy and Highway.pdf PDF
47PC0324R0010 Amendment 0014.pdf PDF
Updated Wage Det NY20260120 Franklin County Building.pdf PDF
47PC0324R0010 Amendment 0013 SF 30 pdf.pdf PDF
47PC0324R0010 Amendment 0012 SF30.pdf PDF
47PC0324R0010 Amendment 0011 SF 30.pdf PDF
47PC0324R0010 Amendment 0010 SF 30.pdf PDF
47PC0324R0010 Amendment 0009 SF 30.pdf PDF
Trout River LPOE GC- Pricing Sheet-REVISION 2 - 09182025.pdf PDF
47PC0324R0010 Amendment 0008 SF 30.pdf PDF
47PC0324R0010 Amendment 0007 SF 30.pdf PDF
Draft Agreement GC Trout River LPOE rev. 1 - 09102025.pdf PDF
Trout River LPOE GC- Pricing Sheet-rev. 1 - 09102025.pdf PDF
47PC0324R0010 Amendment 0006 SF 30 .pdf PDF
Solicitation GC Trout River LPOE rev. 1 - 09102025.pdf PDF
47PC0324R0010 Amendment 0005 SF 30.pdf PDF
47PC0324R0010- Amendment 0003 SF30.pdf PDF
47PC0324R0010- Amendment 0002 SF30.pdf PDF
List of attendees in person at Trout River LPOE Second Site Visit 081125.pdf PDF
List of attendees in person at Trout River LPOE pre prop meeting 072925.pdf PDF
47PC0324R0010- Amendment 0001 SF30.pdf PDF
Wage Det NY20250120 Building Franklin County V010325.pdf PDF
GSA527-21.pdf PDF
Trout River LPOE GC- Reps and Certs GC MAY 2025.pdf PDF
SF24-23a.pdf PDF
Instructions to SAM Entities Trying to Request Controlled Docs Access rev051524 (1).pdf PDF
Draft Agreement GC Trout River LPOE.pdf PDF
Wage Det NY20250035 Heavy and Highway Franklin County V010325.pdf PDF
Attachment 3 - Small Business Utilization Form.pdf PDF
Attachment 1 - Experience Form.pdf PDF
Trout River LPOE GC- Pricing Sheet.pdf PDF
47PC0324R0010 Form 1442.pdf PDF
Solicitation Trout River LPOE GC.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

PAST PERFORMANCE QUESTIONNAIRE

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Firm Name:

Address:

Phone Number:

UEI Number:

Contact Name:

Email Address:

Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: ☐ Prime Contractor ☐ Subcontractor ☐ Joint Venture ☐ Other (Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: ☐ Firm Fixed Price ☐ Cost Reimbursement ☐ Other (Please explain)

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: ☐ High ☐ Med ☐ Routine

How is this project relevant to the project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E)

Exceptional Performance meets contractual requirements and exceeds many to the

Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the

Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(G)

Good

Performance meets contractual requirements and exceeds some to the

Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Good rating is appropriate when the

Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S)

Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per

DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than

Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the

Government/Owner.

(U)

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the

Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not

Applicable No information or did not apply to your contract.

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

CLIENT INFORMATION

Client Point of Contact Information

Name:

Title:

Phone Number:

Email Address:

Project Information

Contract Type:

Contract Title:

Contract Location:

Describe your role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E E G S M U N

(a) Quality of technical data/report preparation efforts. ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to meet quality standards specified for technical performance. ☐ ☐ ☐ ☐ ☐ ☐

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E E G S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.

3. CUSTOMER SATISFACTION: E E G S M U N

(a) To what extent were the end users satisfied with the project? ☐ ☐ ☐ ☐ ☐ ☐

(b) Contractor was reasonable and cooperative in dealing with your staff

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

(d) Overall customer satisfaction. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR E E G S M U N

(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

(b) Ability to hire, apply, and retain a qualified workforce to this effort. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR – Continued E E G S M U N

(c) Government Property Control. ☐ ☐ ☐ ☐ ☐ ☐

(d) Knowledge/expertise demonstrated by contractor personnel. ☐ ☐ ☐ ☐ ☐ ☐

(e) Utilization of Small Business concerns. ☐ ☐ ☐ ☐ ☐ ☐

(f) Ability to simultaneously manage multiple projects with multiple disciplines.

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program).

5. COST/FINANCIAL MANAGEMENT E E G S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)?

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk

Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).

(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in the comment section below.)

☐ Yes ☐ No

(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in the comment section below.)

☐ Yes ☐ No

(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)

☐ Yes ☐ No

6. SAFETY/SECURITY EE G S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all security requirements for the project and personnel security requirements.

7. GENERAL E E G S M U N

(a) Ability to successfully respond to emergency and/or surge situations

(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below

(c) In summary, provide an overall rating for the work performed by this contractor.

8. SUSTAINABILITY

Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and

Certification Systems.) (If yes, please explain in the comments section below.)

☐ Yes ☐ No

9. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.)

☐ Yes ☐ No http://www.wbdg.org/resources/gbs.php#rcas http://www.wbdg.org/resources/gbs.php#rcas

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .