This document is a technical specification and engineering drawing set for a new process chiller unit to be installed at a facility. The document includes photographs of existing equipment and detailed engineering schematics showing the installation configuration for an FFDG-supplied process chiller.

The existing facility currently operates a chiller located on the lower level with water supply and return lines positioned on the side of the unit per manufacturer specifications. The new process chiller installation will involve connecting to these existing water lines. Two electrical panels (PHP-MI31A1-1 and PHP-MI31A1-2) operating at 277/480 volts AC will supply power to the outdoor condensing unit. The breaker and panel that powered the existing chiller will be marked as spare after conductors are removed. The outdoor condensing unit will be prepped for future removal. Engineering drawings detail the chiller's internal components including refrigerant leak sensors (R454B units only), optional ambient air temperature sensors, side-stream filtration, auto water make-up capability, and external manual bypass options. The unit features dual pumps (Pump 1: 7.50 KW at 5.59 FLA and Pump 2: 3.00 KW at 2.24 FLA), two fans at 2 HP each, and operates on R410A refrigerant with a design pressure of 575 PSI and maximum working pressure of 650 PSI. The chiller includes an HMI display, audible/visual alarm, E-stop button, and pump selector switch. Unit dimensions are approximately 83.25 inches wide, 42.75 inches deep, and 80 inches tall, with caster mounting options provided.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

jperona Image jperona Image jperona Image jperona Image jperona Image jperona Image jperona Architect jperona Cloud+ Existing Process Chiller Located on the lower level.

jperona Architect jperona Cloud+ Existing water lines. The new unit Supply and return are on the side of the unit. Water connection per manufactures specifications.

jperona Architect jperona Cloud+ No modification to this part. Reference picture only.

jperona Architect jperona Cloud+ Outdoor condensing unit will be prepped for future removal.

jperona Architect jperona Cloud+ New Process chill Manual.

jperona Image jperona Image jperona Image jperona Image jperona Image jperona Image jperona Architect jperona Cloud+ Breaker and Panel location for the outdoor condensing unit. The conductors will be removed back to panel and this breaker will be marked as spare.

jperona Architect jperona Cloud+ Breaker, Panel, and Disconnect for the LL Process Chiller.

jperona Architect jperona Cloud+ Actual nameplate off of the new FFDG-Supplied Process Chiller.

RIA TNEIBMA LANOITPO

NOITACOL RSNS PMET

FI DEDULCNI YLNO(

EGAKCAP ROSNES

EES - DETCELES NOITPO

ROF 00.88125.298

)NOITAMROFNI LANOITIDDA

ROTOM NAF RESNEDNOC LACIPYT

YLNO STINU ROODNI - NOITACOL DFV

ROF EMAS EHT SI NWOHS NOITACOL LARENEG(

)NWOHS DFV ELYTS 081SCA - SDFV ELYTS LLA

"8/3 1 0306100A

ESOH SSAPYB

0306100A

ESOH NIARD

TNAREGIRFER

ROSNES KAEL

)YLNO STINU B454R(

6811550A - ESOH

0468450A - PMALC

SSAPYB LAUNAM LANRETXE

)LANOITPO(

PU-EKAM RETAW OTUA

)LANOITPO(

MAERTS-EDIS

RETLIF

)LANOITPO(

6811550A - ESOH

0468450A - PMALC

A

B

C

D

12345678

8 7 6 5 4 3 2 1

D

C

B

E

5202/72/01

01.70075.288

E

MCM

srellihC

3 FO 1 :TEEHS

:ETON

SNOINU PMUP ROF ECAPS WOLLA OT KNAT DEVOM

p u o r G

01.70075.288

LAUTCA - TUOYAL DRADNATS A STNESERPER GNIWARD.1

SECNAIRAV THGILS EVAH YAM TINU

MCM

R

NOITCEJORP ELGNA DRIHT

1A7:1 :ELACS. D

1A .PUORG SCA FO NOISSIMREP NETTIRW DESSERPXE EHT TUOHTIW EDAM EB YAM FOEREHT TRAP YNA FO ESU RO NOITCUDORPER ,ERUSOLCSID ON ,YRATEIRPORP SI TNEMUCOD SIHT

EZIS .ON GWD VER.ELACS OT DETNIRP EB TON YAM GNIWARDTHGIEW

YROGETAC TCUDORP

YLIMAF TCUDORP

6202/8/1

:SECNARELOT ,A70LPG,AM,GWD

PMP,YBDNATS/W,TCES-2

SCASECNARELOT NOITACIRBAF

:DEIFICEPS ESIWREHTO SSELNU

SEHCNI NI ERA SNOISNEMID

SNOISNEMID RALUGNA 1

SNOITCARF 61/1

LAMICED ECALP OWT 60.0

LAMICED ECALP EERHT 030.0

EMAN ETAD

.RPPA GNE

DEKCEHC

NWARD

:ON TRAP

ELTIT

ETADEMANVER NOITPIRCSED NCE

jperona Architect Engineering Drawings of the new FFDG-Supplied Process Chiller.

:NOITACOL KNAT

** "1

** "8/3 6

"2/1 9

NOITCUS PMUP

"4/3 32

NOITCUS PMUP

B-B NOITCES

OT NOITALUSNI KNAT MORF ERA SNOISNEMID **

LIAR RENROC LACITREV FO ECAFRUS EDISNI

A LIATED

5.1 : 1 ELACS

ELOH ETON

NOITACOL

"8/3 12

ETON DFV EES

1 TEEHS

"8/5 23

B

B

A

B

C

D

12345678

8 7 6 5 4 3 2 1

D

C

B

E

5202/72/01

01.70075.288

E

MCM

srellihC

3 FO 2 :TEEHS

SNOINU PMUP ROF ECAPS WOLLA OT KNAT DEVOM

p u o r G

01.70075.288

MCM

R

NOITCEJORP ELGNA DRIHT

1A4:1 :ELACS. D

1A .PUORG SCA FO NOISSIMREP NETTIRW DESSERPXE EHT TUOHTIW EDAM EB YAM FOEREHT TRAP YNA FO ESU RO NOITCUDORPER ,ERUSOLCSID ON ,YRATEIRPORP SI TNEMUCOD SIHT

EZIS .ON GWD VER.ELACS OT DETNIRP EB TON YAM GNIWARDTHGIEW

YROGETAC TCUDORP

YLIMAF TCUDORP

6202/8/1

:SECNARELOT ,A70LPG,AM,GWD

PMP,YBDNATS/W,TCES-2

SCASECNARELOT NOITACIRBAF

:DEIFICEPS ESIWREHTO SSELNU

SEHCNI NI ERA SNOISNEMID

SNOISNEMID RALUGNA 1

SNOITCARF 61/1

LAMICED ECALP OWT 60.0

LAMICED ECALP EERHT 030.0

EMAN ETAD

.RPPA GNE

DEKCEHC

NWARD

:ON TRAP

ELTIT

ETADEMANVER NOITPIRCSED NCE

"4/3 01

"8/5 11 "0

"8/7 5

"8/7 11

"4/3 81

"52

"8/1 7

LANRETXE "4/3

SSAPYB LAUNAM

)LANOITPO(

TPNF "2/1

NIARD

TPNF "2/1

PU-EKAM RETAW OTUA

)LANOITPO(

TPNF "4/1-1

SSECORP MORF

TPNF "4/1-1

SSECORP OT

IMH

TLUAF LARENEG

MRALA LAUSIV/ELBIDUA

POTS-E

ROTCELES PMUP

HCTIWS

"04 "4/3 24

"08

"4/1 38

"77

A

B

C

D

12345678

8 7 6 5 4 3 2 1

D

C

B

E

5202/72/01

01.70075.288

E

MCM

srellihC

3 FO 3 :TEEHS

SRETSAC :NOITPO GNITNUOM

SNOINU PMUP ROF ECAPS WOLLA OT KNAT DEVOM

p u o r G

01.70075.288

MCM

R

NOITCEJORP ELGNA DRIHT

1A5.7:1 :ELACS. D

1A .PUORG SCA FO NOISSIMREP NETTIRW DESSERPXE EHT TUOHTIW EDAM EB YAM FOEREHT TRAP YNA FO ESU RO NOITCUDORPER ,ERUSOLCSID ON ,YRATEIRPORP SI TNEMUCOD SIHT

EZIS .ON GWD VER.ELACS OT DETNIRP EB TON YAM GNIWARDTHGIEW

YROGETAC TCUDORP

YLIMAF TCUDORP

6202/8/1

:SECNARELOT ,A70LPG,AM,GWD

PMP,YBDNATS/W,TCES-2

SCASECNARELOT NOITACIRBAF

:DEIFICEPS ESIWREHTO SSELNU

SEHCNI NI ERA SNOISNEMID

SNOISNEMID RALUGNA 1

SNOITCARF 61/1

LAMICED ECALP OWT 60.0

LAMICED ECALP EERHT 030.0

EMAN ETAD

.RPPA GNE

DEKCEHC

NWARD

:ON TRAP

ELTIT

ETADEMANVER NOITPIRCSED NCE

File details come from the government source that posted it. Updated .