Attachment 2 - Maintenance Task List.pdf

PDF 275 KB Posted

Attached to
Preventive Maintenance on Cold Seal Machine at DLA Distribution Albany, Georgia - CSS SP3300-25-Q-0252
Solicitation number
SP3300-25-Q-0252
Issued by

About this file

This document is a Maintenance Task List for a Cold Pack Machine (9000 Cold Seal) that provides a comprehensive preventive maintenance checklist and replacement parts list. The checklist includes 19 detailed maintenance tasks such as inspecting product detection sensors, checking sealing wheels, examining conveyor belts, verifying pulleys and rollers, lubricating moving parts, and checking pneumatic lines for leaks. The replacement parts list includes six specific components with their OEM part numbers and quantities, including shear blades, spring plungers, pull roll tires, bronze bearing sleeves, and seal cushions. The Pull Roll tires have a noted expected lifespan of 2 years, and the maintenance instructions emphasize replacing or adjusting components showing signs of wear, damage, or improper functioning to ensure optimal machine performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE TASK LIST – COLD PACK MACHINE

9000 Cold Seal – Preventive Maintenance Checklist

Inspect product detection sensors for dust buildup to prevent false triggering.

Inspect sealing wheels and shear blades for any excessive buildup.

Wipe down all exposed machine surfaces to prevent contamination.

Check the regulator filter for excessive water; drain if necessary.

Vacuum or blow out contaminants and paper dust from the seal area.

Inspect the shear blade for unusual wear; replace if necessary.

Inspect heated side seal wheels for damage, looseness, or excessive play.

Inspect all conveyor belts for tears or broken lacing; replace if necessary.

Inspect motor and drive components for overheating or unusual noise.

Verify that all pulleys and rollers are turning smoothly and are free from wear or buildup.

Inspect and grease shear slide rods.

Ensure all guards and covers are securely in place.

Inspect Pull Roll tires for excessive wear; replace if needed (expected lifespan: 2 years).

Inspect upper and lower shear blades and spring plungers. If the cut is not clean, Replace the blades and/or adjust the spring plungers.

Inspect bearings, valves, cylinders, seal cushions, and sealing wheels; replace any worn components.

Check all pneumatic lines for leaks; repair or replace as necessary.

Inspect belts and chains for proper tension and alignment.

Check and tighten all bolts, screws, and fasteners.

Lubricate bearings, chains, or other moving parts

Replacement Parts List

Item Description OEM Part Number Quantity 1 Shear Blade; Lower; 25.50in 06001.071 1 2 Shear Blade; Lower 06001.070 1 3 SPRING PLUNGER 5/8-11 x 1.062 K7-N 4 4 10" Pull Roll Tire C-917 4

BRONZE BEARING SLEEVE; 3/4in ID X 1in OD X 3/4in LG; CAST

UNI-BBS-121612-001

6 BLACK SEAL CUSHION BLNEO.125X0.75X19.00 3

File details come from the government source that posted it. Updated .