Attachment (2) J-0200000-14 ELINs_Hangar Door.xlsx
XLSX spreadsheet 94 KB Posted
- Attached to
- MAINTENANCE AND REPAIR SERVICES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN
- Solicitation number
- N4008424B6300
About this file
This document contains pricing schedules and line item exhibits for a federal contract solicitation to provide maintenance and repair services for hangar door systems at a naval facility in Japan over a five-year period. The contractor will be responsible for recurring work including service orders and preventative maintenance, as well as non-recurring work on an as-needed basis. Pricing is provided for labor, materials, and equipment for recurring and non-recurring tasks during base and option years. Line items specify requirements for fence installation, repair, and removal services. The solicitation also includes provisions for expedited services, temporary fencing rental, and recycling of removed materials. The Naval Facilities Engineering Command is seeking these services under solicitation number N4008424B6300 for the Yokose LCAC facility operated by Commander, Fleet Activities Sasebo in Japan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (3) PWS_Hangar Door_CFAS_ Amend0002.pdf | ||
| N4008424B6300_AMEND0002.pdf | ||
| N4008424B6300_AMEND0001.pdf | ||
| (g) J-1502000-04 Ref Drawings for eP1769314.zip | ZIP file | |
| Attachment (e) PIEE Solicitation Module Guide.pdf | ||
| Attachment (b) Provision 52.204-24.pdf | ||
| Attachment (c) Provision 52.229-11.pdf | ||
| Attachment (a) Pre-Bid Inquiry Form.doc | DOC document | |
| N4008424B6300.pdf | ||
| Attachment (f) Access Request Form.xlsx | XLSX spreadsheet | |
| Attachment (d) W-14.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total
ATTACHMENT J-0200000-14
MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY
FOR COMMANDER, FLEET ACTIVITIES, SASEBO (CFAS), JAPAN
SOLICITATION/CONTRACT N4008424B6300
CLIN PERIOD Amount (¥) per CLIN
| 0001 | BASE PERIOD - Recurring Work | ¥ - |
| 0002 | BASE PERIOD - Non-recurring Work | ¥ 5,000,000 |
| 0003 | FIRST (1ST) OPTION PERIOD - Recurring Work | ¥ - |
| 0004 | FIRST (1ST) OPTION PERIOD - Non-recurring Work | ¥ 5,000,000 |
| 0005 | SECOND (2ND) OPTION PERIOD - Recurring Work | ¥ - |
| 0006 | SECOND (2ND) OPTION PERIOD - Non-recurring Work | ¥ 5,000,000 |
| 0007 | THIRD (3RD) OPTION PERIOD - Recurring Work | ¥ - |
| 0008 | THIRD (3RD) OPTION PERIOD - Non-recurring Work | ¥ 5,000,000 |
| 0009 | FOURTH (4TH) OPTION PERIOD - Recurring Work | ¥ - |
| 0010 | FOURTH (4TH) OPTION PERIOD - Non-recurring Work | ¥ 5,000,000 |
TOTAL OF CONTRACT AMOUNT FOR FIVE YEARS ¥ 25,000,000
&"Arial,Bold"CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELIN-Base Period Recurring Work
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0001 |
| Line Item 0001 Recurring Work - Base Period (16 APR 2024 though 15 APR 2025) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price (¥) Total (¥)
| A001 | Service Orders for Bldg. 7025/7029/7030, Spec Item 3.1. | |||
| A001AA | Urgent Service Orders, Spec Item 3.1.1 | 12 | MO | ¥ - |
| A001AB | Routine Service Orders, Spec Item 3.1.2 | 12 | MO | ¥ - |
| Subtotal A001 | ¥ - |
| A002 | Preventive Maintenance (PM) Program, Spec Item 3.2 and Inpection and Testing Program, Spec Item 3.3. | |||
| A002AA | PM / Inspection and Testing Program for Bldg. 7025 - Semiannual Service OR recommended by OEM. | 12 | MO | ¥ - |
| A002AB | PM / Inspection and Testing Program for Bldg. 7029 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| A002AC | PM / Inspection and Testing Program for Bldg. 7030 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| Subtotal A002 | ¥ - |
TOTAL RECURRING WORK LINE ITEMS (A001 THRU A002) TOTAL ¥ -
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
&"Arial,Bold"CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-Base Period-Non-recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0002 |
| Line Item 0002 Non-recurring Work - Base Period (16 APR 2024 though 15 APR 2025) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Labor: Unit Priced Labor (UPL)Work - During Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 400 | HR | ¥ - |
| A701 | Labor: Unit Priced Labor (UPL)Work - Outside Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 100 | HR | ¥ - | |
| A702 | Material and Equipment: UPL Work (Negotiated) | ||
| Provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. |
The price for this ELIN shall include all costs associated with the equipment and materials including all overheads and profit associate with the equipment and materials. There will be no separate ELIN(s) for any overheads and profit associate with the equipment and materials.
| 5,000,000 | LS | Negotiated at time of order. | ¥ 5,000,000 | |
| TOTAL NON-RECURRING WORK PRICE BASE PERIOD | ¥ 5,000,000 |
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELIN-1st Opt Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0003 |
| Line Item 0003 Recurring Work - First (1st) Option Period (16 APR 2025 though 15 APR 2026) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price (¥) Total (¥)
| B001 | Service Orders for Bldg. 7025/7029/7030 | |||
| B001AA | Urgent Service Orders, Spec Item 3.1.1 | 12 | MO | ¥ - |
| B001AB | Routine Service Orders, Spec Item 3.1.2 | 12 | MO | ¥ - |
| Subtotal B001 | ¥ - |
| B002 | Preventive Maintenance (PM) Program, Spec Item 3.2 and Inpection and Testing Program, Spec Item 3.3. | |||
| B002AA | PM / Inspection and Testing Program for Bldg. 7025 - Semiannual Service OR recommended by OEM. | 12 | MO | ¥ - |
| B002AB | PM / Inspection and Testing Program for Bldg. 7029 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| B002AC | PM / Inspection and Testing Program for Bldg. 7030 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| Subtotal B002 | ¥ - |
TOTAL RECURRING WORK LINE ITEMS (B001 THRU B002) TOTAL ¥ -
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
&"Arial,Bold"CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-1st Non-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0004 |
| Line Item 0004 Non-recurring Work - First (1st) Option Period (16 APR 2025 though 15 APR 2026) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Labor: Unit Priced Labor (UPL)Work - During Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 400 | HR | ¥ - |
| B701 | Labor: Unit Priced Labor (UPL)Work - Outside Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 100 | HR | ¥ - | |
| B702 | Material and Equipment: UPL Work (Negotiated) | ||
| Provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. |
The price for this ELIN shall include all costs associated with the equipment and materials including all overheads and profit associate with the equipment and materials. There will be no separate ELIN(s) for any overheads and profit associate with the equipment and materials.
| ¥5,000,000 | LS | Negotiated at time of order. | ¥ 5,000,000 | |
| TOTAL NON-RECURRING WORK PRICE FIRST OPTION PERIOD | ¥ 5,000,000 |
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELIN-2nd Opt-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0005 |
| Line Item 0005 Recurring Work - Second (2nd) Option Period (16 APR 2026 though 15 APR 2027) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs C001 through C002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price (¥) Total (¥)
| C001 | Service Orders for Bldg. 7025/7029/7030 | |||
| C001AA | Urgent Service Orders, Spec Item 3.1.1 | 12 | MO | ¥ - |
| C001AB | Routine Service Orders, Spec Item 3.1.2 | 12 | MO | ¥ - |
| Subtotal C001 | ¥ - |
| C002 | Preventive Maintenance (PM) Program, Spec Item 3.2 and Inpection and Testing Program, Spec Item 3.3. | |||
| C002AA | PM / Inspection and Testing Program for Bldg. 7025 - Semiannual Service OR recommended by OEM. | 12 | MO | ¥ - |
| C002AB | PM / Inspection and Testing Program for Bldg. 7029 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| C002AC | PM / Inspection and Testing Program for Bldg. 7030 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| Subtotal C002 | ¥ - |
TOTAL RECURRING WORK LINE ITEMS (C001 THRU C002) TOTAL ¥ -
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
&"Arial,Bold"CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-2nd Opt Non-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0006 |
| Line Item 0006 Non-recurring Work - Second (2nd) Option Period (16 APR 2026 though 15 APR 2027) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Labor: Unit Priced Labor (UPL)Work - During Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 400 | HR | ¥ - |
| C701 | Labor: Unit Priced Labor (UPL)Work - Outside Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 100 | HR | ¥ - | |
| C702 | Material and Equipment: UPL Work (Negotiated) | ||
| Provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. |
The price for this ELIN shall include all costs associated with the equipment and materials including all overheads and profit associate with the equipment and materials. There will be no separate ELIN(s) for any overheads and profit associate with the equipment and materials.
| ¥5,000,000 | LS | Negotiated at time of order. | ¥ 5,000,000 | |
| TOTAL NON-RECURRING WORK PRICE SECOND OPTION PERIOD | ¥ 5,000,000 |
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELIN-3rd Opt-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0007 |
| Line Item 0007 Recurring Work - Third Option (3rd) Period (16 APR 2027 though 15 APR 2028) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs D001 through D002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price (¥) Total (¥)
| D001 | Service Orders for Bldg. 7025/7029/7030 | |||
| D001AA | Urgent Service Orders, Spec Item 3.1.1 | 12 | MO | ¥ - |
| D001AB | Routine Service Orders, Spec Item 3.1.2 | 12 | MO | ¥ - |
| Subtotal D001 | ¥ - |
| D002 | Preventive Maintenance (PM) Program, Spec Item 3.2 and Inpection and Testing Program, Spec Item 3.3. | |||
| D002AA | PM / Inspection and Testing Program for Bldg. 7025 - Semiannual Service OR recommended by OEM. | 12 | MO | ¥ - |
| D002AB | PM / Inspection and Testing Program for Bldg. 7029 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| D002AC | PM / Inspection and Testing Program for Bldg. 7030 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| Subtotal D002 | ¥ - |
TOTAL RECURRING WORK LINE ITEMS (D001 THRU D002) TOTAL ¥ -
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
&"Arial,Bold"CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-3rd Opt Non-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0008 |
| Line Item 0008 Non-recurring Work - Third (3rd) Option Period (16 APR 2027 though 15 APR 2028) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs D700 through D703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | Labor: Unit Priced Labor (UPL)Work - During Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 400 | HR | ¥ - |
| D701 | Labor: Unit Priced Labor (UPL)Work - Outside Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 100 | HR | ¥ - | |
| D702 | Material and Equipment: UPL Work (Negotiated) | ||
| Provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. |
The price for this ELIN shall include all costs associated with the equipment and materials including all overheads and profit associate with the equipment and materials. There will be no separate ELIN(s) for any overheads and profit associate with the equipment and materials.
| ¥5,000,000 | LS | Negotiated at time of order. | ¥ 5,000,000 | |
| TOTAL NON-RECURRING WORK PRICE THIRD OPTION PERIOD | ¥ 5,000,000 |
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELIN-4th Opt-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0009 |
| Line Item 0009 Recurring Work - Fourth (4th) Option Period (16 APR 2028 though 15 APR 2029) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs E001 through E002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price (¥) Total (¥)
| E001 | Service Orders for Bldg. 7025/7029/7030 | |||
| E001AA | Urgent Service Orders, Spec Item 3.1.1 | 12 | MO | ¥ - |
| E001AB | Routine Service Orders, Spec Item 3.1.2 | 12 | MO | ¥ - |
| Subtotal E001 | ¥ - |
| E002 | Preventive Maintenance (PM) Program, Spec Item 3.2 and Inpection and Testing Program, Spec Item 3.3. | |||
| E002AA | PM / Inspection and Testing Program for Bldg. 7025 - Semiannual Service OR recommended by OEM. | 12 | MO | ¥ - |
| E002AB | PM / Inspection and Testing Program for Bldg. 7029 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| E002AC | PM / Inspection and Testing Program for Bldg. 7030 - Annual Service OR recommended by OEM. | 12 | MO | ¥ - |
| Subtotal E002 | ¥ - |
TOTAL RECURRING WORK LINE ITEMS (E001 THRU E002) TOTAL ¥ -
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
&"Arial,Bold"CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-4th Opt Non-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008424B6300 |
| TITLE: MAINTENANCE AND REPAIR SERIVCES OF HANGAR DOOR SYSTEMS AT YOKOSE LCAC FACILITY, CFAS, JAPAN |
| EXHIBIT A - CLIN 0010 |
| Line Item 0010 Non-recurring Work - Fourth (4th) Option Period (16 APR 2028 though 15 APR 2029) |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs E700 through E703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| E700 | Labor: Unit Priced Labor (UPL)Work - During Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 400 | HR | ¥ - |
| E701 | Labor: Unit Priced Labor (UPL)Work - Outside Regular Working Hours. |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor.
| 100 | HR | ¥ - | |
| E702 | Material and Equipment: UPL Work (Negotiated) | ||
| Provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. |
The price for this ELIN shall include all costs associated with the equipment and materials including all overheads and profit associate with the equipment and materials. There will be no separate ELIN(s) for any overheads and profit associate with the equipment and materials.
| ¥5,000,000 | LS | Negotiated at time of order. | ¥ 5,000,000 | |
| TOTAL NON-RECURRING WORK PRICE FOURTH OPTION PERIOD | ¥ 5,000,000 |
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
Source Selection Information -- See FAR 2.101 and 3.104[when filled]
File details come from the government source that posted it. Updated .