The document provided is Attachment 2 - ISU Construction Guide (Reference for Custom Build), which is related to the federal contract opportunity for a "Custom ISU" with Solicitation Number FA560624Q0073. The contract opportunity is a resolicitation by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa for a customized internal airlift/helicopter slingable container unit (ISU) capable of housing tools and equipment necessary to maintain and store explosives in any environment. The Construction Guide appears to provide reference details for the custom build requirements of the ISU.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Combo - FA560624Q0073.pdf | ||
| Attachment 3 - Questions and Answers FA560624Q0073.docx | DOCX document | |
| Attachment 1 - Custom ISU Minimum Requirements.pdf | ||
| Solicitation Combo - FA560624Q0073.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the purpose of this document:
This will be referred to as the left side
This will be referred to as the right side
Height from bottom of door to top of bracket is xx”
Right edge aligns with door mounting hardware to clear our chosen toolboxes
This is the eyewash we chose.
Others will meet needs but we chose this style because it’s what the shop already has so for ease of maintenance
Hardware:
3- ¼”x1 ½”x20 bolts
3- ¼”x 20 NY lock nuts
6- ¼” flat washers
To mount:
- Determine desired location
- Mark 3 holes
- Drill ¼” hole through door
- Fill hole with RTV
- Install flat washer on bolts
- Insert bolts from outside
- Position bracket
- Install flat washer
- Install NY lock nuts
Left Wall
Bottom X-track:
Height from floor-37” Distance from tall wall-10”
Top X-track:
Height from floor-68 ½” Distance from tall wall-1 1/8”
Heights were determined by ensuring table height was same as opposite wall and table could be stowed while clearing underside of storage boxes
How to mount track:
Hardware:
14- #14x1/2” stainless self tapping screws per track
- Mark Holes
- Drill 13/64” pilot holes
- Lubricate and install screws
Right Wall
Bottom X-track:
Height from floor-37” Distance from tall wall-17 ¼”
Top X-track:
Height from floor-63 ¼” Distance from tall wall-8 ¼”
Heights were determined by ensuring table would clear seat stand (not pictured) and table would clear eyewash station while stowed/deployed
How to mount track:
Hardware:
14- #14x1/2” stainless self tapping screws per track
- Mark Holes
- Drill 13/64” pilot holes
- Lubricate and install screws
Building Tables
- Wood was cut to 46x22 1/2”
- Legs were attached to X-track
- Sheetmetal formed the aluminum table skins
Hardware (per table):
12- #6x1/2” screws 8- #12x1/2” screws
#6 screws mount the wood to the legs from underneath
#12 screws mount the metal to the wood
Ground Reel Aligned with top and inboard edge of beam it is mounted too
Mounting:
-Hardware- 4-#14x1/2” screws, 4-1/4” flat washers -Mark 4 holes -Drill 13/64” pilot holes -Install reel to wall with screws and washers
Ground Bar 4 3/4” from top X-track 35 1/4” from tall wall
Mounting:
-Hardware- 4-#14x1/2” screws -Mark 4 holes -Drill 13/64” pilot holes -Install reel to wall with screws and washers -All cables connect with crimp on eye-connecters and 1/4x1 ½” bolts and nuts
Right Table Ground Attachment
Hardware:
1/4x1 ½” bolt and lock nut
-Leave table top mount screw out of this location -drill through entire table with ¼” drill bit -Install bolt from underside and tighten
Allows use of clamp to attach to either table or seat ground point
Left Table Ground Attachment
Use crimp on eye connector and attach to table mounting screw
Ground Reel Attachment
-Remove paint from screw hole on reel bracket -Install using crimp on eye connector between screw and washer
Preparing Explosive Storage Boxes
2-1/4x1” bolts 2-1/4” lock washers 2-1/4” nuts
-Drill ¼” hole in top of 2 boxes -Remove paint -Install bolt from inside, install lock washer, install nut
3 cables are routed around top from bar. Use clamps as necessary to retain cables.
Clamps are mounted with #12 screws into a 11/64” pilot hole.
Cables continue using same mounting method.
2 are terminated with clamps to allow easy connection to boxes. 3rd is installed to table previously shown
Mounting Extinguishers
4- #14x1/2” Screws
-Position bracket -Mark holes -Drill 13/64” pilot holes -Install bracket
Left Extinguisher is against tall wall 45 1/2” above floor and as close to door as possible while retaining ease of use
Right Extinguisher is against short wall 17 1/2” above floor and as close to door as possible while retaining ease of use
Preparing duct work
2 rectangular holes must be cut to allow closeout panel latch operation (outlined in red)
1 notch must be made larger to allow wiring passage (outlined in yellow)
Mounting Duct
4-#6x1/2” self drilling metal screws
-Position duct as shown -Mark holes -Drill 7/64” pilot holes -Install with screws
Screw locations circled in red
Mounting Diffuser
6-#xx3/4” self drilling metal screws
-Position diffuser as shown -Mark holes -Drill 7/64” pilot holes -Install with screws
Screw locations circled in red
Prepping Diffuser
-Cut out 2 slats from each corner of the diffuser -Glue the 4 rectangular metal bars into the black duct (outlined in red). They will self center around the bolt hole and in a channel molded into the ductwork.
Fitting Outer, Removable Part of Unit
-Cut the foam connecting duct to a height of 2” -Place connecting duct over inner portion of ducting -Carefully place unit down onto ISU roof making sure the supply lines up with the connecting duct.
Note: When the ISU is prepped for shipment, the outer portion of the unit AND the connecting duct must be removed for the closeout panel to fit. The inner portions of the unit remain installed.
2”
Final Install
4 bolts and 4 washers supplied with unit by MFG
-Align outer portion of unit with holes.
-Install 4 bolts and washers.
Wiring the HVAC Plug
Instructions for assembly/disassembly of the plug are supplied in the packaging.
-Disassemble plug -Connect wires: Green/Yellow to G
1 to X 2 to W
-Re-assemble plug G
X
W
Y
View From Face of Plug
Not used. Fill with RTV
Awning 10” from Side wall
10” from Side wall
3/8” hole Through ceiling
3/8” bolt x 6”
Nylon
Nylon
Nylon
Spacer
Bracket
1 5/8” Square 3/8” Hole
Interior: attach a flat washer, Spring washer Nut.
Seat Stand
¼” Aluminum Braces
½ “ hole with a 1/2” x 6” bolt
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Awning |
| Seat Stand |
File details come from the government source that posted it. Updated .