This document appears to be an IDIQ pricing schedule for the repair and overhaul of Pratt & Whitney PW123E and PW150A aircraft engines. The scope of work covers engine repair, hot section inspections, overhauls, test cell services, demilitarization, and supply of new/repaired/overhauled engines. The contract term is five years from September 14, 2024 to September 13, 2029. The pricing includes firm-fixed price and cost reimbursable CLINs for labor, materials, and services. The pricing schedule provides detailed unit prices and quantities for the base year and four option years. The federal agency involved is the Department of State Office of Acquisition Management.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM24R0146.pdf | ||
| ATTACHMENT 1 - STATEMENT OF WORK 19AQMM24R0146 FINAL.docx | DOCX document | |
| Attachment 3 Past Performance Questionnaire 146_FINAL.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
Engine Type Total Pricing
PW123E $ - 0
PW150A $ - 0
Total FFP Pricing $ - 0
PW123E series (DHC-8)
| Base Year | Option Year One | Option Year Two | Option Year Three | Option Year Four | |||||||||||||
| CLIN | PW123E (DHC-8) | Unit Price | Qty | Total | Unit Price | Qty | Total | Unit Price | Qty | Total | Unit Price | Qty | Total | Unit Price | Qty | Total | Total |
| 1 |
Ubbink, John:
Engine Repair & Return to Service - PWC-123E (series) (FFP) This is a FFP CLIN for the inspection and repair of PW-123E (series) engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection of the PWC-123E; Induction test cell performance run as may be required with USG written approval; Tear-down evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029
Engine Repair & Return to Service - PWC-123E (series) (FFP) $ - 0 1 $ - 0 $ - 0 1 $ - 0 $ - 0 1 $ - 0 $ - 0 1 $ - 0 1 $ - 0 $ - 0
Ubbink, John:
Test Cell (Induction run) This is a Firm Fixed Price (FFP) CLIN to perform Induction test cell run(s). Includes pre test cell run inspection and evaluation; pre-run cleaning; all consumables including fuel; any hardware used; FOD checks, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Test Cell (Induction run) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 2 |
Ubbink, John:
Engine HSI PW-123E (series) This is a Firm-fixed price CLIN to perform engine hot section inspections (HSI). HSIs will be performed IAW criteria detailed in the Engine Inspection Section (72-00-00) of each appropriate engine type Maintenance Manual. Price includes workscope labor, 100% parts, and applicable testing.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Engine Hot Section Inspection (HSI) PW-123E (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 3 |
Ubbink, John:
Overhaul Aircraft Engine PW123E This is a Firm-Fixed Priced (FFP) CLIN for a Basic PW123E Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Overhaul Aircraft Engine PW123E (series) (FFP) $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | 1 | $ - 0 | $ - 0 |
| 4 |
Ubbink, John:
Over and Above Labor PW123E This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Over and Above Labor PW123E (series) (FFP) p/hr fully loaded | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 5 |
Ubbink, John:
Over and Above Materials PW123E (series) This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The new parts price is the Manufacturer's List Price less a discount of 30%. The overhauled parts price is the Manufacturer's List Price less a discount of 45%. The subcontract rate is 12%.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Over and Above Materials PW123E (series) (T&M) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| 6 |
Ubbink, John:
Over and Above Repair and Rework PW-123E (series) This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN. This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above CLINs AD and AE respectively.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | O&A Repair and Rework PW123E (series) (T&M) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| 7 |
Ubbink, John:
Engine Performance Run PW-123E (series) This is a Firm Fixed Price (FFP) CLIN to perform Engine Performance test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables including fuel; any hardware used; engine test cell run(s); post test cell run FOD check, filter(s) replacement, oil sampling and results; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Engine Performance Run PW123E (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 8 |
Ubbink, John:
Demilitarization and Property Disposal This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Demil/Disposal PW123E (series) p/hr fully loaded (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 9 |
Ubbink, John:
Over and Above Property Disposal Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Over & Above Property Disposal (T&M) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| 10 |
Haughton, Stephen M CTR:
Purchase of Engine - PW-123E (series) This is a Firm Fixed Price CLIN for the purchase of a new/repaired/overhauled engine. Contractor shall submit a proposal for each engine request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. New/Repaired/Overhauled engines must meet the most recent Original Equipment Manufacturer (OEM) et al criteria as described in Section 2 - Scope of the Statement of Work. Also included with the engine shall be a serviceable condition metal engine shipping and storage container. All engines purchased shall be covered under the warranty plan as described under Section 3.3 – Warranty of the Statement of Work. The Contractor shall provide all relevant documentation and historical logs for each engine.
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Purchase of Engine - PW-123E (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 11 |
Ubbink, John:
Shipping Container Refurbishment Not to exceed This is a FFP CLIN for refurbishing metal containers used for shipment of PW-1213E (series) engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repairs including welding; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029
| Shipping Container Refurb PW123E (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 12 |
Ubbink, John:
Off-site Field Services This is a Firm-fixed priced CLIN at a field service fully burdened per man hour rate to provide on-demand technical and logistics support services at CONUS, OCONUS and austere locations. This includes but is not limited to evaluations, trobleshooting, scheduled inspections, repair, rework and/or warranty work.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Off-site Field Services p/hr fully loaded (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 13 |
Ubbink, John:
Engineering, Training, and System Safety This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, in both CONUS and austere OCONUS when required at the fully loaded labor rate p/hr
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Engineering, Training, and System Safety p/hr fully loaded (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 14 |
Ubbink, John:
Contractor Travel This is a Not-to-Exceed Cost Reimbursable in accordance with JTR rates. CLIN for approved Offeror's travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Contractor Travel PW123E (series) (NTE Cost) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| $ - 0 | ||||||||||||||||||
| $ - 0 | ||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
PW150A series (Q-400)
| Base Year | Option Year One | Option Year Two | Option Year Three | Option Year Four | |||||||||||||
| CLIN | PW150A (Q-400) | Unit Price | Qty | Total | Unit Price | Qty | Total | Unit Price | Qty | Total | Unit Price | Qty | Total | Unit Price | Qty | Total | Total |
| 15 |
Ubbink, John:
Engine Repair & Return to Service - PW150A (series) (FFP) This is a FFP CLIN for the inspection and repair of PW150A (series) engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection of the PW150A; Induction test cell performance run as may be required with USG written approval; Tear-down evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029
Engine Repair & Return to Service - PW-150A (series) (FFP) $ - 0 1 $ - 0 $ - 0 1 $ - 0 $ - 0 1 $ - 0 $ - 0 1 $ - 0 1 $ - 0 $ - 0
Ubbink, John:
Test Cell (Induction run) This is a Firm Fixed Price (FFP) CLIN to perform Induction test cell run(s). Includes pre test cell run inspection and evaluation; pre-run cleaning; all consumables including fuel; any hardware used; FOD checks, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Test Cell (Induction run) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 16 |
Ubbink, John:
Engine HSI PW150A (series) This is a Firm-fixed price CLIN to perform engine hot section inspections (HSI). HSIs will be performed IAW criteria detailed in the Engine Inspection Section (72-00-00) of each appropriate engine type Maintenance Manual. Price includes workscope labor, 100% parts, and applicable testing.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Engine Hot Section Inspection (HSI) PW-150A (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 17 |
Ubbink, John:
Overhaul Aircraft Engine PW150A This is a Firm-Fixed Priced (FFP) CLIN for a Basic PW150A Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Overhaul Aircraft Engine PW-150A (series) (FFP) $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | 1 | $ - 0 | $ - 0 |
| 18 |
Ubbink, John:
Over and Above Labor PW150A This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Over and Above Labor PW-150A (series) (FFP) p/hr fully loaded | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 19 |
Ubbink, John:
Over and Above Materials PW150A (series) This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The new parts price is the Manufacturer's List Price less a discount of 30%. The overhauled parts price is the Manufacturer's List Price less a discount of 45%. The subcontract rate is 12%.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Over and Above Materials PW150A (series) (T&M) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| 20 |
Ubbink, John:
Over and Above Repair and Rework PW150A (series) This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN. This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above CLINs AD and AE respectively.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | O&A Repair and Rework PW150A (series) (T&M) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| 21 |
Ubbink, John:
Engine Performance Run PW150A (series) This is a Firm Fixed Price (FFP) CLIN to perform Engine Performance test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables including fuel; any hardware used; engine test cell run(s); post test cell run FOD check, filter(s) replacement, oil sampling and results; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Engine Performance Run PW-150A (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 22 |
Ubbink, John:
Demilitarization and Property Disposal This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Demil/Disposal PW-150A (series) p/hr fully loaded (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 23 |
Ubbink, John:
Over and Above Property Disposal Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Over & Above Property Disposal (T&M) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| 24 |
Haughton, Stephen M CTR:
Purchase of Engine - PW150A (series) This is a Firm Fixed Price CLIN for the purchase of a new/repaired/overhauled engine. Contractor shall submit a proposal for each engine request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. New/Repaired/Overhauled engines must meet the most recent Original Equipment Manufacturer (OEM) et al criteria as described in Section 2 - Scope of the Statement of Work. Also included with the engine shall be a serviceable condition metal engine shipping and storage container. All engines purchased shall be covered under the warranty plan as described under Section 3.3 – Warranty of the Statement of Work. The Contractor shall provide all relevant documentation and historical logs for each engine.
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Purchase of Engine - PW-150A (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 25 |
Ubbink, John:
Shipping Container Refurbishment Not to exceed This is a FFP CLIN for refurbishing metal containers used for shipment of PW150A (series) engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repairs including welding; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029
| Shipping Container Refurb PW-150A (series) (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 26 |
Ubbink, John:
Off-site Field Services This is a Firm-fixed priced CLIN at a field service fully burdened per man hour rate to provide on-demand technical and logistics support services at CONUS, OCONUS and austere locations. This includes but is not limited to evaluations, trobleshooting, scheduled inspections, repair, rework and/or warranty work.
Taxes included:
| Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 | Off-site Field Services p/hr fully loaded (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 27 |
Ubbink, John:
Engineering, Training, and System Safety This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, in both CONUS and austere OCONUS when required at the fully loaded labor rate p/hr
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Engineering, Training, and System Safety p/hr fully loaded (FFP) | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 |
| 28 |
Ubbink, John:
Contractor Travel This is a Not-to-Exceed Cost Reimbursable in accordance with JTR rates. CLIN for approved Offeror's travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.
Taxes included:
Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:
| "On Condition" repair cycle. | Contractor Travel PW150A (series) (NTE Cost) | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| $ - 0 | ||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |