This document is an Attachment 2 - Hampton Roads Asphalt Paving IDIQ Exhibit Line Item Numbers (ELINs) for a federal contract opportunity.

The solicitation is for an Indefinite Delivery Indefinite Quantity (IDIQ) regional construction maintenance contract for asphalt paving and minor concrete work at various naval facilities throughout the Hampton Roads area of Virginia. The contract has a base year and four option years. The document provides a detailed schedule of prices for over 300 line items across 32 contract line items (CLINs) for work such as demolition, earthwork, aggregates, paving, concrete, drainage, pavement markings, signs, and miscellaneous items. Estimated quantities are provided for each ELIN. Pricing is requested in a unit price format. The contract includes both pre-priced and non-pre-priced work, with a $500,000 allowance for non-pre-priced material, equipment, and shipping costs. The contract also includes a requirement for command interest work to respond within 48 hours. This document does not provide information on the response dates, award dates, small business set asides, or incumbent contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CONTRACT SUMMARY

BASE YEAR
OPTION 1
OPTION 2
OPTION 3
OPTION 4

TOTAL CONTRACT

Base Year

SOLICITATION NO. TBD

INDEFINITE DELIVERY INDEFINITE QUANTITY REGIONAL CONSTRUCTION MAINTENANCE CONTRACT FOR
ASPHALT PAVING AND MINOR CONCRETE WORK AT VARIOUS NAVAL FACILITIES THROUGHOUT HAMPTON ROADS AREA, VIRGINIA

REFER TO SECTION 01 11 00 PART 1.10 SYNOPSIS OF LINE ITEMS FOR ADDITIONAL DESCRIPTIVE INFORMATION ABOUT ELINS BELOW

EXHIBIT A, EXHIBIT LINE ITME NUMBERS
SCHEDULE OF PRICES FOR SUPPLIES/SERVICES
ELIN / Sub ELINDescriptionEstimated QuantityUnit of IssueUnit PriceTotal
INDEFINITY QUANTITY (IQ) WORK ITEMS - BASE YEAR - CLIN 0001
A001DEMOLITION, REMOVAL, AND DISPOSAL (Section 02 41 00)
Sawcutting, Concrete or Asphalt Paving Removal, Curb Removal, Pavement Milling, Parking Control Bumpers Removal, etc. including the methodology of demolition, removal, transportation and proper disposal of each line item including cleanup where applicable. (Extra materials may be ordered on other line items.) With regard to piping, price includes excavation to the bottom of each pipe, pipe removal, pipe disposal, backfill with excavated materials, grade, and cleanup. (Extra fill may be ordered on other line items.) With regard to storm structures, price includes excavation, backfill, grade, and cleanup. (Extra fill may be ordered on other line items.) (CY, SYPI, EA or LF)
A001AASawcutting (Per LF up to 4 inches deep)46,000LF$ - 0$ - 0
A001ABSawcutting (Per LF beyond 4 inches deep to 12 inches deep to be ordered only with A001AA for additional depth of cut)8,000LF$ - 0$ - 0
A001ACConcrete Removal-Plain Heavy Equip. 0 To 25 CY100CY$ - 0$ - 0
A001ADConcrete Removal-Plain, Heavy Equip. Over 25 CY200CY$ - 0$ - 0
A001AEConcrete Removal-Reinf, Heavy Equip. 0 To 25 CY200CY$ - 0$ - 0
A001AFConcrete Removal-Reinf, Heavy Equip. Over 25 CY3,200CY$ - 0$ - 0
A001AGConcrete Removal-Plain, includes jackhammer and buggy20CY$ - 0$ - 0
A001AHConcrete Removal-Reinf, includes jackhammer and buggy20CY$ - 0$ - 0
A001AJConcrete Removal-Reinf, includes jackhammer and buggy, adjacent to railroad20CY$ - 0$ - 0
A001AKRemove and Dispose of standard 4" thick sidewalk3,200SY$ - 0$ - 0
A001ALCurb Removal (composite rate for standard curb removal)2,800LF$ - 0$ - 0
A001AMCurb and gutter Removal (composite rate for standard curb and gutter removal)2,800LF$ - 0$ - 0
A001ANBituminous Pavement Removal, with heavy equipment 0 to 50 CY400CY$ - 0$ - 0
A001APBituminous Pavement Removal, with heavy equipment over 50 CY1,800CY$ - 0$ - 0
A001AQBituminous Pavement Removal, with Jackhammer and Buggy20CY$ - 0$ - 0
A001ARBituminous Pavement Removal, includes jackhammer and buggy, adjacent to railroad20CY$ - 0$ - 0
A001ASMilling of Bituminous Pavement, 0 to 2000 SY (per inch thick)20,000SYPI$ - 0$ - 0
A001ATMilling of Bituminous Pavement, 2000 to 5000 SY (per inch thick)30,000SYPI$ - 0$ - 0
A001AUMilling of Bituminous Pavement, Over 5000 SY (per inch thick)100,000SYPI$ - 0$ - 0
A001AVParking Control Bumpers Blocks and Pins- 6'500EA$ - 0$ - 0
A001AWRemoval and Disposal of Parking Control Poles, Tracks, Logs, etc.100LF$ - 0$ - 0
A001AXRemoval and Disposal of Parking Control Jersey Barricade100EA$ - 0$ - 0
A001AYRemoval and Disposal of Existing Guard Post100EA$ - 0$ - 0
A001BARemoval and Disposal of Existing Traffic Signs40EA$ - 0$ - 0
A001BBRemoval and Reinstall Existing Traffic Signs, Includes Post and up to 12 SF Per Sign40EA$ - 0$ - 0
A001BCRemoval and Disposal of Existing Railroad Trackage and Railroad Ties40LF$ - 0$ - 0
A001BDRemoval and Disposal of Existing Railroad Trackage and Railroad Ties (in concrete)400LF$ - 0$ - 0
A001BERemoval and Disposal of Existing Catch Basin40EA$ - 0$ - 0
A001BFRemoval and Disposal of Existing Manhole ( max. 4' dia., max. 6' depth)10EA$ - 0$ - 0
A001BGRemoval and Disposal of Existing Manhole ( max. 4' dia., max. 10' depth)10EA$ - 0$ - 0
A001BHRemoval and Disposal of Existing Manhole ( max' 8' dia., max. 6' depth)10EA$ - 0$ - 0
A001BJRemoval and Disposal of Existing Manhole (max 8' dia., max. 10' depth)10EA$ - 0$ - 0
A001BKRemoval and Disposal of Existing Curb Inlet40EA$ - 0$ - 0
A001BLRemoval and Disposal of Existing Concrete Pipe. Regular or Reinforced, Composite rate for sizes 0" to 24"300LF$ - 0$ - 0
A001BMRemoval and Disposal of Existing Concrete Pipe. Regular or Reinforced, Composite rate for sizes 27" to 36"800LF$ - 0$ - 0
A001BNRemoval and Disposal of Existing PVC Pipe. Composite rate for sizes 0" to 24"800LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A001$ - 0
A002EARTHWORK (Section 31 00 00)
Earthwork includes the methodology of excavation, stockpiling, removal, disposal and grading (rough and fine) of materials where applicable. (Additional measures may be ordered on other line items.) (CY)
A002AAExcavation and Grading (Jobs up to 50 CY)300CY$ - 0$ - 0
A002ABExcavation and Grading (Jobs Over 50 CY)40,000CY$ - 0$ - 0
A002ACHand Excavation400CY$ - 0$ - 0
A002ADFurnish and Apply in Place, Fine Aggregate (Sand)1,300CY$ - 0$ - 0
A002AEFurnish and Apply in Place, Select Material12,000CY$ - 0$ - 0
A002AFFurnish and Apply in Place, Top Soil2,000CY$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A002$ - 0
A003FABRICS (FURNISH AND INSTALL)
A003AASoil Reinforcement Fabric20,000SY$ - 0$ - 0
A003ABPavement Fabric, Standard700SY$ - 0$ - 0
A003ACSilt Fence (Section 01 57 19)16,000LF$ - 0$ - 0
A003ADBank Stabilization Excelsior Blanket, EC-25,000SY$ - 0$ - 0
A003AEProtection Safety Fence, Type I, Orange (Section 01 50 00)1,700LF$ - 0$ - 0
A003AFInlet Protection, Type I (includes hardware, cloth and stone) (Section 01 57 19)100EA$ - 0$ - 0
A003AGInlet Protection, Type II, (Stone filled filter bags) (Section 01 57 19)100EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A003$ - 0
A004AGGREGATE BASE COURSE (Section 32 11 23)
A004AAAggregate Base Course, 21A, 0 to 900 SY/IN4,000SYIN$ - 0$ - 0
A004ABAggregate Base Course, 21A, 901 to 2,727 SY/IN12,000SYIN$ - 0$ - 0
A004ACAggregate Base Course, 21A, 2,728 to 9,100 SY/IN36,000SYIN$ - 0$ - 0
A004ADAggregate Base Course, 21A, 9,100 to 18,180 SY/IN72,000SYIN$ - 0$ - 0
A004AEAggregate Base Course, 21A, Over , 18,181 SY/IN200,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A004$ - 0
A005EXISTING AGGREGATE OR BASE COURSE REWORK, RIPRAP, No. 57 AGGREGATE
A005AAScalping Existing Aggregate and Reinstall, 0 to 900 SY/IN (Section 32 11 23)5,000SYIN$ - 0$ - 0
A005ABScalping Existing Aggregate and Reinstall, 901 to 2727 SY/IN (Section 32 11 23)10,000SYIN$ - 0$ - 0
A005ACScalping Existing Aggregate and Reinstall, 2728 to 9,100 SY/IN (Section 32 11 23)20,000SYIN$ - 0$ - 0
A005ADScalping Existing Aggregate and Reinstall, Over 9,100 SY/IN (Section 32 11 23)80,000SYIN$ - 0$ - 0
A005AEFine Grade Existing Base Course, not to exceed 3" deep 0 to 1000 SY (Section 32 11 23)4,000SY$ - 0$ - 0
A005AFFine Grade Existing Base Course, not to exceed 3" deep 1001 to 2000 SY (Section 32 11 23)7,000SY$ - 0$ - 0
A005AGFine Grade Existing Base Course, not to exceed 3" deep 2001 to 3000 SY (Section 32 11 23)10,000SY$ - 0$ - 0
A005AHFine Grade Existing Base Course, not to exceed 3" deep Over 3000 SY (Section 32 11 23)40,000SY$ - 0$ - 0
A005AJProvide and apply RIP RAP (Stone) (Section 31 00 00)100TN$ - 0$ - 0
A005AKVDOT No. 57 Open Graded Coarse Aggregate (Section 31 00 00)900TN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A005$ - 0
A006SUPERPAVE LIQUID BITUMINOUS
A006AALiquid Bituminous (Section 32 12 13)20,000GL$ - 0$ - 0
A006ABCrack Sealing (Section 32 01 17.61)6,000LF$ - 0$ - 0
A006ACBituminous Rejuvenation (Spray on or Mop on) (Section 32 01 13.64)36,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A006$ - 0
A007VDOT SUPERPAVE BITUMINOUS BASE MIX (Section 32 12 16.16)
A007AABituminous Concrete BM-25.0 A, 0 to 900 SY/IN2,000SYIN$ - 0$ - 0
A007ABBituminous Concrete BM-25.0 A, 901 to 2,727 SY/IN6,000SYIN$ - 0$ - 0
A007ACBituminous Concrete BM-25.0 A, 2,728 to 9,100 SY/IN20,000SYIN$ - 0$ - 0
A007ADBituminous Concrete BM-25.0 A, Over 9,101 SY/IN70,000SYIN$ - 0$ - 0
A007AE100% Hand Work BM-25.0 A10,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A007$ - 0
A008VDOT SUPERPAVE BITUMINOUS SURFACE MIX (Section 32 12 16.16)
A008AABituminous Concrete SM-9.5 A, 0 To 900 SY/IN14,000SYIN$ - 0$ - 0
A008ABBituminous Concrete SM-9.5 A, 901 To 2,727 SY/IN34,000SYIN$ - 0$ - 0
A008ACBituminous Concrete SM-9.5 A, 2,728 To 9,100 SY/IN98,000SYIN$ - 0$ - 0
A008ADBituminous Concrete SM-9.5 A, 9,101 To 18,180 and over SY/IN260,000SYIN$ - 0$ - 0
A008AE100% Hand Work SM-9.5 A5,000SYIN$ - 0$ - 0
A008AFBituminous Concrete SM-9.5 D, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
A008AGBituminous Concrete SM-9.5 D, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
A008AHBituminous Concrete SM-9.5 D, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
A008AJBituminous Concrete SM-9.5 D, 9,101 To 18,180 and over SY/IN20,000SYIN$ - 0$ - 0
A008AK100% Hand Work SM-9.5 D20SYIN$ - 0$ - 0
A008ALBituminous Concrete SM-12.5 A, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
A008AMBituminous Concrete SM-12.5 A, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
A008ANBituminous Concrete SM-12.5 A, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
A008APBituminous Concrete SM-12.5 A, 9,101 To 18,180 and over SY/IN20,000SYIN$ - 0$ - 0
A008AQ100% Hand Work SM-12.5 A6,000SYIN$ - 0$ - 0
A008ARBituminous Concrete SM-12.5 D, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
A008ASBituminous Concrete SM-12.5 D, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
A008ATBituminous Concrete SM-12.5 D, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
A008AUBituminous Concrete SM-12.5 D, over 9,101 SY/IN20,000SYIN$ - 0$ - 0
A008AV100% Hand Work SM-12.5 D1,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A008$ - 0
A009VDOT SUPERPAVE BITUMINOUS INTERMEDIATE MIX (Section 32 12 16.16)
A009AABituminous Concrete IM-19.0 A, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
A009ABBituminous Concrete IM-19.0 A, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
A009ACBituminous Concrete IM-19.0 A, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
A009ADBituminous Concrete IM-19.0 A, over 9,101 SY/IN20,000SYIN$ - 0$ - 0
A009AE100% Hand Work IM-19.0 A1,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A009$ - 0
A010STAMPED ASPHALT (Section 32 12 30)
A010AAStamped Asphalt, various patterns and colors15,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A010$ - 0
A011MANHOLES AND DRAINAGE (Section 33 40 00)
Price includes excavation, backfill with excavated materials, grade, and cleanup as well as the cost for all joints, connections, etc. (Extra fill may be ordered on other line items.)
A011AAProvide and Install New Reinforced Concrete Pipe Class III, 12" or elliptical pipe equivalent1,100LF$ - 0$ - 0
A011ABProvide and Install New Reinforced Concrete Pipe Class III, 15" or elliptical pipe equivalent800LF$ - 0$ - 0
A011ACProvide and Install New Reinforced Concrete Pipe Class III, 18" or elliptical pipe equivalent600LF$ - 0$ - 0
A011ADProvide and Install New Reinforced Concrete Pipe Class III, 24" or elliptical pipe equivalent500LF$ - 0$ - 0
A011AEProvide and Install New Reinforced Concrete Pipe Class III, 30" or elliptical pipe equivalent400LF$ - 0$ - 0
A011AFProvide and Install New Reinforced Concrete Pipe Class III, 36" or elliptical pipe equivalent400LF$ - 0$ - 0
A011AGAdjust Manhole or Drainage Inlet. Metal Riser Ring Method40V/ Inch$ - 0$ - 0
A011AHAdjust Manhole or Drainage Inlet Masonry Method40V/ Inch$ - 0$ - 0
A011AJAdjust Valve or Meter Box100V/ Inch$ - 0$ - 0
A011AKProvide and Install New Manhole max. 4' dia., max. 8' deep with Frame and Cover40V/ foot$ - 0$ - 0
A011ALProvide and Install New Catch Basin max. 4' dia., max. 8' deep with Frame and Grate200V/ foot$ - 0$ - 0
A011AMProvide and Install New Frame and Cover (F&C) on Existing Utilities, Includes Removal and Disposal of old F&C40EA$ - 0$ - 0
A011ANProvide and Install New Valve or Meter Box40EA$ - 0$ - 0
A011APProvide and Install New Curb Inlet with Frame and Cover200V/ foot$ - 0$ - 0
A011AQAdditional Cost to Provide and Install Pre-Cast Manhole, Catch Basin, and Curb Inlet in Lieu of Masonry40V/ foot$ - 0$ - 0
A011ARFixture Tags (Brass) Provide and Install on Drainage Fixtures (Section 01 11 00)20EA$ - 0$ - 0
A011ASTie in of New Pipe to Existing Brick Structure (Composite rate up to 30" pipe)40EA$ - 0$ - 0
A011ATTie in of New Pipe to Existing Concrete Structure (Composite rate up to 30" pipe)40EA$ - 0$ - 0
A011AUGrout (plug) Abandoned Pipe (Composite Rate for up to 15" pipe)40EA$ - 0$ - 0
A011AVGrout (plug) Abandoned Pipe (Composite Rate for above 15" to 30" pipe)40EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A011$ - 0
A012PROVIDE AND INSTALL NEW POLYVINYL CHLORIDE (PVC) PIPE (Section 33 40 00, Paragraph 2.1.3)
Price is valid for all PVC materials under Paragraph 2.1.3 and includes excavation to the bottom of each pipe trench, backfill, grade, and cleanup as well as the cost for all joints, ell's, tees, couplings, etc. (Extra fill may be ordered on other line items.)
A012AAProvide and Install New Polyvinyl Chloride (PVC) Pipe 6"200LF$ - 0$ - 0
A012ABProvide and Install New Polyvinyl Chloride (PVC) Pipe 8"400LF$ - 0$ - 0
A012ACProvide and Install New Polyvinyl Chloride (PVC) Pipe 10"200LF$ - 0$ - 0
A012ADProvide and Install New Polyvinyl Chloride (PVC) Pipe 12"100LF$ - 0$ - 0
A012AEProvide and Install New Polyvinyl Chloride (PVC) Pipe 15"800LF$ - 0$ - 0
A012AFProvide and Install New Polyvinyl Chloride (PVC) Pipe 18"600LF$ - 0$ - 0
A012AGProvide and Install New Polyvinyl Chloride (PVC) Pipe 24"500LF$ - 0$ - 0
A012AHProvide and Install New Polyvinyl Chloride (PVC) Pipe 30"400LF$ - 0$ - 0
A012AJProvide and Install New Polyvinyl Chloride (PVC) Pipe 36"400LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A012$ - 0
A013PROVIDE AND INSTALL NEW POLYETHYLENE (PE) PIPE (Section 33 40 00, Paragraph 2.1.4)
Price is valid for all PE materials under Paragraph 2.1.4 and includes excavation to the bottom of each pipe trench, backfill, grade, and cleanup as well as the cost for all joints, ell's, tees, couplings, etc. (Extra fill may be ordered on other line items.)
A013AAProvide and Install Polyethylene (PE) Pipe 12"1,100LF$ - 0$ - 0
A013ABProvide and Install Polyethylene (PE) Pipe 15"800LF$ - 0$ - 0
A013ACProvide and Install Polyethylene (PE) Pipe 18"600LF$ - 0$ - 0
A013ADProvide and Install Polyethylene (PE) Pipe 24"500LF$ - 0$ - 0
A013AEProvide and Install Polyethylene (PE) Pipe 30"400LF$ - 0$ - 0
A013AFProvide and Install Polyethylene (PE) Pipe 36"400LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A013$ - 0
A014PROVIDE AND INSTALL NEW DUCTILE IRON (DI) PIPE (Section 33 40 00)
Price includes excavation to the bottom of each pipe trench, backfill, grade, and cleanup as well as the cost for all joints, ell's, tees, couplings, etc. (Extra fill may be ordered on other line items.)
A014AAProvide and Install Ductile Iron (DI) Pipe 6"100LF$ - 0$ - 0
A014ABProvide and Install Ductile Iron (DI) Pipe 8"200LF$ - 0$ - 0
A014ACProvide and Install Ductile Iron (DI) Pipe 10"100LF$ - 0$ - 0
A014ADProvide and Install Ductile Iron (DI) Pipe 12"500LF$ - 0$ - 0
A014AEProvide and Install Ductile Iron (DI) Pipe 14"200LF$ - 0$ - 0
A014AFProvide and Install Ductile Iron (DI) Pipe 16"200LF$ - 0$ - 0
A014AGProvide and Install Ductile Iron (DI) Pipe 18"100LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A013$ - 0
A015VDOT STANDARD CURB CG 2 AND 3 (Section 32 16 19)
A015AAVDOT Standard Curb CG 2 and 3, 0 to 100 LF400LF$ - 0$ - 0
A015ABVDOT Standard Curb CG 2 and 3, 101 to 500 LF4,000LF$ - 0$ - 0
A015ACVDOT Standard Curb CG 2 and 3, Over 500 LF2,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A014$ - 0
A016VDOT STANDARD RADIAL CURB CG 2 AND 3 (Section 32 16 19)
A016AAVDOT Standard Radial Curb CG 2 and 3, 0 to 100 LF300LF$ - 0$ - 0
A016ABVDOT Standard Radial Curb CG 2 and 3, 101 to 500 LF600LF$ - 0$ - 0
A016ACVDOT Standard Radial Curb CG 2 and 3, Over 500 LF1,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A015$ - 0
A017VDOT STANDARD CURB CG 6 AND 7 (Section 32 16 19)
A017AAVDOT Standard Curb CG 6 and 7, 0 to 100 LF600LF$ - 0$ - 0
A017ABVDOT Standard Curb CG 6 and 7, 101 to 500 LF2,000LF$ - 0$ - 0
A017ACVDOT Standard Curb CG 6 and 7, Over 500 LF4,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A016$ - 0
A018VDOT STANDARD RADIAL CURB CG 6 AND 7 (Section 32 16 19)
A018AAVDOT Standard Radial Curb CG 6 and 7, 0 to 100 LF400LF$ - 0$ - 0
A018ABVDOT Standard Radial Curb CG 6 and 7, 101 to 500 LF800LF$ - 0$ - 0
A018ACVDOT Standard Radial Curb CG 6 and 7, Over 500 LF1,200LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A017$ - 0
A019MISC CONCRETE
A019AAConcrete Sidewalks 4" deep (Section 32 16 19)6,000SY$ - 0$ - 0
A019ABConcrete Aprons (CG-9D) Standard Entrance, 7" deep (Section 32 13 13.06)40SY$ - 0$ - 0
A019ACConcrete Valley Gutters, (CG) 7" deep (Section 32 16 19)700SY$ - 0$ - 0
A019ADConcrete Handicap Aprons, (CG-12) 7" Deep, Heavy Broom Finish included Tactile Warning Mat (Section 32 13 13.06)300SY$ - 0$ - 0
A019AEPavement Type Slab (Section 32 13 13.06)700CY$ - 0$ - 0
A019AFMisc. Cast in Place Concrete, by Chute (Section 03 30 53)100CY$ - 0$ - 0
A019AGMisc. Cast in Place Concrete, by Hand Buggy (Section 03 30 53)40CY$ - 0$ - 0
A019AHMisc. Cast in Place Concrete, by Hydraulic Pumping (Section 03 30 53)100CY$ - 0$ - 0
A019AJHigh Early Concrete, additional cost in conjunction with other Concrete Line Items Ordered (Section 03 30 53)40CY$ - 0$ - 0
A019AKMinor Concrete Repairs (Section 32 01 29.61)200SF$ - 0$ - 0
A019ALVapor Barrier (SQ= 100 SF)50SQ$ - 0$ - 0
A019AMWelded Wire Fabric (SQ= 100SF) (Section 32 16 13)200SQ$ - 0$ - 0
A019ANDeformed Straight Rebars (Section 32 16 13)2,000LB$ - 0$ - 0
A019APDowels 1" x 18" (includes drilling, epoxy, and caps) (Section 32 16 13)100EA$ - 0$ - 0
A019AQExpansion Material (1/2 x various depths) (Section 32 16 13)4,000SF$ - 0$ - 0
A019ARJoint Sealing (Section 32 16 19)5,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A019$ - 0
A020PAVEMENT MARKINGS (Section 32 17 23)
A020AAPaint Removal (eradicate), Contractor Contains and transports2,000SF$ - 0$ - 0
A020ABThermoplastic Removal (eradicate)20,000SF$ - 0$ - 0
A020ACBlack Out/Black Background (Section 32 12 36.13)20,000SF$ - 0$ - 0
A020ADPavement Markers (Raised) Removal (Section 02 41 00)200EA$ - 0$ - 0
A020AEPavement Markers (Recessed ) Removal (Section 02 41 00)200EA$ - 0$ - 0
A020AFPaint Marking, 4" wide with Glass Beads50,000LF$ - 0$ - 0
A020AGPaint Marking, 4" wide without Glass Beads36,000LF$ - 0$ - 0
A020AHPaint Marking, 4" wide Thermoplastic320,000LF$ - 0$ - 0
A020AJPaint Marking, 4" wide High Build Acrylic Coating100,000LF$ - 0$ - 0
A020AKPaint Marking, Various Widths with Glass Beads30,000SF$ - 0$ - 0
A020ALPaint Marking, Various Widths without Glass Beads120,000SF$ - 0$ - 0
A020AMThermoplastic, Various Widths30,000SF$ - 0$ - 0
A020ANHigh Build Acrylic Coating, Various Widths30,000SF$ - 0$ - 0
A020APArrows Straight or Curved, Paint with Glass Beads20EA$ - 0$ - 0
A020AQArrows Straight or Curved, Paint without Glass Beads20EA$ - 0$ - 0
A020ARArrows Straight or Curved, Thermoplastic200EA$ - 0$ - 0
A020ASArrows Straight or Curved, High Build Acrylic Coating200EA$ - 0$ - 0
A020ATBlue Government Property Lines10,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A020$ - 0
A021CROSSWALKS (Section 32 17 23)
Total Square footage includes all transversed and hatched lines indicated on task drawings. Measurement and payment is based on total painted and unpainted pavement area contained within the hatched area.
A021AACrosswalks, Paint with Glass Beads3,000SF$ - 0$ - 0
A021ABCrosswalks, Thermoplastic46,000SF$ - 0$ - 0
A021ACCrosswalks, High Build Acrylic Coating40,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A021$ - 0
A022HATCHED LINES OTHER THAN CROSSWALKS (Section 32 17 23)
Total square footage includes all transversed and hatched lines indicated on task drawings. Measurement and payment is based on total painted and unpainted pavement area contained within the hatched area.
A022AAHatched Lines, Paint (various widths) with Glass Beads7,000SF$ - 0$ - 0
A022ABHatched Lines, Paint (various widths) without Glass Beads20,000SF$ - 0$ - 0
A022ACHatched Lines, Thermoplastic (various widths)16,000SF$ - 0$ - 0
A022ADHatched Lines, High Build Acrylic Coating (various widths)16,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A022$ - 0
A023LETTERS AND NUMERALS, PAINT WITH GLASS BEADS (Section 32 17 23)
A023AA3" Paint Letters/Numerals with Glass Beads100EA$ - 0$ - 0
A023AB6" Paint Letters/Numerals with Glass Beads10,000EA$ - 0$ - 0
A023AC12" Paint Letters/Numerals with Glass Beads40EA$ - 0$ - 0
A023AD24" Paint Letters/Numerals with Glass Beads100EA$ - 0$ - 0
A023AE72" Painted Letters and Numerals with Glass Beads20EA$ - 0$ - 0
A023AF96" Painted Letters and Numerals with Glass Beads20EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A023$ - 0
A024LETTERS AND NUMERALS, THERMOPLASTIC (Section 32 17 23)
A024AA12" Thermoplastic Letters and Numerals100EA$ - 0$ - 0
A024AB24" Thermoplastic Letters and Numerals100EA$ - 0$ - 0
A024AC72" Thermoplastic Letters and Numerals150EA$ - 0$ - 0
A024AD96" Thermoplastic Letters and Numerals200EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A024$ - 0
A025LETTERS AND NUMBERS, HIGH BUILD ACRYLIC COATING (Section 32 17 23)
A025AA12" High Build Acrylic Coating Letters and Numerals100EA$ - 0$ - 0
A025AB24" High Build Acrylic Coating Letters and Numerals100EA$ - 0$ - 0
A025AC72" High Build Acrylic Coating Letters and Numerals150EA$ - 0$ - 0
A025AD96" High Build Acrylic Coating Letters and Numerals200EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A025$ - 0
A026HANDICAP PARKING SYMBOLS (Section 32 17 23)
A026AAHandicap Parking Symbols, Reflective Paint40EA$ - 0$ - 0
A026ABHandicap Parking Symbols, Reflective Decal/Paint40EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A026$ - 0
A027PAINT CURBS (Section 32 17 23)
A027AAPaint Curbs Various Colors3,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A027$ - 0
A028MARKERS (Section 32 17 23)
A028AAPavement Markers Retroreflective (above grade)50EA$ - 0$ - 0
A028ABPavement Markers Retroreflective (recessed)50EA$ - 0$ - 0
A028ACPavement Markers Retroreflective (raised 6" Ceramic Doughnut)100EA$ - 0$ - 0
A028ADTemporary Lane Dividers "L" Shaped Reflective Above Grade300EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A028$ - 0
A029TRAFFIC SIGNS (Section 10 14 00.10)
A029AATraffic Signs, Furnish and Install New Road Signs, Diamond Grade (Composite rate for various symbols, numbers, and lettering)800SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A029$ - 0
A030SIGN POST (Section 10 14 00.10)
Includes excavation, and concrete embedment.
A030AA2" Galv. Post Square Tube Two Part, Breakaway100EA$ - 0$ - 0
A030AB4 x 4 Post, Treated Wood, VDOT Standard40EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A030$ - 0
A031MISCELLANEOUS
A031AAPothole Patching and Repair (Section 32 01 29.61)32,000SF$ - 0$ - 0
A031ABFine grade Existing Topsoil and seed, 0 to 100 SY (Section 31 00 00)200SY$ - 0$ - 0
A031ACFine grade Existing Topsoil and seed, 101 to 250 SY (Section 31 00 00)500SY$ - 0$ - 0
A031ADFine grade Existing Topsoil and seed, 251 to 500 SY (Section 31 00 00)1,500SY$ - 0$ - 0
A031AEFine grade Existing Topsoil and seed, Over 500 SY (Section 31 00 00)3,000SY$ - 0$ - 0
A031AFFurnish, fine grade and seed topsoil (Average 4") 0 to 100 SY (Section 31 00 00)200SY$ - 0$ - 0
A031AGFurnish, fine grade and seed topsoil (Average 4") 101 to 250 SY (Section 31 00 00)500SY$ - 0$ - 0
A031AHFurnish, fine grade and seed topsoil (Average 4") 251 to 500 SY (Section 31 00 00)2,000SY$ - 0$ - 0
A031AJFurnish, fine grade and seed topsoil (Average 4") Over 500 SY (Section 31 00 00)20,000SY$ - 0$ - 0
A031AKFine grade existing topsoil and install sod, 0 to 100 SY (Section 31 00 00)200SY$ - 0$ - 0
A031ALFine grade existing topsoil and install sod, 101 to 250 SY (Section 31 00 00)500SY$ - 0$ - 0
A031AMFine grade existing topsoil and install sod, 251 to 500 SY (Section 31 00 00)1,000SY$ - 0$ - 0
A031ANFine grade existing topsoil and install sod, Over 500 SY (Section 31 00 00)1,000SY$ - 0$ - 0
A031APFurnish and fine grade topsoil, install sod (Average 4") 0 to 100 SY (Section 31 00 00)200SY$ - 0$ - 0
A031AQFurnish and fine grade topsoil, install sod (Average 4") 101 to 250 SY (Section 31 00 00)500SY$ - 0$ - 0
A031ARFurnish and fine grade topsoil, install sod (Average 4") 251 to 500 SY (Section 31 00 00)1,000SY$ - 0$ - 0
A031ASFurnish and fine grade topsoil, install sod (Average 4") Over 500 SY (Section 31 00 00)1,000SY$ - 0$ - 0
A031ATHerbicide10,000SY$ - 0$ - 0
A031AUParking Control Bumpers (PCB) Remove and Reinstall Existing 6' Long Bumpers200EA$ - 0$ - 0
A031AVParking Control Poles, Ties, Tracks, Logs, Jersey Type, etc.. (Remove and Reinstall in same location)80LF$ - 0$ - 0
A031AWInstall Government Furnished Bumpers. Contractor to furnish and install new pins. Bumpers = 6' long200EA$ - 0$ - 0
A031AXFurnish and Install New 6' Concrete Parking Bumpers w/pins1,000EA$ - 0$ - 0
A031AYHand Sweeping and Cleaning of Railroad and Crane Track Wheel Single Flangeway5,000LF$ - 0$ - 0
A031BACleaning of areas by Hand Where Other Methods are not Applicable.400SY$ - 0$ - 0
A031BBInstall Traffic Loop (Sawcut, Epoxy, and tie into Hand Hole) In existing Bituminous or Portland2,000LF$ - 0$ - 0
A031BCFurnish and Install New Guard Post, Painted Solid or Stripes100EA$ - 0$ - 0
A031BDSupply Steel road plate to bridge repair area and allow road to open to traffic until repairs can be resumed or until repaired area will support traffic. Up to 30 day usage per Order. (See "Section 01 11 00" Summary of Work paragraph 1.10 "Synopsis of Line Items")2,000SF$ - 0$ - 0
A031BEHauling and Dumping of government owned material (Measure mileage from base exit closest to government designated dump site, by the most direct legal route to the dump site one way only)100MI$ - 0$ - 0
A031BFAsphalt Speed Humps8,000LF$ - 0$ - 0
A031BGParking Lot and Street Sweeping Services600,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A031$ - 0
A032NON-PREPRICED WORK, MATERIAL, LABOR, AND COMMAND INTEREST WORK (Section 01 11 00)
A032AAMaterial, Equipment, and Shipping Costs
($500,000.00 shall remain as bid price)1LS$ 500,000.00$ 500,000.00
A032ABLabor3,500HRS$ - 0$ - 0
A032ACCommand Interest Work
(One time cost per task order to respond within 48 hours and work diligently until all work is completed)125EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A032$ - 0

BASE YEAR TOTAL CONTRACT PRICE $0.00

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Option Year 1

SOLICITATION NO. TBD

INDEFINITE DELIVERY INDEFINITE QUANTITY REGIONAL CONSTRUCTION MAINTENANCE CONTRACT FOR
ASPHALT PAVING AND MINOR CONCRETE WORK AT VARIOUS NAVAL FACILITIES THROUGHOUT HAMPTON ROADS AREA, VIRGINIA

REFER TO SECTION 01 11 00 PART 1.10 SYNOPSIS OF LINE ITEMS FOR ADDITIONAL DESCRIPTIVE INFORMATION ABOUT ELINS BELOW

EXHIBIT B, EXHIBIT LINE ITME NUMBERS
SCHEDULE OF PRICES FOR SUPPLIES/SERVICES
ELIN / Sub ELINDescriptionEstimated QuantityUnit of IssueUnit PriceTotal
INDEFINITY QUANTITY (IQ) WORK ITEMS - OPTION YEAR ONE - CLIN 0002
B001DEMOLITION, REMOVAL, AND DISPOSAL (Section 02 41 00)
Sawcutting, Concrete or Asphalt Paving Removal, Curb Removal, Pavement Milling, Parking Control Bumpers Removal, etc. including the methodology of demolition, removal, transportation and proper disposal of each line item including cleanup where applicable. (Extra materials may be ordered on other line items.) With regard to piping, price includes excavation to the bottom of each pipe, pipe removal, pipe disposal, backfill with excavated materials, grade, and cleanup. (Extra fill may be ordered on other line items.) With regard to storm structures, price includes excavation, backfill, grade, and cleanup. (Extra fill may be ordered on other line items.) (CY, SYPI, EA or LF)
B001AASawcutting (Per LF up to 4 inches deep)46,000LF$ - 0$ - 0
B001ABSawcutting (Per LF beyond 4 inches deep to 12 inches deep to be ordered only with B001AA for additional depth of cut)8,000LF$ - 0$ - 0
B001ACConcrete Removal-Plain Heavy Equip. 0 To 25 CY100CY$ - 0$ - 0
B001ADConcrete Removal-Plain, Heavy Equip. Over 25 CY200CY$ - 0$ - 0
B001AEConcrete Removal-Reinf, Heavy Equip. 0 To 25 CY200CY$ - 0$ - 0
B001AFConcrete Removal-Reinf, Heavy Equip. Over 25 CY3,200CY$ - 0$ - 0
B001AGConcrete Removal-Plain, includes jackhammer and buggy20CY$ - 0$ - 0
B001AHConcrete Removal-Reinf, includes jackhammer and buggy20CY$ - 0$ - 0
B001AJConcrete Removal-Reinf, includes jackhammer and buggy, adjacent to railroad20CY$ - 0$ - 0
B001AKRemove and Dispose of standard 4" thick sidewalk3,200SY$ - 0$ - 0
B001ALCurb Removal (composite rate for standard curb removal)2,800LF$ - 0$ - 0
B001AMCurb and gutter Removal (composite rate for standard curb and gutter removal)2,800LF$ - 0$ - 0
B001ANBituminous Pavement Removal, with heavy equipment 0 to 50 CY400CY$ - 0$ - 0
B001APBituminous Pavement Removal, with heavy equipment over 50 CY1,800CY$ - 0$ - 0
B001AQBituminous Pavement Removal, with Jackhammer and Buggy20CY$ - 0$ - 0
B001ARBituminous Pavement Removal, includes jackhammer and buggy, adjacent to railroad20CY$ - 0$ - 0
B001ASMilling of Bituminous Pavement, 0 to 2000 SY (per inch thick)20,000SYPI$ - 0$ - 0
B001ATMilling of Bituminous Pavement, 2000 to 5000 SY (per inch thick)30,000SYPI$ - 0$ - 0
B001AUMilling of Bituminous Pavement, Over 5000 SY (per inch thick)100,000SYPI$ - 0$ - 0
B001AVParking Control Bumpers Blocks and Pins- 6'500EA$ - 0$ - 0
B001AWRemoval and Disposal of Parking Control Poles, Tracks, Logs, etc.100LF$ - 0$ - 0
B001AXRemoval and Disposal of Parking Control Jersey Barricade100EA$ - 0$ - 0
B001AYRemoval and Disposal of Existing Guard Post100EA$ - 0$ - 0
B001BARemoval and Disposal of Existing Traffic Signs40EA$ - 0$ - 0
B001BBRemoval and Reinstall Existing Traffic Signs, Includes Post and up to 12 SF Per Sign40EA$ - 0$ - 0
B001BCRemoval and Disposal of Existing Railroad Trackage and Railroad Ties40LF$ - 0$ - 0
B001BDRemoval and Disposal of Existing Railroad Trackage and Railroad Ties (in concrete)400LF$ - 0$ - 0
B001BERemoval and Disposal of Existing Catch Basin40EA$ - 0$ - 0
B001BFRemoval and Disposal of Existing Manhole ( max. 4' dia., max. 6' depth)10EA$ - 0$ - 0
B001BGRemoval and Disposal of Existing Manhole ( max. 4' dia., max. 10' depth)10EA$ - 0$ - 0
B001BHRemoval and Disposal of Existing Manhole ( max' 8' dia., max. 6' depth)10EA$ - 0$ - 0
B001BJRemoval and Disposal of Existing Manhole (max 8' dia., max. 10' depth)10EA$ - 0$ - 0
B001BKRemoval and Disposal of Existing Curb Inlet40EA$ - 0$ - 0
B001BLRemoval and Disposal of Existing Concrete Pipe. Regular or Reinforced, Composite rate for sizes 0" to 24"300LF$ - 0$ - 0
B001BMRemoval and Disposal of Existing Concrete Pipe. Regular or Reinforced, Composite rate for sizes 27" to 36"800LF$ - 0$ - 0
B001BNRemoval and Disposal of Existing PVC Pipe. Composite rate for sizes 0" to 24"800LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B001$ - 0
B002EARTHWORK (Section 31 00 00)
Earthwork includes the methodology of excavation, stockpiling, removal, disposal and grading (rough and fine) of materials where applicable. (Additional measures may be ordered on other line items.) (CY)
B002AAExcavation and Grading (Jobs up to 50 CY)300CY$ - 0$ - 0
B002ABExcavation and Grading (Jobs Over 50 CY)40,000CY$ - 0$ - 0
B002ACHand Excavation400CY$ - 0$ - 0
B002ADFurnish and Apply in Place, Fine Aggregate (Sand)1,300CY$ - 0$ - 0
B002AEFurnish and Apply in Place, Select Material12,000CY$ - 0$ - 0
B002AFFurnish and Apply in Place, Top Soil2,000CY$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B002$ - 0
B003FABRICS (FURNISH AND INSTALL)
B003AASoil Reinforcement Fabric20,000SY$ - 0$ - 0
B003ABPavement Fabric, Standard700SY$ - 0$ - 0
B003ACSilt Fence (Section 01 57 19)16,000LF$ - 0$ - 0
B003ADBank Stabilization Excelsior Blanket, EC-25,000SY$ - 0$ - 0
B003AEProtection Safety Fence, Type I, Orange (Section 01 50 00)1,700LF$ - 0$ - 0
B003AFInlet Protection, Type I (includes hardware, cloth and stone) (Section 01 57 19)100EA$ - 0$ - 0
B003AGInlet Protection, Type II, (Stone filled filter bags) (Section 01 57 19)100EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B003$ - 0
B004AGGREGATE BASE COURSE (Section 32 11 23)
B004AAAggregate Base Course, 21A, 0 to 900 SY/IN4,000SYIN$ - 0$ - 0
B004ABAggregate Base Course, 21A, 901 to 2,727 SY/IN12,000SYIN$ - 0$ - 0
B004ACAggregate Base Course, 21A, 2,728 to 9,100 SY/IN36,000SYIN$ - 0$ - 0
B004ADAggregate Base Course, 21A, 9,100 to 18,180 SY/IN72,000SYIN$ - 0$ - 0
B004AEAggregate Base Course, 21A, Over , 18,181 SY/IN200,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B004$ - 0
B005EXISTING AGGREGATE OR BASE COURSE REWORK, RIPRAP, No. 57 AGGREGATE
B005AAScalping Existing Aggregate and Reinstall, 0 to 900 SY/IN (Section 32 11 23)5,000SYIN$ - 0$ - 0
B005ABScalping Existing Aggregate and Reinstall, 901 to 2727 SY/IN (Section 32 11 23)10,000SYIN$ - 0$ - 0
B005ACScalping Existing Aggregate and Reinstall, 2728 to 9,100 SY/IN (Section 32 11 23)20,000SYIN$ - 0$ - 0
B005ADScalping Existing Aggregate and Reinstall, Over 9,100 SY/IN (Section 32 11 23)80,000SYIN$ - 0$ - 0
B005AEFine Grade Existing Base Course, not to exceed 3" deep 0 to 1000 SY (Section 32 11 23)4,000SY$ - 0$ - 0
B005AFFine Grade Existing Base Course, not to exceed 3" deep 1001 to 2000 SY (Section 32 11 23)7,000SY$ - 0$ - 0
B005AGFine Grade Existing Base Course, not to exceed 3" deep 2001 to 3000 SY (Section 32 11 23)10,000SY$ - 0$ - 0
B005AHFine Grade Existing Base Course, not to exceed 3" deep Over 3000 SY (Section 32 11 23)40,000SY$ - 0$ - 0
B005AJProvide and apply RIP RAP (Stone) (Section 31 00 00)100TN$ - 0$ - 0
B005AKVDOT No. 57 Open Graded Coarse Aggregate (Section 31 00 00)900TN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B005$ - 0
B006SUPERPAVE LIQUID BITUMINOUS
B006AALiquid Bituminous (Section 32 12 13)20,000GL$ - 0$ - 0
B006ABCrack Sealing (Section 32 01 17.61)6,000LF$ - 0$ - 0
B006ACBituminous Rejuvenation (Spray on or Mop on) (Section 32 01 13.64)36,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B006$ - 0
B007VDOT SUPERPAVE BITUMINOUS BASE MIX (Section 32 12 16.16)
B007AABituminous Concrete BM-25.0 A, 0 to 900 SY/IN2,000SYIN$ - 0$ - 0
B007ABBituminous Concrete BM-25.0 A, 901 to 2,727 SY/IN6,000SYIN$ - 0$ - 0
B007ACBituminous Concrete BM-25.0 A, 2,728 to 9,100 SY/IN20,000SYIN$ - 0$ - 0
B007ADBituminous Concrete BM-25.0 A, Over 9,101 SY/IN70,000SYIN$ - 0$ - 0
B007AE100% Hand Work BM-25.0 A10,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B007$ - 0
B008VDOT SUPERPAVE BITUMINOUS SURFACE MIX (Section 32 12 16.16)
B008AABituminous Concrete SM-9.5 A, 0 To 900 SY/IN14,000SYIN$ - 0$ - 0
B008ABBituminous Concrete SM-9.5 A, 901 To 2,727 SY/IN34,000SYIN$ - 0$ - 0
B008ACBituminous Concrete SM-9.5 A, 2,728 To 9,100 SY/IN98,000SYIN$ - 0$ - 0
B008ADBituminous Concrete SM-9.5 A, 9,101 To 18,180 and over SY/IN260,000SYIN$ - 0$ - 0
B008AE100% Hand Work SM-9.5 A5,000SYIN$ - 0$ - 0
B008AFBituminous Concrete SM-9.5 D, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
B008AGBituminous Concrete SM-9.5 D, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
B008AHBituminous Concrete SM-9.5 D, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
B008AJBituminous Concrete SM-9.5 D, 9,101 To 18,180 and over SY/IN20,000SYIN$ - 0$ - 0
B008AK100% Hand Work SM-9.5 D20SYIN$ - 0$ - 0
B008ALBituminous Concrete SM-12.5 A, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
B008AMBituminous Concrete SM-12.5 A, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
B008ANBituminous Concrete SM-12.5 A, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
B008APBituminous Concrete SM-12.5 A, 9,101 To 18,180 and over SY/IN20,000SYIN$ - 0$ - 0
B008AQ100% Hand Work SM-12.5 A6,000SYIN$ - 0$ - 0
B008ARBituminous Concrete SM-12.5 D, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
B008ASBituminous Concrete SM-12.5 D, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
B008ATBituminous Concrete SM-12.5 D, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
B008AUBituminous Concrete SM-12.5 D, over 9,101 SY/IN20,000SYIN$ - 0$ - 0
B008AV100% Hand Work SM-12.5 D1,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B008$ - 0
B009VDOT SUPERPAVE BITUMINOUS INTERMEDIATE MIX (Section 32 12 16.16)
B009AABituminous Concrete IM-19.0 A, 0 To 900 SY/IN1,000SYIN$ - 0$ - 0
B009ABBituminous Concrete IM-19.0 A, 901 To 2,727 SY/IN3,000SYIN$ - 0$ - 0
B009ACBituminous Concrete IM-19.0 A, 2,728 To 9,100 SY/IN10,000SYIN$ - 0$ - 0
B009ADBituminous Concrete IM-19.0 A, over 9,101 SY/IN20,000SYIN$ - 0$ - 0
B009AE100% Hand Work IM-19.0 A1,000SYIN$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B009$ - 0
B010STAMPED ASPHALT (Section 32 12 30)
B010AAStamped Asphalt, various patterns and colors15,000SF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B010$ - 0
B011MANHOLES AND DRAINAGE (Section 33 40 00)
Price includes excavation, backfill with excavated materials, grade, and cleanup as well as the cost for all joints, connections, etc. (Extra fill may be ordered on other line items.)
B011AAProvide and Install New Reinforced Concrete Pipe Class III, 12" or elliptical pipe equivalent1,100LF$ - 0$ - 0
B011ABProvide and Install New Reinforced Concrete Pipe Class III, 15" or elliptical pipe equivalent800LF$ - 0$ - 0
B011ACProvide and Install New Reinforced Concrete Pipe Class III, 18" or elliptical pipe equivalent600LF$ - 0$ - 0
B011ADProvide and Install New Reinforced Concrete Pipe Class III, 24" or elliptical pipe equivalent500LF$ - 0$ - 0
B011AEProvide and Install New Reinforced Concrete Pipe Class III, 30" or elliptical pipe equivalent400LF$ - 0$ - 0
B011AFProvide and Install New Reinforced Concrete Pipe Class III, 36" or elliptical pipe equivalent400LF$ - 0$ - 0
B011AGAdjust Manhole or Drainage Inlet. Metal Riser Ring Method40V/ Inch$ - 0$ - 0
B011AHAdjust Manhole or Drainage Inlet Masonry Method40V/ Inch$ - 0$ - 0
B011AJAdjust Valve or Meter Box100V/ Inch$ - 0$ - 0
B011AKProvide and Install New Manhole max. 4' dia., max. 8' deep with Frame and Cover40V/ foot$ - 0$ - 0
B011ALProvide and Install New Catch Basin max. 4' dia., max. 8' deep with Frame and Grate200V/ foot$ - 0$ - 0
B011AMProvide and Install New Frame and Cover (F&C) on Existing Utilities, Includes Removal and Disposal of old F&C40EA$ - 0$ - 0
B011ANProvide and Install New Valve or Meter Box40EA$ - 0$ - 0
B011APProvide and Install New Curb Inlet with Frame and Cover200V/ foot$ - 0$ - 0
B011AQAdditional Cost to Provide and Install Pre-Cast Manhole, Catch Basin, and Curb Inlet in Lieu of Masonry40V/ foot$ - 0$ - 0
B011ARFixture Tags (Brass) Provide and Install on Drainage Fixtures (Section 01 11 00)20EA$ - 0$ - 0
B011ASTie in of New Pipe to Existing Brick Structure (Composite rate up to 30" pipe)40EA$ - 0$ - 0
B011ATTie in of New Pipe to Existing Concrete Structure (Composite rate up to 30" pipe)40EA$ - 0$ - 0
B011AUGrout (plug) Abandoned Pipe (Composite Rate for up to 15" pipe)40EA$ - 0$ - 0
B011AVGrout (plug) Abandoned Pipe (Composite Rate for above 15" to 30" pipe)40EA$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM B011$ - 0
B012PROVIDE AND INSTALL NEW POLYVINYL CHLORIDE (PVC) PIPE (Section 33 40 00, Paragraph 2.1.3)
Price is valid for all PVC materials under Paragraph 2.1.3 and includes excavation to the bottom of each pipe trench, backfill, grade, and cleanup as well as the cost for all joints, ell's, tees, couplings, etc. (Extra fill may be ordered on other line items.)
B012AAProvide and Install New Polyvinyl Chloride (PVC) Pipe 6"200LF$ - 0$ - 0
B012ABProvide and Install New Polyvinyl Chloride (PVC) Pipe 8"400LF$ - 0$ - 0
B012ACProvide and Install New Polyvinyl Chloride (PVC) Pipe 10"200LF$ - 0$ - 0
B012ADProvide and Install New Polyvinyl Chloride (PVC) Pipe 12"100LF$ - 0$ - 0
B012AEProvide and Install New Polyvinyl Chloride (PVC) Pipe 15"800LF$ - 0$ - 0
B012AFProvide and Install New Polyvinyl Chloride (PVC) Pipe 18"600LF$ - 0$ - 0
B012AGProvide and Install New Polyvinyl Chloride (PVC) Pipe 24"500LF$ - 0$ - 0
B012AHProvide and Install New Polyvinyl Chloride (PVC) Pipe 30"400LF$ - 0$ - 0
B012AJProvide and Install New Polyvinyl Chloride (PVC) Pipe 36"400LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A012$ - 0
B013PROVIDE AND INSTALL NEW POLYETHYLENE (PE) PIPE (Section 33 40 00, Paragraph 2.1.4)
Price is valid for all PE materials under Paragraph 2.1.4 and includes excavation to the bottom of each pipe trench, backfill, grade, and cleanup as well as the cost for all joints, ell's, tees, couplings, etc. (Extra fill may be ordered on other line items.)
B013AAProvide and Install Polyethylene (PE) Pipe 12"1,100LF$ - 0$ - 0
B013ABProvide and Install Polyethylene (PE) Pipe 15"800LF$ - 0$ - 0
B013ACProvide and Install Polyethylene (PE) Pipe 18"600LF$ - 0$ - 0
B013ADProvide and Install Polyethylene (PE) Pipe 24"500LF$ - 0$ - 0
B013AEProvide and Install Polyethylene (PE) Pipe 30"400LF$ - 0$ - 0
B013AFProvide and Install Polyethylene (PE) Pipe 36"400LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A013$ - 0
B014PROVIDE AND INSTALL NEW DUCTILE IRON (DI) PIPE (Section 33 40 00)
Price includes excavation to the bottom of each pipe trench, backfill, grade, and cleanup as well as the cost for all joints, ell's, tees, couplings, etc. (Extra fill may be ordered on other line items.)
B014AAProvide and Install Ductile Iron (DI) Pipe 6"100LF$ - 0$ - 0
B014ABProvide and Install Ductile Iron (DI) Pipe 8"200LF$ - 0$ - 0
B014ACProvide and Install Ductile Iron (DI) Pipe 10"100LF$ - 0$ - 0
B014ADProvide and Install Ductile Iron (DI) Pipe 12"500LF$ - 0$ - 0
B014AEProvide and Install Ductile Iron (DI) Pipe 14"200LF$ - 0$ - 0
B014AFProvide and Install Ductile Iron (DI) Pipe 16"200LF$ - 0$ - 0
B014AGProvide and Install Ductile Iron (DI) Pipe 18"100LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A013$ - 0
B015VDOT STANDARD CURB CG 2 AND 3 (Section 32 16 19)
B015AAVDOT Standard Curb CG 2 and 3, 0 to 100 LF400LF$ - 0$ - 0
B015ABVDOT Standard Curb CG 2 and 3, 101 to 500 LF4,000LF$ - 0$ - 0
B015ACVDOT Standard Curb CG 2 and 3, Over 500 LF2,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A014$ - 0
B016VDOT STANDARD RADIAL CURB CG 2 AND 3 (Section 32 16 19)
B016AAVDOT Standard Radial Curb CG 2 and 3, 0 to 100 LF300LF$ - 0$ - 0
B016ABVDOT Standard Radial Curb CG 2 and 3, 101 to 500 LF600LF$ - 0$ - 0
B016ACVDOT Standard Radial Curb CG 2 and 3, Over 500 LF1,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A015$ - 0
B017VDOT STANDARD CURB CG 6 AND 7 (Section 32 16 19)
B017AAVDOT Standard Curb CG 6 and 7, 0 to 100 LF600LF$ - 0$ - 0
B017ABVDOT Standard Curb CG 6 and 7, 101 to 500 LF2,000LF$ - 0$ - 0
B017ACVDOT Standard Curb CG 6 and 7, Over 500 LF4,000LF$ - 0$ - 0
TOTAL COST FOR CONTRACT LINE ITEM A016$ - 0
B018VDOT STANDARD RADIAL CURB CG 6 AND 7 (Section 32 16 19)

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .