This document is Attachment 2 - Government Furnished Equipment for the Willamette Valley Downstream Fish Passage Monitoring contract solicitation (W9127N25R0005).

The key details are:

  • The U.S. Army Corps of Engineers (USACE) will provide various government-furnished equipment for the contractor to use, including two fish transport tanks, one flatbed trailer, 21 rotary screw traps located at various sites in the Willamette Valley, 5 rotary screw trap trailers, and two small circular fish tanks at Cougar Dam.
  • The equipment will be made available to the contractor starting on 01 July 2025, except for certain rotary screw traps that will be available starting 15 July 2025 or following removal from previous sampling sites.
  • The contractor will be responsible for taking possession and maintaining all the provided equipment once it becomes available under the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127N25R0005 Attachment 2 - Government Furnished Equipment for Willamette Valley

Downstream Fish Passage Monitoring

Attachment 2 – Government Furnished Equipment for Willamette Valley Downstream Fish Passage Monitoring – 2025 – Rotary Screw Trap Sampling & Bulk Marking

ITEM DESCRIPTION ITEM CONDITION ANTICIPATED

LOCATION AT TIME

OF AWARD

Available starting 01 July

(2) Fish Transport Tanks

(1) Flatbed Trailer

<USED>

Two fish transport tanks designed for use on flatbed trucks and/or flatbed trailers. These tanks are in need of routine maintenance, as well as refurbishment prior to use including, but not necessarily limited to, repair/replace of 02 regulators, diffusors, oxygen meters, electrical systems, aerators, valves, hinges, security/tie-down/attachment points. One tank is approximately 150 gallons and one tank is approximately 305 gallons.

One flatbed trailer as pictured - trailer is used and condition is unknown but appears to be acceptable. The GVWR is stated to be 7000 lbs on the manufacturer tag.

Lookout Point Dam or Fall Creek Dam storage yard(s)

To be returned to Fall Creek Dam storage yard, if used by Contractor

(21) Rotary Screw Traps <Used>

The Corps’ has a total of 21 Rotary Screw Traps (RSTs) for the purpose of this contract.

These RSTs will be in-use at time of contract award; these RST’s will become available as follows:

All equipment listed below is available starting 30 June 2025 unless otherwise specified.

- Big Cliff Dam Tailrace - One 8ft diameter RST

- North Santiam River above Detroit Dam –

One 5ft diameter RST

- Breitenbush River above Detroit Dam – One

5ft diameter RST

- Green Peter Dam Tailrace - One 8ft diameter

RST

- Middle Santiam River above GPR – One 5ft diameter RST

- South Santiam River above Foster Dam – One

5ft diameter RST

- Cougar Dam tailrace - One 5ft diameter RST

Fall Creek Dam Storage Yard or deployed in-river in respective sub-basin as specified in Regulating Outlet (RO), Two 8ft diameter RSTs in Powerhouse channel (PH)

- South Fork McKenzie River above Cougar

Dam – One 5ft diameter RST

- Fall Creek Dam Tailrace - One 8ft diameter

RST - Available starting 15 July 2025

- Dexter Dam Tailrace - One 5ft diameter RST

- Lookout Point Dam Tailrace - Three 8ft diameter RSTs

- Above Lookout Point Dam - One 5ft diameter

RST

- Hills Creek Dam Tailrace – One 5ft diameter

RST below RO; One 8ft diameter RST below

PH

- Fall Creek Storage Yard - One spare 5ft RST;

One 8ft diameter RST from Fall Creek Head of Reservoir – Available following removal from sample site and return to Fall Creek Dam storage yard by previous contractor in July 2025.

- One 5ft diameter RST from Hills Creek Head of Reservoir – Available starting following removal from sample site and return to Fall Creek Dam storage yard by previous contractor in July 2025.

The Contractor is responsible for taking possession and maintaining all RSTs once they become available under this contract (i.e., some RSTs will be in the non-sampling position at their respective location upon assumption of responsibility under this contract).

RST Trailers Five RST trailers are available for transport of RSTs.

Fall Creek Dam Storage Yard

Fish Tanks <USED> Two small circular fish tanks are available at Cougar Dam tailrace, adjacent to the powerhouse.

These tanks are small and only suitable for holding fish for 24-hour holding studies.

Cougar Dam Powerhouse tailrace