Attachment 2 - Furniture Layout.pdf
PDF 673 KB Posted
- Attached to
- Det 1 Workspace Furniture
- Solicitation number
- F3GEBB5178A001
About this file
The document is a furniture layout design for Nellis Air Force Base prepared by 53 TEG Engineering and HB Workplaces, dated 3/14/2025. The layout depicts a comprehensive office furniture arrangement featuring multiple workstations with modular desks, overhead storage units, file cabinets, and shared central spaces. The design includes specific furniture elements such as servers, printers, and refrigerators strategically positioned throughout the floor plan, with detailed measurements and spatial considerations. The document includes multiple views of the proposed layout, including 2D floor plans and 3D rendering perspectives, intended for client approval and space planning purposes. The final page includes important disclaimers noting that the plans are for space planning only, subject to field verification, and do not constitute construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - SoW.pdf | ||
| Attachment 1 - Items List and Specifications.pdf | ||
| Attachment 4 - Bldg 878 Rm 13A Drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
53 TEG Engineering
Furniture Package For:
Nellis AFB
3/14/2025
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
R
BF
Fr idg e Sh re dd er
Pr int er Pr int er
Se rv er Se rv er
4'- 8"
2'-6"
3'3'
5'-6"
3'- 6"
135169
CORE:Doreen Daddis
DESIGNER:
135169Nellis AFB_ 53 TEG.cmdrw
Client Approval Drawings
ACCT MGR:
Floor 1
SHEET:
Rachel Conrad
Overall Drawing
53 TEG Engineering
Nellis AFB
2/5
3/14/2025
Floor 1
Overall Drawing 3/14/2025
DESIGNER:
ACCT MGR:
3/5
CORE:
Client Approval Drawings
135169
SHEET:
135169Nellis AFB_ 53 TEG.cmdrw
53 TEG Engineering
Nellis AFB Doreen Daddis
Rachel Conrad
135169Nellis AFB_ 53 TEG.cmdrw
CORE:Nellis AFB
4/5
SHEET:
135169
Floor 1
Doreen Daddis
53 TEG Engineering
3/14/2025
ACCT MGR:
Rachel ConradDESIGNER:
Client Approval Drawings Overall Drawing
Account Manager ddaddis@hbworkplaces.com
The pricing estimates in this document do not include delivery, installation, or applicable services and are valid for 30 days. Estimated costs are subject to change.
The graphic material and design concepts in this document remain at all time property of HB Workplaces, LLC.
Reproduction of the material and design contained herein is prohibited without written consent of HB Workplaces, LLC.
• These floor plans are for space planning purposes only and are not to be used for construction documents.
• These floor plans are subject to all state and local codes
• All sizes are approximate and are subject to field verification.
• Layout is subject to field dimension verification.
• Finishes and fabrics to be selected prior to order entry.
• Signed approval returned to HB Workplaces.
• All connections to building utilities to be completed by appropriate subcontractors.
• Client responsible for coordination and/or relocation of electrical and data needs.
• Client responsible for moving all existing furniture which may interfere with installation.
• All items labeled N.I.C. are not in contract.
• All items labeled EX. are existing by client.
Doreen Daddis
Contact Us
Creating Inspiring Places to Work, Grow and Thrive.
File details come from the government source that posted it. Updated .