Attachment 2 FR 3264 Description of Work.pdf

PDF 48 KB Posted

Attached to
Road Reconditioning of FR 3263 (Van Winkle) and FR3264 (Mud Pond).
Solicitation number
1264R420Q0012
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FR 3264 Mud Pond

MILEPOST DESCRIPTION OF WORK

0.00 Begin reconditioning of FR 3264.

Remove vegetation to open outlet ditches with appropriate construction epuipment.

Mowing and limbing of roads according to specifications may be necessary.

Begin re-establishing double ditch section having a subgrade consistent with current road prism.

Clean and recondition all outlets and cut ditches no less than 1 foot deep whether identified of not.

Begin spreading and mix with subgrade 1” clean crushed aggregate a depth of 2” and a width of 16’.

All disturbed areas outside the roadway, including outlet ditches shall be seeded with a 50/50 mix rye and wheat.

0.09 Clean B-B type outlet ditches left and right.

0.14 Clean A-A type outlet ditch right.

0.23 Clean B-B type outlet ditches left and right.

0.30 Clean B-B type outlet ditches left and right.

0.37 Clean B-B type outlet ditch right.

0.47 FR 3264A right.

0.55 Clean B-B type outlet ditches left and right.

0.60 Clean A-A type outlet ditch left.

0.68 Maintain A-type dip.

Clean B-B type outlet ditch left.

0.72 Clean A-A type outlet ditches left and right.

0.77 Clean A-A type outlet ditch left.

0.83 Clean A-A type outlet ditch right.

0.86 Clean B-B type outlet ditches left and right.

0.92 Clean A-A type outlet ditch right.

0.98 Non-system road left.

1.00 Clean B-B type outlet ditches left and right.

1.08 Clean B-B type outlet ditches left and right.

1.25 Clean B-B type outlet ditches left and right.

1.35 Clean B-B type outlet ditches left and right.

1.59 Clean B-B type outlet ditches left and right.

1.64 Camp area left.

1.69 Clean inlet and outlet of culvert.

1.74 Clean B-B type outlet ditch left.

1.88 Clean B-B type outlet ditches left and right.

2.08 Clean B-B type outlet ditches left and right.

2.16 Clean B-B type outlet ditches left and right.

2.26 Clean B-B type outlet ditch left.

2.31 Clean B-B type outlet ditch right.

2.38 FR 3264B right.

Clean A-A type outlet ditch right.

2.39 Clean A-A type outlet ditch right.

2.48 Non-system road left.

2.55 Clean inlet and outlet of culvert.

2.60 Clean A-A type outlet ditch left.

2.66 Clean B-B type outlet ditches left and right.

2.82 Clean A-A type outlet ditch left.

2.89 Clean inlet and outlet of culvert.

2.93 Clean B-B type outlet ditches left and right.

3.11 Clean B-B type outlet ditches left and right.

3.18 Clean B-B type outlet ditches left and right.

3.23 Clean B-B type outlet ditch right.

3.35 Clean B-B type outlet ditches left and right.

3.42 Non-system road right.

3.49 Clean B-B type outlet ditches left and right.

3.55 Clean B-B type outlet ditches left and right.

3.61 Clean B-B type outlet ditches left and right.

3.68 Clean B-B type outlet ditches left and right.

3.88 Clean A-A type outlet ditch left.

3.91 Clean B-B type outlet ditches left and right.

4.02 Maintain T-type turnaround.

Place 12 ton 1”clean crushed aggregate on turnaround.

End reconditioning of FR 3264.

File details come from the government source that posted it. Updated .