Attachment 1 FR 3263 Description of Work.pdf
PDF 51 KB Posted
- Solicitation number
- 1264R420Q0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 Map.pdf | ||
| Attachment 3 SCHEDULE OF ITEMS.docx | DOCX document | |
| RFQ_1264R420Q0012_MTNF_Road_Reconditioning.pdf | ||
| Attachment 2 FR 3264 Description of Work.pdf | ||
| Attachment 5 Wage Determination MO20190001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FR 3263 Van Winkle
MILEPOST DESCRIPTION OF WORK
0.00 Begin reconditioning of FR 3263.
Remove vegetation to open outlet ditches with appropriate construction epuipment.
Mowing and limbing of roads according to specifications may be necessary.
Begin re-establishing double ditch section having a 16’ subgrade consistent with current road prism.
Clean and recondition all outlets and cut ditches no less than 1 foot deep whether identified of not.
Begin spreading and mix with subgrade 1” clean crushed aggregate a depth of 2” and a width of 14’.
All disturbed areas outside the roadway, including outlet ditches shall be seeded with a 50/50 mix rye and wheat.
0.01 Clean A-A type outlet ditches left and right.
0.17 Clean A-A type outlet ditch left.
0.24 Clean B-B type outlet ditches left and right.
0.27 Clean B-B type outlet ditch left.
0.31 FR 3263A right.
0.34 Clean B-B type outlet ditches left and right.
0.39 Maintain turnaround left.
Place 7 ton 1”clean crushed aggregate on turnaround.
0.42 Clean B-B type outlet ditches left and right.
0.47 Maintain turnaround left.
Place 7 ton 1”clean crushed aggregate on turnaround.
0.50 Clean B-B type outlet ditch left.
0.57 Clean B-B type outlet ditches left and right.
0.61 Maintain turnout right.
Place 12 tons 1” clean crushed aggregate on widening.
0.72 Clean A-A type outlet ditch left.
0.82 Clean B-B type outlet ditch right.
0.85 Maintain turnout left.
Place 12 tons 1” clean crushed aggregate on widening.
0.91 Clean B-B type outlet ditch right.
0.93 Clean B-B type outlet ditch left.
0.95 Clean B-B type outlet ditches left and right.
1.18 Clean B-B type outlet ditch right.
1.21 Clean B-B type outlet ditch left.
1.29 Clean B-B type outlet ditches left and right.
1.41 Clean inlet and outlet of culvert.
1.43 Maintain turnout right.
Place 12 tons 1” clean crushed aggregate on widening.
1.49 Clean B-B type outlet ditches left and right.
1.62 Clean A-A type outlet ditch left.
1.74 Maintain turnout right.
Place 12 tons 1” clean crushed aggregate on widening.
Clean B-B type outlet ditch left.
1.80 Clean B-B type outlet ditches left and right.
1.86 Clean A-A type outlet ditches left and right.
1.89 Clean A-A type outlet ditches left and right.
1.93 Begin re-establishing double ditch section having a 14’ subgrade consistent with current road prism.
Begin spreading and mix with subgrade 1” clean crushed aggregate a depth of 2” and a width of 12’.
Clean B-B type outlet ditch right.
1.96 Clean B-B type outlet ditches left and right.
2.02 FR 3263B left.
2.04 Clean A-A type outlet ditches left and right.
2.06 Clean A-A type outlet ditch left.
2.08 Clean A-A type outlet ditch right.
2.12 Clean A-A type outlet ditch right.
2.14 Clean A-A type outlet ditches left and right.
2.18 Clean B-B type outlet ditches left and right.
2.23 Maintain turnout right.
Place 12 tons 1” clean crushed aggregate on widening.
2.26 Clean A-A type outlet ditch left.
2.29 Clean B-B type outlet ditches left and right.
2.37 Clean A-A type outlet ditches left and right.
2.41 Maintain turnout right.
Place 12 tons 1” clean crushed aggregate on widening.
2.44 Clean B-B type outlet ditches left and right.
2.48 Clean A-A type outlet ditches left and right.
2.53 Maintain turnout left.
Place 12 tons 1” clean crushed aggregate on widening.
2.59 Clean A-A type outlet ditches left and right.
2.66 Clean A-A type outlet ditch right.
2.68 Clean B-B type outlet ditches left and right.
2.72 Clean B-B type outlet ditch right.
2.78 Maintain B-type dip.
Pond right.
Clean B-B type outlet ditch right. Avoid sediment in pond.
2.80 Clean A-A type outlet ditch right.
2.86 Clean B-B type outlet ditch left.
2.88 Clean A-A type outlet ditch right.
2.92 Clean B-B type outlet ditches left and right.
2.95 Clean B-B type outlet ditch left.
2.99 Clean B-B type outlet ditches left and right.
3.06 Clean B-B type outlet ditches left and right.
3.12 Clean B-B type outlet ditch left.
Clean A-A type outlet ditch right.
3.15 Maintain turnout right.
Place 12 tons 1” clean crushed aggregate on widening.
3.18 Maintain B-type dip.
Clean B-B type outlet ditch right.
3.25 Clean B-B type outlet ditches left and right.
3.29 Clean A-A type outlet ditches left and right.
3.35 Clean B-B type outlet ditches left and right.
3.44 Clean A-A type outlet ditches left and right.
3.51 Maintain T-type turnaround.
Place 12 ton 1”clean crushed aggregate on turnaround.
End reconditioning of FR 3263.
File details come from the government source that posted it. Updated .