Attachment 2 - FIR (WLB 225B) DS FQ3 NLR 22R0.pdf
PDF 2 MB Posted
- Solicitation number
- 70Z08522QP4501100
About this file
This specification outlines various dockside repair requirements for the USCGC FIR (WLB 225B), a 225-foot ocean-going buoy tender. The contractor shall provide all necessary labor, materials, services and equipment to complete work items including cleaning and inspecting fuel tanks; inspecting voids and vent ducts; servicing hatches and davits; and commercial cleaning of exhaust piping. The specification references Coast Guard technical publications and drawings for guidance. The contractor must submit inspection reports and implement protective measures, safety protocols, and environmental compliance. Work shall be performed at the contractor's facility in accordance with solicitation terms and applicable quality, safety and regulatory standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CGC FIR - Amendment 00002 7 Sept 21.pdf | ||
| FIR (WLB 225B) DS FQ3 NLR 22R1.pdf | ||
| CGC FIR DS FY22 - Amendment 0001.pdf | ||
| Revised Combined Synopsis Sol FIR FY22 DS - Amendment 0001.doc | DOC document | |
| Attachment 5 Notice for Filing Agency Protests.doc | DOC document | |
| Attachment 1 - FIR (WLB 225B) DS FQ3 BLS 22ER0_BLANK.xls | XLS spreadsheet | |
| Attachment 6 - Justification for Other than Full and Open Competition Appleton.pdf | ||
| Combined Synopsis Sol FIR FY22 DS.doc | DOC document | |
| Attachment 4 Request for Clarification.docx | DOCX document | |
| Attachment 3 Past Performance Information Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC FIR (WLB 213)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2022
Developed By: Bronson L Suyat
(Rev-0, 17 May 2021)
USCGC FIR (WLB-225B) DOCKSIDE AVAILABILITY FY2022
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................ xiii General Requirements WORK ITEM 1: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect WORK ITEM 2: Voids (Accessible, Weather Deck Exposed), Inspect WORK ITEM 3: Tanks, MP Fuel Service, Clean and Inspect WORK ITEM 4: Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect WORK ITEM 5: Tanks, Potable Water, Clean and Inspect WORK ITEM 6: Tanks, Lube Oil, Clean and Inspect WORK ITEM 7: Voids, Accessible, Clean and Inspect WORK ITEM 8: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 9: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean WORK ITEM 10: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean WORK ITEM 11: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning WORK ITEM 12: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning WORK ITEM 13: Vent Ducts, Laundry Exhaust, Commercial Cleaning WORK ITEM 14: Vent Ducts, All Other, Commercial Cleaning WORK ITEM 15: Potable Water Pneumatic Tanks, Clean and Inspect WORK ITEM 16: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift ... 60 WORK ITEM 17: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 18: Hydraulic Chain Stoppers, Inspect and Service WORK ITEM 19: Crossdeck Winches, Inspect and Service WORK ITEM 20: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 21: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 22: Warping Capstan, Inspect and Service WORK ITEM 23: Commissary Hoist, Inspect and Service WORK ITEM 24: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 25: Sewage Holding Tanks, Clean and Inspect WORK ITEM 26: Grey Water Piping, Clean and Flush WORK ITEM 27: Sewage Piping, Clean and Flush WORK ITEM 28: Temporary Services, Provide - Cutter WORK ITEM 29: Single Point Davit, Inspect and Service WORK ITEM 30: Buoy Crane, Appleton EB600-60-40, Inspect and Service WORK ITEM 31: Escape Trunk, Preserve and Repair WORK ITEM 32: Bulkhead Plating Repair WORK ITEM 33: Ventilation, Galley Pre-Heater, Renew WORK ITEM 34: Tanks (Grey Water Holding), Preserve “Partial” WORK ITEM 35: Tanks (Sewage Holding), Preserve “Partial” WORK ITEM 36: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 37: Point of Use Potable Water Filters, Install WORK ITEM 38: Tanks, Potable Water, Preserve, Partial, iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 111-001, Rev A, Shell Expansion
Coast Guard Drawing 225B WLB 259-001, Rev C, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 259-006, Rev C, Combustion Intake & Exhaust A&D Hull Blocks 970
& 975
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B WLB 512-002, Rev F, Ventilation Schedule
Coast Guard Drawing 225B WLB 512-003, Rev B, HVAC A&D FR 05 Thru FR 12 Hull Block 901
Coast Guard Drawing 225B WLB 512-004, Rev E, HVAC A&D FR 12-30, Hull Block 910
Coast Guard Drawing 225B WLB 512-006, Rev. E, HVAC Sys Drawing
Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform
Coast Guard Drawing 225B WLB 512-012, Rev A, HVAC Standard Details and General Instructions
Coast Guard Drawing 225B WLB 512-019, Rev. B, Ventilation Schedule Incidental to MMA
Coast Guard Drawing 225B WLB 528-001, Rev E, Plumbing and Interior Deck Drains
Coast Guard Drawing 225B WLB 528-002, Rev D, Weather Deck Drains Diagram
Coast Guard Drawing 225B WLB 532-002, Rev D, Potable Water Sys Diagram
Coast Guard Drawing 225B WLB 541-001, Rev G; Fuel Oil System Diagram
Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank
Coast Guard Drawing 225B WLB 549-001, Rev C, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 551-001, Rev G, Compressed Air System Diagram
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 556-005, Rev D, Aft Hydraulic System A/D, Fr 66 Aft, Block 950, 970
Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller Stopper
Coast Guard Drawing 225B WLB 573-011, Rev -, ATON Tie Downs
Coast Guard Drawing 225B WLB 573-012, Rev -, Rising Sheave Chain Stopper Ripout Incidental to
Upgrade v (Rev-0)
Coast Guard Drawing 225B WLB 573-013, Rev B, Rising Sheave Chain Stopper Mechanical Mods
Incidental to Upgrade
Coast Guard Drawing 225B WLB 573-014, Rev -, Rising Sheave Chain Stopper Hydraulic Mods
Incidental to Upgrade
Coast Guard Drawing 225B WLB 593-001, Rev D, Sewage and Waste Water System Diagram
Coast Guard Drawing 225B WLB 593-009, Rev B, Sewage Holding Tank
Coast Guard Drawing 225B WLB 601-001, Rev M, General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 225B WLB 601-002, Rev L, Booklet of General Drawings
Coast Guard Drawing 225B WLB 631-002, Rev G, Painting Schedule
Coast Guard Drawing 225B WLB 672-001, Rev C, Storerooms, Cargo Stowage and Ship Store
Arrangement and Details
Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves
Coast Guard Drawing 225B WLB 801-013, Rev B, Midship Section & Typical Sections
Coast Guard Drawing 225B WLB 801-015, Rev B, Scantling, Decks, & Platforms
Coast Guard Drawing 225B WLB 801-016, Rev -, Scantling, Watertight Bulkheads
Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves
Coast Guard Drawing 225B WLB 910-001, Rev F, Hull Block 910 - Panels
Coast Guard Drawing 225B-WLB-320-019, Rev. E, MMA HVAC Sys Elec Pwr & Control
Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-034, Rev D, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-
1/4"
Coast Guard Drawing FL 533-001, Rev B, Placard Potable Water Flush
Coast Guard Drawing FL 533-002, Rev -, Point of Use Water Filter Install
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
Coast Guard Drawing FL-1702-011, Rev -, Inspection of Sheaves
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 10512, Section 573-A, July 2018, Buoy Handling Crane – Model
EB600-60-40
Coast Guard Technical Publication (TP) 11101,SWBS 583, Section A (SWBS 583A), Davit, Single Point
Slewing Arm Model - RAD30 - 15.5 (BMD-710)
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3548, Manufacturer's Instruction Book-SWBS Group(s) 512
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS
Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-
Coast Guard Technical Publication (TP) 3562, Sep 2013, SWBS 589, Section C, Dumbwaiter, Model –F-
WK-806
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper
Coast Guard Technical Publication (TP) 3750, SWBS 573-A, Dec 2012, Rising Sheave Chain Stopper vi (Rev-0)
Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60
(13’-4”)
Fans, Centrifugal, Buffalo Forge, Technical Publication 3549 (Tech Pub 3549), SWBS 512, Section A, 11
APR 2000
Motor Controllers, Technical Publication 3535 (Tech Pub 3535), SWBS 320, Section E, 22 JAN 2009
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2020, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2020, Install New
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, 2015, Standard Practice for Commercial Packaging
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (AN)
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An)
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment vii (Rev-0)
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
International Standard Organization (ISO) 2953, 2000, Mechanical Vibration, Balancing Machines, Description and Evaluation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173E INT AMD 1, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold
Application
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 16 (SSPC-SP 16), 2010, Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and
Non-Ferrous Metals
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning viii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
8 N Cargo Hatch Gasket Walz & Krenzer P/N D-WK-
837-1-4 or equivalent
2 200.00
7 N Switch, Liquid Level 00-800-5243 7 ea. 131.17
15 N 2 Inch 150 braze in gate valve
CPW-V-V106-7 1 ea. 700.00
18 N Repair Kit, HYD
Chain Stopper Rising
Sheave (for Para. 3.2, Tasks #2 and #3)
NSN: 2040-01-483-3947 2 ea. 2,631.46
18 N Repair Kit, Cylinder NSN: 3040-01-485-3997 2 ea. 2,484.27
19 N Hand Pump SS NSN: 4320-01-517-1444 1 ea 1,499.66
19 N Pressure Gauge -
Model BMD-471
NSN: 6685-01-437-2519 4 ea 43.79
19 N Wire Rope Assembly NSN: 4010-01-643-2077 4 ea 900.00
19 N Hydraulic Brake
Repair Kit - Model
BMD-471
NSN: 3950-01-526-9090 4 ea. 913.00
19 N Counterbalance Valve
- Model BMD-471
NSN: 4810-01-353-0586 4 ea. 150.00
19 N Shuttle Valve - Model
BMD-471
NSN: 4820-01-317-2748 4 ea. 35.00
19 N Hydraulic Motor Seal
Kit - Model BMD-471
NSN: 5330-01-475-4566 8 ea. 84.00
19 N Clutch Shoe - Model
BMD-471
NSN: 4910-01-475-4125 4 ea. 56.90
19 N Drum Bushing - Model
BMD-471
NSN: 3950-01-631-0884 8 ea. 272.00
19 N Shaft Bushing - Model
BMD-471
NSN: 3950-01-631-0771 4 ea. 298.00
19 N Gearbox Seal Kit (For
Winch Gearbox
Assemblies) - Model
BMD-471
NIIN: XFC343225 PN: YMD-
8194-R
4 ea. 70.00
19 N Control Station Repair
Parts. Kit
NSN: 6110-01-644-9898 4 ea. 438.00
19 N Flag Block Bearing Kit NSN: 3940-01-526-5592 2 ea. 180.00
19 N Flag Block Bearing
Cup, Sheave
NSN: 3110-01-644-9670 2 ea. 231.00
19 N Flag Block Bearing
Cone, Sheave
NSN: 3110-01-013-4036 2 ea. 182.00
19 N Seal NSN: 5330-01-287-2826 2 ea. 104.00 ix (Rev-0)
19 N Manifold Repair Kit PN: YMD-8192-R 4 ea. 551.00
20 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00
20 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25
20 N Level wind pivot bushing
NSN: 3120-01-621-2293 1 ea. 1,139.00
20 N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
20 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29
20 N Rexroth Sandwich
Flow Control
NSN: 4810-01-505-9289 1 ea. 250.00
20 N Sun Sandwich Relief
Valves
NSN: 4820-01-439-2451 2 ea. 900.00
20 Y Level Wind Hydraulic
Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
20 N 3:1 Pilot Ratio, Vented
Counterbalance Valve
Assembly
NSN: 4820-01-563-5841 1 ea 98.70
20 N Fully Adjustable
Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75
20 N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00
20 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998
20 N **Pump, Hydraulic
Ram, Hand Driven
NSN: 4320-01-286-4065 1 ea. 419.77
20 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00
20 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00
21 N Hardware Kit, Pins NSN: 2030-01-485-7209 2 ea. 528.47
21 N Hardware Kit, Mechanical
NSN: 2030-01-485-7215 2 ea. 538.91
29 N Swing Brake Seal Kit NSN: 5330-01-390-3514 PN:
90-016-2011
2 ea 68.45
29 N Swing Brake Disc Kit NSN: 3010-01-464-1040 PN:
90-016-2131
2 ea 187.20
29 N Swing Holding Valve NSN: 4820-01-466-4918 PN:
CBEA-LHV-YHL (Sun
Hydraulics)
1 ea 251.50
29 N Wire Rope Assembly NSN: 4010-01-620-9604 PN:
JWCG062100PL
1 ea 660.00
30 N 4 Year Davit In-Place
Overhaul Kit
NSN: 3950-01-F18-5354 PN:
892-02053
1 ea. 124,229.92
31 N Main Fall Wire Rope NSN: 4010-01-486-0047 PN:
JWCG13001919PL
1 ea 2,642.00
31 N Aux Fall Wire Rope NSN: 4010-01-594-2228 PN:
JWCG75200637PL
1 ea 805.32
36 N INDEECO Heater* PN:
0106-
512-01-
D24
TFZU
36 N 830U
40 N Water Filter Assembly PN: DWS160-L (3M) NSN: 9 ea. 160.00 x (Rev-0)
(ACN) 44330-01-F20-5959
40 N Water Filter Element PN: 56134-44 (3M) 9 ea. 180.00
40 N Placard - Potable
Water Flush
N/A 29 ea. 50.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect
2 Voids (Accessible, Weather Deck Exposed), Inspect
3 Tanks, MP Fuel Service, Clean and Inspect
4 Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect
5 Tanks, Potable Water, Clean and Inspect
6 Tanks, Lube Oil, Clean and Inspect
7 Voids, Accessible, Clean and Inspect
8 Hydraulically Operated Cargo Hatch, Inspect and Service
9 Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean
10 Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean
11 Vent Ducts, Engine And Motor Room, All, Commercial Cleaning
12 Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning
13 Vent Ducts, Laundry Exhaust, Commercial Cleaning
14 Vent Ducts, All Other, Commercial Cleaning
15 Potable Water Pneumatic Tanks, Clean and Inspect
16 Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift
18 Hydraulic Chain Stoppers, Inspect and Service
19 Crossdeck Winches, Inspect and Service
20 Hydraulic Inhaul Winch, Inspect And Service
21 Mechanical Chain Stoppers, Inspect and Service
22 Warping Capstan, Inspect and Service xii (Rev-0)
23 Commissary Hoist, Inspect and Service
24 Grey Water Holding Tanks, Clean and Inspect
25 Sewage Holding Tanks, Clean and Inspect
27 Sewage Piping, Clean and Flush
28 Temporary Services, Provide - Cutter
29 Single Point Davit, Inspect and Service
30 Welin Lambie Dual Point Davit TWPIV 5.0B, Inspect, Test, and Overhaul
31 Buoy Crane, Appleton EB600-60-40, Inspect and Service
40 Point of Use Potable Water Filters, Install xiii (Rev-0)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0"
Length between perpendiculars 206' 0"
Maximum beam 46'
Designed draft 13' 0"
Full load displacement 1905.6 Long Tons SW
Light ship displacement 1500.7 Long Tons SW
Minimum operating displacement 1869.2 Long Tons SW
Mast height (above 12' waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79
Frame spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction
Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of propellers 1
Number of blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW
Emergency diesel generator One Caterpillar 3406 DITA, 280 KW
Shore tie Two 450 VAC, 400 Amp, 3-wire
Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL
Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-0)
00000_0121_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor must be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 3 (Rev-0) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
7 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
8 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
9 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
10 (Rev-0)
12300_ESD_0121_FLT
REC_12311_FLT_225’ WLB ‘B’ Class (ALL) (0121)
WORK ITEM 1: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TYPE OF TANK LOCATION CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
Diesel Fuel Storage 4-17-1-F 5,090 161
Diesel Fuel Storage 4-17-4-F 3,457 109
Diesel Fuel Storage 4-30-0-F 20,615 651
Diesel Fuel Storage 4-30-1-F 7,225 228
Diesel Fuel Storage 4-30-2-F 7,225 228
Cargo Diesel Fuel
Storage
3-48-0-FF 5,549 175
Diesel Fuel Storage 3-48-1-F 7,813 247
Diesel Fuel Storage 3-48-2-F 7,813 247
Diesel Fuel Overflow 3-54-0-F 5,549 175
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 541-001, Rev G; Fuel Oil System Diagram
Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank
11 (Rev-0)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
OTHER REFERENCES
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Fuel
Piping
Tank access cover
3.1.4.1 Remove up to a total of 5,000 gallons of diesel fuel. Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.1.4.2 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations.
3.1.4.3 Provide the following to support Coast Guard personnel to refuel equipment:
boom around cutter tagout crane way equipment
12 (Rev-0)
Oil transfer supervisor.
NOTE
Vessel may come in with less tank fluid contents than specified above.
Initial and post repair operational tests apply only to tanks that possess TLIs.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.
TLI for tanks
3.3 Plug log. The Contractor must keep a written record of all plugs put in any tank vents. A separate list must be kept for each tank being entered.
3.3.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.3.2 The plug log must be available to the Coast Guard Inspector when the inspector is performing his close-out inspection on each tank.
3.4 Cleaning requirements. The Contractor must refer to Coast Guard Drawings 225B WLB 541-001 and 225B WLB 541-007 for guidance. The Contractor must remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual fuel or water, sediment, sludge, rust, or biological growth, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.5 Tank content and waste disposal. The Contractor must dispose of residual tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.6 Inspection. The Contractor must visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
Tank structural condition.
Inaccessible areas.
Condition of tank coating, including; measurements taken, percentage, location, and type of coating failure (if tank interior surfaces are coated).
Tank level indicator (TLI) and/or float switch condition, as applicable.
Sounding/vent tube and striker plate condition (including vent check valve and waster piece).
13 (Rev-0)
Suction and discharge piping condition.
Fastener material and condition (correct fastener material is stainless steel).
3.7 Tank closing. The Contractor must ensure that the tank(s) remain open for at least 24 hours after completion of any KO-authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
Chase threads on studs to ensure even installation of the access covers. Renew any damaged nuts.
3.7.1 The Contractor must renew 100% of fasteners.
3.8 Operational test, post repairs. After completion of work and in the presence of the Coast Guard
Inspector, the Contractor must thoroughly test and demonstrate the equipment listed below to be in satisfactory operating condition. Submit a CFR.
Designated tank TLIs
Vent check valves
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.9 Ultrasonic thickness (UT) measurement. The Contractor must take a total of 50 UT measurements of tank plating in each tank in accordance with SFLC Std Spec 0740, Appendix C in locations designated by the Coast Guard Inspector. Submit a CFR.
3.9.1 In addition to the UT measurements, take up to 10 pit-depth measurements within each tank, using a suitable pit depth gauge.
4. NOTES
4.1 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.
4.2 Tank inspection. The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.
4.3 Tank content restoration. The Ship’s force will procure new fluids and refill all tanks at the appropriate time.
14 (Rev-0)
12300_DCH_0714_IBCT
REC_12300(AccessibleVoidsWeather)_IBCT_225B WLB ‘B’ Class (ALL) (1213)
WORK ITEM 2: Voids (Accessible, Weather Deck Exposed), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect the following accessible voids:
VOID DESCRIPTION VOID LOCATION PLUG
QTY
BUOY PORT VOID PORT BUOY DECK 2
BUOY PORT VOID STBD BUOY DECK 2
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-
Component Adhesives (An)
MIL PRF-16173E INT AMD 1, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
15 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.2 (Inspection particulars).
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.2 Inspection particulars. In the presence of the Coast Guard Inspector, the Contractor shall accomplish the following tasks, using the Coast Guard drawings listed in Section 2 (References) as guidance; and submit a CIR:
3.2.1 Visual. Remove and dispose of the existing drain plugs. Plugs are heavily corroded and will require extra effort to remove, to include welding or cutting to extract old plugs. Note and collect any liquids draining from any of the voids, indicating the presence of a leak. Dispose of any drained liquids in accordance with all Federal, state, and local laws and regulations.
CAUTION
Some liquids that are drained may be may be classified as hazardous materials or hazardous waste depending on state and local regulations. The vessel environmental coordinator may assist with determination of waste category.
3.2.2 Air test. Apply a vacuum or pressure of 2 psig to the void, in accordance with SFLC Std Spec
0740, Appendix C.
3.3 Plug renewal. Upon completion of all work on appendages, the Contractor shall accomplish the following tasks:
Chase the hull insert threads of all plugs.
Install new stainless steel, Type 316, or Monel drain plugs, in place of original plugs.
Coat new plugs prior to installation with a sealing and locking compound conforming to
ASTM D5363-AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II.
16 (Rev-0)
4. NOTES
This section is not applicable to this work item.
17 (Rev-0)
12305_ESD_0121_FLT
REC_12311_FLT_225’ WLB ‘B’ Class (ALL) (0121)
WORK ITEM 3: Tanks, MP Fuel Service, Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following
TABLE 1 - FUEL SERVICE TANKS
LOW SUCTION
(GALLONS)
Diesel Fuel Service 3-61-1-F 4,341 137
Diesel Fuel Service 3-62-2-F 3,472 137
Emergency Generator
Diesel Fuel Service
01-78-1-F 576 0
Incinerator Diesel Fuel
Service
02-86-2-F 101 4
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 541-001, Rev G; Fuel Oil System Diagram
Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
18 (Rev-0)
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a Critical Inspection Report as required by the following paragraphs:
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Fuel
Piping
Tank access cover
3.1.4.1 The Contractor must remove up to a total of 5,000 gallons of diesel fuel. Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.1.4.2 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations
(see 4.2 (Tank content restoration)).
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard
Personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.
19 (Rev-0)
Designated tank TLIs
3.3 Plug log. The Contractor must keep a written record of all plugs put in any tanks vents. A separate list must be kept for each tank being entered.
3.3.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.3.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.
NOTE
Initial and post repair operational tests apply only to tanks that possess TLIs.
3.4 Cleaning requirements. The Contractor must remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual fuel or water, sediment, sludge, rust, or biological growth, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths. The Contractor must refer to Coast Guard Drawings 225B WLB
541-001 and 225B WLB 541-007 for guidance.
3.5 Tank content and waste disposal. The Contractor must dispose of residual tank contents and any cleaning…