Attachment 2 - FAR 52.212-1 and FAR 52.212-2.pdf
PDF 166 KB Posted
- Attached to
- 8-channel Transcranial Electrical Stimulator
- Solicitation number
- NIMH-21-004243
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2:
FAR 52.212-1, Instructions to Offerors – Commercial Items, (JUN 2020)
FAR 52.212-2, Evaluation – Commercial Items, (OCT 2014)
FAR 52.212-1, Instructions to Offerors – Commercial Items, (Jun 2020)
In addition to 52.212-1, Instructions to Offerors – Commercial, the following instructions apply to this acquisition.
The Government intends to issue a Firm Fixed Price purchase order for this requirement.
Invoicing shall be in accordance with the Prompt Payment Act and payment shall be made via Electronic Funds Transfer (EFT).
TECHNICAL PROPOSAL
Offerors may provide up to 10, 8.5 by 11-inch pages (using no less than 10 font size) as their proposal to be evaluated by the Source Evaluation Panel. The technical submission will address the Purchase Description and be responsive to the attached evaluation factors. The 10-page technical submission limitation does not include and is in addition to the price proposal. Technical submission pages in excess of this page limitation will not be considered.
PRICE PROPOSAL
The price quote shall include: unit price, list price, shipping and handling costs, delivery days after contract award, delivery terms, prompt payment discount terms, F.O.B. Point (Destination or Origin), product or catalog number(s); product description; and any other information or factors that may be considered in the award decision.
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Technical factors together shall be significantly more important than price. The following technical evaluation criteria will be used by the Government when reviewing the technical portion of the quotation. The criteria below are listed in descending order of relative importance.
Factor 1: Technical Approach
The Contractor’s proposal shall address each area of the Purchase Description requirements in sufficient detail to demonstrate a clear understanding of the technical proposal of how it meets each of the project requirements. This shall include the ability of the offeror to deliver a DC-
STIMULATOR with eight (8) electrically independent programmable channels. The stimulator should 1) have the ability to reach high frequency stimulation bands (1000Hz), 2) uses smaller size electrodes (down to 10 mm diameter), 3) have 8 freely programmable channels for direct current stimulation, alternating current stimulation, cranial electrical stimulation, galvanic vestibular stimulation, and random noise stimulation, 4) provide a current strength of up to
4000 mA.
Factor 2: Clinical Research Approach
The stimulator shall be used for clinical research transcranial electrical stimulation (tES) applications, delivering four (4) standard modes of stimulation: tDCS continuous stimulation, cyclical stimulation, sinus wave, and normally distributed random noise (tRNS).
Factor 3: Approach to Delivery and Warranty
The offer shall detail in its technical proposal how it shall meet the delivery and warranty requirements. All materials and shipping are to be provided by the offeror. A minimum of at least a 12-month comprehensive warranty is required.
Price Evaluation
NIH will consider and evaluate the following factors when determining an Offeror’s price quote:
• The CO will determine that the total price is reasonable.
• Any assumptions or clarifications to price provided by the Offeror.
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the
Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
File details come from the government source that posted it. Updated .