Attachment_2_-_Drawings_Kobayashi_Dock.pdf
PDF 758 KB Posted
- Attached to
- Kobayashi Dock Federal contract opportunity
- Solicitation number
- 140L3624Q0053
About this file
This document appears to be a set of drawings and specifications for a federal contract opportunity related to the Kobayashi Dock replacement project.
The key details are:
- The project involves furnishing and delivering a courtesy floating boat dock along Ennis Lake in Madison County, MT for the Bureau of Land Management's Dillon Field Office.
- The prefabricated dock system shall consist of three 20-foot by 8-foot sections, with one section attaching to an 8-foot wide concrete abutment using a hinge system.
- Required materials include composite decking, dock skirting, pontoons, cleats, wheels/bearings, dock anchoring attachments, and an abutment attachment/hinge system.
- The contract will be a Firm Fixed Price service contract awarded to a 100% Small Business under NAICS code 332999.
- Questions are due by 15 April 2024 and quotes are due by 18 April 2024.
- Award will be made via the Simplified Acquisition Procedures, with payment through the Invoice Processing Platform.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_02_0002.pdf | ||
| Sol_140L3624Q0053_Amd_0002.pdf | ||
| Attachment_1_-_Updated_SOW_Kobayashi_Dock_0001.pdf | ||
| Sol_140L3624Q0053_Amd_0001.pdf | ||
| Amendment_01_0001.pdf | ||
| Attachment_4_-_Price_Schedule.docx | DOCX document | |
| Sol_140L3624Q0053.pdf | ||
| Attachment_3_-_Additional_Information.pdf | ||
| Attachment_1_-_SOW_Kobayashi_Dock.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
CANADA
UNITED STATES
SASKATC
H
EW
AN
ALBERTA
B R
ITIS
H
C O
LU
M
B
IA
N O
R T
H
D
A K
O T
A
S O
U T
H
D
A K
O T
A
WYOMING
ALT
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
KOBIYASHI BEACH DOCK REPLACEMENT
MADISON COUNTY
DILLON FIELD OFFICE
DRAWING INDEX
01 COVER SHEET
02 KOBIYYASHI DOCK DETAILS
VICINITY MAP
(N.T.S)
ESTIMATED QUANTITIES
ITEM QUANTITY UNIT
FLOATING DOCK SYSTEM 1 EA
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEQHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. TE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO QUOTING THE WORK FOR THE CONSTRUCTION COVERED
BY THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE
(1-800-STAE-IT) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH
DISCREPANCY.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
ENGINEER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
C O
V E
R
S
H E
E T
PROJECT LOCATION
DIRECTIONS TO KOBIYASHI BEACH:
FROM BOZEMAN, HEAD WEST ON US-191 S./W MAIN ST TOWARD S
WILLSON AVE FOR 7.4 MILES. CONTINUE ONTO MT-84/NORRIS RD FOR
28.8 MILES. TURN LEFT ONTO US-287 S. TRAVEL SOUTH FROR 9.7
MILES. TURN LEFT ONTO N ENNIS LAKE RD. KOBIYASHI BEACH IS
LOCATED ON THE RIGHT-HAND SIDE OF THE ROAD AFTER 3.1 MILES.
K O
B I Y
A S
H I
D
O C
K
R
E P
L A
C E
M E
N T
B U
R E
A U
O
F
L A
N D
M
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
H E
I
T E
R I O
R
(DESIGNED BY: CLJ AND OTHERS DRAWN BY: CLJ CHECKED BY: GJA APPROVED BY:KRU)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
E
R
S
U P
P L Y
C
N
T R
A C
T
W E
S T
E R
N
M
O N
T A
I S
T R
I C
T
D I L L O
N
F
I E
L
F
I C
E
PROJECT DESCRIPTION:
Work effort consists of furnishing and delivery of a courtesy floating boat dock within the BLM's Dillion Field Office, located in Madison County, MT along Ennis Lake. The courtesy dock shall be designed for removal from the water in the winter. The prefabricated courtesy dock system shall consist of three, 20-foot-long by 8-foot-wide sections. One section shall attach to an 8' wide concrete abutment utilizing a hinge system that allows for vertical movement. The hinge system will be designed to be taken apart as the dock will need to be easily detached from the abutment each year. The contractor shall provide instructions/drawings on how to connect hinge system to current concrete abutment. The courtesy dock system shall be designed utilizing a galvanized steel frame. The Contractor will be required to provide documentation showing all material that must be approved by the government. Required materials are as follows:
· Composite Decking: 2” x 6” dimensions
· Dock Skirting
· Pontoons
· Cleats
· Wheels and Bearings
· Dock anchoring attachments
· Abutment attachment/hinge system
AutoCAD SHX Text
KOBIYASHI BOAT LANDING
AutoCAD SHX Text
ENNIS LAKE
AutoCAD SHX Text
BOZEMAN
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INTERSTATE HIGHWAY
AutoCAD SHX Text
U.S. HIGHWAY
AutoCAD SHX Text
STATE CAPITOL
AutoCAD SHX Text
BLM STATE OFFICE
AutoCAD SHX Text
BLM DISTRICT OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UPREPARED BY
AutoCAD SHX Text
AutoCAD SHX Text
STATE HIGHWAY
AutoCAD SHX Text CIVIL ENGINEER: CONNOR JOHNSON BUREAU OF LAND MANAGEMENT'S WESTERN MONTANA DISTRICT OFFICE 106 N. PAKRMONT BUTTE, MT 59701
%%uCOURTESY DOCK - PROFILE
AutoCAD SHX Text
%%UCOURTESY DOCK - PLAN
AutoCAD SHX Text
XX%%%
AutoCAD SHX Text
WATER ELEV
AutoCAD SHX Text
XXXX.XX
AutoCAD SHX Text
8'-0" WIDE CONCRETE
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
HINGE
AutoCAD SHX Text
OTHERS
AutoCAD SHX Text
OVERALLVIEW.DWG
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
JOHNSON
AutoCAD SHX Text
MONTANA WESTERN ZONE
AutoCAD SHX Text
BUTTE F.O.
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWING NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
OVER ALL VIEW COURTESY DOCK
AutoCAD SHX Text
KOBAYASHI BEACH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02/03/2024
AutoCAD SHX Text
DOCK SECTION 1
AutoCAD SHX Text
TIE UP CLEATS 3 PER DOCK SECTION
AutoCAD SHX Text
TOP OF CONCRETE RAMP
AutoCAD SHX Text FIRST DOCK TO HAVE HINGE SYSTEM AND LEGS FOR STAGING (WHEELS REQUIRED AT ALL OTHER ENDS OF DOCKS)
AutoCAD SHX Text
DOCK SECTION 2
AutoCAD SHX Text
DOCK SECTION 3
AutoCAD SHX Text
CHAIN ATTACH SYSTEM
AutoCAD SHX Text
LAKE FLOOR
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
INSTALL HINGE SYSTEM WITH A GANGWAY TRANSITION PIECE FROM ABUTMENT TO DOCK
AutoCAD SHX Text
CHAIN&TENSION-SYSTEM (INSTALLED BY BLM)
AutoCAD SHX Text
CONCRETE ANCHOR (INSTALLED BY BLM)
AutoCAD SHX Text
CONCRETE BLOCKS INSTALLED BY BLM
AutoCAD SHX Text
CHAIN ATTACH SYSTEM
AutoCAD SHX Text
CHAIN ATTACH SYSTEM
AutoCAD SHX Text
ANCHOR ATTACHMENT
AutoCAD SHX Text
ANCHOR ATTACHMENT
AutoCAD SHX Text
ANCHOR ATTACHMENT
AutoCAD SHX Text
ANCHOR ATTACHMENT
AutoCAD SHX Text
ANCHOR ATTACHMENT
AutoCAD SHX Text
ANCHOR ATTACHMENT
AutoCAD SHX Text
CONCRETE ABUTMENT WORK DONE BY BLM
AutoCAD SHX Text NOTE:ANCHOR ATTACHMENT CONNNECTION TO BE INSTALLED DURING FABRICATION. INSTALL CONNECTION APP. EVERY 20' AT THE END OF EACH DOCK SECTION ON EACH CORNER. CONNECTION MUST BE CONSTRUCTED TO WITHSTAND WAVE ACTION FORCES OF ENNIS LAKE.
AutoCAD SHX Text
DOCK SECTION 1
AutoCAD SHX Text
DOCK SECTION 3
AutoCAD SHX Text
DOCK SECTION 2
AutoCAD SHX Text
HINGE
HINGE
| KOBIYASHI COVR |
| Sheets and Views |
| KOBIYASHI - COVR-1 COVR |
| KOBIYASHI DOCK |
| Sheets and Views |
| KOBIYASHI DOCK-Model |
File details come from the government source that posted it. Updated .