The provided document appears to be Attachment 2 - Drawings for the Hoh Fiber Optic Trenching requirement under Solicitation Number 140P8324B0002, issued by the Department of the Interior National Park Service Pacific West Region.
This solicitation is for the trenching and installation of single-mode fiber optic cable in conduit with all necessary appurtenances in the Hoh Rain Forest. The work includes providing all labor, equipment, and materials required to complete the fiber optic cable installation. No specific pricing terms, set asides, award dates, or incumbent information is provided in this attachment. This document appears to be solely the technical drawings outlining the locations and specifications for the required fiber optic cable installation work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET SUB SHEET TITLE OF SHEET
1 G0 COVER SHEET
2 G1 GENERAL NOTES
3 G2 1968 EXISTING UTILITIES
4 G3 1992 SEWER AS-BUILT
5 G4 TRENCHING OVERVIEW
6 C1 VISITOR CENTER ELEVATION
7 C2 VISITOR CENTER TERMINATION
8 C3 WEST TRENCH ALIGNMENT
9 C4 CENTRAL TRENCH ALIGNMENT
10 C5 HOUSING TERMINATION
11 C6 EAST TRENCH ALIGNMENT
12 C7 RANGER STATION TERMINATION
13 C8 RANGER STATION ELEVATION
14 C9 TRENCH & VAULT DETAILS
15 C10 POST & NETWORK DETAILS
16 T1 PATCH PANEL WIRING DIAGRAM
UNITED STATES
DEPARTMENT OF THE INTERIOR
TITLE OF PROJECT
HOH FIBER OPTIC TRENCHING
DRAWING NO.
_149_
193,315
NATIONAL PARK SERVICE
OLYMPIC NATIONAL PARK
LOCATION WITHIN PARK
HOH RAIN FOREST
PMIS/PKG NO.
XXXXXX
REGION COUNTY STATE
PACIFIC WEST JEFFERSON WASHINGTON
SHEET
_1_ OF _16_
GENERAL NOTES
1. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH NPS STANDARDS, THE
LATEST WASHINGTON STATE (WSDOT) STANDARD SPECIFICATIONS FOR ROAD,
BRIDGE AND MUNICIPAL CONSTRUCTION, AND RELEVANT REQUIREMENTS OF
ANSI/TIA/EIA, NECA/NEIS & lSO/IEC FOR A STRUCTURED COMMUNICATIONS
SYSTEM (IN ADDITION TO OTHER STATE AND LOCAL STANDARDS).
2. CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND
PROTECTION OF EXISTING UTILITIES. CONTACT DIG ALERT AND FIELD VERIFY
ALL UTILITIES PRIOR TO EXCAVATION. CONTRACTOR SHALL BE RESPONSIBLE
FOR MAINTAINING ALL LOCATE MARKS ONCE UTILITIES HAVE BEEN LOCATED.
3. DIMENSIONS SHOWN ON PLANS ARE TO BE USED BY CONTRACTOR TO
DETERMINE APPROXIMATE FIELD CONDITIONS. PRIOR TO CONSTRUCTION,
CONTRACTOR SHALL FIELD VERIFY EXISTING LOCATIONS, ELEVATIONS,
MATERIAL TYPES, DIAMETER OF PIPES, ETC. OF ALL UTILITIES AND FEATURES
WHERE PROPOSED IMPROVEMENTS CONNECT.
4. EXISTING FACILITIES, INCLUDING BUT NOT LIMITED TO ROADS, WALKWAYS,
SIGNAGE, STRUCTURES, AND UTILITIES DAMAGED BY CONTRACTOR’S
OPERATIONS SHALL BE RESTORED TO MATCH ORIGINAL PRE-CONSTRUCTION
CONDITION WITHOUT ADDITIONAL COST.
5. ALL DISTURBED ASPHALT, CONCRETE, GRAVEL ROADS, GRASS, DRAINAGE
PATTERNS, ROADSIDE DITCHES, TRAILS AND GRADE SHALL BE RESTORED TO
ITS ORIGINAL CONDITION OR AS CALLED FOR IN THE CONTRACT DOCUMENTS,
WHICHEVER IS MORE STRINGENT.
6. CONTRACTOR SHALL FURNISH AND INSTALL EVERYTHING REQUIRED TO
PROVIDE COMPLETE AND OPERABLE FACILITIES AS SHOWN HEREIN. IF THERE
IS AN OMISSION ON THE CONSTRUCTION DOCUMENTS, SUCH OMISSION
SHALL NOT BE CONSTRUED TO MEAN THAT THE CONTRACTOR IS NOT
REQUIRED TO FURNISH OR PROVIDE EVERYTHING THAT IS NECESSARY TO
PROVIDE COMPLETE AND OPERABLE FACILITIES.
7. EQUIPMENT USED ONSITE SHALL BE PRESSURE CLEANED AND FREE OF WEEDS,
SEED, DEBRIS AND MUD TO PREVENT INTRODUCTION AND/OR SPREAD OF
EXOTIC, INVASIVE PLANTS. EQUIPMENT SHALL BE INSPECTED DAILY FOR
LEAKS, AND NECESSARY REPAIRS SHALL BE MADE PRIOR TO OPERATION.
8. ALL CONTRACTORS WORKING WITH THE PROJECT BOUNDARIES ARE RESPONSIBLE
FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS, INCLUDING REQUIRED
TRENCH SHORING. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EMPLOYEES
AND/OR SUBCONTRACTORS WITH PERSONAL PROTECTIVE EQUIPMENT AND
FOLLOWING ALL SAFETY PROTOCOLS.
9. TRENCH EXCAVATION, BEDDING AND BACKFILL SHALL BE ACCOMPLISHED IN
ACCORDANCE WITH WSDOT SECTION 7-08. TRENCH SHALL BE KEPT FREE FROM
WATER UNTIL JOINTING IS COMPLETE. CONTRACTOR SHALL MAINTAIN SUFFICIENT
PUMPING EQUIPMENT ON THE JOB TO ENSURE THESE PROVISIONS ARE CARRIED
OUT.
10. ALL COSTS INCURRED IN CORRECTION OF DEFICIENT WORK SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
11. CONSTRUCTION FENCING OR BARRIERS SHALL BE PROVIDED WHERE NECESSARY,
INCLUDING AROUND OPEN EXCAVATIONS WHEN WORK IS NOT ACTIVELY IN
PROGRESS, TO PREVENT THE PUBLIC FROM ENTERING WORK AREAS.
12. UNLESS OTHERWISE INDICATED, DEMOLISHED MATERIALS BECOME THE PROPERTY
OF THE CONTRACTOR. COMPLY WITH EPA REGULATIONS AND DISPOSAL
REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
13. ARCHAEOLOGICAL MONITORING IS REQUIRED. PROVIDE THREE WEEKS NOTICE PRIOR
TO CONSTRUCTION START DATE.
14. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR ALL WORK CONDUCTED
WITHIN THE ROAD CORRIDOR. CONTRACTOR SHALL ENSURE ONE LANE REMAINS
OPEN AND ACCESSIBLE FOR TRAVEL AT ALL TIMES.
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
GENERAL NOTES
DRAWING NO.
_149_
193,315
TECH REVIEW:
G1 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
_2_ OF _16_
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
1968 EXISTING UTILITIES
DRAWING NO.
_149_
193,315
TECH REVIEW:
G2 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
_3_ OF _16_
SUB SHEET NO. TITLE OF SHEET
1992 SEWER AS-BUILT
DRAWING NO.
_149_
193,315
TECH REVIEW:
G3 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
_4_ OF _16_
SUB SHEET NO. TITLE OF SHEET
TRENCHING OVERVIEW
DRAWING NO.
_149_
193,315
TECH REVIEW:
G4 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_5_ OF _16_
VISITOR
CENTER
MAINTENANCE
SHOP
RANGER
STATION
HOUSING
LEGEND:
FIBER OPTIC TRENCH
4’X4’X4’ H-20 FIBER VAULT WITH 12-PORT PATCH PANEL
STARLINK SATELLITE POST WITH ENCLOSURE
ELECTRICAL TRENCH
SUB SHEET NO. TITLE OF SHEET
VISITOR CENTER ELEVATION
DRAWING NO.
_149_
193,315
TECH REVIEW:
C1 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_6_ OF _16_
4” CONDUIT
2” CONDUIT
14 x 19 x 12
HDPE PULL BOX
INSTALL 6-PORT ST
FIBER PATCH
PANEL
APPROXIMATE
LOCATION OF
CONDUIT
PENETRATION
UNDER RAFTERS
APPROXIMATE
LOCATION OF
CONDUIT ROUTED
THROUGH ATTIC &
INTO MECHANICAL
ROOM VIA OPEN
ACCESS HATCH
NOTES:
1. TRANSITION FROM 4” HORIZONTAL (UNDERGROUND)
CONDUIT TO 2” VERTICAL CONDUIT VIA 14” X 19” X
12” HDPE PULL BOX LOCATED AT SOUTHWEST
CORNER OF VISITOR CENTER.
2. SUPPORT 2” CONDUIT AT INTERVALS NO LESS THAN
3’. ROUTE CONDUIT VERTICALLY AT SOUTHWEST
CORNER, THEN NORTH UNDERNEATH RAFTERS TO
PENETRATE ATTIC SPACE. EXTERIOR CONDUIT SHALL
BE PAINTED IN COLOR ‘BEACHWOOD’ TO MATCH
EXISTING SIDING.
3. ROUTE CONDUIT THROUGH ATTIC SPACE TO
TERMINATE AT ACCESS HATCH ON NORTH WALL OF
VISITOR CENTER MECHANICAL ROOM.
4. TERMINATE FIBER WITH 10’ OF SLACK COILED IN
ATTIC SPACE AND ONE ST SINGLE MODE CONNECTOR
PAIR CONNECTED TO NEW 6-PORT ST FIBER PATCH
PANEL, MOUNTED ON WALL.
ACCESS HATCH
SUB SHEET NO. TITLE OF SHEET
VISITOR CENTER TERMINATION
DRAWING NO.
_149_
193,315
TECH REVIEW:
C2 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_7_ OF _16_
NOTES:
1. SEE SUB SHEET NO. C1 FOR
WEST ELEVATION OF
VISITOR CENTER
2. TRENCH ALIGNMENT SHALL
FOLLOW WATER LINE
ALIGNMENT, AS INDICATED
BY PATCHED UTILITY CUTS
IN ASPHALT
MATCH TO WEST TRENCH
ALIGNMENT – SUB SHEET NO. C3
14 x 19 x 12
HDPE PULL BOX
MECHANICAL
ROOM
ROAD CUTS
INDICATING WATER
LINE TRENCH
SUB SHEET NO. TITLE OF SHEET
WEST TRENCH ALIGNMENT
DRAWING NO.
_149_
193,315
TECH REVIEW:
C3 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_8_ OF _16_
MATCH TO VISITOR CENTER
TERMINATION – SUB SHEET NO. C2
FOLLOW EXISTING
WATER LINE ALIGNMENT
& ROAD CUTS
CUT & REPLACE
CONCRETE CURB
MATCH TO CENTRAL TRENCH
ALIGNMENT – SUB SHEET NO. C4
SUB SHEET NO. TITLE OF SHEET
CENTRAL TRENCH ALIGNMENT
DRAWING NO.
_149_
193,315
TECH REVIEW:
C4 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_9_ OF _16_
NOTES:
1. FOLLOW EXISTING WATER LINE ALIGNMENT AND ROAD CUTS
2. CUT & REPLACE CONCRETE CURB (2 LOCATIONS SHOWN ON SUB SHEET NO. C4)
3. PROTECT IN PLACE OR REMOVE AND REPLACE SIGNAGE IMPACTED BY CONSTRUCTION
LOOKING SOUTH ACROSS RV PARKING
(FOREGROUND) & MAIN ROAD LOOP
LOOKING NORTH TOWARD MAIN ROAD AND PARKING LOOP
FROM HOUSING/RANGER STATION ACCESS ROAD
LOOKING NORTHWEST ALONG HOUSING/RANGER STATION ACCESS ROAD
SUB SHEET NO. TITLE OF SHEET
HOUSING TERMINATION
DRAWING NO.
_149_
193,315
TECH REVIEW:
C5 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_10_ OF _16_
NOTES:
1. TRANSITION FROM 4” HORIZONTAL (UNDERGROUND)
CONDUIT TO 2” VERTICAL CONDUIT VIA 14” X 19” X
12” HDPE PULL BOX LOCATED AT BASE OF POST.
2. INSTALL 1” ELECTRICAL CONDUIT FROM WEATHER
STATION POWER SOURCE TO NEMA 3 RATED
ENCLOSURE ON POST. PROVIDE PULL STRING FOR NPS
TO RUN 120V CONDUCTORS AT FUTURE DATE.
3. MOUNT 18” X 14” X 9” NON-METALLIC NEMA 3
LOCKABLE ENCLOSURE ON POST. TERMINATE 1” & 2”
CONDUITS FROM THE PULL BOX INTO THE
ENCLOSURE BASE. EXTEND ONE 1” CONDUIT FROM
TOP OF ENCLOSURE TO TOP OF POST FOR FUTURE
USE WITH STARLINK SATELLITE CABLE (TO BE
INSTALLED BY NPS).
4. TERMINATE FIBER WITH 2’ OF FREE STRAND (NO
JACKET) SLACK AND ONE ST SINGLE MODE
CONNECTOR PAIR CONNECTED TO NEW 6-PORT ST
FIBER PATCH PANEL, MOUNTED INSIDE ENCLOSURE.
COORDINATE WITH NPS FOR EXACT MOUNTING
LOCATION.
14 x 19 x 12
HDPE PULL BOX
AT BASE OF POST
LEGEND:
FIBER OPTIC TRENCH
STARLINK SATELLITE POST WITH ENCLOSURE
ELECTRICAL TRENCH
SUB SHEET NO. TITLE OF SHEET
EAST TRENCH ALIGNMENT
DRAWING NO.
_149_
193,315
TECH REVIEW:
C6 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_11_ OF _16_
NOTES:
1. PROVIDE AASHTO H-20 LOAD RATED
CONCRETE VAULT WITH COVER. H2 PRE-CAST,
INC. 444 VAULT BASE WITH 440-13 COVER, OR
EQUAL AS APPROVED BY NPS CONTRACTING
OFFICER. SET TOP OF VAULT FLUSH WITH
FINISHED SURFACE.
2. TERMINATE ALL FIBER OPTIC CABLE WITH 10’
OF SLACK PER LINE (COILED AND SECURED
INSIDE VAULT) AND ONE (OR MORE) ST
SINGLE MODE CONNECTOR PAIR CONNECTED
TO NEW 12-PORT ST FIBER PATCH PANEL,
MOUNTED INSIDE VAULT. SEE SUB SHEET NO.
C9 FOR VAULT DETAIL AND E1 FOR PATCH
PANEL WIRING DIAGRAM.
3. NOTE THAT RANGER STATION AND
MAINTENANCE SHOP FIBER OPTIC CONDUIT
SHALL SHARE A TRENCH UNTIL POINT OF
DIVERGENCE.
SUB SHEET NO. TITLE OF SHEET
RANGER STATION TERMINATION
DRAWING NO.
_149_
193,315
TECH REVIEW:
C7 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_12_ OF _16_
MAINTENANCE SHOP
ROUTE THROUGH WEST WALL
OF MAINTENANCE SHOP VIA
EXISTING PENETRATION
14 x 19 x 12
HDPE PULL BOX
RE-USE OR REPLACE EXISTING
1 ½” CONDUIT & PENETRATION
SUB SHEET NO. TITLE OF SHEET
RANGER STATION ELEVATION
DRAWING NO.
_149_
193,315
TECH REVIEW:
C8 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_13_ OF _16_
NOTES:
1. TRANSITION FROM 4” HORIZONTAL (UNDERGROUND) CONDUIT TO EXISTING 1 ½” VERTICAL CONDUIT VIA 14” X 19” X 12” HDPE
PULL BOX LOCATED UNDER PEAK OF RANGER STATION ON WEST SIDE. CAREFULLY CUT AND RE-CONNECT EXISTING 1 ½”
CONDUIT TO PASS THROUGH NEW PULL BOX, OR REPLACE VERTICAL SEGMENT IN-KIND.
2. PROTECT EXISTING ETHERNET CABLE INSIDE EXISTING 1 ½” CONDUIT. CUT EXISTING CONDUIT AND LOCATE PULL BOX SO THAT ETHERNET CABLE CAN BE RE-ESTABLISHED. COORDINATE ETHERNET CABLE OUTAGE WITH NPS CONTRACTING OFFICER.
3. ROUTE CONDUIT THROUGH INTERIOR WOOD CABINET TO TERMINATE AT MEDIA CONVERTER LOCATED INSIDE ENCLOSURE.
4. TERMINATE FIBER WITH 5’ OF SLACK, INCLUDING 2’ OF FREE STRAND (NO JACKET) SLACK, COILED OUTSIDE EXISTING CABINET
AND THREE ST SINGLE MODE CONNECTOR PAIRS CONNECTED TO NEW 6-PORT ST FIBER PATCH PANEL, TO BE MOUNTED BY NPS
INSIDE ENCLOSURE WITH EXISTING MEDIA CONVERTER.
RE-USE OR REPLACE
EXISTING 1 ½” CONDUIT FOR
OPTICAL FIBER
4” CONDUIT 14 x 19 x 12
HDPE PULL BOX
MEDIA CONVERTER
LOCATED INSIDE
ENCLOSURE
SUB SHEET NO. TITLE OF SHEET
TRENCH & VAULT DETAILS
DRAWING NO.
_149_
193,315
TECH REVIEW:
C9 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_14_ OF _16_
4” M
IN
2” MIN. BEDDING
A TRENCH & CONDUIT DETAIL
C9 N.T.S.
VA
RI
ES
8”
M
IN
B H-20 CONCRETE VAULT SECTIONS & PLAN
C9 N.T.S.
INSTALL MAGNETIC 3” WIDE
DETECTABLE TAPE 12” ABOVE
CONDUIT
NOTES:
1. CONCRETE 28 DAY COMPRESSIVE STRENGTH
4,500 PSI.
2. REBAR ASTM A-615 GRADE 60, MESH ASTM A-
185 GRADE 65.
3. ASTM C-857 MINIMUM STRUCTURAL DESIGN
LOADING FOR UNDERGROUND PRECAST
CONCRETE STRUCTURES.
4. H-20 LOAD RATING FOR INCIDENTAL TRAFFIC.
5. GROUT TO FULL WALL THICKNESS AROUND
PIPES AT KNOCKOUTS.
10 CF OF 1” TO 1 ½”
GRAVEL UNDER SUMP
SUB SHEET NO. TITLE OF SHEET
POST & NETWORK DETAILS
DRAWING NO.
_149_
193,315
TECH REVIEW:
C10 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_15_ OF _16_
A SATELLITE POST DETAIL
C10 N.T.S.
B FIBER OPTIC NETWORK SCHEMATIC DIAGRAM
C10 N.T.S.
NOTES:
1. WOOD SERVICE POST SHALL
BE 25’ MIN (SET 5’MIN INTO
GROUND).
2. SERVICE POST SHALL BE
SOLID (NOT LAMINATED) 6”
X 6” TIMBER, PRESSURE
TREATED FOR GROUND
CONTACT.
3. CONDUIT SHALL BE 1” & 2”
SCH 40 PVC, FASTENED TO
POST AT INTERVALS NOT
GREATER THAN 3’.
4. ALL CONDUIT AND FITTINGS
SHALL BE RAIN-TIGHT.
1” SCH
40 PVC
NEMA 3 NON-
METALLIC ENCLOSURE
18” x 14” x 9”
22” TRENCH DEPTH
TO TOP OF CONDUIT
25’ MIN
5’ MIN
1” & 2” SCH
40 PVC
HDPE LIGHT-DUTY PULL BOX
14” x 19” x 12”
36” RADIUS 90 DEGREE SCH 40
PVC SWEEP ELBOW
NPS TO MOUNT
STARLINK SATELLITE
UNIT TO TOP OF POST
(FUTURE) 120V POWER
(FROM WEATHER
STATION – NPS)
STARLINK UNIT
(W/ SATELLITE
CABLE – NPS)
- 6-PORT ST FIBER
PATCH PANEL
- MEDIA CONVERTER (NPS )
- 120V GFCI RECEPTACLE (NPS)
- STARLINK POWER SUPPLY W/
AC CABLE (NPS)
VISITOR CENTER
6-PORT ST FIBER
PATCH PANEL
RANGER STATION
6-PORT ST FIBER
PATCH PANEL
MAINTENANCE SHOP
6-PORT ST FIBER
PATCH PANEL
12-PORT SINGLE MODE ST
FIBER PATCH PANEL
4’ x 4’ x 4’ H-20 VAULT
NEMA 3 ENCLOSURE
LEGEND:
ST SINGLE MODE CONNECTORS
SUB SHEET NO. TITLE OF SHEET
PATCH PANEL WIRING DIAGRAM
DRAWING NO.
_149_
193,315
TECH REVIEW:
T1 HOH FIBER OPTIC TRENCHING
PMIS/PKG NO.
XXXXXX
DATE:
4/2024
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_16_ OF _16_
LEGEND:
SL STARLINK SATELLITE POST – HOUSING AREA
M MAINTENANCE SHOP – OFFICE CORNER
VC VISITOR CENTER – MECHANICAL ROOM
RS RANGER STATION – OFFICE AREA
ALL CONNECTIONS ON
“OTHER SIDE” OF 6-PORT
PATCH PANELS WILL BE
MADE BY NPS AFTER
FIBER OPTIC TESTING &
ACCEPTANCE
| Slide Number 1 |
| GENERAL NOTES |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
File details come from the government source that posted it. Updated .