Attachment 2 - Drawings.pdf
PDF 7 MB Posted
- Attached to
- Construct SOF 65 SOS Infrastructure and Security Building 90131 Federal contract opportunity
- Solicitation number
- FA441721R0003
About this file
This solicitation is for the construction of 65 SOS Infrastructure and Security Building 90131 at Hurlburt Field, Florida. The contractor shall furnish all labor, materials, tools, supervision and equipment to complete all work in accordance with the provided drawings and specifications. The work includes constructing the building foundation, roof framing, concrete details, and completing the building in accordance with the 195 calendar day period of performance after issuance of the notice to proceed. The Department of the Air Force Special Operations Command is the issuing agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA441721R00030003 SF 30.pdf | ||
| Solicitation Amendment FA441721R00030002 SF 30.pdf | ||
| FA441721R0003 J_A _Redacted.pdf | ||
| Attachment 2 - Revised Drawings.pdf | ||
| RFP Questions Answers - 10 Feb 21 CE responses.pdf | ||
| Attachment 1 - Revised Specifications.pdf | ||
| Site Visit Brief.pdf | ||
| Site Visit - List of Contractors.docx | DOCX document | |
| Solicitation Amendment FA441721R00030001 SF 30.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Solicitation - FA441721R0003.pdf | ||
| Attachment 6 - 50 Division Construction Cost Estimate Worksheet.xls | XLS spreadsheet | |
| Attachment 4 - PPQ.docx | DOCX document | |
| Attachment 1 - Specifications.pdf | ||
| Attachment 5 - Financial Reference Sheet.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR REFERENCE ONLY
ZONE
(SEE FIGURE)
ROOF ZONE 1
ROOF ZONE 2
ROOF ZONE 3
WIND PRESSURE (+) / SUCTION (-) IN POUNDS PER SF
-69.0
-105.0
-207.0
EFFECTIVE WIND AREA (FEET SQUARE)
COMPONENTS AND CLADDING WIND
NOTE: a=4'-0" INTERNAL PRESSURE COEFFICIENT = +/-0.00
32.3
48.6
64.6
NOTES:
1. POSITIVE SIGN INDICATES THAT THE PRESSURE IS ACTING TOWARDS THE
SURFACE. NEGATIVE SIGN INDICATES THAT THE PRESSURE IS ACTING AWAY
FROM THE STRUCTURE.
2. THE WIND LOADS SHOWN HAVE BEN CALCULATED INTERNATIONAL BUILDING
CODE 2018 EDITION AND ASCE 7-16. LINEAR INTERPOLATION MAY BE APPLIED
FOR LOADING AREAS BETWEEN THE PROVIDED. LOADS SHOWN ARE ULTIMATE
LOADS AND MAY BE FACTORED BY 0.6 WHEN APPLICABLE TO REDUCE TO ASD
LOADING PRESSURES. THIS INCLUDES ALL ROOF SYSTEMS.
-69.0
-105.0
-105.0
ROOF WIND PRESSURE DIAGRAM
NOTE: a=4'-0"
"a
"a
"a" "a"
32.3
48.6
64.6
32.3
48.6
64.6
-69.0
-105.0
-207.0
MAIN WIND FORCE RESISTING WIND LOAD
INTERNAL PRESSURE COEFFICIENT = +/-0.18
MAIN WIND FORCE RESISTING
SYSTEM PRESSURES
ROOF
OPEN
WIND
VELOCITY
WALL
(PSF)(MPH) (PSF)
-49.4145 N/A
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
A
TI
O
M M
S
CO
D
S
P E
C
IA
L O
P E
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
H U
R
LB
U R
T
FI
E
LD
, F
LO
R
ID
A
O P
E R
A
TI
O N
S C
O M
M A
N D
A
IR
F O
R C
E S
P E
C
IA
L
SHEETNUMBER:
SHEET REFERENCE:
R E
V
D E
S C
R
IP
T
IO
N D
A T
E
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
PEI 20063
S O
F C
O N
S
TR
U C
T
S O
S
IN
FR
A
S
TR
U C
TU
R
E A
N D
S E
C U
R
IT
Y , B
U
IL
D
IN
G
G E
N E
R A
L N
O T
E S
S-001
DJM
WEH
7 DEC 2020
CP1038168
90131
STRUCTURAL - GENERAL NOTES
1. TO THE BEST OF OUR KNOWLEDGE, THE STRUCTURAL PLANS AND SPECIFICATIONS COMPLY
WITH THE APPLICABLE REQUIREMENTS OF THE FOLLOWING GOVERNING DESIGN CODES:
A. INTERNATIONAL BUILDING CODE 2018 EDITION
B. AISC STEEL CONSTRUCTION MANUAL (2016 EDITION)
C. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, (ACI 318-14)
D. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES (ASCE 7-16)
E. STRUCTURAL WELDING CODE AWS D1.1, 2008
F. UFC 1-200-01, DoD BUILDING CODE, 8 OCTOBER 2019
G. UFC 3-301-01, STRUCTURAL ENGINEERING, 1 OCTOBER 2019
H. UFC 3-320-06A, CONCRETE FLOOR SLABS ON GRADE SUBJECTED TO HEAVY LOADS, 1
MARCH 2005
2. THE STRUCTURAL DOCUMENTS ARE TO BE USED IN CONJUNCTION WITH THE
ARCHITECTURAL, MECHANICAL, AND ELECTRICAL. USE THESE NOTES IN CONJUNCTION WITH
THE PROJECT SPECIFICATIONS. IF A CONFLICT EXISTS, THE MORE STRINGENT GOVERNS.
3. SEE PROJECT SPECIFICATIONS FOR TESTING.
4. THE CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS; INCLUDING DIMENSIONS,
AND SITE CONDITIONS AND COORDINATE WITH FIELD DIMENSIONS AND PROJECT SHOP
DRAWINGS PRIOR TO CONSTRUCTION. ANY AND ALL DISCREPANCIES SHALL BE SUBMITTED IN
WRITING TO CONTRACTING OFFICER. DO NOT MODIFY OR CHANGE THE SIZE OR DIMENSIONS
OF STRUCTURAL MEMBERS WITHOUT WRITTEN INSTRUCTIONS FROM THE CONTRACTING
OFFICER.
5. IT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR TO LOCATE ANY AND ALL
EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT, AND TO PROTECT EXISTING
FACILITIES, STRUCTURES AND UTILITY LINES FROM ALL DAMAGE. EACH CONTRACTOR SHALL
PROTECT HIS WORK, ADJACENT PROPERTY AND THE PUBLIC. EACH CONTRACTOR IS SOLELY
RESPONSIBLE FOR DAMAGE OR INJURY DUE TO HIS ACT OR NEGLECT.
6. WHERE A CONSTRUCTION DETAIL IS NOT SHOWN OR NOTED, THE DETAIL SHALL BE THE
SAME AS FOR OTHER SIMILAR WORK. DETAILS LABELED "TYPICAL DETAILS" ON THE
DRAWINGS APPLY TO ALL SITUATIONS THAT ARE THE SAME OR SIMILAR TO THOSE
SPECIFICALLY DETAILED. ANY QUESTIONS REGARDING APPLICABILITY OF TYPICAL DETAILS
SHALL BE RESOLVED BY THE CONTRACTING OFFICER.
7. DESIGN LOAD CRITERIA:
A. BUILDING OCCUPANCY CATEGORY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II
B. GRAVITY LOADS:
a. SLAB-ON-GRADE (U.N.O.). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 PSF
b. ROOF LIVE LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 PSF
c. ROOF DEAD LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 PSF
8. WIND LOADS:
A. ULTIMATE DESIGN WIND SPEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .145 MPH B. NOMINAL DESIGN WIND SPEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112 MPH C. WIND EXPOSURE CATEGORY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D D. INTERNAL PRESSURE COEFFICIENT . . . . . . . . . . . . . . . . . . . . . . . . . . . ±0.00 (OPEN)
9. SEISMIC LOADS:
A. SEISMIC IMPORTANCE FACTOR Ie. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0 B. SEISMIC RESPONSE, Ss . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (0.075) 7.5% C. SEISMIC RESPONSE, S1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (0.053) 5.3% D. SPECTRAL RESPONSE, Sds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.080g E. SPECTRAL RESPONSE, Sd1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.085g
F. SEISMIC FORCE RESISTING SYSTEM. . .STEEL ORD. CONC. BRACED FRAMES
E. DESIGN BASE SHEAR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A G. SEISMIC RESPONSE COEFFICIENT, Cs. . . . . . . . . . . . . . . . . . . . . .(0.0246) 2.46% H. RESPONSE MODIFICATION COEFFICIENT, R. . . . . . . . . . . . . . . . . . . . . 3.25
I. SEISMIC DESIGN CATEGORY . . . . . . . . . . . . . EQUIVALENT LATERAL FORCE
J. SEISMIC DESIGN CATEGORY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B
10. THE SPECIALTY ENGINEER, DEFINED AS - A PROFESSIONAL ENGINEER, LICENSED IN THE
STATE WHERE THE PROJECT IS LOCATED, WHO PERFORMS SPECIALTY STRUCTURAL
ENGINEERING SERVICES FOR SELECTED SPECIALTY-ENGINEERED ELEMENTS IDENTIFIED IN
THE CONTRACT DOCUMENTS, AND WHO HAS EXPERIENCE AND TRAINING IN THE SPECIALTY.
DOCUMENTS SIGNED AND SEALED BY THE SPECIALTY ENGINEER SHALL BE COMPLETED BY
OR UNDER THE DIRECT SUPERVISION OF THE SPECIALTY ENGINEER. AT MINIMUM ALL METAL
BUILDING COMPONENTS AND MEMBERS, ETC AND THEIR ATTACHMENTS TO THE STRUCTURE
SHALL BE DESIGNED BY A SPECIALTY ENGINEER TO CONFORM TO ALL LOADING
REQUIREMENTS.
11. DO NOT SCALE THE DRAWINGS, USE DIMENSIONS SHOWN ON PLAN IN CONJUNCTION WITH
CONTRACTOR FIELD VERIFIED INFORMATION. IF A CONFLICT EXISTS, NOTIFY THE
CONTRACTING OFFICER IN WRITING FOR RESOLUTION OF ANY AND ALL CONFLICTS.
SHOP DRAWING SUBMITTALS
1. THE REVIEW OF SUBMITTALS AND/ OR SHOP DRAWINGS DONE BY THE STRUCTURAL ENGINEER
DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP
DRAWINGS BEFORE SUBMITTAL TO THE STRUCTURAL ENGINEER. THE REVIEW BY THE
STRUCTURAL ENGINEER IS FOR GENERAL CONFORMANCE ONLY. IF SHOP DRAWINGS HAVE
NOT BEEN REVIEWED AND APPROVED BEFORE SUBMITTAL TO THE STRUCTURAL ENGINEER,
THEY SHALL BE RETURNED WITHOUT APPROVAL.
2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY AND ALL ERRORS AND OMISSIONS
ASSOCIATED WITH THE PREPARATION OF ALL SHOP DRAWINGS IN RELATIONSHIP TO THE
CONSTRUCTION DOCUMENTS.
3. ALL MODIFICATIONS MADE FOR SUBMITTALS THAT ARE RE-SUBMITTED SHALL CLEARLY NOTE
ALL CHANGES.
4. REPRODUCING THE CONTRACT DOCUMENTS FOR USE AS SHOP DRAWINGS IS NOT ALLOWED,
AND SHOP DRAWINGS WILL BE RETURNED WITHOUT APPROVAL.
5. GENERAL SHOP DRAWING REQUIREMENTS:
A. SUBMIT SHOP DRAWINGS AND ANY OTHER SPECIAL INFORMATION NECESSARY FOR
PROPER FABRICATION, ERECTION, AND PLACEMENT OF STRUCTURAL FABRICATIONS.
INCLUDE PLANS, ELEVATIONS, AND SECTIONS. CLEARLY SHOW ANCHORAGES,
CONNECTIONS, AND ACCESSORY ITEMS. THE DETAILER MUST INTERPRET THE
CONTRACT DOCUMENTS AND CLEARLY CONVEY THIS INTERPRETATION TO THE FIELD IN
THE FORM OF PLACING OR ERECTION DRAWINGS.
B. CONCRETE REINFORCING DETAILER- PROVIDE PLACING DRAWINGS FOR FABRICATION
AND PLACING OF REINFORCING STEEL. THESE DRAWINGS SHALL INCLUDE, BUT ARE
NOT LIMITED TO THE FOLLOWING: BAR LISTS, SCHEDULES, BENDING DETAILS, PLACING
DETAILS, PLACING PLANS, AND PLACING ELEVATIONS.
• CLEARLY SHOW FOUNDATION REINFORCING. INDICATE BAR LENGTHS, LOCATION
AND SPLICES OF CONTINUOUS BARS, AND BAR SUPPORTS. CLEARLY SHOW
LOCATIONS OF ALL DOWELS ON PLAN. INDICATE FOOTING STEP LOCATIONS AND
PROVIDE DETAILS.
SPECIALTY ENGINEER SHOP DRAWING SUBMITTALS
1. SPECIALTY ENGINEER:
A. SHALL BE AN EMPLOYEE OR OFFICER OF A FABRICATOR, AN
EMPLOYEE OR OFFICER OF AN ENTITY SUPPLYING COMPONENTS
TO A FABRICATOR, OR AN INDEPENDENT CONSULTANT RETAINED
BY THE FABRICATOR OR HIS SUPPLIER.
2. THE FOLLOWING SYSTEMS AND COMPONENTS AS A MINIMUM REQUIRE
FABRICATION AND ERECTION DRAWINGS WITH ROOF SYSTEMS (INCLUDING
PRE-ENGINEERED METAL BUILDING STRUCTURE.
3. THE SPECIALTY ENGINEER OR MANUFACTURER SHALL DESIGN, PROVIDE,
AND INSTALL THEIR COMPONENTS AND THE COMPONENT CONNECTIONS
TO THE PRIMARY STRUCTURE PER THE CRITERIA STATED IN THESE NOTES
OR THE CURRENT GOVERNING BUILDING CODES, WHICHEVER IS MORE
STRINGENT.
4. SUBMITTALS SHALL CLEARLY IDENTIFY THE SPECIFIC PROJECT AND
APPLICABLE CODES, LIST THE DESIGN CRITERIA, AND SHOW ALL DETAILS
AND PLANS NECESSARY FOR PROPER FABRICATION AND INSTALLATION.
CALCULATIONS AND SHOP DRAWINGS SHALL IDENTIFY SPECIFIC PRODUCT
UTILIZED. GENERIC PRODUCTS WILL NOT BE ACCEPTED.
5. SHOP DRAWINGS AND CALCULATIONS REQUIRE THE SEAL, DATE AND
SIGNATURE OF THE SPECIALTY ENGINEER. COMPUTER PRINTOUTS ARE AN
ACCEPTABLE SUBSTITUTE FOR MANUAL COMPUTATIONS PROVIDED THEY
ARE ACCOMPANIED BY SUFFICIENT DESCRIPTIVE INFORMATION TO PERMIT
THEIR PROPER EVALUATION. SUCH DESCRIPTIVE INFORMATION SHALL
BEAR THE SEAL AND SIGNATURE OF THE SPECIALTY ENGINEER AS AN
INDICATION THAT HE HAS ACCEPTED RESPONSIBILITY FOR THE RESULTS.
6. REVIEW BY THE STRUCTURAL ENGINEER OF RECORD OF SUBMITTALS IS
LIMITED TO VERIFYING THE FOLLOWING
A. THAT THE SPECIFIED STRUCTURAL SUBMITTALS HAVE BEEN
FURNISHED.
B. THAT THE STRUCTURAL SUBMITTALS HAVE BEEN SIGNED AND
SEALED BY THE SPECIALTY ENGINEER.
C. THAT THE SPECIALTY ENGINEER HAS UNDERSTOOD THE DESIGN
INTENT AND HAS USED THE SPECIFIED STRUCTURAL CRITERIA. (NO
DETAILED CHECK OF CALCULATIONS WILL BE MADE.)
D. THAT THE CONFIGURATION SET FORTH IN THE STRUCTURAL
SUBMITTALS IS CONSISTENT WITH THE CONTRACT DOCUMENTS.
(NO DETAILED CHECK OF DIMENSIONS OR QUANTITIES WILL BE
MADE.)
7. SUBMITTALS NOT MEETING THE ABOVE REQUIREMENTS WILL NOT BE
REVIEWED AND WILL BE RETURNED TO CONTRACTOR MARKED REVISE AND
RESUBMIT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DELAYS
WHICH MAY RESULT.
8. IN ADDITION TO SUBMITTALS REQUIRED BY THE PROJECT SPECIFICATIONS
AND CONSTRUCTION DOCUMENTS, THE FOLLOWING "STRUCTURAL
SUBMITTALS" ARE REQUIRED FOR REVIEW BY THE STRUCTURAL ENGINEER
OF RECORD.
A. METAL BUILDING DRAWINGS: DESIGN CALCULATIONS AND
FABRICATION AND ERECTION DRAWINGS.
B. CONCRETE WORK: CONCRETE MIX DESIGNS AND REBAR SHOP
DRAWINGS.
9. ALL STRUCTURAL SUBMITTALS SHALL BE PREPARED BY THE SPECIALTY
ENGINEER.
10. DRAWINGS PREPARED SOLELY AS A GUIDE FOR ERECTION AND
INSTALLATION AND CATALOG INFORMATION WILL NOT REQUIRE AN
ENGINEERS SEAL; HOWEVER, THEY SHALL BEAR THE ENGINEERS
SIGNATURE AND AN INDICATION THAT THE WORK WAS CHECKED.
SHALLOW FOUNDATION REQ’S
1. GEOTECHNICAL REPORT - FOUNDATION DESIGN CRITERIA WAS TAKEN
FROM RECOMMENDATIONS SET FORTH IN GEOTECHNICAL REPORT BY NOVA
ENGINEERING, INC., PROJECT NO. 10116-2020137, DATED AUGUST 18, 2020.
FOUNDATION DESIGN SHALL BE BASED ON A MAXIMUM ALLOWABLE SOIL
BEARING CAPACITY OF 2000 PSF FOR FOOTINGS. RECOMMENDATIONS IN
THIS REPORT SHALL BE FOLLOWED. CONSULT SOILS REPORT BY NOVA
ENGINEERING FOR FOUNDATION PREPARATION AND EXCAVATION
INFORMATION.
2. IF BEARING SOIL IS DISTURBED DURING FOUNDATION PREPARATION, THE
CONTRACTOR SHALL RECOMPACT TO REQUIRED DENSITY, AS DEFINED BY
THE GEOTECHNICAL ENGINEER.
3. DO NOT EXCAVATE FOR ANY PURPOSE WITHIN ONE FOOT OF THE ANGLE OF
REPOSE OF ANY SOIL BEARING FOOTING OR FOUNDATION UNLESS FOOTING
OR FOUNDATION IS FIRST PROPERLY PROTECTED AGAINST SETTLEMENT.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE DISPOSAL OF ALL
ACCUMULATED WATER FROM EXCAVATIONS AND DEWATERING
OPERATIONS IN SUCH A WAY AS NOT TO CAUSE INCONVENIENCE TO THE
WORK AND DAMAGE TO THE STRUCTURAL ELEMENTS.
STRUCTURAL CONCRETE
1. ALL CAST-IN-PLACE CONCRETE WORK SHALL BE IN ACCORDANCE WITH ACI
318-14 AND ACI 301, EXCEPT AS MODIFIED BY THE PROJECT CONSTRUCTION
DOCUMENTS. ALL CONCRETE WORK SHALL BE PERFORMED IN
ACCORDANCE WITH SPECIFICATION SECTION 03 30 00.
2. ALL CONCRETE SHALL MEET THE PROJECT SPECIFICATIONS AND SHALL
DEVELOP COMPRESSIVE STRENGTHS AS FOLLOWS (28 DAY STRENGTH):
A. NORMAL WEIGHT CONCRETE (145 PCF)
B. FOUNDATION & SLABS ON GRADE . . . . . . . . . . . 3500 PSI
PROVIDE CURRENT (MAX. 1 YEAR OLD) STATISTICAL DATA FOR EACH
CONCRETE MIX SUBMITTED IN ACCORDANCE WITH ACI 318-14.
3. ALL REINFORCING BARS FOR CONCRETE SHALL HAVE A MINIMUM YIELD
STRENGTH OF 60,000 PSI AND MEET THE REQUIREMENTS OF ASTM A-615.
FOR PLACEMENT OF REINFORCING CONFORM TO ACI-301, ACI-315, ACI-318,
AND CRSI "MANUAL OF STANDARD PRACTICE". ALL REINFORCING SHALL BE
ACCURATELY PLACED, RIGIDLY SUPPORTED, AND FIRMLY TIED IN PLACE
WITH BAR SUPPORTS AND SPACERS IN ACCORDANCE WITH THE ABOVE
REQUIREMENTS. PROVIDE CLASS "B" LAP SPLICE FOR CONTINUOUS BARS.
USE THE FOLLOWING COVER:
A. CONCRETE COVER REQUIREMENTS FOR REINFORCEMENT, U.N.O.:
a. CONCRETE CAST AGAINST EARTH. . . . . . . . . . . . . . . . 3"
b. CONCRETE POURED IN FORMS BUT EXPOSED TO WEATHER
OR EARTH:
• #5 REINFORCEMENT AND SMALLER . . . . . 1 1/2"
• REINFORCEMENT LARGER THAN #5 . . . . . . . 2"
• CONCRETE POURED IN FORMS BUT NOT EXPOSED TO
WEATHER OR EARTH.
c. #11 REINFORCEMENT AND SMALLER. . . . . . . . . . . . . . 3/4"
4. NO CONDUIT PLACED IN CONCRETE SLAB SHALL HAVE AN OUTSIDE
DIAMETER GREATER THAN 1/3 THE THICKNESS OF THE SLAB. NO CONDUIT
SHALL BE EMBED IN A SLAB THAT IS LESS THAN 4" THICK. MINIMUM CLEAR
DISTANCE SHALL BE IN ACCORDANCE WITH ACI 318.
5. ALL REINFORCING BARS, ANCHOR BOLTS, DOWELS AND OTHER CONCRETE
INSERTS SHALL BE SECURED ADEQUATELY IN POSITION PRIOR TO
PLACEMENT OF CONCRETE. CONTRACTOR SHALL USE TEMPLATES TO
INSURE ACCURATE PLACEMENT OF ANCHOR BOLTS, DOWELS, ETC.
6. ALL CONCRETE SHALL BE CONSOLIDATED BY USE OF A MECHANICAL
VIBRATOR OR OTHER MEANS APPROVED BY THE ENGINEER.
7. CONCRETE SHALL COMPLY WITH ALL THE REQUIREMENTS OF ASTM
STANDARD C94 FOR MEASURING, MIXING, TRANSPORTING, ETC. CONCRETE
TICKETS SHALL BE TIME STAMPED WHEN CONCRETE IS BATCHED.
CONCRETE SHALL BE PLACED IN ITS FINAL POSITION WITHIN 90 MINUTES
AFTER ADDITION OF BATCH WATER. CONCRETE SHALL BE DISCARDED IF
THE FOREGOING ELAPSED TIME IS EXCEEDED.
SLAB ON GRADE NOTES
1. ENSURE THAT REINFORCEMENT IS LOCATED IN SLAB CORRECTLY BY
CHAIRING REINFORCING ADEQUATELY DURING CONCRETE PLACEMENT.
2. PROVIDE POROUS DRAINAGE LAYER UNDER INTERIOR PORTIONS OF SLAB
ON GRADE. DRAINAGE LAYER SHALL CONSIST OF CLEAN, FREE-DRAINAGE
PEA GRAVEL, CRUSHED STONE, OR COARSE SAND. THIS DRAINAGE LAYER
SHALL CONSIST OF NATURAL SAND WITH A MAXIMUM 50% PASSING THE NO.
50 SIEVE AND 5% PASSING A NO. 200 SIEVE AS MINIMUM. SEE PROJECT
GEOTECHNICAL REPORT FOR GUIDELINES. THE CONTRACTOR SHALL
COORDINATE THESE REQUIREMENTS WITH THE GEOTECHNICAL ENGINEER
OF RECORD PRIOR TO FOUNDATION PREPARATION.
3. PLACE CRACK CONTROL JOINTS USING A MAXIMUM 2:1 LENGTH TO WIDTH
RATIO WITH 20'-0" MAXIMUM SPACING, UNLESS LOCATED ON PLANS. PLACE
MANDATORY CONSTRUCTION JOINTS AS SHOWN.
PRE-ENGINEERED METAL BUILDING
1. THE METAL BUILDING SHALL BE DESIGNED AND INSTALLED ACCORDING TO
THE LATEST METAL BUILDING STRUCTURAL CODE(S) AND SPECIFICATION
REQUIREMENTS.
2. THE M.B.M. SHALL PROVIDE CALCULATIONS WHICH ARE SIGNED AND SEALED
BY A PROFESSIONAL ENGINEER IN THE STATE OF ALABAMA OR AS
APPROVED BY CONTRACTING. THIS REGISTERED ENGINEER SHALL BE
RESPONSIBLE FOR ALL COMPONENTS RELATED THE SUPERSTRUCTURE.
3. CALCULATIONS PROVIDED TO THE EOR FOR REVIEW SHALL INCLUDE
DEFLECTION AND CAMBER REQUIREMENTS, DEAD LOADS, LIVE LOADS, AND
ALL SUPERIMPOSED LOADS. TOTAL BUILDING DRIFT SHALL NOT EXCEED
H/100. TOTAL DEFLECTION OF WIND BEAMS AND SOFFIT PANELS SHALL NOT
EXCEED L/180 FOR METAL PANELS. ANY MEMBER SUPPORTING MASONRY OR
BRICK SHALL NOT EXCEED L/600.
4. PROVIDE SUPPORT FOR ALL WALLS BY CONTRACTOR AT EAVES AND DESIGN
FRAMES FOR WIND LOAD INDUCED BY WALLS ACCORDING THE WIND LOADS
PROVIDED. THIS SHALL BE PROVIDED BY THE MBM SPECIALTY ENGINEER.
CHEMICAL ADHESIVE FOR ANCHORAGE (IF REQUIRED)
1. ADHESIVE ANCHORS SHALL BE AS SPECIFIED ON THE CONSTRUCTION
DRAWINGS OR APPROVED EQUIVALENT. ACCEPTABLE SYSTEMS SHALL
INCLUDE: SIMPSON, HILTI (EPOXY OR POLYESTER RESIN ADHESIVE)
ANCHORS OR APPROVED EQUIVALENT WITH DIAMETER AND EMBEDMENT
LENGTH AS NOTED ON THE DRAWINGS OR IN ACCORDANCE WITH THE
MANUFACTURERS SPECIFICATIONS. INSTALL ALL ANCHORAGE PER THE
MANUFACTURERS RECOMMENDATIONS.
2. DIAMETER OF HOLE SHALL BE AS RECOMMENDED BY MANUFACTURER FOR
THE PARTICULAR PRODUCT SPECIFIED IN THE DRAWINGS.
3. UNLESS NOTED, ANCHOR SPACING AND ANCHOR EDGE DISTANCE SHALL BE
ACCORDING TO THE MANUFACTURER'S MOST CURRENT PUBLICATION IN
ORDER TO DEVELOP MAXIMUM WORKING LOADS.
4. DO NOT EXCEED MANUFACTURER'S MAX. RECOMMENDED TIGHTENING
TORQUE.
5. ALL ANCHORS SHALL BE INSTALLED AS PER MANUFACTURER'S
RECOMMENDATIONS AND UNDER MANUFACTURER'S SUPERVISION IN ORDER
TO DEVELOP THE MOST CURRENT PUBLISHED WORKING LOADS.
6. INSTALLATION OF ALL ANCHORS SHALL BE PERFORMED BY PERSONNEL
CERTIFIED BY AN APPLICABLE CERTIFICATION PROGRAM. CERTIFICATION
SHALL INCLUDE WRITTEN AND PERFORMANCE TESTS IN ACCORDANCE WITH
ACI/CRSI ADHESIVE ANCHOR INSTALLER CERTIFICATION PROGRAM OR
EQUIVALENT.
7. ALL ANCHORS INSTALLED SHALL BE CONTINUOUSLY INSPECTED DURING
INSTALLATION BY AN INSPECTOR SPECIALLY APPROVED FOR THAT PURPOSE
BY THE BUILDING OFFICIAL. THE SPECIAL INSPECTOR SHALL FURNISH A
REPORT TO THE LICENSED DESIGN PROFESSIONAL AND BUILDING OFFICIAL
THAT THE WORK COVERED BY THE REPORT HAS BEEN PERFORMED AND THE
MATERIALS USED AND THE INSTALLATION PROCEDURES USED CONFORM
WITH THE APPROVED CONTRACT DOCUMENTS AND THE MANUFACTURER'S
PRINTED INSTALLATION INSTRUCTIONS (MPII)
8. TESTING OF EPOXIED ANCHORAGE SHALL BE REQUIRED. THE CONTRACTOR
SHALL TEST A MINIMUM OF 10% OF EACH DAYS PRODUCTION AND NOT LESS
THAN TWO ANCHORS. THE TEST SHALL BE ACCOMPLISHED BY A APPLYING A
TENSILE LOAD OF 1000 POUNDS TO THE EMBED ANCHOR. IF ANY TEST FAILS
THE LOAD TEST, ALL APPLICATIONS FOR THAT DAY SHALL BE TESTED. THE
TESTING RESULTS SHALL BE REVIEWED BY THE STRUCTURAL ENGINEER.
EPOXY ANCHOR INSTALLATION NOTES (IF REQUIRED)
HOLE PREPARATION
1. DRILL – DRILL HOLE TO SPECIFIED DIAMETER AND DEPTH.
2. BLOW – REMOVE DUST FROM HOLE WITH OIL-FREE COMPRESSED
AIR FOR A MINIMUM OF 4 SECONDS. COMPRESSED AIR NOZZLE MUST
REACH THE BOTTOM OF THE HOLE.
3. BRUSH – CLEAN WITH A NYLON BRUSH FOR A MINIMUM OF 4
CYCLES. BRUSH SHOULD PROVIDE RESISTANCE TO INSERTION. IF NO
RESISTANCE IS FELT, THE BRUSH IS WORN AND MUST BE REPLACED.
4. BLOW – REMOVE DUST FROM HOLE WITH OIL-FREE COMPRESSED
AIR FOR A MINIMUM OF 4 SECONDS. COMPRESSED AIR NOZZLE MUST
REACH THE BOTTOM OF THE HOLE.
CARTRIDGE PREPARATION
1. CARTRIDGE PREPARATION SHALL INCLUDE CHECKING EXPIRATION
DATE ON PRODUCT LABEL. DO NOT USE EXPIRED PRODUCT.
PRODUCT IS USABLE UNTIL END OF PRINTED EXPIRATION MONTH.
2. ATTACH – ATTACH PROPER NOZZLE TO CARTRIDGE. DO NOT
MODIFY NOZZLE.
3. INSERT – INSERT CARTRIDGE INTO DISPENSING TOOL.
4. DISPENSE – DISPENSE ADHESIVE TO THE SIDE UNTIL PROPERLY
MIXED (UNIFORM COLOR).
FILLING THE HOLE
1. INSTALL ADHESIVE RETAINING CAP. REFER TO ADHESIVE RETAINING
CAPS FOR PROPER ARC SIZE.
2. FILL – FILL HOLE 1/2 - 2/3 FULL, STARTING FROM BOTTOM OF HOLE TO
PREVENT AIR POCKETS. WITHDRAW NOZZLE AS HOLE FILLS UP.
INSERT CLEAN, OIL-FREE ANCHOR, TURNING SLOWLY UNTIL THE ANCHOR
CONTACTS THE BOTTOM OF THE HOLE.
S-200
SEE CIVIL
4' - 6" MIN. 30' - 0"
CIVIL
SEE
MOBILE GCS UNIT
MOBILE GCS UNIT
MOBILE GCS UNIT
MOBILE GCS UNIT
MOBILE GCS UNIT
EX. CONCRETE SLAB, V.I.F., DOWEL INTO
EXISTING SLAB WITH #4 EMBEDDED 4"
INTO EXISTING CONCRETE @3'-0" O.C. NO
DOWEL REQUIRED AT ASPHALT
LOCATIONS
1 2
A
B
C
D
E
F
S E
E C
IV
IL
M
IN
P O
R T
A L
F R
A M
E
P O
R T
A L
F R
A M
E
S E
E C
IV
IL
M
IN
F6 F6
F6 F6
F6 F6
F6 F6
F6 F6
F6 F6
-2' - 0"
(A)
(A)
(A)
(A)
(A)
(A)
(A)
(A)
(B) (B)
(B) (B)
COL. BY MBM, TYP.
T.O.F.
S-200
(2) #4 x4'-0" LONG CENTERED
IN SLAB, TYP. ALL PILASTERS
3"
CONTRACTION JOINT (C.J.)
CONTRACTION JOINT (C.J.)
CONTRACTION JOINT (C.J.)
CONTRACTION JOINT (C.J.)
C O
N T
R A
C T
IO
N
J O
IN
T
C
.J
S-200
S-200
EDGE OF NEW SLAB
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
A
TI
O
M M
S
CO
D
S
P E
C
IA
L O
P E
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
H U
R
LB
U R
T
FI
E
LD
, F
LO
R
ID
A
O P
E R
A
TI
O N
S C
O M
M A
N D
A
IR
F O
R C
E S
P E
C
IA
L
SHEETNUMBER:
SHEET REFERENCE:
R E
V
D E
S C
R
IP
T
IO
N D
A T
E
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
PEI 20063
S O
F C
O N
S
TR
U C
T
S O
S
IN
FR
A
S
TR
U C
TU
R
E A
N D
S E
C U
R
IT
Y , B
U
IL
D
IN
G
F O
U N
D A
T
IO
N
C O
N T
R A
C T
IO
N
J O
IN
T
P L
A N
S-100
DJM
WEH
7 DEC 2020
CP1038168
90131
3/16" = 1'-0"1
FOUNDATION PLAN
PLAN NOTES
1. FINISH FLOOR ELEVATION - MATCH EXISTING PAVEMENT SLOPES.
2. COORDINATE ALL FLOOR DRAINS, ELECTRICAL PENETRATIONS AND SLOPES WITH
ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS.
3. LOCATIONS OF ALL COLUMNS TO BE COORDINATED WITH THE FINAL APPROVED
SPECIALTY ENGINEER BUILDING DRAWINGS WHICH SHALL BE SIGNED AND SEALED
BY A PROFESSIONAL ENGINEER. SEE SPECIALTY ENGINEERING REQUIREMENTS.
4. CONTRACTOR TO VERIFY THE LOCATION OF ALL ANCHOR BOLTS PRIOR TO
CASTING FOUNDATIONS. CONTRACTOR TO COORDINATE WITH CIVIL AND
ARCHITECTURAL SITE PLANS FOR LOCATION AND ORIENTATION OF THE METAL
BUILDING STRUCTURE.
5. SEE CIVIL / ARCHITECTURAL FOR FENCE AND BOLLARD LOCATIONS.
6. REINFORCE 6" SLAB-ON-GRADE W/ #4 @12" O.C., E.W., CENTERED IN SLAB.
7. PORTAL FRAMES TO BE PLACED AT 1A, 2A, 1B, 2B, 1E, 2E, 1F, 2F ONLY.
8. SEE CIVIL FOR LIMITS OF DEMO AND NEW CONCRETE PLACEMENT. LOCATIONS
SHOWN ON THIS PLAN ARE FOR STRUCTURAL ONLY, ADDITIONAL CONCRETE
SLAB DIMENSIONS ARE IDENTIFIED ON THE CIVIL DRAWINGS.
THE CONTRACTOR SHALL VERIFY ALL CONCRETE DIMENSIONS WITH THE FINAL METAL
BUILDING DRAWINGS BEFORE PLACEMENT OF CONCRETE THIS INCLUDES BUT IS NOT
LIMITED TO THE FOLLOWING ITEMS:
1. METAL BUILDING COLUMN LOCATIONS, INCLUDING ANCHOR BOLT LOCATIONS.
2. SUBMIT FINAL REACTION DRAWINGS TO THE E.O.R. FOR REVIEW AND COMPLIANCE
WITH THE FOUNDATION AS SHOWN PRIOR TO CASTING FOUNDATIONS. ANCHOR
BOLTS AND FOUNDATIONS HAVE BEEN DESIGNED FOR THE FOLLOWING
ALLOWABLE STRESS DESIGN LOADS.
A. UPLIFT (ASD) - 12 KIPS
B. DOWNFORCE (ASD) - 12 KIPS
C. SHEAR (ASD) - 13 KIPS
3. CONTRACTOR TO MATCH SLOPE OF EXISTING GRADE FOR PLACEMENT OF NEW
SLAB. PILASTER TO EXTEND MAX. 12" ABOVE NEW SLAB, V.I.F.
3/16" = 1'-0"2
CONTRACTION JOINT PLAN
TRUE
NORTH
PROJECT
NORTH
TRUE
NORTH
PROJECT
NORTH
S-200
FRAME BY MBM
PURLINS BY MBM
1 1/2" / 12"
1 2
A
B
C
D
E
F
1' - 6" 30' - 0" 1' - 6"
SSM ROOF BY SPECIALTY ENGINEER
FRAME BY MBM
FRAME BY MBM
FRAME BY MBM
FRAME BY MBM
FRAME BY MBM
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
A
TI
O
M M
S
CO
D
S
P E
C
IA
L O
P E
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
H U
R
LB
U R
T
FI
E
LD
, F
LO
R
ID
A
O P
E R
A
TI
O N
S C
O M
M A
N D
A
IR
F O
R C
E S
P E
C
IA
L
SHEETNUMBER:
SHEET REFERENCE:
R E
V
D E
S C
R
IP
T
IO
N D
A T
E
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
PEI 20063
S O
F C
O N
S T
R U
C T
S O
S
IN
F R
A S
T R
U C
T U
R E
A N
D S
E C
U R
IT
Y
, B U
IL
D
IN
G
R O
O F
F R
A M
IN
G
P L
A N
S-110
DJM
WEH
7 DEC 2020
CP1038168
90131
3/16" = 1'-0"
ROOF FRAMING PLAN
TRUE
NORTH
PROJECT
NORTH
EAVE HT.
12' - 6"
1' - 6"
1' - 6"
1-1/2" 20GA. TYPE B METAL ROOF DECK
PURLINS AND ATTACHMENTS BY MBM
FRAME BY MBM
1 1/2"
12"
S-300
6" SLAB ON GRADE, SEE PLAN FOR
REINFORCEMENT SIZE AND ARRANGEMENT
1 2
A
S-300
PORTAL FRAME BY MBM
CIVIL
SEE
SAW CUT SLAB, DO NOT CUT
REINF. STEEL
T H
IC
K
N E
S S
/4
S L
A B
COMPACTED BASE, SEE
GEOTECHNICAL REPORT
P L A
N
S E
E
NOTE:
SEAL JOINT, SEE SPECIFICATIONS.
SEE MBM FOR DIA. ASTM
F1554 GALV. FY 50KSI
ANCHOR BOLT WITH HEAVY
HEX NUT WELDED AT
BOTTOM
3" SQ. 1/4" THICK PLATE WASHER,
TYP. SECURE IN PLACE
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
A
TI
O
M M
S
CO
D
S
P E
C
IA
L O
P E
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
H U
R
LB
U R
T
FI
E
LD
, F
LO
R
ID
A
O P
E R
A
TI
O N
S C
O M
M A
N D
A
IR
F O
R C
E S
P E
C
IA
L
SHEETNUMBER:
SHEET REFERENCE:
R E
V
D E
S C
R
IP
T
IO
N D
A T
E
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
PEI 20063
S O
F C
O N
S
TR
U C
T
S O
S
IN
FR
A
S
TR
U C
TU
R
E A
N D
S E
C U
R
IT
Y , B
U
IL
D
IN
G
S T
R U
C T
U R
A L S
E C
T
IO
N (S
D E
T A
IL
(S
S-200
DJM
WEH
7 DEC 2020
CP1038168
90131
1/2" = 1'-0"1
BUILDING SECTION
1" = 1'-0"2
CONTRACTION JOINT (C.J.)
1 1/2" = 1'-0"3
ANCHOR BOLT DETAIL
NOTES:
1. ALL STRUCTURAL FRAMING SHALL HAVE A CLEAR DIMENSION FROM TOP OF NEW SLAB TO
BOTTOM OF STRUCTURE OF +10'-0". THIS INCLUDES PORTAL FRAMING BY METAL BUILDING
MANUFACTURER
Level 1 0' - 0"
FRAME BY MBM
S L A
B
SLAB ON GRADE, SEE PLAN FOR
REINF. SIZE AND ARRANGEMENT
VAPOR BARRIER ON
COMPACTED BASE, SEE
GENERAL NOTES
1" EXPANSION JOINT
AROUND ALL PILASTERS
A
S-300
#6 @9" O.C., BOTTOM E.W. W/ 90 DEGREE HOOK AS SHOWN
#5 @9" O.C., E.W. TOP
SQUARE
6' - 0"
PROVIDE 3/4" CHAMFER ALL PILASTERS
EX. PAVEMENT, V.I.F.
#5 SMOOTH DOWEL 2'-0" LONG CENTERED
IN SLAB, EMBED 6" INTO PILASTER & NEW
SLAB, PROVIDE (2) ON EA. SIDE OF
PILASTER
8"
TYP. TURNDOWN AT EDGE OF
SLAB, ALL LOCATIONS, REINF. WITH
(2) #5 CONT. BOTTOM
2' - 0"
(14) #7 VERT. W/ #4 TIES @6" O.C. AS SHOWN
SQUARE
2' - 0"
(12) #7 VERT. W/ #4 TIES @6" O.C., VERT. AS SHOWN
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
A
TI
O
M M
S
CO
D
S
P E
C
IA
L O
P E
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
H U
R
LB
U R
T
FI
E
LD
, F
LO
R
ID
A
O P
E R
A
TI
O N
S C
O M
M A
N D
A
IR
F O
R C
E S
P E
C
IA
L
SHEETNUMBER:
SHEET REFERENCE:
R E
V
D E
S C
R
IP
T
IO
N D
A T
E
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
PEI 20063
S O
F C
O N
S
TR
U C
T
S O
S
IN
FR
A
S
TR
U C
TU
R
E A
N D
S E
C U
R
IT
Y , B
U
IL
D
IN
G
C O
N C
R E
T E
D E
T A
IL
S
S-300
DJM
WEH
7 DEC 2020
CP1038168
90131
1" = 1'-0"1
PEMB COLUMN FOUNDATION DETAIL @PORTAL FRAME
1" = 1'-0"A
24"X36" PILASTER SECTION (A)
1" = 1'-0"B
24"X24" PILASTER SECTION (B)
SITE PLAN
SCALE: 1/8" = 1'-0"
TRUE
NORTH
A-101
NO PARKING
EX
IS
TI
NG
C
ON
CR
ET
E
DI
TC
H
EXISTING CONCRETE
DITCH
EXISTING
CONCRETE
GENERATOR
PAD
EXISTING
CONCRETE
A/C PAD
EXISTING
CONCRETE
PAD
EXISTING
CONCRETE
4"
EXISTING
CONCRETE
EXISTING
CONCRETE
EXISTING
CONCRETE
EXISTING
CONCRETE
8'-0"
'-2
6'-
6"
'-0
5'- 8"
'-2
6'-
7"
'-2
6'- 4"
'-2
24'-0"
MOBILE GCS UNIT
MOBILE GCS UNIT
MOBILE GCS UNIT
MOBILE GCS UNIT
MOBILE GCS UNIT
EXISTING
CONCRETE
A/C PAD
EXISTING
CONCRETE
A/C PAD
9'-
4"
CANOPY ROOF PLAN
SCALE: 1/8" = 1'-0"
TRUE
NORTH
A-101
PREFINISHED
METAL
GUTTER BY
PEMB MANUF
SLOPE 1-1/2 : 12
'-8
33'-0"
8'- 4"
33'-0"
8'-0" HIGH PERIMETER CHAINLINK
FENCE W/ PRIVACY FABRIC W/ SINGLE
OUTRIGGERS W/ BARB WIRE TYP, SEE
CIVIL DRAWINGS FOR ADDITIONAL INFO
DOUBLE MANUAL
VEHICLE GATES
REMOVABLE PIPE BOLLARD
TYP. OF 5 - SEE CIVIL
DRAWINGS
PREFINISHED STANDING SEAM METAL
ROOF PANELS ON 2" RIGID INSULATION
WITH WATER PROOF MEMBRANE ON METAL
DECK ON ROOF PURLINS BY PEMB MANUF
HVAC
EXISTING ROLLUP DOOR
EXISTING MAN DOOREXISTING BUILDING
90131 OUTLINE
TURN STYLE GATE WITH
ELECTRONIC SECURITY
SYSTEM
EXISTING ROLLUP DOOR
TURN STYLE GATE WITH
ELECTRONIC SECURITY
SYSTEM
EXISTING
ASPHALT
STEEL COLUMN TYPICAL, SEE
STRUCTURAL AND PEMB
MANUF FOR MORE INFO
EXISTING
GRASS
EXISTING
CONCRETE
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
NOTE: DIMESIONS AT MOBILE GCS UNITS PROVIDED
FOR REFERENCE ONLY. SEE STRUCTURAL AND
CIVIL DRAWINGS FOR BUILDING DIMENSIONS
HV
AC
HV
AC
REMOVABLE BOLLARDS -
SEE CIVIL
KEYPLAN
NOT TO SCALE
BLDG 90131
TRUE
NORTH
SCALE: 1/8" = 1'-0"
4'-0" 8'-0"0 16'-0" of 27
90131
S O
F
C
O N
S T
R U
C T
S
O S
I N
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
JCS
PDM
1'-6"
1'-6"
CANOPY ELEVATION
SCALE: 1/4" = 1'-0"
A-201
CANOPY ELEVATION
SCALE: 1/4" = 1'-0"
A-201
1'-6" 1'-6"
1'-6" 1'-6"
1-1/2"
CANOPY ELEVATION
SCALE: 1/4" = 1'-0"
A-201
KEYNOTES:
PREFINISHED METAL EAVE TRIM BY PEMB MFR
METAL OUTRIGGER BY PEMB
MFR ROOF OUTLINE BEYOND
PEMB FRAME TYPICAL, SEE STRUCTURAL AND PEMB
MFR DOCUMENTS
PREFINISHED METAL RAKE TRIM BY PEMB MFR
MOBILE GCS UNIT OUTLINE BEYOND
PREFINISHED METAL EAVE TRIM AT OUTRIGGER
FACE TYPICAL BY PEMB MFR
EXISTING CONC SLAB ON GRADE
PREFINISHED STANDING SEAM METAL ROOF PANELS
ON 2" RIGID INSULATION WITH WATER PROOF
MEMBRANE ON METAL DECK ON ROOF PURLINS BY
PEMB MFR
PREFINISHED METAL GUTTER BY PEMB MFR
PREFINISHED METAL DOWNSPOUT BY PEMB MFR -
TYPICAL
CONC SLAB ON GRADE. SEE STRUCTURAL
DRAWINGS
PREFINISHED METAL BUILDING PANELS BY PEMB
MFR
1-1/2"
CANOPY ELEVATION
SCALE: 1/4" = 1'-0"
A-201
81288
6 6 6 6 6
EXTERIOR FINISH NOTES
1. METAL ROOF PANELS, COLOR WILL BE “MEDIUM
BRONZE”, FASCIA/FLASHINGS/GUTTERS TO MATCH.
2. PEMB STRUCTURE INCLUDING PURLINS WILL BE
PAINTED “TOWNHOUSE TAN SW#2186”, DOWNSPOUTS
TO MATCH.
SCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0" of 27
90131
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
JCS
PDM
CANOPY SECTION
SCALE: 1/2" = 1'-0"
A-301
EXISTING CONC
SLAB ON GRADE
NEW CONC SLAB, SEE
STRUCTURAL DRAWINGS
FOR SIZE AND REINF
8'-0" HIGH PERIMETER
CHAINLINK FENCE W/ PRIVACY
FABRIC W/ CANTED TOP W/
BARB WIRE TYP, SEE CIVIL
DRAWINGS FOR MORE INFO
A-301
A-301
PREFINISHED METAL EAVE
TRIM BY PEMB MANUF
METAL OUTRIGGER BEYOND
BY PEMB MANUF
PREFINISHED METAL
GUTTER BY PEMB MANUF
PREFINISHED METAL
DOWNSPOUT BY PEMB
MANUF BEYOND
PREFINISHED STRUCTURAL STANDING
SEAM METAL ROOF PANELS ROOF
PURLINS BY PEMB MANUF
ROOF PURLINS SPACED
APPROPRIATELY TO SUPPORT
THE METAL LINER PANELS BY
PEMB MANUF
PEMB FRAME BEYOND, SEE
STRUCTURAL AND PEMB MANUF
DOCUMENTS
MOBILE GCS UNIT OUTLINE
BEYOND
CONC SLAB ON GRADE, SEE
STRUCTURAL DRAWINGS FOR
SIZE AND REINF
PREFINISHED METAL EAVE
TRIM BY PEMB MANUF
METAL OUTRIGGER BY PEMB
MANUF BEYOND.
PREFINISHED METAL TRIM AT
ALL OUTRIGGER ENDS
1-1/2"
2" CLR
8'- 9"
T
OP
O F
MO
BI
LE
G
CS
IN
R
AI
SE
D
PO
SI
TI
ON
2'- 0"
C
LE
AR
M
IN
TO
U
ND
ER
SI
DE
OF
S
TR
UC
TU
RE
BASIS OF DESIGN: BIRD-NET BY NIXALITE,
OR APPROVED EQUAL
49 LB. KNOTTED BREAKING STRENGTH
6-PLY HIGH DENSITY POLYETHYLENE
3/4” SQUARE MESH
ABRASION/UV/FLAME/ROT RESISTANT
50 FT. WIDTH
100 FT. LENGTH
ISO 9001-2000 QUALITY STANDARD
EXISTING CONC
SLAB ON GRADE
THICKENED CONC SLAB
EDGE, SEE STRUCTURAL
DRAWINGS FOR SIZE AND
REINF
CANOPY RAKE SECTION DETAIL
SCALE: 1 1/2" = 1'-0"
A-301
1'-6"
CANOPY GUTTER SECTION DETAIL
SCALE: 1 1/2" = 1'-0"
A-301
RAIN GUTTER
STRAP PER MANUF
CANOPY PEAK SECTION DETAIL
SCALE: 1 1/2" = 1'-0"
A-301
1'-6"
"Z" CLOSURE BY PEMB
MANUF
SEALANT AT VERTICAL
LEG & UNDER "Z"
CLOSURE
PREFINISHED STRUCTURAL STANDING
SEAM METAL ROOF PANELS ON ROOF
PURLINS BY PEMB MANUF
FIELD-FORM PANEL LEG TO I.D. OF "J"
CLOSURE BY PEMB MANUF
"J" CLOSURE BY PEMB MANUF
METAL SUPPORT PLATE BY PEMB MANUF
PREFINISHED METAL RAKE TRIM BY PEMB
MANUF
PEMB FRAME, SEE STRUCTURAL AND
PEMB MANUF DOCUMENTS
PREFINISHED METAL
GUTTER BY PEMB MANUF
METAL EAVE STRUT BY
PEMB MANUF
PREFINISHED METAL EAVE
TRIM BY PEMB MANUF
METAL OUTRIGGER BEYOND
BY PEMB MANUF
ROOF PURLINS SPACED
APPROPRIATELY TO
SUPPORT THE METAL
LINER PANELS BY PEMB
MANUF
PEMB FRAME BEYOND, SEE
STRUCTURAL AND PEMB
MANUF DOCUMENTS
PREFINISHED STRUCTURAL
STANDING SEAM METAL ROOF
PANELS ROOF PURLINS BY
PEMB MANUF
PRE-FINISHED METAL
FASCIA/COPING BY PEMB MANUF
PREFINISHED METAL EAVE
TRIM BY PEMB MANUF
METAL EAVE STRUT BY
PEMB MANUF
METAL OUTRIGGER BEYOND
BY PEMB MANUF
ROOF PURLINS SPACED
APPROPRIATELY TO
SUPPORT THE METAL
LINER PANELS BY PEMB
MANUF
1-1/2"
1-1/2"
90131
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
JCS
PDM
SCALE: 1/2" = 1'-0"
1'-0" 2'-0"0 4'-0"
OF 27
90131
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-001
E L
E C
T R
I C
A L
E G
E N
D
G
E N
E R
T
E
G
90131
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-002
R I S
D
A
G R
A M
U
N I S
T R
U
D
T
A I
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-003
N E
W
W
O R
K
E
L E
C T
R I C
T
E
P
L A
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-004
E L
E C
T R
I C
T
E
P
L A
N
D
E T
A I L
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-100
N E
W
W
O R
K
P
O W
P
A
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-101
N E
W
W
O R
K
C
O M
M U
N I C
A T
I O
P
A
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-200
N E
W
W
O R
K
L
I G
H T
I N
G
P
L A
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-201
L I G
H T
I N
G
C
A L
C U
L A
T I O
N
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-300
N E
W
W
O R
K
L
I G
H T
N I N
G
P
R O
T E
C T
I O
N
P
L A
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-301
L I G
H T
N I N
G
P
R O
T E
C T
I O
N
D
E T
A I L
S O
F
C
O N
S T
R U
S
F R
A S
T R
U C
T U
R E
A N
D
S
E C
U R
I T
Y
B
U I L
D I N
G
DMB
DCC
E-400
P A
N E
L
S
C H
E D
U L
E
| G-001 |
| T-101 |
| 20-27_C-101 EXISTING CONDITIONS |
| 20-27_C-102 DEMOLITION AND EROSION CONTROL PLAN |
| 20-27_C-201 SITE LAYOUT PLAN |
| 20-27_C-501 DETAILS |
| 20-27_C-502 DETAILS |
| 20-27_C-503 DETAILS |
| S-001 |
| Sheets |
| S-001 - GENERAL NOTES |
| S-100 - FOUNDATION & CONTRACTION JOINT PLAN |
| S-110 - ROOF FRAMING PLAN |
| S-200 - STRUCTURAL SECTION(S) & DETAIL(S) |
| S-300 - CONCRETE DETAILS |
| S-100 |
| Sheets |
| S-001 - GENERAL NOTES |
| S-100 - FOUNDATION & CONTRACTION JOINT PLAN |
| S-110 - ROOF FRAMING PLAN |
| S-200 - STRUCTURAL SECTION(S) & DETAIL(S) |
| S-300 - CONCRETE DETAILS |
| S-110 |
| Sheets |
| S-001 - GENERAL NOTES |
| S-100 - FOUNDATION & CONTRACTION JOINT PLAN |
| S-110 - ROOF FRAMING PLAN |
| S-200 - STRUCTURAL SECTION(S) & DETAIL(S) |
| S-300 - CONCRETE DETAILS |
| S-200 |
| Sheets |
| S-001 - GENERAL NOTES |
| S-100 - FOUNDATION & CONTRACTION JOINT PLAN |
| S-110 - ROOF FRAMING PLAN |
| S-200 - STRUCTURAL SECTION(S) & DETAIL(S) |
| S-300 - CONCRETE DETAILS |
| S-300 |
| Sheets |
| S-001 - GENERAL NOTES |
| S-100 - FOUNDATION & CONTRACTION JOINT PLAN |
| S-110 - ROOF FRAMING PLAN |
| S-200 - STRUCTURAL SECTION(S) & DETAIL(S) |
| S-300 - CONCRETE DETAILS |
| A-101 |
| A-201 |
| A-301 |
| E-001 |
| E-002 |
| E-003 |
| E-004 |
| E-100 |
| E-101 |
| E-200 |
| E-201 |
| E-300 |
| E-301 |
| E-400 |
File details come from the government source that posted it. Updated .