This file is a comprehensive drawing index and civil/site plan document for the EHRM Infrastructure Upgrades Construction project at Kerrville VA Medical Center (Project 671A4-21-700). The document contains 339 pages of construction drawings organized by discipline including general, civil, environmental, architectural, mechanical, electrical, telecommunications, and technology categories. The Architect/Engineer of Record is IMEG Corp. (IMEG #23001093) with consultant support from Spees Design Build, and the project involves multiple buildings (001, 002, 011, 018, 029, 046, 096, and site improvements) located at 3600 Memorial Boulevard, Kerrville, Texas 78208.
The civil and site plan portions detail existing conditions, demolition requirements, erosion control measures, utility coordination, and grading specifications. Key civil notes emphasize contractor responsibility for utility location verification, ground penetrating radar surveys, and potholing at new utility crossings. Environmental hazards assessments are included for multiple buildings and rooms. The drawings establish detailed specifications for site preparation, fill material compaction to 95% density, stormwater management compliance with City of Kerrville and Texas TCEQ standards, and sediment control through silt fencing and temporary sediment basins. Contractors are required to maintain construction entrances, prevent off-site sediment tracking, and perform weekly erosion control inspections. All disturbed areas must be seeded and stabilized upon project completion. The document was issued on 11/21/2025 for 100% Construction Documents phase, with revisions dated 11/18/25.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/22/2026 1 of 339
1/22/2026 2 of 339
1/22/2026
83 of 339 096A-101 BLDG 096 -LVL 01 -DEMO, FLOOR PLAN & RCPS 169 of 339 11-EP400 BLDG 11 - LEVEL 00 - ENLARGED ELECTRICAL PLANS 256 of 339 11ET100 BLDG 11 - LEVEL 00 - TELECOMMUNICATIONS PLAN SHEET # SHEET NAME 84 of 339 096A-202 BLDG 096 -LVL 02 -ARCHITECTURAL PLAN 170 of 339 11-EL400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - LIGHTING PLANS 257 of 339 11ET101 BLDG 11 - LEVEL 01 - TELECOMMUNICATIONS PLAN
85 of 339 096AS102 BLDG 096 -LVL 02 -PHASING PLAN 171 of 339 11-EL400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - LIGHTING PLANS 258 of 339 11ET102 BLDG 11 - LEVEL 02 - TELECOMMUNICATIONS PLAN 1 of 339 G-001 COVER SHEET 86 of 339 096A-102 BLDG 096 -LVL 02 -DEMO, FLOOR PLAN & RCPS 172 of 339 11-EL400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - LIGHTING PLANS 259 of 339 11ET103 BLDG 11 - LEVEL 03 -TELECOMMUNICATIONS PLAN 2 of 339 G-002 VA POC INFORMATION, GENERAL NOTES -CONSTRUCTION 87 of 339 A-601 ROOM FINISH SCHEDULE 173 of 339 11-EP400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1-POWER PLANS 260 of 339 11ET104 BLDG 11 - LEVEL 04 - TELECOMMUNICATIONS PLAN 3 of 339 G-003 DRAWING INDEX 88 of 339 A-602 DOOR SCHEDULE, TYPES & DETAILS 174 of 339 11-EP400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - POWER PLANS 261 of 339 11ET105 BLDG 11 - LEVEL 05 - TELECOMMUNICATIONS PLAN
89 of 339 A-603 DETAILS 175 of 339 11-EP400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - POWER PLANS 262 of 339 11ET106 BLDG 11 - LEVEL 06 - TELECOMMUNICATIONS PLAN 4 of 339 CJ100 CIVIL NOTES 90 of 339 AE421 INTERIOR ELEVATIONS & TR PLAN VIEW 176 of 339 11-EP400d BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - POWER PLANS 263 of 339 11ET107 BLDG 11 - LEVEL 07 - TELECOMMUNICATIONS PLAN 5 of 339 CD100 EXISTING CONDITIONS AND DEMOLITION PLAN 91 of 339 AW001 IN-03.01 -ROOM NUMBER SIGN & SIGNAGE SCHEDULE 177 of 339 11-EP400e BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - POWER PLANS 264 of 339 18ET101 BLDG 18 - LEVEL 01 - TELECOMMUNICATIONS PLAN 6 of 339 CG100 EROSION CONTROL PLAN 178 of 339 11-EP400f BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - POWER PLANS 265 of 339 29ET101 BLDG 29 - LEVEL 01 - TELECOMMUNICATIONS PLAN 7 of 339 CU100 OVERALL UTILITY PLAN 92 of 339 F-001 FIRE PROTECTION GENERAL NOTES, ABBREVIATION AND LEGENDS 179 of 339 11-EF400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - FIRE ALARM PLANS 266 of 339 29ET102 BLDG 29 - LEVEL 02 - TELECOMMUNICATIONS PLAN 8 of 339 CU101 PLAN AND PROFILE - FOC 1 & FOC 2 93 of 339 011-F-101 BLDG -011 -LVL -00 -OVERALL PLAN 180 of 339 11-EF400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - FIRE ALARM PLANS 267 of 339 46ET101 BLDG 46 - LEVEL 01 - TELECOMMUNICATIONS PLAN 9 of 339 CU102 PLAN AND PROFILE - FOC 3 94 of 339 011-FD401 BLDG -011 -LVL -00 -MCR -PHASE 01 -DEMO FIRE PROTECTION FLOOR PLAN 181 of 339 11-EF400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - FIRE ALARM PLANS 268 of 339 96ET101 BLDG 96 - LEVEL 01 - TELECOMMUNICATIONS PLAN 10 of 339 CU103 PLAN AND PROFILE - FOC 3 95 of 339 011-FX402 BLDG -011 -LVL -00 -MCR -PHASE 01 -FIRE PROTECTION FLOOR PLAN 182 of 339 11-EG400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - GROUNDING PLANS 269 of 339 96ET102 BLDG 96 - LEVEL 02 - TELECOMMUNICATIONS PLAN 11 of 339 CU104 PLAN AND PROFILE - ELEC 96 of 339 011-FD403 BLDG -011 -LVL -00 -MCR -PHASE 02 -DEMO FIRE PROTECTION FLOOR PLAN 183 of 339 11-EG400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - GROUNDING PLANS 270 of 339 01ET401 BLDG 01 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 12 of 339 CK100 CIVIL DETAILS 97 of 339 011-FX404 BLDG -011 -LVL -00 -MCR -PHASE 02 -FIRE PROTECTION FLOOR PLAN 184 of 339 11-EG400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - GROUNDING PLANS 271 of 339 02ET401 BLDG 02 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS
98 of 339 011-FD405 BLDG -011 -LVL -00 -MCR -PHASE 03 -DEMO FIRE PROTECTION FLOOR PLAN 185 of 339 11-EP401a BLDG 11 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 272 of 339 11ET400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - DEMO FLOOR PLAN 13 of 339 HA-100 KERRVILLE CAMPUS -ENVIRONMENTAL HAZARDS 99 of 339 011-FX406 BLDG -011 -LVL -00 -MCR -PHASE 03 -FIRE PROTECTION FLOOR PLAN 186 of 339 11-EP401b BLDG 11 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 273 of 339 11ET400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - TELECOM PLAN 14 of 339 001HA101 BLDG 001 -LVL 01 -ENVIRONMENTAL HAZARDS 100 of 339 M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATION 187 of 339 11-EP402 BLDG 11 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 274 of 339 11ET400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - DEMO FLOOR PLAN 15 of 339 001HA102 BLDG 001 -LVL 02 -ENVIRONMENTAL HAZARDS 101 of 339 M-002 MECHANICAL LEGENDS 188 of 339 11-EP403 BLDG 11 - LEVEL 03 - ENLARGED ELECTRICAL PLANS 275 of 339 11ET400d BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - TELECOM PLAN 16 of 339 02HA101 BLDG 02 -LVL 01 -ENVIRONTMENTAL HAZARDS 102 of 339 001-M-101 BLDG -001 -LVL -01 -OVERALL PLAN 189 of 339 11-EP404 BLDG 11 - LEVEL 04 - ENLARGED ELECTRICAL PLANS 276 of 339 11ET400e BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - DEMO FLOOR PLAN 17 of 339 011HA100 BLDG 011 -LVL 00 -RM 0A -ENVIRONMENTAL HAZARDS 103 of 339 001-M-401 BLDG -001 -LVL -01 -DEMO, FLOOR PLANS AND RCPS 190 of 339 11-EP405 BLDG 11 - LEVEL 05 - ENLARGED ELECTRICAL PLANS 277 of 339 11ET400f BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - TELECOM PLAN 18 of 339 011HA101 BLDG 011 -LVL 01 -RM 120B -ENVIRONMENTAL HAZARDS 104 of 339 002-M-101 BLDG -002 -LVL -01 -OVERALL PLAN 191 of 339 11-EP406 BLDG 11 - LEVEL 06 - ENLARGED ELECTRICAL PLANS 278 of 339 11ET400g BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - DEMO OVERHEAD PLAN 19 of 339 011HA102 BLDG 011 -LVL 02 -RM 201A -ENVIRONMENTAL HAZARDS 105 of 339 002-M-401 BLDG -002 -LVL -01 -DEMO, FLOOR PLANS & RCPS 192 of 339 11-EP407 BLDG 11 - LEVEL 07 - ENLARGED ELECTRICAL PLANS 279 of 339 11ET400h BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - DISTR OVERHEAD PLAN 20 of 339 011HA103 BLDG 011 -LVL 03 -RM 388 -ENVIRONMENTAL HAZARDS 106 of 339 011-M-101 BLDG -011 -LVL -00 -OVERALL PLAN 193 of 339 11-EP408 BLDG 11 - PENTHOUSE - ENLARGED ROOF PLAN 280 of 339 11ET400i BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - DEMO OVERHEAD PLAN 21 of 339 011HA104 BLDG 011 -LVL 04 -RM 457 -ENVIRONMENTAL HAZARDS 107 of 339 011-M-102 BLDG -011 -LVL -01 -OVERALL PLAN 194 of 339 18-EP401 BLDG 18 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 281 of 339 11ET400j BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - DISTR OVERHEAD PLAN 22 of 339 011HA105 BLDG 011 -LVL 05 -RM 580 -ENVIRONMENTAL HAZARDS 108 of 339 011-M-103 BLDG -011 -LVL -02 -OVERALL PLAN 195 of 339 29-EP402 BLDG 29 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 282 of 339 11ET400k BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - DEMO OVERHEAD PLAN 23 of 339 011HA106 BLDG 011 -LVL 06 -RM 601B -ENVIRONMENTAL HAZARDS 109 of 339 011-M-104 BLDG -011 -LVL -03 -OVERALL PLAN 196 of 339 46-EP401 BLDG 46 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 283 of 339 11ET400l BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - DISTR OVERHEAD PLAN 24 of 339 011HA107 BLDG 011 -LVL 07 -RM 702 -ENVIRONMENTAL HAZARDS 110 of 339 011-M-105 BLDG -011 -LVL -04 -OVERALL PLAN 197 of 339 96-EP401 BLDG 96 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 284 of 339 11ET400m BLDG 11 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS PLANS 25 of 339 011HA108 BLDG 011 -ROOF -ENVIRONMENTAL HAZARDS 111 of 339 011-M-106 BLDG -011 -LVL -05 -OVERALL PLAN 198 of 339 96-EP402a BLDG 96 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 285 of 339 11ET400n BLDG 11 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS PLANS 26 of 339 018HA101 BLDG 018 -LVL 01 -ENVIRONMENTAL HAZARDS 112 of 339 011-M-107 BLDG -011 -LVL -06 -OVERALL PLAN 199 of 339 96-EP402b BLDG 96 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 286 of 339 11ET400o BLDG 11 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS PLANS 27 of 339 029HA101 BLDG 29 -LVL 01 -ENVIRONMENTAL HAZARDS 113 of 339 011-M-108 BLDG -011 -LVL -07 -OVERALL PLAN 200 of 339 E-501 ELECTRICAL DETAILS 287 of 339 11ET401a BLDG 11 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 28 of 339 029HA102 BLDG 29 -LVL 02 -ENVIRONMENTAL HAZARDS 114 of 339 011-MD401 BLDG -011 -LVL -00 -MCR -PHASE 01 -MECHANICAL DEMO FLOOR PLAN 201 of 339 E-502 ELECTRICAL DETAILS 288 of 339 11ET401b BLDG 11 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 29 of 339 046HA101 BLDG 046 -LVL 01 -ENVIRONMENTAL HAZARDS 115 of 339 011-MH402 BLDG -011 -LVL -00 -MCR -PHASE 01 -HVAC DUCT FLOOR PLAN 202 of 339 E-503 ELECTRICAL DETAILS 289 of 339 11ET402a BLDG 11 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 30 of 339 096HA101 BLDG 096 -LVL 01 -ENVIRONMENTAL HAZARDS 116 of 339 011-MP403 BLDG -011 -LVL -00 -MCR -PHASE 01 -HVAC PIPING FLOOR PLAN 203 of 339 E-504 ELECTRICAL DETAILS 290 of 339 11ET402b BLDG 11 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 31 of 339 096HA102 BLDG 096 -LVL 02 -ENVIRONMENTAL HAZARDS 117 of 339 011-MD404 BLDG -011 -LVL -00 -MCR -PHASE 02 -MECHANICAL DEMO FLOOR PLAN 204 of 339 E-505 ELECTRICAL DETAILS 291 of 339 11ET402c BLDG 11 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS
118 of 339 011-MH405 BLDG -011 -LVL -00 -MCR -PHASE 02 -HVAC DUCT FLOOR PLAN 205 of 339 E-506 ELECTRICAL DETAILS 292 of 339 11ET403a BLDG 11 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS PLANS 32 of 339 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS 119 of 339 011-MP406 BLDG -011 -LVL -00 -MCR -PHASE 02 -HVAC PIPING FLOOR PLAN 206 of 339 E-507 ELECTRICAL DETAILS 293 of 339 11ET403b BLDG 11 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS PLANS 33 of 339 AS101 ICRA DETAILS 120 of 339 011-MD407 BLDG -011 -LVL -00 -MCR -PHASE 03 -MECHANICAL DEMO FLOOR PLAN 207 of 339 E-508 ELECTRICAL DETAILS 294 of 339 11ET405a BLDG 11 - LEVEL 05 - ENLARGED TELECOMMUNICATIONS PLANS 34 of 339 001A-201 BLDG 001 -LVL 01 -ARCHITECTURAL PLANS 121 of 339 011-MH408 BLDG -011 -LVL -00 -MCR -PHASE 03 -HVAC DUCT FLOOR PLAN 208 of 339 E-509 ELECTRICAL DETAILS 295 of 339 11ET405b BLDG 11 - LEVEL 05 - ENLARGED TELECOMMUNICATIONS PLANS 35 of 339 001AS101 BLDG 001 -LVL 01 -PHASING PLAN 122 of 339 011-MP409 BLDG -011 -LVL -00 -MCR -PHASE 03 -HVAC PIPING FLOOR PLAN 209 of 339 EF601 DATA CENTER FIRE ALARM RISER DIAGRAM AND I/O MATRIX 296 of 339 11ET406a BLDG 11 - LEVEL 06 - ENLARGED TELECOMMUNICATIONS PLANS 36 of 339 001A-101 BLDG 001 -LVL 01 -DEMO, FLOOR PLAN & RCPS 123 of 339 011-M-410 BLDG -011 -LVL -00 -DEMOLITION, FLOOR PLANS & RCPS 210 of 339 EG601 TELECOMMUNICATIONS BONDING RISER DIAGRAM 297 of 339 11ET406b BLDG 11 - LEVEL 06 - ENLARGED TELECOMMUNICATIONS PLANS 37 of 339 001AS102 BLDG 001 -LVL 02 -PHASING PLAN 124 of 339 011-M-411 BLDG -011 -LVL -01 -DEMOLITION, FLOOR PLANS & RCPS 211 of 339 00-EP611 CAMPUS - ONE-LINE DIAGRAM 298 of 339 11ET407a BLDG 11 - LEVEL 07 - ENLARGED TELECOMMUNICATIONS PLANS 38 of 339 002A-201 BLDG 002 -LVL 01 -ARCHITECTURAL PLAN 125 of 339 011-M-412 BLDG -011 -LVL -02 -DEMOLITION, FLOOR PLANS & RCPS 212 of 339 01-EP601 BLDG 01 - ONE-LINE DIAGRAM - EXISTING 299 of 339 11ET407b BLDG 11 - LEVEL 07 - ENLARGED TELECOMMUNICATIONS PLANS 39 of 339 002AS101 BLDG 002 -LVL 01 -PHASING PLAN 126 of 339 011-M-413 BLDG -011 -LVL -03 -DEMOLITION, FLOOR PLANS & RCPS 213 of 339 01-EP611 BLDG 01 - ONE-LINE DIAGRAM - REVISED 300 of 339 18ET401a BLDG 18 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 40 of 339 002A-101 BLDG 002 -LVL 01 -DEMO, FLOOR PLAN & RCPS 127 of 339 011-M-414 BLDG -011 -LVL -04 -DEMOLITION, FLOOR PLANS & RCPS 214 of 339 02-EP601 BLDG 02 - ONE-LINE DIAGRAM - EXISTING 301 of 339 18ET401b BLDG 18 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 41 of 339 011A-200 BLDG 011 -LVL 00 -ARCHITECTURAL PLAN 128 of 339 011-M-415 BLDG -011 -LVL -05 -DEMOLITION, FLOOR PLANS & RCPS 215 of 339 02-EP611 BLDG 02 - ONE-LINE DIAGRAM - REVISED 302 of 339 29ET402a BLDG 29 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 42 of 339 011AS100 BLDG 011 -LVL 00 -PHASING PLAN 129 of 339 011-M-416 BLDG -011 -LVL -06 -DEMOLITION, FLOOR PLANS & RCPS 216 of 339 11-EP601 BLDG 11 - ONE-LINE DIAGRAM - PHASE 1 -PART 1 OF 3 303 of 339 29ET402b BLDG 29 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 43 of 339 011A-100 BLDG 011 -LVL 00 -DEMO, FLOOR PLAN & RCPS 130 of 339 011-M-417 BLDG -011 -LVL -07 -DEMOLITION, FLOOR PLANS & RCPS 217 of 339 11-EP602 BLDG 11 - ONE-LINE DIAGRAM - PHASE 1 -PART 2 OF 3 304 of 339 46ET401a BLDG 46 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 44 of 339 011A-100a BLDG 011 -LVL 00 -DATA CENTER -PHASE 1 -DEMO FLOOR PLAN 131 of 339 011-M-418 BLDG -011 -ROOF PLAN 218 of 339 11-EP603 BLDG 11 - ONE-LINE DIAGRAM - PHASE 1 -PART 3 OF 3 305 of 339 46ET401b BLDG 46 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 45 of 339 011A-100b BLDG 011 -LVL 00 -DATA CENTER -PHASE 1 FLOOR PLAN 132 of 339 018-M-101 BLDG -018 -LVL -01 -OVERALL PLAN 219 of 339 11-EP604 BLDG 11 - ONE-LINE DIAGRAM - PHASE 2 -PART 1 OF 3 306 of 339 96ET401a BLDG 96 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 46 of 339 011A-100c BLDG 011 -LVL 00 -DATA CENTER -PHASE 2 -DEMO FLOOR PLAN 133 of 339 018-M-401 BLDG -018 -LVL -01 -DEMOLITION, FLOOR PLANS & RCPS 220 of 339 11-EP605 BLDG 11 - ONE-LINE DIAGRAM - PHASE 2 -PART 2 OF 3 307 of 339 96ET401b BLDG 96 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 47 of 339 011A-100d BLDG 011 -LVL 00 -DATA CENTER -PHASE 2 -FLOOR PLAN 134 of 339 018-M-402 BLDG -018 -LVL -01 -DEMOLITION & FLOOR PLAN 221 of 339 11-EP606 BLDG 11 - ONE-LINE DIAGRAM - PHASE 2 -PART 3 OF 3 308 of 339 96ET401c BLDG 96 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 48 of 339 011A-100e BLDG 011 -LVL 00 -DATA CENTER -PHASE 3 -DEMO FLOOR PLAN 135 of 339 029-M-101 BLDG -029 -LVL -02 -OVERALL PLAN 222 of 339 11-EP607 BLDG 11 - ONE-LINE DIAGRAM - PHASE 3 -PART 1 OF 3 309 of 339 96ET402a BLDG 96 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 49 of 339 011A-100f BLDG 011 -LVL 00 -DATA CENTER -PHASE 3 -FLOOR PLAN 136 of 339 029-M-401 BLDG -029 -LVL -02 -FLOOR PLAN & RCPS 223 of 339 11-EP608 BLDG 11 - ONE-LINE DIAGRAM - PHASE 3 -PART 2 OF 3 310 of 339 96ET402b BLDG 96 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 50 of 339 011A-201 BLDG 011 -LVL 01 -ARCHITECTURAL PLAN 137 of 339 046-M-101 BLDG -046 -LVL -01 -OVERALL PLAN 224 of 339 11-EP609 BLDG 11 - ONE-LINE DIAGRAM - PHASE 3 -PART 3 OF 3 311 of 339 ET501 TELECOMMUNICATIONS DETAILS 51 of 339 011AS101 BLDG 011 -LVL 01 -PHASING PLAN 138 of 339 046-M-401 BLDG -046 -LVL -01 -DEMOLITION, FLOOR PLAN & RCPS 225 of 339 18-EP601 BLDG 18 - ONE-LINE DIAGRAM - EXISTING 312 of 339 ET502 TELECOMMUNICATIONS DETAILS 52 of 339 011A-101 BLDG 011 -LVL 01 -DEMO, FLOOR PLAN & RCPS 139 of 339 096-M-101 BLDG -096 -LVL -01 -OVERALL PLAN 226 of 339 18-EP611 BLDG 18 - ONE-LINE DIAGRAM - REVISED 313 of 339 ET503 TELECOMMUNICATIONS DETAILS 53 of 339 011A-202 BLDG 011 -LVL 02 -ARCHITECTURAL PLAN 140 of 339 096-M-102 BLDG -096 -LVL -02 -OVERALL PLAN 227 of 339 29-EP601 BLDG 29 - ONE-LINE DIAGRAM - EXISTING 314 of 339 ET504 TELECOMMUNICATIONS DETAILS 54 of 339 011AS102 BLDG 011 -LVL 02 -PHASING PLAN 141 of 339 096-M-401 BLDG -096 -LVL -01 -DEMOLITION, FLOOR PLANS & RCPS 228 of 339 29-EP611 BLDG 29 - ONE-LINE DIAGRAM - REVISED 315 of 339 ET505 TELECOMMUNICATIONS DETAILS 55 of 339 011A-102 BLDG 011 -LVL 02 -DEMO, FLOOR PLAN & RCPS 142 of 339 096-M-402 BLDG -096 -LVL -02 -DEMOLITION, FLOOR PLANS & RCPS 229 of 339 46-EP601 BLDG 46 - ONE-LINE DIAGRAM - EXISTING 316 of 339 ET506 TELECOMMUNICATIONS DETAILS 56 of 339 011A-203 BLDG 011 -LVL 03 -ARCHITECTURAL PLAN 143 of 339 M-501 MECHANICAL DETAILS I 230 of 339 46-EP611 BLDG 46 - ONE-LINE DIAGRAM - REVISED 317 of 339 ET701 TELECOMMUNICATIONS SCHEDULES 57 of 339 011AS103 BLDG 011 -LVL 03 -PHASING PLAN 144 of 339 M-502 MECHANICAL DETAILS II 231 of 339 90-EP601 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -EXISTING - PART 1 OF 2 58 of 339 011A-103 BLDG 011 -LVL 03 -DEMO, FLOOR PLAN & RCPS 145 of 339 M-503 MECHANICAL DETAILS III 232 of 339 90-EP602 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -EXISTING - PART 2 OF 2 318 of 339 TN000 TECHNOLOGY COVERSHEET 59 of 339 011A-204 BLDG 011 -LVL 04 -ARCHITECTURAL PLAN 146 of 339 M-601 MECHANICAL SCHEDULES 233 of 339 90-EP611 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -REVISED - PART 1 OF 2 319 of 339 TN100 SITE PLAN 60 of 339 011AS104 BLDG 011 -LVL 04 -PHASING PLAN 147 of 339 M-602 MECHANICAL SCHEDULES 234 of 339 90-EP612 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -REVISED - PART 2 OF 2 320 of 339 01TN101 BUILDING 01 -LEVEL 01 -FLOOR PLAN 61 of 339 011A-104 BLDG 011 -LVL 04 -DEMO, FLOOR PLAN & RCPS 148 of 339 M-701 MECHANICAL CONTROL LEGENDS & ABBREVIATIONS 235 of 339 96-EP601 BLDG 96 - ONE-LINE DIAGRAM - EXISTING 321 of 339 02TN101 BUILDING 02 -LEVEL 01 -FLOOR PLAN 62 of 339 011A-205 BLDG 011 -LVL 05 -ARCHITECTURAL PLAN 149 of 339 M-702 MECHANICAL CONTROLS I 236 of 339 96-EP611 BLDG 96 - ONE-LINE DIAGRAM - REVISED 322 of 339 11TN100 BUILDING 11 -LEVEL 00 -FLOOR PLAN 63 of 339 011AS105 BLDG 011 -LVL 05 -PHASING PLAN 150 of 339 M-703 MECHANICAL CONTROLS II 237 of 339 EP701 ELECTRICAL SCHEDULES 323 of 339 11TN101 BUILDING 11 -LEVEL 01 -FLOOR PLAN 64 of 339 011A-105 BLDG 011 -LVL 05 -DEMO, FLOOR PLAN & RCPS 238 of 339 01-EP701 ELECTRICAL SCHEDULES 324 of 339 11TN102 BUILDING 11 -LEVEL 02 -FLOOR PLAN 65 of 339 011A-206 BLDG 011 -LVL 06 -ARCHITECTURAL PLAN 151 of 339 E-001 ELECTRICAL ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX 239 of 339 02-EP701 ELECTRICAL SCHEDULES 325 of 339 11TN103 BUILDING 11 -LEVEL 03 -FLOOR PLAN 66 of 339 011AS106 BLDG 011 -LVL 06 -PHASING PLAN 152 of 339 E-002 ELECTRICAL LEGENDS 240 of 339 11-EP701 ELECTRICAL SCHEDULES 326 of 339 11TN104 BUILDING 11 -LEVEL 04 -FLOOR PLAN 67 of 339 011A-106 BLDG 011 -LVL 06 -DEMO, FLOOR PLAN & RCPS 153 of 339 ES-001 OVERALL ELECTRICAL SITE PLAN 241 of 339 11-EP702 ELECTRICAL SCHEDULES 327 of 339 11TN105 BUILDING 11 -LEVEL 05 -FLOOR PLAN 68 of 339 011A-207 BLDG 011 -LVL 07 -ARCHITECTURAL PLAN 154 of 339 01-EP101 BLDG 01 - LEVEL 01 - ELECTRICAL PLAN 242 of 339 11-EP703 ELECTRICAL SCHEDULES 328 of 339 11TN106 BUILDING 11 -LEVEL 06 -FLOOR PLAN 69 of 339 011AS107 BLDG 011 -LVL 07 -PHASING PLAN 155 of 339 02-EP101 BLDG 02 - LEVEL 01 - ELECTRICAL PLAN 243 of 339 11-EP704 ELECTRICAL SCHEDULES 329 of 339 11TN107 BUILDING 11 -LEVEL 07 -FLOOR PLAN 70 of 339 011A-107 BLDG 011 -LVL 07 -DEMO, FLOOR PLAN & RCPS 156 of 339 11-EP100 BLDG 11 - LEVEL 00 - ELECTRICAL PLAN 244 of 339 11-EP705 ELECTRICAL SCHEDULES 330 of 339 18TN101 BUILDING 18 -LEVEL 01 -FLOOR PLAN 71 of 339 018A-201 BLDG 018 -LVL 01 -ARCHITECTURAL PLAN 157 of 339 11-EP101 BLDG 11 - LEVEL 01 - ELECTRICAL PLAN 245 of 339 11-EP706 ELECTRICAL SCHEDULES 331 of 339 29TN101 BUILDING 29 -LEVEL 01 -FLOOR PLAN 72 of 339 018AS101 BLDG 018 -LVL 01 -PHASING PLAN 158 of 339 11-EP102 BLDG 11 - LEVEL 02 - ELECTRICAL PLAN 246 of 339 18-EP701 ELECTRICAL SCHEDULES 332 of 339 29TN102 BUILDING 29 -LEVEL 02 -FLOOR PLAN 73 of 339 018A-101 BLDG 018 -LVL 01 -DEMO, FLOOR PLAN & RCPS 159 of 339 11-EP103 BLDG 11 - LEVEL 03 - ELECTRICAL PLAN 247 of 339 29-EP701 ELECTRICAL SCHEDULES 333 of 339 46TN101 BUILDING 46 -LEVEL 01 -FLOOR PLAN 74 of 339 029AS101 BLDG 029 -LVL 01 -PHASING PLAN 160 of 339 11-EP107 BLDG 11 - LEVEL 07 - ELECTRICAL PLAN 248 of 339 46-EP701 ELECTRICAL SCHEDULES 334 of 339 96TN101 BUILDING 96 -LEVEL 01 -FLOOR PLAN 75 of 339 029A-202 BLDG 029 -LVL 02 -ARCHITECTURAL PLAN 161 of 339 18-EP101 BLDG 18 - LEVEL 01 - ELECTRICAL PLAN 249 of 339 96-EP701 ELECTRICAL SCHEDULES 335 of 339 96TN102 BUILDING 96 -LEVEL 02 -FLOOR PLAN 76 of 339 029AS102 BLDG 029 -LVL 02 -PHASING PLAN 162 of 339 29-EP101 BLDG 29 - LEVEL 01 - ELECTRICAL PLAN 250 of 339 96-EP702 ELECTRICAL SCHEDULES 336 of 339 TN501 TECHNOLOGY DETAILS 77 of 339 029A-102 BLDG 029 -LVL 02 -DEMO, FLOOR PLAN & RCPS 163 of 339 46-EP101 BLDG 46 - LEVEL 01 - ELECTRICAL PLAN 337 of 339 TN601 TECHNOLOGY DIAGRAMS 78 of 339 046A-201 BLDG 046 -LVL 01 -ARCHITECTURAL PLANS 164 of 339 90-EP101 BLDG 90 - LEVEL 01 - ELECTRICAL PLAN 251 of 339 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX 338 of 339 TN602 TECHNOLOGY DIAGRAMS 79 of 339 046AS101 BLDG 046 -LVL 01 -PHASING PLAN 165 of 339 96-EP101 BLDG 96 - LEVEL 01 - ELECTRICAL PLAN 252 of 339 ETG002 TELECOMMUNICATIONS LEGENDS 339 of 339 TN701 TECHNOLOGY SCHEDULES 80 of 339 046A-101 BLDG 046 -LVL 01 -DEMO, FLOOR PLAN & RCPS 166 of 339 96-EP102 BLDG 96 - LEVEL 02 - ELECTRICAL PLAN 253 of 339 01ET101 BLDG 01 - LEVEL 01 - TELECOMMUNICATIONS PLAN 81 of 339 096A-201 BLDG 096 -LVL 01 -ARCHITECTURAL PLAN 167 of 339 01-EP401 BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 254 of 339 01ET102 BLDG 01 - LEVEL 02 - TELECOMMUNICATIONS PLAN 82 of 339 096AS101 BLDG 096 -LVL 01 -PHASING PLAN 168 of 339 02-EP401 BLDG 02 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 255 of 339 02ET101 BLDG 02 - LEVEL 01 - TELECOMMUNICATIONS PLAN
TELECOMMUNCATIONS
TECHNOLOGY
MECHANICAL
ELECTRICAL
PAGE #
DRAWING INDEX
GENERAL
CIVIL
ENVIRONMENTAL
ARCHITECTURAL
83 of 339 096A-101 BLDG 096 -LVL 01 -DEMO, FLOOR PLAN & RCPS 169 of 339 11-EP400 BLDG 11 - LEVEL 00 - ENLARGED ELECTRICAL PLANS 256 of 339 11ET100 BLDG 11 - LEVEL 00 - TELECOMMUNICATIONS PLAN SHEET # SHEET NAME 84 of 339 096A-202 BLDG 096 -LVL 02 -ARCHITECTURAL PLAN 170 of 339 11-EL400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - LIGHTING PLANS 257 of 339 11ET101 BLDG 11 - LEVEL 01 - TELECOMMUNICATIONS PLAN
85 of 339 096AS102 BLDG 096 -LVL 02 -PHASING PLAN 171 of 339 11-EL400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - LIGHTING PLANS 258 of 339 11ET102 BLDG 11 - LEVEL 02 - TELECOMMUNICATIONS PLAN 1 of 339 G-001 COVER SHEET 86 of 339 096A-102 BLDG 096 -LVL 02 -DEMO, FLOOR PLAN & RCPS 172 of 339 11-EL400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - LIGHTING PLANS 259 of 339 11ET103 BLDG 11 - LEVEL 03 -TELECOMMUNICATIONS PLAN 2 of 339 G-002 VA POC INFORMATION, GENERAL NOTES -CONSTRUCTION 87 of 339 A-601 ROOM FINISH SCHEDULE 173 of 339 11-EP400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1-POWER PLANS 260 of 339 11ET104 BLDG 11 - LEVEL 04 - TELECOMMUNICATIONS PLAN 3 of 339 G-003 DRAWING INDEX 88 of 339 A-602 DOOR SCHEDULE, TYPES & DETAILS 174 of 339 11-EP400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - POWER PLANS 261 of 339 11ET105 BLDG 11 - LEVEL 05 - TELECOMMUNICATIONS PLAN
89 of 339 A-603 DETAILS 175 of 339 11-EP400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - POWER PLANS 262 of 339 11ET106 BLDG 11 - LEVEL 06 - TELECOMMUNICATIONS PLAN 4 of 339 CJ100 CIVIL NOTES 90 of 339 AE421 INTERIOR ELEVATIONS & TR PLAN VIEW 176 of 339 11-EP400d BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - POWER PLANS 263 of 339 11ET107 BLDG 11 - LEVEL 07 - TELECOMMUNICATIONS PLAN 5 of 339 CD100 EXISTING CONDITIONS AND DEMOLITION PLAN 91 of 339 AW001 IN-03.01 -ROOM NUMBER SIGN & SIGNAGE SCHEDULE 177 of 339 11-EP400e BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - POWER PLANS 264 of 339 18ET101 BLDG 18 - LEVEL 01 - TELECOMMUNICATIONS PLAN 6 of 339 CG100 EROSION CONTROL PLAN 178 of 339 11-EP400f BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - POWER PLANS 265 of 339 29ET101 BLDG 29 - LEVEL 01 - TELECOMMUNICATIONS PLAN 7 of 339 CU100 OVERALL UTILITY PLAN 92 of 339 F-001 FIRE PROTECTION GENERAL NOTES, ABBREVIATION AND LEGENDS 179 of 339 11-EF400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - FIRE ALARM PLANS 266 of 339 29ET102 BLDG 29 - LEVEL 02 - TELECOMMUNICATIONS PLAN 8 of 339 CU101 PLAN AND PROFILE - FOC 1 & FOC 2 93 of 339 011-F-101 BLDG -011 -LVL -00 -OVERALL PLAN 180 of 339 11-EF400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - FIRE ALARM PLANS 267 of 339 46ET101 BLDG 46 - LEVEL 01 - TELECOMMUNICATIONS PLAN 9 of 339 CU102 PLAN AND PROFILE - FOC 3 94 of 339 011-FD401 BLDG -011 -LVL -00 -MCR -PHASE 01 -DEMO FIRE PROTECTION FLOOR PLAN 181 of 339 11-EF400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - FIRE ALARM PLANS 268 of 339 96ET101 BLDG 96 - LEVEL 01 - TELECOMMUNICATIONS PLAN 10 of 339 CU103 PLAN AND PROFILE - FOC 3 95 of 339 011-FX402 BLDG -011 -LVL -00 -MCR -PHASE 01 -FIRE PROTECTION FLOOR PLAN 182 of 339 11-EG400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - GROUNDING PLANS 269 of 339 96ET102 BLDG 96 - LEVEL 02 - TELECOMMUNICATIONS PLAN 11 of 339 CU104 PLAN AND PROFILE - ELEC 96 of 339 011-FD403 BLDG -011 -LVL -00 -MCR -PHASE 02 -DEMO FIRE PROTECTION FLOOR PLAN 183 of 339 11-EG400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - GROUNDING PLANS 270 of 339 01ET401 BLDG 01 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 12 of 339 CK100 CIVIL DETAILS 97 of 339 011-FX404 BLDG -011 -LVL -00 -MCR -PHASE 02 -FIRE PROTECTION FLOOR PLAN 184 of 339 11-EG400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - GROUNDING PLANS 271 of 339 02ET401 BLDG 02 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS
98 of 339 011-FD405 BLDG -011 -LVL -00 -MCR -PHASE 03 -DEMO FIRE PROTECTION FLOOR PLAN 185 of 339 11-EP401a BLDG 11 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 272 of 339 11ET400a BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - DEMO FLOOR PLAN 13 of 339 HA-100 KERRVILLE CAMPUS -ENVIRONMENTAL HAZARDS 99 of 339 011-FX406 BLDG -011 -LVL -00 -MCR -PHASE 03 -FIRE PROTECTION FLOOR PLAN 186 of 339 11-EP401b BLDG 11 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 273 of 339 11ET400b BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - TELECOM PLAN 14 of 339 001HA101 BLDG 001 -LVL 01 -ENVIRONMENTAL HAZARDS 100 of 339 M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATION 187 of 339 11-EP402 BLDG 11 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 274 of 339 11ET400c BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - DEMO FLOOR PLAN 15 of 339 001HA102 BLDG 001 -LVL 02 -ENVIRONMENTAL HAZARDS 101 of 339 M-002 MECHANICAL LEGENDS 188 of 339 11-EP403 BLDG 11 - LEVEL 03 - ENLARGED ELECTRICAL PLANS 275 of 339 11ET400d BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - TELECOM PLAN 16 of 339 02HA101 BLDG 02 -LVL 01 -ENVIRONTMENTAL HAZARDS 102 of 339 001-M-101 BLDG -001 -LVL -01 -OVERALL PLAN 189 of 339 11-EP404 BLDG 11 - LEVEL 04 - ENLARGED ELECTRICAL PLANS 276 of 339 11ET400e BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - DEMO FLOOR PLAN 17 of 339 011HA100 BLDG 011 -LVL 00 -RM 0A -ENVIRONMENTAL HAZARDS 103 of 339 001-M-401 BLDG -001 -LVL -01 -DEMO, FLOOR PLANS AND RCPS 190 of 339 11-EP405 BLDG 11 - LEVEL 05 - ENLARGED ELECTRICAL PLANS 277 of 339 11ET400f BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - TELECOM PLAN 18 of 339 011HA101 BLDG 011 -LVL 01 -RM 120B -ENVIRONMENTAL HAZARDS 104 of 339 002-M-101 BLDG -002 -LVL -01 -OVERALL PLAN 191 of 339 11-EP406 BLDG 11 - LEVEL 06 - ENLARGED ELECTRICAL PLANS 278 of 339 11ET400g BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - DEMO OVERHEAD PLAN 19 of 339 011HA102 BLDG 011 -LVL 02 -RM 201A -ENVIRONMENTAL HAZARDS 105 of 339 002-M-401 BLDG -002 -LVL -01 -DEMO, FLOOR PLANS & RCPS 192 of 339 11-EP407 BLDG 11 - LEVEL 07 - ENLARGED ELECTRICAL PLANS 279 of 339 11ET400h BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 1 - DISTR OVERHEAD PLAN 20 of 339 011HA103 BLDG 011 -LVL 03 -RM 388 -ENVIRONMENTAL HAZARDS 106 of 339 011-M-101 BLDG -011 -LVL -00 -OVERALL PLAN 193 of 339 11-EP408 BLDG 11 - PENTHOUSE - ENLARGED ROOF PLAN 280 of 339 11ET400i BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - DEMO OVERHEAD PLAN 21 of 339 011HA104 BLDG 011 -LVL 04 -RM 457 -ENVIRONMENTAL HAZARDS 107 of 339 011-M-102 BLDG -011 -LVL -01 -OVERALL PLAN 194 of 339 18-EP401 BLDG 18 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 281 of 339 11ET400j BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 2 - DISTR OVERHEAD PLAN 22 of 339 011HA105 BLDG 011 -LVL 05 -RM 580 -ENVIRONMENTAL HAZARDS 108 of 339 011-M-103 BLDG -011 -LVL -02 -OVERALL PLAN 195 of 339 29-EP402 BLDG 29 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 282 of 339 11ET400k BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - DEMO OVERHEAD PLAN 23 of 339 011HA106 BLDG 011 -LVL 06 -RM 601B -ENVIRONMENTAL HAZARDS 109 of 339 011-M-104 BLDG -011 -LVL -03 -OVERALL PLAN 196 of 339 46-EP401 BLDG 46 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 283 of 339 11ET400l BLDG 11 - LEVEL 00 - DATA CENTER - PHASE 3 - DISTR OVERHEAD PLAN 24 of 339 011HA107 BLDG 011 -LVL 07 -RM 702 -ENVIRONMENTAL HAZARDS 110 of 339 011-M-105 BLDG -011 -LVL -04 -OVERALL PLAN 197 of 339 96-EP401 BLDG 96 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 284 of 339 11ET400m BLDG 11 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS PLANS 25 of 339 011HA108 BLDG 011 -ROOF -ENVIRONMENTAL HAZARDS 111 of 339 011-M-106 BLDG -011 -LVL -05 -OVERALL PLAN 198 of 339 96-EP402a BLDG 96 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 285 of 339 11ET400n BLDG 11 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS PLANS 26 of 339 018HA101 BLDG 018 -LVL 01 -ENVIRONMENTAL HAZARDS 112 of 339 011-M-107 BLDG -011 -LVL -06 -OVERALL PLAN 199 of 339 96-EP402b BLDG 96 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 286 of 339 11ET400o BLDG 11 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS PLANS 27 of 339 029HA101 BLDG 29 -LVL 01 -ENVIRONMENTAL HAZARDS 113 of 339 011-M-108 BLDG -011 -LVL -07 -OVERALL PLAN 200 of 339 E-501 ELECTRICAL DETAILS 287 of 339 11ET401a BLDG 11 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 28 of 339 029HA102 BLDG 29 -LVL 02 -ENVIRONMENTAL HAZARDS 114 of 339 011-MD401 BLDG -011 -LVL -00 -MCR -PHASE 01 -MECHANICAL DEMO FLOOR PLAN 201 of 339 E-502 ELECTRICAL DETAILS 288 of 339 11ET401b BLDG 11 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 29 of 339 046HA101 BLDG 046 -LVL 01 -ENVIRONMENTAL HAZARDS 115 of 339 011-MH402 BLDG -011 -LVL -00 -MCR -PHASE 01 -HVAC DUCT FLOOR PLAN 202 of 339 E-503 ELECTRICAL DETAILS 289 of 339 11ET402a BLDG 11 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 30 of 339 096HA101 BLDG 096 -LVL 01 -ENVIRONMENTAL HAZARDS 116 of 339 011-MP403 BLDG -011 -LVL -00 -MCR -PHASE 01 -HVAC PIPING FLOOR PLAN 203 of 339 E-504 ELECTRICAL DETAILS 290 of 339 11ET402b BLDG 11 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 31 of 339 096HA102 BLDG 096 -LVL 02 -ENVIRONMENTAL HAZARDS 117 of 339 011-MD404 BLDG -011 -LVL -00 -MCR -PHASE 02 -MECHANICAL DEMO FLOOR PLAN 204 of 339 E-505 ELECTRICAL DETAILS 291 of 339 11ET402c BLDG 11 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS
118 of 339 011-MH405 BLDG -011 -LVL -00 -MCR -PHASE 02 -HVAC DUCT FLOOR PLAN 205 of 339 E-506 ELECTRICAL DETAILS 292 of 339 11ET403a BLDG 11 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS PLANS 32 of 339 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS 119 of 339 011-MP406 BLDG -011 -LVL -00 -MCR -PHASE 02 -HVAC PIPING FLOOR PLAN 206 of 339 E-507 ELECTRICAL DETAILS 293 of 339 11ET403b BLDG 11 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS PLANS 33 of 339 AS101 ICRA DETAILS 120 of 339 011-MD407 BLDG -011 -LVL -00 -MCR -PHASE 03 -MECHANICAL DEMO FLOOR PLAN 207 of 339 E-508 ELECTRICAL DETAILS 294 of 339 11ET405a BLDG 11 - LEVEL 05 - ENLARGED TELECOMMUNICATIONS PLANS 34 of 339 001A-201 BLDG 001 -LVL 01 -ARCHITECTURAL PLANS 121 of 339 011-MH408 BLDG -011 -LVL -00 -MCR -PHASE 03 -HVAC DUCT FLOOR PLAN 208 of 339 E-509 ELECTRICAL DETAILS 295 of 339 11ET405b BLDG 11 - LEVEL 05 - ENLARGED TELECOMMUNICATIONS PLANS 35 of 339 001AS101 BLDG 001 -LVL 01 -PHASING PLAN 122 of 339 011-MP409 BLDG -011 -LVL -00 -MCR -PHASE 03 -HVAC PIPING FLOOR PLAN 209 of 339 EF601 DATA CENTER FIRE ALARM RISER DIAGRAM AND I/O MATRIX 296 of 339 11ET406a BLDG 11 - LEVEL 06 - ENLARGED TELECOMMUNICATIONS PLANS 36 of 339 001A-101 BLDG 001 -LVL 01 -DEMO, FLOOR PLAN & RCPS 123 of 339 011-M-410 BLDG -011 -LVL -00 -DEMOLITION, FLOOR PLANS & RCPS 210 of 339 EG601 TELECOMMUNICATIONS BONDING RISER DIAGRAM 297 of 339 11ET406b BLDG 11 - LEVEL 06 - ENLARGED TELECOMMUNICATIONS PLANS 37 of 339 001AS102 BLDG 001 -LVL 02 -PHASING PLAN 124 of 339 011-M-411 BLDG -011 -LVL -01 -DEMOLITION, FLOOR PLANS & RCPS 211 of 339 00-EP611 CAMPUS - ONE-LINE DIAGRAM 298 of 339 11ET407a BLDG 11 - LEVEL 07 - ENLARGED TELECOMMUNICATIONS PLANS 38 of 339 002A-201 BLDG 002 -LVL 01 -ARCHITECTURAL PLAN 125 of 339 011-M-412 BLDG -011 -LVL -02 -DEMOLITION, FLOOR PLANS & RCPS 212 of 339 01-EP601 BLDG 01 - ONE-LINE DIAGRAM - EXISTING 299 of 339 11ET407b BLDG 11 - LEVEL 07 - ENLARGED TELECOMMUNICATIONS PLANS 39 of 339 002AS101 BLDG 002 -LVL 01 -PHASING PLAN 126 of 339 011-M-413 BLDG -011 -LVL -03 -DEMOLITION, FLOOR PLANS & RCPS 213 of 339 01-EP611 BLDG 01 - ONE-LINE DIAGRAM - REVISED 300 of 339 18ET401a BLDG 18 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 40 of 339 002A-101 BLDG 002 -LVL 01 -DEMO, FLOOR PLAN & RCPS 127 of 339 011-M-414 BLDG -011 -LVL -04 -DEMOLITION, FLOOR PLANS & RCPS 214 of 339 02-EP601 BLDG 02 - ONE-LINE DIAGRAM - EXISTING 301 of 339 18ET401b BLDG 18 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 41 of 339 011A-200 BLDG 011 -LVL 00 -ARCHITECTURAL PLAN 128 of 339 011-M-415 BLDG -011 -LVL -05 -DEMOLITION, FLOOR PLANS & RCPS 215 of 339 02-EP611 BLDG 02 - ONE-LINE DIAGRAM - REVISED 302 of 339 29ET402a BLDG 29 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 42 of 339 011AS100 BLDG 011 -LVL 00 -PHASING PLAN 129 of 339 011-M-416 BLDG -011 -LVL -06 -DEMOLITION, FLOOR PLANS & RCPS 216 of 339 11-EP601 BLDG 11 - ONE-LINE DIAGRAM - PHASE 1 -PART 1 OF 3 303 of 339 29ET402b BLDG 29 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 43 of 339 011A-100 BLDG 011 -LVL 00 -DEMO, FLOOR PLAN & RCPS 130 of 339 011-M-417 BLDG -011 -LVL -07 -DEMOLITION, FLOOR PLANS & RCPS 217 of 339 11-EP602 BLDG 11 - ONE-LINE DIAGRAM - PHASE 1 -PART 2 OF 3 304 of 339 46ET401a BLDG 46 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 44 of 339 011A-100a BLDG 011 -LVL 00 -DATA CENTER -PHASE 1 -DEMO FLOOR PLAN 131 of 339 011-M-418 BLDG -011 -ROOF PLAN 218 of 339 11-EP603 BLDG 11 - ONE-LINE DIAGRAM - PHASE 1 -PART 3 OF 3 305 of 339 46ET401b BLDG 46 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 45 of 339 011A-100b BLDG 011 -LVL 00 -DATA CENTER -PHASE 1 FLOOR PLAN 132 of 339 018-M-101 BLDG -018 -LVL -01 -OVERALL PLAN 219 of 339 11-EP604 BLDG 11 - ONE-LINE DIAGRAM - PHASE 2 -PART 1 OF 3 306 of 339 96ET401a BLDG 96 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 46 of 339 011A-100c BLDG 011 -LVL 00 -DATA CENTER -PHASE 2 -DEMO FLOOR PLAN 133 of 339 018-M-401 BLDG -018 -LVL -01 -DEMOLITION, FLOOR PLANS & RCPS 220 of 339 11-EP605 BLDG 11 - ONE-LINE DIAGRAM - PHASE 2 -PART 2 OF 3 307 of 339 96ET401b BLDG 96 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 47 of 339 011A-100d BLDG 011 -LVL 00 -DATA CENTER -PHASE 2 -FLOOR PLAN 134 of 339 018-M-402 BLDG -018 -LVL -01 -DEMOLITION & FLOOR PLAN 221 of 339 11-EP606 BLDG 11 - ONE-LINE DIAGRAM - PHASE 2 -PART 3 OF 3 308 of 339 96ET401c BLDG 96 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS PLANS 48 of 339 011A-100e BLDG 011 -LVL 00 -DATA CENTER -PHASE 3 -DEMO FLOOR PLAN 135 of 339 029-M-101 BLDG -029 -LVL -02 -OVERALL PLAN 222 of 339 11-EP607 BLDG 11 - ONE-LINE DIAGRAM - PHASE 3 -PART 1 OF 3 309 of 339 96ET402a BLDG 96 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 49 of 339 011A-100f BLDG 011 -LVL 00 -DATA CENTER -PHASE 3 -FLOOR PLAN 136 of 339 029-M-401 BLDG -029 -LVL -02 -FLOOR PLAN & RCPS 223 of 339 11-EP608 BLDG 11 - ONE-LINE DIAGRAM - PHASE 3 -PART 2 OF 3 310 of 339 96ET402b BLDG 96 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS PLANS 50 of 339 011A-201 BLDG 011 -LVL 01 -ARCHITECTURAL PLAN 137 of 339 046-M-101 BLDG -046 -LVL -01 -OVERALL PLAN 224 of 339 11-EP609 BLDG 11 - ONE-LINE DIAGRAM - PHASE 3 -PART 3 OF 3 311 of 339 ET501 TELECOMMUNICATIONS DETAILS 51 of 339 011AS101 BLDG 011 -LVL 01 -PHASING PLAN 138 of 339 046-M-401 BLDG -046 -LVL -01 -DEMOLITION, FLOOR PLAN & RCPS 225 of 339 18-EP601 BLDG 18 - ONE-LINE DIAGRAM - EXISTING 312 of 339 ET502 TELECOMMUNICATIONS DETAILS 52 of 339 011A-101 BLDG 011 -LVL 01 -DEMO, FLOOR PLAN & RCPS 139 of 339 096-M-101 BLDG -096 -LVL -01 -OVERALL PLAN 226 of 339 18-EP611 BLDG 18 - ONE-LINE DIAGRAM - REVISED 313 of 339 ET503 TELECOMMUNICATIONS DETAILS 53 of 339 011A-202 BLDG 011 -LVL 02 -ARCHITECTURAL PLAN 140 of 339 096-M-102 BLDG -096 -LVL -02 -OVERALL PLAN 227 of 339 29-EP601 BLDG 29 - ONE-LINE DIAGRAM - EXISTING 314 of 339 ET504 TELECOMMUNICATIONS DETAILS 54 of 339 011AS102 BLDG 011 -LVL 02 -PHASING PLAN 141 of 339 096-M-401 BLDG -096 -LVL -01 -DEMOLITION, FLOOR PLANS & RCPS 228 of 339 29-EP611 BLDG 29 - ONE-LINE DIAGRAM - REVISED 315 of 339 ET505 TELECOMMUNICATIONS DETAILS 55 of 339 011A-102 BLDG 011 -LVL 02 -DEMO, FLOOR PLAN & RCPS 142 of 339 096-M-402 BLDG -096 -LVL -02 -DEMOLITION, FLOOR PLANS & RCPS 229 of 339 46-EP601 BLDG 46 - ONE-LINE DIAGRAM - EXISTING 316 of 339 ET506 TELECOMMUNICATIONS DETAILS 56 of 339 011A-203 BLDG 011 -LVL 03 -ARCHITECTURAL PLAN 143 of 339 M-501 MECHANICAL DETAILS I 230 of 339 46-EP611 BLDG 46 - ONE-LINE DIAGRAM - REVISED 317 of 339 ET701 TELECOMMUNICATIONS SCHEDULES 57 of 339 011AS103 BLDG 011 -LVL 03 -PHASING PLAN 144 of 339 M-502 MECHANICAL DETAILS II 231 of 339 90-EP601 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -EXISTING - PART 1 OF 2 58 of 339 011A-103 BLDG 011 -LVL 03 -DEMO, FLOOR PLAN & RCPS 145 of 339 M-503 MECHANICAL DETAILS III 232 of 339 90-EP602 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -EXISTING - PART 2 OF 2 318 of 339 TN000 TECHNOLOGY COVERSHEET 59 of 339 011A-204 BLDG 011 -LVL 04 -ARCHITECTURAL PLAN 146 of 339 M-601 MECHANICAL SCHEDULES 233 of 339 90-EP611 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -REVISED - PART 1 OF 2 319 of 339 TN100 SITE PLAN 60 of 339 011AS104 BLDG 011 -LVL 04 -PHASING PLAN 147 of 339 M-602 MECHANICAL SCHEDULES 234 of 339 90-EP612 BLDG 90 - PARTIAL ONE-LINE DIAGRAM -REVISED - PART 2 OF 2 320 of 339 01TN101 BUILDING 01 -LEVEL 01 -FLOOR PLAN 61 of 339 011A-104 BLDG 011 -LVL 04 -DEMO, FLOOR PLAN & RCPS 148 of 339 M-701 MECHANICAL CONTROL LEGENDS & ABBREVIATIONS 235 of 339 96-EP601 BLDG 96 - ONE-LINE DIAGRAM - EXISTING 321 of 339 02TN101 BUILDING 02 -LEVEL 01 -FLOOR PLAN 62 of 339 011A-205 BLDG 011 -LVL 05 -ARCHITECTURAL PLAN 149 of 339 M-702 MECHANICAL CONTROLS I 236 of 339 96-EP611 BLDG 96 - ONE-LINE DIAGRAM - REVISED 322 of 339 11TN100 BUILDING 11 -LEVEL 00 -FLOOR PLAN 63 of 339 011AS105 BLDG 011 -LVL 05 -PHASING PLAN 150 of 339 M-703 MECHANICAL CONTROLS II 237 of 339 EP701 ELECTRICAL SCHEDULES 323 of 339 11TN101 BUILDING 11 -LEVEL 01 -FLOOR PLAN 64 of 339 011A-105 BLDG 011 -LVL 05 -DEMO, FLOOR PLAN & RCPS 238 of 339 01-EP701 ELECTRICAL SCHEDULES 324 of 339 11TN102 BUILDING 11 -LEVEL 02 -FLOOR PLAN 65 of 339 011A-206 BLDG 011 -LVL 06 -ARCHITECTURAL PLAN 151 of 339 E-001 ELECTRICAL ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX 239 of 339 02-EP701 ELECTRICAL SCHEDULES 325 of 339 11TN103 BUILDING 11 -LEVEL 03 -FLOOR PLAN 66 of 339 011AS106 BLDG 011 -LVL 06 -PHASING PLAN 152 of 339 E-002 ELECTRICAL LEGENDS 240 of 339 11-EP701 ELECTRICAL SCHEDULES 326 of 339 11TN104 BUILDING 11 -LEVEL 04 -FLOOR PLAN 67 of 339 011A-106 BLDG 011 -LVL 06 -DEMO, FLOOR PLAN & RCPS 153 of 339 ES-001 OVERALL ELECTRICAL SITE PLAN 241 of 339 11-EP702 ELECTRICAL SCHEDULES 327 of 339 11TN105 BUILDING 11 -LEVEL 05 -FLOOR PLAN 68 of 339 011A-207 BLDG 011 -LVL 07 -ARCHITECTURAL PLAN 154 of 339 01-EP101 BLDG 01 - LEVEL 01 - ELECTRICAL PLAN 242 of 339 11-EP703 ELECTRICAL SCHEDULES 328 of 339 11TN106 BUILDING 11 -LEVEL 06 -FLOOR PLAN 69 of 339 011AS107 BLDG 011 -LVL 07 -PHASING PLAN 155 of 339 02-EP101 BLDG 02 - LEVEL 01 - ELECTRICAL PLAN 243 of 339 11-EP704 ELECTRICAL SCHEDULES 329 of 339 11TN107 BUILDING 11 -LEVEL 07 -FLOOR PLAN 70 of 339 011A-107 BLDG 011 -LVL 07 -DEMO, FLOOR PLAN & RCPS 156 of 339 11-EP100 BLDG 11 - LEVEL 00 - ELECTRICAL PLAN 244 of 339 11-EP705 ELECTRICAL SCHEDULES 330 of 339 18TN101 BUILDING 18 -LEVEL 01 -FLOOR PLAN 71 of 339 018A-201 BLDG 018 -LVL 01 -ARCHITECTURAL PLAN 157 of 339 11-EP101 BLDG 11 - LEVEL 01 - ELECTRICAL PLAN 245 of 339 11-EP706 ELECTRICAL SCHEDULES 331 of 339 29TN101 BUILDING 29 -LEVEL 01 -FLOOR PLAN 72 of 339 018AS101 BLDG 018 -LVL 01 -PHASING PLAN 158 of 339 11-EP102 BLDG 11 - LEVEL 02 - ELECTRICAL PLAN 246 of 339 18-EP701 ELECTRICAL SCHEDULES 332 of 339 29TN102 BUILDING 29 -LEVEL 02 -FLOOR PLAN 73 of 339 018A-101 BLDG 018 -LVL 01 -DEMO, FLOOR PLAN & RCPS 159 of 339 11-EP103 BLDG 11 - LEVEL 03 - ELECTRICAL PLAN 247 of 339 29-EP701 ELECTRICAL SCHEDULES 333 of 339 46TN101 BUILDING 46 -LEVEL 01 -FLOOR PLAN 74 of 339 029AS101 BLDG 029 -LVL 01 -PHASING PLAN 160 of 339 11-EP107 BLDG 11 - LEVEL 07 - ELECTRICAL PLAN 248 of 339 46-EP701 ELECTRICAL SCHEDULES 334 of 339 96TN101 BUILDING 96 -LEVEL 01 -FLOOR PLAN 75 of 339 029A-202 BLDG 029 -LVL 02 -ARCHITECTURAL PLAN 161 of 339 18-EP101 BLDG 18 - LEVEL 01 - ELECTRICAL PLAN 249 of 339 96-EP701 ELECTRICAL SCHEDULES 335 of 339 96TN102 BUILDING 96 -LEVEL 02 -FLOOR PLAN 76 of 339 029AS102 BLDG 029 -LVL 02 -PHASING PLAN 162 of 339 29-EP101 BLDG 29 - LEVEL 01 - ELECTRICAL PLAN 250 of 339 96-EP702 ELECTRICAL SCHEDULES 336 of 339 TN501 TECHNOLOGY DETAILS 77 of 339 029A-102 BLDG 029 -LVL 02 -DEMO, FLOOR PLAN & RCPS 163 of 339 46-EP101 BLDG 46 - LEVEL 01 - ELECTRICAL PLAN 337 of 339 TN601 TECHNOLOGY DIAGRAMS 78 of 339 046A-201 BLDG 046 -LVL 01 -ARCHITECTURAL PLANS 164 of 339 90-EP101 BLDG 90 - LEVEL 01 - ELECTRICAL PLAN 251 of 339 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX 338 of 339 TN602 TECHNOLOGY DIAGRAMS 79 of 339 046AS101 BLDG 046 -LVL 01 -PHASING PLAN 165 of 339 96-EP101 BLDG 96 - LEVEL 01 - ELECTRICAL PLAN 252 of 339 ETG002 TELECOMMUNICATIONS LEGENDS 339 of 339 TN701 TECHNOLOGY SCHEDULES 80 of 339 046A-101 BLDG 046 -LVL 01 -DEMO, FLOOR PLAN & RCPS 166 of 339 96-EP102 BLDG 96 - LEVEL 02 - ELECTRICAL PLAN 253 of 339 01ET101 BLDG 01 - LEVEL 01 - TELECOMMUNICATIONS PLAN 81 of 339 096A-201 BLDG 096 -LVL 01 -ARCHITECTURAL PLAN 167 of 339 01-EP401 BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 254 of 339 01ET102 BLDG 01 - LEVEL 02 - TELECOMMUNICATIONS PLAN 82 of 339 096AS101 BLDG 096 -LVL 01 -PHASING PLAN 168 of 339 02-EP401 BLDG 02 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 255 of 339 02ET101 BLDG 02 - LEVEL 01 - TELECOMMUNICATIONS PLAN
TELECOMMUNCATIONS
TECHNOLOGY
MECHANICAL
ELECTRICAL
PAGE #
DRAWING INDEX
GENERAL
CIVIL
ENVIRONMENTAL
ARCHITECTURAL
Know what's
R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA, 98032
(206) 590 - 2118
RAY SPEES
VA TX KERRVILLE EHRM
INFRASTRUCTURE
Kerrville VA Medical Center 3600, Memorial Blvd, Kerrville Texas 78208
671A4-21-700
Revisions: Date:
11/18/25 LKS PTD
100% CONSTRUCTION
DOCUMENTSENGINEERING DISCIPLINE:
CONSULTANT
117 STATE STREET, SUITE 201
BETTENDORF, IA
52722
PH: 563.344.0260
www.imegcorp.com
IMEG #23001093
FULLY SPRINKLERED
LINNEA K.
SHAW
062-074863
CIVIL NOTES
RAILROAD SPIKE, FOUND
SURVEY BOUNDARY
HANDHOLE
POWER POLE
HYDRANT
WATER VALVE
GAS VALVE
LIGHT POLE
SIGN
SPOT ELEVATION
MEASURED DIMENSION
RECORDED DIMENSION
R.O.W. MARKER, FOUND
ELECTRIC PEDESTAL/TRANSFORMER
TELEPHONE PEDESTAL
TELEPHONE POLE
SOIL BORING HOLE
FLARED END SECTION
SECTION LINE
EASEMENT LINE
CHAIN LINK FENCE
OVERHEAD ELECTRIC
GAS LINEUNDERGROUND ELECTRIC
GUARD RAIL
SANITARY/STORM CLEANOUT
TELEPHONE LINE
R.O.W. LINE
ELECTRIC MANHOLE
TELEPHONE MANHOLE
UTILITY MANHOLE
LIGHT JUNCTION BOX
CONIFER TREE
DECIDUOUS TREE
TREE STUMP
BUSH/SHRUB
VAPOR LIGHT
CONTROL POINT
UNKNOWN MANHOLE
WELL
GUY WIRE
FLAGPOLE
POST/BOLLARD
TREE LINE
HISTORICAL LINE - AS NOTED
PROPERTY LINE
DOWNSPOUT
BENCHMARK
ELECTRIC METER
WATER METER
FORCE MAIN
SANITARY SEWER
STORM SEWER
PIPE UNDERDRAIN
WATER LINE
SETBACK LINE
UTILITY LINE
GUY POLE
GRADE LABEL
POWER POLE W/ LIGHT
POWER POLE W/ METER
DRAINAGE SLOPE
LINE CONTINUATION
CONTOUR
CENTERLINE
SANITARY MANHOLE
FLOOD PLAIN
FLOODWAY
SILT FENCE
CONCRETE MONUMENT, FOUND
CONSTRUCTION LIMITS
PIPE, FOUND
SPRINKLER BOX
WATER SERVICE
EDGE OF WATER LINE/DITCH FLOWLINE
GENERAL NOTES
1. ALL IMPROVEMENTS SHOWN ON THESE ENGINEERING PLANS SHALL COMPLY
WITH THE CITY OF KERRVILLE DESIGN AND STANDARD SPECIFICATIONS, LATEST
EDITION, AND THE STANDARDS OF THE TEXAS COMMISSION ON ENVIRONMENTAL
QUALITY, LATEST EDITION.
2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED
FROM AVAILABLE SURVEYS, RECORDS, AND FIELD INVESTIGATION. THEIR
LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE
MAY BE OTHERS, THE EXISTENCE OF WHICH PRESENTLY NOT KNOWN OR
SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR
EXISTENCE AND EXACT LOCATION AND TO AVOID DAMAGE THERETO.
3. ALL DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE
PROPERLY DISPOSED OF OFF-SITE UNLESS NOTED.
4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
5. CLEANUP AND FINAL INSPECTION. WORK BROKEN OR DAMAGED BY CONTRACTOR
ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
ALL WASTE MATERIAL, CONCRETE WASHOUT, LANDSCAPE WASTE AND BUILDING
MATERIAL SHALL BE REMOVED. SOIL SHALL BE REMOVED FROM PAVED AREAS
AND THE PROJECT SHALL BE LEFT IN A CLEAN AND WORKMANLIKE MANNER.
6. IF SURPLUS SOIL NEEDS TO BE REMOVED FROM SITE, SOIL SHALL BE
CONSIDERED CONTAMINATED AND TREATED AS SUCH PER SPECIFICATION 31 20
11. CONTRACTOR SHALL PROPOSED A STORAGE AREA ON SITE, WITHIN PROJECT
BOUNDARIES, FOR VA REVIEW AND APPROVAL. SURPLUS SOILS CAN BE USED AS
BACKFILL IF THE VA GEMS AND/OR COR APPROVE, AFTER REVIEW OF PROPOSED
WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PICK A PERMITTED
LOCATION FOR SOIL STORAGE AND ASSUME ALL COSTS FOR SOIL DISPOSAL.
7. EXISTING LINEWORK BASED ON PUBLIC GIS DATA DATED 2019 CIVIL SURVEY
DATED 12/15/2022 .
GRADING NOTES
1. ALL ELEVATIONS SHOWN ARE TO FLOWLINE FINISHED GRADE OR TOP OF
PAVEMENT UNLESS OTHERWISE STATED.
2. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREAS.
DO NOT ALLOW WATER TO POND ON PROPERTY.
3. PRIOR TO PLACEMENT OF ANY FILL, THE STRIPPED SITE SHALL BE SCARIFIED TO
A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY. ANY UNSUITABLE
SOILS FOUND AT THIS TIME SHALL BE DRIED AND RECOMPACTED OR REMOVED IF
REQUIRED COMPACTION CANNOT BE OBTAINED. CUT AREAS SHALL ALSO BE
SCARIFIED TO A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY.
4. ALL FILL MATERIAL SHALL CONSIST OF APPROVED, SUITABLE SOILS PLACED IN
LOOSE LIFTS OF 9 INCHES OR LESS AND COMPACTED TO AT LEAST 95% OF THE
MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698) IN ALL
PAVEMENT AND BUILDING ADDITIONS. THE COMPACTION WILL BE FIELD TESTED
BY A SOILS ENGINEERING CONSULTANT REPRESENTING THE OWNER.
5. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM
CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM
THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS REQUIRED BY
THE PERMIT.
6. ALL DISTURBED EMBANKMENTS GREATER THAN 3:1 SLOPES SHALL BE SEEDED
ACCORDING TO A RECOMMENDED SEEDING MIX BY THE LANDSCAPER AND
COVERED WITH EROSION CONTROL BLANKETS OR AS DIRECTED BY PLAN
DOCUMENTS.
7. CONTRACTOR SHALL ADHERE TO THE CITY OF KERRVILLE DRAINAGE DESIGN
MANUAL AND THE STATE OF TEXAS CONSTRUCTION STORMWATER
MANAGEMENT PROGRAM.
8. ALL AREAS TO BE GREENSPACE AT PROJECT COMPLETION SHALL BE LEFT WITH 6
INCHES OF TOPSOIL WHEN MASS GRADING ACTIVITIES ARE COMPLETE.
UTILITY NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL
EXISTING UTILITIES AND PAVED STREETS, INCLUDING ANY NOT SHOWN ON
THESE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY CONFLICTS WITH
THE DRAWINGS OCCUR. ANY DAMAGE TO EXISTING UTILITIES AND/OR PAVED
STREETS CAUSED BY TRENCHING AND GRADING OPERATIONS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE. EXISTING UTILITY LOCATIONS
SHOWN ON THE DRAWINGS ARE APPROXIMATE.
2. ALL EXISTING UNDERGROUND UTILITIES SHOWN WERE LOCATED PARTIALLY IN
THE FIELD AND PARTIALLY FROM REVIEW OF EXISTING PUBLIC RECORDS. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT EACH UTILITY
COMPANY FOR THE FIELD LOCATION OF THEIR EXISTING LINES IN OR NEARBY
THE CONSTRUCTION AREA PRIOR TO BEGINNING ANY CONSTRUCTION.
CONTRACTOR IS REQUIRED TO PROVIDE GROUND PENETRATING RADAR
SURVEY WITHIN 10 FEET OF ALL NEW PROPOSED UNDERGROUND UTILITY
ROUTES (20 FEET WIDE SURVEY FOR ALL NEW ROUTES). CONTRACTOR IS
RESPONSIBLE TO PROVIDE POTHOLING AT ALL LOCATIONS WHERE A NEW
UNDERGROUND UTILITY WILL CROSS AN EXISTING UNDERGROUND UTILITY
IDENTIFIED BY THE GROUND PENETRATING RADAR PROVIDED BY CONTRACTOR.
3. CONTRACTOR IS RESPONSIBLE FOR PUBLIC AND PRIVATE UTILITY LOCATES.
4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
5. THE LOCATIONS OF THOSE BURIED AND ABOVE GROUND UTILITIES SHOWN ARE
APPROXIMATE, ARE SHOWN FOR CONTRACTOR INFORMATIONAL USE ONLY, AND
ARE NOT TO BE REFERENCED FOR CONSTRUCTION PURPOSES. THE IMPLIED
PRESENCE OR ABSENCE OF UTILITIES IS NOT TO BE CONSTRUED BY THE
OWNER, ENGINEER, CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATE
AND COMPLETE REPRESENTATION OF UTILITIES THAT MAY OR MAY NOT EXIST
ON THE CONSTRUCTION SITE. BURIED AND ABOVE GROUND UTILITY LOCATION,
IDENTIFICATION, AND MARKING ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY
UTILITY MUST BE COORDINATED BETWEEN THE CONTRACTOR, UTILITY
COMPANY AND OWNER. SITE SAFETY, INCLUDING THE AVOIDANCE OF HAZARDS
ASSOCIATED WITH BURIED AND ABOVEGROUND UTILITIES, REMAINS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
6. UTILITY PIPING. ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH THE
PIPE MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION METHODS
INCLUDING BACKFILL MATERIAL AND MATERIAL DEPTHS. PIPE MATERIAL SHALL
BE AS SPECIFIED ON THE PLANS. ALL MATERIAL SHALL MEET THE
REQUIREMENTS OF THE LOCAL JURISDICTION FOR STRENGTH, MATERIAL TYPE
AND CONFORMITY WITH THE EXISTING SYSTEM. SEWER LINES SHALL BE
CONSTRUCTED STRAIGHT TO THE SPECIFIED LINE AND GRADES. MANHOLES,
STORM INLETS, VALVE BOXES AND APPURTENANCES SHALL BE ADJUSTED TO
GRADE OR PER PLAN PRIOR TO SEEDING/LANDSCAPING ACTIVITIES.
SITE CONTROL
EROSION CONTROL NOTES
1. EROSION CONTROL SHALL BE INSTALLED PRIOR TO ANY GRADING
OPERATIONS WHERE POSSIBLE.
2. CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT OFF-SITE
TRACKING OF SEDIMENT ONTO PUBLIC ROADWAYS. ANY SEDIMENT
DEPOSITED ON PUBLIC ROADS SHALL BE REMOVED BY SHOVELING OR
STREET CLEANING BEFORE THE END OF EACH WORKING DAY.
3. SHOWN LOCATION OF SILTATION CONTROL IS APPROXIMATE. ACTUAL
LOCATIONS TO BE DETERMINED IN THE FIELD AT THE TIME OF
CONSTRUCTION.
4. WATER PUMPED DURING CONSTRUCTION OPERATIONS SHALL BE FILTERED.
5. ONCE CONSTRUCTION HAS BEEN COMPLETED, OR TEMPORARILY SUSPENDED
FOR LONGER THAN 14 DAYS (SUCH AS WINTER SHUTDOWN), THE
CONTRACTOR SHALL INITIATE SEEDING ON ALL AREAS DISTURBED
IMMEDIATELY OF THE LAST DISTURBANCE. EROSION CONTROL DEVICES
SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE CONTRACTOR
ESTABLISHES A GOOD STAND OF GRASS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .