This is a design and construction document prepared by the Natural Resources Conservation Service (NRCS) under the Emergency Watershed Protection (EWP) Act for streambank stabilization work on Elkhorn Creek in McDowell County, West Virginia. The project encompasses two sites requiring different stabilization approaches: Site 1 utilizes grouted rock riprap streambank stabilization, while Site 2 employs a gabion wall system. The document includes 14 sheets of detailed engineering drawings, specifications, and construction notes prepared by N. Knox in May 2025, with approvals planned through July 2025.

Site 1 requires an estimated 500 square yards of geotextile, 79 tons of blanket drain, 25 linear feet of solid drain pipe, 10 linear feet of perforated drain pipe, 5 drain pipe tees, 10 drain pipe caps, 179 tons of riprap, and 36 cubic yards of grout riprap. Foundation preparation includes 30 square yards for shallow bedrock and unspecified earth fill as needed. Site 2 requires 155 square yards of gabion geotextile, 160 cubic yards of gabions, and foundation preparation consisting of 62 square yards for shallow bedrock and 186 tons of rock riprap foundation, with 248 square yards of geotextile for the riprap foundation. Construction notes emphasize utility location via 811 call, sediment and erosion control measures, material disposal at approved offsite locations, and proper drainage provisions. The work is classified as Job Approval Class V and will be managed with NRCS field representative oversight throughout implementation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

McDowell County

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N M

C D

O W

EL

L

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

EL

KH

O

R N

C R

EE

K, S

IT

ES

C O

VE

R

S H

EE

T

N . K

N O

X 5/

UTILITY NOTIFICATION

"The Natural Resources Conservation Service makes no representation as to the existence or non-existence of any utilities at the construction site. Shown on these construction drawings are those utilities which have been identified. It is the responsibility of the contractor(s) to assure themselves that no hazard exists or damage will occur to utilities."

COVER SHEET

QUANTITIES AND CONSTRUCTION NOTES

LOCATION MAP

SHEET LIST TABLE

SITE 1 - SITE MAP

SHEET TITLE

SITE 1 - PLAN VIEW

TYPICAL GROUTED ROCK RIPRAP SECTION & DETAILS

SITE 2 - PLAN VIEW

14 TYPICAL CHANNEL BOTTOM CONFIGURATION

TYPICAL GROUTED ROCK RIPRAP DETAILS

SITE 2 - SITE MAP8

TYPICAL SECTION ON RIPRAP FOUNDATION

TYPICAL GABION WALL SECTION & DETAILS

TYPICAL GABION WALL DETAILS

12 TYPICAL FOUNDATION PREPARATION ON SHALLOW BEDROCK

A.

D

EI

C

H

ER

T

A.

D

EI

C

H

ER

T

PM

, D

S, R

S, T

S

5/

6/

7/

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

%%ULOCATION MAP

AutoCAD SHX Text K E N T U C K Y

AutoCAD SHX Text O H I O

AutoCAD SHX Text V I R G I N I A

AutoCAD SHX Text P E N N S Y L V A N I A

AutoCAD SHX Text M A R Y

AutoCAD SHX Text L A N D

AutoCAD SHX Text

JOB APPROVAL

AutoCAD SHX Text

CLASS V

AutoCAD SHX Text DRAWINGS PREPARED UNDER THE AUTHORITY OF THE EMERGENCY WATERSHED PROTECTION ACT by the NATURAL RESOURCES CONSERVATION SERVICE of the UNITED STATES DEPARTMENT OF AGRICULTURE STREAMBANK STABILIZATION ELKHORN CREEK, SITES 1 & 2 DAMAGE SURVEY REPORT NO. 54-02-25-5087-001 MCDOWELL COUNTY, WEST VIRGINIA ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

Q

U

AN

TI

TI

ES

A

N D

C O

N

ST

R U

C

TI

O N

N O

TE

S

N . K

N O

X 5/

* THE AREA REQUIRED FOR OVERLAP IS NOT

INCLUDED IN THE QUANTITY FOR GEOTEXTILE.

CONSTRUCTION NOTES

1. Call 811 to locate utilities prior to mobilization and excavation.

2. Access roads shall be restored to pre-construction condition or better.

3. All fences removed and/or damaged as a result of the contractor's operations shall be restored to a condition equal to or better than they existed before the start of work.

4. Soil compacted as a result of construction operations shall be loosened for a depth of 6-inches below the compacted soil layer and re-graded to blend with existing ground.

5. Provide sub-channel as shown on Typical Channel Bottom Configuration drawing.

6. While working in the stream all efforts will be made to reduce downstream impacts including keeping the excavator tracks elevated above flowing water. A diversion berm shall be established at the top of each stream access point to minimize surface water from flowing toward the stream.

7. Required pollution control measures shall be installed as needed in accordance with Construction Specification 5, Pollution Control.

8. Site access shall be off the main road and shall be in accordance with all West Virginia Department of Highways rules and guidelines. The contractor shall provide signage and flagmen for traffic control as required. See Construction Specification 9, Traffic Control.

9. Excess material from the excavation & obstruction removal shall be wasted off-site in accordance with all local, state, & federal regulations and as approved by the NRCS representative in the field. Floodplains will not be allowed as waste areas under any circumstances. Waste areas shall be seeded according to Construction Specification 6, Seeding, Sprigging and Mulching.

10. The contractor shall provide approved fill as required to complete the work.

11. Trash, tires, & woody debris within the work limits shall be disposed of off-site in an approved landfill. The contractor shall be responsible for the landfill tipping fees.

12. All pipes encountered in the embankment shall be extended through the rock riprap and/or gabions with the same pipe material or better to the face of the slope or baskets.

13. Pipes 12" diameter and larger shall be encased in a minimum of 6" of concrete when passing through rock riprap and/or gabions. Concrete shall have a minimum compressive strength of 2500 psi.

14. The contractor shall maintain the cleanliness of public and private roads impacted by hauling operations during the duration of the work.

15. Starting location of baskets will be marked in the field.

16. Reshape/transition stream banks at the upstream and downstream ends of stabilization measures as directed by NRCS representative.

SITE 2 - TABLE OF ESTIMATED QUANTITIES

GABION

GEOTEXTILE

SY*

RIPRAP

TONS

GABIONS

CY

EARTH FILL

CY

FOUNDATION PREP

SHALLOW BEDROCK

SY**

FOUNDATION PREP

ROCK RIPRAP

TONS***

FOUNDATION PREP

GEOTEXTILE

SY***

155 0 160 62 186 248AS NEEDED

** QUANTITIES ASSUMING BEDROCK

ENCOUNTERED FOR ENTIRE AREA.

*** QUANTITIES ASSUMING ROCK RIPAP

FOUNDATION FOR ENTIRE AREA.

GEOTEXTILE

SY*

BLANKET

DRAIN

TONS

RIPRAP

TONS

GROUT

RIPRAP

CY

FOUNDATION PREP

SHALLOW BEDROCK

SY**

500 79 179 36 30

* THE AREA REQUIRED FOR OVERLAP IS NOT

INCLUDED IN THE QUANTITY FOR GEOTEXTILE.

SITE 1 - TABLE OF ESTIMATED QUANTITIES

DRAIN PIPE

LF

DRAIN PIPE

PERFORATED

LF

DRAIN PIPE

CAP

EA

DRAIN PIPE

TEE

EA

EARTH FILL

CY

AS NEEDED

** QUANTITIES ASSUMING BEDROCK

ENCOUNTERED FOR ENTIRE AREA.

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Date ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

LO

C

AT

IO

N

M

AP

N . K

N O

X 5/

SITE 2

LAT: N37.38605

LON: W81.41680

SITE 1

LAT: N37.41588

LON: W81.42810

Feet 0 2000 4000

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

E BARKER ST

ROCK RIPRAP STREAMBANK STABILIZATION.

SEE DETAILS, SHEETS 5 - 7.

CH

ER

O

KE

E

RD

ELKRIDGE AVE

NORTHFORK

CL CL

CL

CL

NORTHFORK

BAPTIST CHURCH

ELKHORN

CREE

K

NORTHFORK

FIRE DEPARTMENT

PINTO ST

KYLE BOTTOM RD

CONSTRUCTION LIMITS

ELKHORN CREEK

TBM

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

SI

TE

SI

TE

M

AP

N . K

N O

X 5/

NAD83 WV STATE PLANE, SOUTH ZONE, US FOOT GRID. NAVD88 VERTICAL DATUM

ELEVATIONEASTINGNORTHINGDESCRIPTION

PROJECT CONTROL

EXISTING TBM 1721.251844064.98151717.77

- DUPLEX NAIL IN POWER POLE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

E BARKER ST

ROCK RIPRAP STREAMBANK STABILIZATION.

SEE DETAILS, SHEETS 6 & 7.

CH

ER

O

KE

E

RD

ELKRIDGE AVE

NORTHFORK ELKHORN CREEK

RESTORE ORIGINAL STREAM

BOTTOM WIDTH APPROX. 21'

CL

CL

CL

CL

CL

CL

CL

CL

CL

NORTHFORK

BAPTIST CHURCH

75'

KEY AND TRANSITION ROCK RIPRAP

SLOPE TO EXISTING, BOTH ENDS.

TBM

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

SI

TE

PL

AN

V

IE

W

N . K

N O

X 5/

LEGEND

EDGE OF PAVED PARKING

TOP OF BANK

CENTERLINE OF STREAM

TOE OF SLOPE

EDGE OF ACCESS ROAD

CONSTRUCTION LIMITSCL

CONTROL POINT

NOTES

1. CHANNEL CLEARING AND DEBRIS DISPOSAL SHALL

BE DIRECTED BY NRCS REPRESENTATIVE.

2. BORROW MATERIAL SHALL BE TAKEN FROM WITHIN

THE CONSTRUCTION LIMITS DIRECTED BY THE

NRCS REPRESENTATIVE.

3. DISPOSAL AREA FOR EXCAVATED MATERIAL SHALL

BE AT AN APPROVED LOCATION OFFSITE.

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

GROUND

SECTION - GROUTED ROCK RIPRAP

3' MIN. OR TO BEDROCK. IF BEDROCK

ENCOUNTERED, SEE TOE ON BEDROCK

DETAIL, SHEET 7.

VARIES

1.5

EXCAVATION

LIMITS

1'- 6"

6"

3'

5'

1.5

2' OF 6"- 18" ROCK RIPRAP PLACED WITH VOIDS

FOR GROUT PLACEMENT. FOR DETAILS, SEE

CONSTRUCTION SPECIFICATION 62

BLANKET DRAIN

1' OF #57 AGGREGATE

1' MIN. OF TOPSOIL ON GEOTEXTILE

OVER TOP OF RIPRAP. PROVIDE

POSITIVE DRAINAGE.

GEOTEXTILE

2'

4'

5'

3.6'

FLOW

OR

POSITIVE DRAINAGE

DRAIN PIPE, 3" DIA. SCH. 40

ASTM D1785 SOLID PIPE, 10'

C.C. (MAX). SLOPE TO DRAIN.

SEE DETAILS, SHEET 7.

6"

DRAIN PIPE, 3" DIA. SCH. 40

ASTM D1785 PERFORATED PIPE.

SEE DETAILS, SHEET 7.

FINAL GRADE. SEE TYPICAL CHANNEL

BOTTOM CONFIGURATION ON

SHEET 14.

EXCAVATION LIMITS. BACKFILL AFTER

ROCK RIPRAP WITH GROUT PLACEMENT.

1'

BEGINNING/END OF ROCK

RIPRAP STABILIZATION

PLAN - RIPRAP KEY

GEOTEXTILEBLANKET DRAIN

ROCK RIPRAP WITH GROUT

TOP OF ROCK RIPRAP SLOPE

TOE OF ROCK RIPRAP SLOPE

INSTALL ALONG SLOPE FROM

THE TOE OF EXCAVATION TO

TOP OF ROCK RIPRAP.

TYP.

RIPRAP KEY

TOE OF

EXCAVATION

TOP OF ROCK RIPRAP

AND BLANKET DRAIN

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K

SI

TE

S

TY

PI

C

AL

G

R O

U

TE

D R

O C

K R

IP

R

AP

SE

C

TI

O N

D

ET

AI

LS

N . K

N O

X 5/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

EXISTING

GROUND

0' TO 3' MAX.

1.5

EXCAVATION

LIMITS

1'- 6"

1.5

BLANKET DRAIN

1' OF #57 AGGREGATE

CHANNEL BOTTOM

GEOTEXTILE

2'

DRAIN PIPE, 3" SCH. 40 ASTM

D1785 SOLID DRAINAGE PIPE,

10' C.C. (MAX). SLOPE TO DRAIN.

6"

SECTION - TOE ON BEDROCK

BEDROCK

2'- 6" EQUAL EQUAL

#8x4' REBAR 5' C.C MAX.

DRILL 1-1/4" DIA HOLE INTO BEDROCK.

EPOXY OR GROUT NOT REQUIRED.

2' OF 6"- 18" ROCK RIPRAP PLACED WITH VOIDS

FOR GROUT PLACEMENT . FOR DETAILS, SEE

CONSTRUCTION SPECIFICATION 62.

6"

5'

21' MIN. OF TOPSOIL ON GEOTEXTILE

OVER TOP OF RIPRAP. PROVIDE

POSITIVE DRAINAGE.

1'

(CONDITIONAL - SHALLOW BEDROCK)

TEE

120°

PERFORATED PIPE

1'

2.5"

1"

PERFORATED PIPE WITH

TWO ROWS OF 3 8" HOLES

ANIMAL GUARD, 12" STAINLESS

BOLT WITH WASHERS AND NUT

2" FROM END.

ANIMAL GUARD

END CAP

PLAN - BACKFILL DRAIN

2"ANIMAL GUARD

DRAIN PIPE, 3" DIA. SCH. 40

ASTM D1785 SOLID PIPE

5'

END CAP

3" DIA. TWO-WAY

CLEANOUT TEE

1'DRAIN PIPE, 3" DIA SCH. 40,

ASTM D1785 PERFORATED

PIPE. SEE DETAILS ABOVE.

BEGIN/END BLANKET

DRAIN 5' MAX. FROM

END CAP

BLANKET DRAIN

#57 AGGREGATE

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K

SI

TE

S

TY

PI

C

AL

G

R O

U

TE

D R

O C

K R

IP

R

AP

D

ET

AI

LS

N . K

N O

X 5/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

CONSTRUCTION LIMITS

GABION WALL STREAMBANK STABILIZATION.

SEE DETAILS, SHEETS 9 - 13.

ELKHORN STATION RD

COPPER BOTTOM RD

ELKHORN

CREEK

COPPER HILL DR

WINDCHIME LN

CL

CL

CLC

L

CL

CL

TBM

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

SI

TE

SI

TE

M

AP

N . K

N O

X 5/

NAD83 WV STATE PLANE, SOUTH ZONE, US FOOT GRID. NAVD88 VERTICAL DATUM

ELEVATIONEASTINGNORTHINGDESCRIPTION

PROJECT CONTROL

EXISTING TBM - PK NAIL 1878.231847498.43140812.73

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CL

CL

CL

CL

CL

CL

CL

CL

C L

CL

CL

CL

CLRESTORE ORIGINAL

STREAM BOTTOM

WIDTH APPROX. 16'

EXISTING GAS LINE.

DO NOT DISTURB.

BEGIN AT EXISTING GABION WALL

DOWNSTREAM OF EXISTING BRIDGE.

GABION WALL FOUNDATION

SET AT ELEVATION 1868.2

ELKHORN STATION RD

COPPER BOTTOM RD

ELKHORN CREEK

COPPER HILL DR

W

INDCHIM

E LN

93' OF 7.5' HIGHGABION WALL

STOCKPILE AND

STAGING AREA.

AC

CE

SS

EXISTING SCOUR HOLE

GABION WALL FOUNDATION

SET AT ELEVATION 1868.2

BR

ID

G E

EXISTING BLUE UTILITY PIPE ALONG EXISTING WALL.

SEE CONSTRUCTION NOTE 12, SHEET 2 OR RELOCATE

AS DIRECTED BY THE NRCS REPRESENTATIVE.

TBM

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

SI

TE

PL

AN

V

IE

W

N . K

N O

X 5/

LEGEND

EXISTING WALL

TOP OF BANK

EDGE OF STREAM

TOE OF SLOPE

CONSTRUCTION LIMITSCL

CONTROL POINT

NOTES

1. EXCAVATED MATERIAL NOT SUITABLE FOR BACKFILL, DEBRIS AND

REQUIRED WALL REMOVAL WITHIN THE CONSTRUCTION LIMITS

SHALL BE DISPOSED OF AT AN APPROVED LOCATION OFFSITE.

2. GABION WALL ALIGNMENT AND LAYOUT LOCATION MAY VARY AS

DETERMINED BY THE NRCS REPRESENTATIVE.

3. BACKFILL MATERIAL BEHIND GABIONS SHALL BE FROM CHANNEL

SHAPING AND/OR FROM EXCAVATION AS DETERMINED BY THE

NRCS REPRESENTATIVE. BACKFILL MATERIAL SHALL BE FREE OF

TRASH, CONCRETE, WOODY DEBRIS, ETC.

4. CONTRACTOR SHALL CONSERVE SUITABLE MATERIALS FOR

FINAL GRADING AND SEEDING OPERATIONS.

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECTION - 7.5' HIGH GABION WALL

2' MIN. EMBEDMENT OR TO BEDROCK

IF BEDROCK IS LESS THAN 2', SEE

FOUNDATION PREPARATION ON

SHALLOW BEDROCK, SHEET 12.

6'x 3'x 3'

2' MIN. 1' MIN.

LOWEST POINT

IN STREAM

EXCAVATION LIMITS

BACKFILL AFTER GABION

INSTALLATIONEXCAVATION LIMITS

GEOTEXTILE

6'x 4.5'x 3'

5.

5'

EXISTING

GROUND

6'x 3'x 1.5'

TYP.

1.5'

POSITIVE DRAINAGE

6' MIN.

NOTES

1. SEE TYPICAL CHANNEL BOTTOM CONFIGURATION SHEET 14.

2. REFER TO SHEET 2 FOR ESTIMATED QUANTITIES.

3. AFTER THE FOUNDATION IS EXCAVATED, NRCS

REPRESENTATIVE SHALL DETERMINE IF FOUNDATION

TREATMENT WILL BE REQUIRED AND TYPE. SEE

CONDITIONAL FOUNDATION DETAILS ON SHEETS 12 & 13.

4. THE CONTRACTOR SHALL ONLY EXCAVATE THE AMOUNT OF

FOUNDATION NEEDED TO INSTALL THE BOTTOM LAYER OF

GABION WALL INTENDED TO PLACE PER MANUFACTURER'S

RECOMMENDATIONS DURING THE SAME WORKDAY.

5. BACKFILL BEHIND EACH LAYER OF GABIONS AS THE LAYERS

PROGRESS VERTICALLY.

1' BACKFILL

OR FLATTER BASED

ON ACTUAL SITE

CONDITIONS

9.5

6°

FINAL GRADE. SEE TYPICAL

CHANNEL BOTTOM CONFIGURATION

ON SHEET 14.

EXISTING CHANNEL

BOTTOM

12' (MAX.) LEADING

EXCAVATION

SEE NOTE 4

BACKFILL AND NEXT LAYER

TRAILING COMPLETED

LOWER LAYER

WHEN MORE GABIONS ARE INTENDED,

LEAVE LAST GABION EMPTY TO

FACILITATE LACING THE NEXT AS

PLACEMENT PROGRESSES.

PROFILE - GABION

PLACEMENT/FILLING SEQUENCE

FOUNDATION GRADE

BOTTOM LAYER

9' (MIN.) COMPLETED LOWER LAYER IN

ADVANCE OF BACKFILL OF ADJACENT

GABIONS AND START OF NEXT LAYER

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

TY

PI

C

AL

G

AB

IO

N W

AL

L

SE

C

TI

O

N

D

ET

AI

LS

N . K

N O

X 5/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

CONSTRUCTION NOTES

1. EACH VERTICAL SEAM SHALL BE LACED PRIOR TO SETTING BASKET

IN PLACE AND PRIOR TO LACING TO ADJOINING BASKETS.

2. EACH BASKET SHALL BE LACED TO THE ADJOINING BASKET AT ALL

VERTICAL EDGES AND HORIZONTAL EDGES.

3. EACH DIAPHRAGM SHALL BE LACED TO THE LID OF THE BASKET

AFTER CLOSING. DIAPHRAGM SHALL BE LACED ALONG ALL SIDES.

4. ALL LACING SHALL BE DONE WITH 13.5 GAUGE WIRE USING THE TWO,

ONE, TWO, LOOPING PROCEDURE AS SHOWN IN THE LACING DETAILS.

5. ALL WIRE SHALL BE TIGHTLY LACED AND THE ENDS OF THE LACING

WIRE SHALL BE DOUBLED BACK AND TWISTED NOT LESS THAN THREE

TURNS AROUND ITSELF IN A LENGTH NOT GREATER THAN ONE INCH.

6. INSTALL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.

7. GABION BASKET LENGTH MAY VARY FROM TYPICAL LAYER DIAGRAM

WHERE APPLICABLE TO STAGGER SEAM WITH LAYER BELOW AS

APPROVED BY THE NRCS REPRESENTATIVE.

6'x 4.5'x 3'

6'x 3'x 3'

7.5' HIGH GABION WALL

WITH COUNTERFORT

1/3 H

1/3 H

1/3 H

1/3 L 1/3 L

1/3 L

INTERIOR SUPPORT DETAIL

5"5"

LACING DETAIL

1/3 L 1/3 L

1/3 L

LA

YE

R

LA

YE

R

6'x 3'x 3'

6'x 3'x 3'

6'x 3'x 3'

7.

5'

LAYER 3

6'x 3'x 3'

6'x 4.5'x 3'

6' x

3' x

1.

5'

6'x 3'x 3'

LAYER 2 LAYER 1

FR

O

N T

FA

C

E

FR

O

N T

FA

C

E

FR

O

N T

FA

C

E6'x 3'x 3'

6'x 3'x 3'

6' x

3' x

1.

5'

6' 4.5' 3'

12'

COUNTERFORT

LAYER DIAGRAM

6'x 3'x 1.5'

INSTALL COUNTERFORT AT

BOTH ENDS AND MIDDLE

OF GABION WALL.

3'

6'x 3'x 3'

6'x 3'x 1.5'

9'x 3'x 3'

6'x 4.5'x 3'

6'x 3'x 3'

LAYER 1

6'x 4.5'x 3'

3'

6'x 3'x 3'

WIRE DOUBLED BACK

AND TWISTED

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, SI

TE

S

TY

PI

C

AL

G

AB

IO

N W

AL

L

D

ET

AI

LS

N . K

N O

X 5/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

1.25'

(TYP.)

VARIES

VA

R

IE

S

1' MIN. TO 1.5' MAX.

0' TO 2' MAX.

CHANNEL BOTTOM

1.5'

2.5'

PROFILE - GABIONS

WITH REBAR SPACING

BEDROCK

1.25' MAX.

(TYP.)

2.

5'

M

AX

(T

YP

1.25' (TYP.)

NO. 10 REBAR

(TYP.)

NO. 10 REBAR

(TYP.)

G

AB

IO

N

W

ID

TH

VARIES

FOUNDATION PREPARATION PAYMENT LIMITS

1' MIN. TO 1.5' MAX.

FO

U

N D

AT

IO

N

PR

EP

AR

AT

IO

N

PA

YM

EN

T

LI

M

IT

S

PLAN - GABIONS WITH

REBAR/DRILLHOLE PATTERN

0' TO 2' MAX.

VA

R

IE

S

1.5'

2.5'

2.5' MAX.

(TYP.)1' MIN. TO 1.5' MAX.

FINAL GRADE

SECTION - GABIONS

WITH REBAR SPACING

MAXIMUM ANGLE OF

REBAR/DRILLHOLE PATTERN

~1.5'

~2.5'

15° MAX.

VERTICAL NO. 10 REBAR

(TYP.)

MAX. TILT OF

REBAR/DRILLHOLE

FRONT OF

GABION

BACK OF

GABION

CHANNEL BOTTOM

BEDROCK

1' MAX.

BEDROCK

NOTES:

1. Drill holes for Rebar shall be 1 3/8" diameter. The use of epoxy or non-shrink grout is not required.

The rebar shall be driven by hammer to the required depth without bending.

2. Care shall be taken by the contractor to prevent damage to the rebar during gabion filling operations.

3. Different gabion bottom layer configurations will require additional rebar by repeating the pattern shown. Quantities on sheet 2 based on bottom width x length.

NOTE: Final pattern and spacing to be directed by NRCS representative in the field. Na tu ra l R es ou rc es Co ns er va tio n Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

TY

PI

C

AL

F

O U

N D

AT

IO

N P

R

EP

AR

AT

IO

N

O N

S H

AL

LO

W B

ED

R

O C

K D

ET

AI

L

N . K

N O

X 5/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

9.5

6°

FINAL

GRADE

EXCAVATION LIMITS

BACKFILL AFTER GABION

INSTALLATION

EXCAVATION LIMITS

BACKFILL AFTER

GABION INSTALLATION

POSITIVE DRAINAGE

SECTION - ON RIPRAP FOUNDATION

1.5'

1.5'

3' MIN.

VA

R

IE

S

FOUNDATION PREPARATION PAYMENT LIMITS

VARIES WITH GABION CONFIGURATION.

ASSUMED 12' FOR QUANTITIES ON SHEET 2.

NRCS REPRESENTATIVE WILL DETERMINE

DEPTH OF ROCK RIPRAP IN THE FIELD.

ASSUMED 3' FOR QUANTITIES ON SHEET 2.

GEOTEXTILE

0.6'

ROCK RIPRAP FOUNDATION PREPARATION

6"- 18" GRADATION.

OR FLATTER BASED ON

ACTUAL SITE CONDITIONS

2' MIN. BACKFILL

NRCS REPRESENTATIVE WILL DETERMINE

DISTANCE BASED ON ACTUAL SITE CONDITIONS

ASSUMED 3' FOR QUANTITIES ON SHEET 2.

FINAL GRADE. SEE TYPICAL CHANNEL

BOTTOM CONFIGURATION ON

SHEET 14.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

TY

PI

C

AL

S

EC

TI

O N

O N

R

IP

R

AP

F O

U N

D

AT

IO

N

N . K

N O

X 5/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Notes:

1. Final location of subchannel to be located in the field by the NRCS representative. The subchannel shall be transitioned as necessary to meet existing grades at the upstream and downstream site extents.

2. Subchannels are not required for bedrock streambeds.

3. Use material from the required excavations and/or approved fill from offsite to reconstruct streambanks as necessary. Seed and mulch per

Construction Specification 6, Seeding, Sprigging and Mulching.

EXISTING

GROUNDFINAL CHANNEL BOTTOM SHALL

BE ROUGH & IRREGULAR.

PROVIDE POSITIVE DRAINAGE

TOWARD SUBCHANNEL.

~1

~1

1'

1/3 BW

SUBCHANNEL

BOTTOM WIDTH

(BW)

~2

DEPOSITION VARIES

CHANNEL BOTTOM CONFIGURATION

SEE SITE PLAN

STREAMBANK STABILIZATION

MEASURE, GABION WALL OR

ROCK RIPRAP SLOPE.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

EL

KH

O R

N C

R

EE

K, S

IT

ES

TY

PI

C

AL

C

H

AN

N

EL

B O

TT

O

M C

O N

FI

G

U R

AT

IO

N

N . K

N O

X 5/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Sheets and Views
8.5x11 Cover
2-QuantitiesNotes.pdf
Sheets and Views
2-QuantitiesNotes
3-LocationMap.pdf
Sheets and Views
8.5x11 LOCATION
4-Site1-SiteMap.pdf
Sheets and Views
SITE MAP
5-Site1-PlanView.pdf
Sheets and Views
PLANVIEW
6-TypGroutedRiprapSection&Details.pdf
Sheets and Views
6 RiprapSection
7-TypGroutedRiprapDetails.pdf
Sheets and Views
7 RiprapDetails
8-Site2-SiteMap.pdf
Sheets and Views
8-SITE MAP
9-Site2-PlanView.pdf
Sheets and Views
SITE2-PLANVIEW
10-TypGabionSectionDetails.pdf
Sheets and Views
10_7.5FT-SEC
11-TypGabionDetails.pdf
Sheets and Views
11_7.5FT-GABION DETAILS
12-TypFoundPrepBedrockDetails.pdf
Sheets and Views
12-TYP BEDROCK
13-TypSecRiprapFoundDetails.pdf
Sheets and Views
13-RIPRAP FOUNDATION
14-TypChannelBottomDetails.pdf
Sheets and Views
14-TYP CHANNEL
1-CoverSheet.pdf
Sheets and Views
8.5x11 Cover
2-QuantitiesNotes.pdf
Sheets and Views
2-QuantitiesNotes
6-TypGroutedRiprapSection&Details.pdf
Sheets and Views
6 RiprapSection
7-TypGroutedRiprapDetails.pdf
Sheets and Views
7 RiprapDetails
9-Site2-PlanView.pdf
Sheets and Views
SITE2-PLANVIEW
2-QuantitiesNotes.pdf
Sheets and Views
2-QuantitiesNotes

File details come from the government source that posted it. Updated .