This document is a comprehensive design package for the renovation of Building EC04 at the USDA Agricultural Research Service facility in El Reno, Oklahoma, located at 7207 West Cheyenne Street. The project involves renovation of a headhouse, two greenhouses (west and east), and associated infrastructure serving research facilities.
The Base Bid scope includes: removal and installation of overhead door seals and safety edges on three doors; repair of bollards with new sleeves/covers; installation of a new water treatment system (reverse osmosis with pre-treatment); installation of two new safety showers; removal and replacement of evaporative cooling pads, sidewall exhaust fans, and gas unit heaters with galvanized gas lines in the west greenhouse; replacement of axial circulation fans with horizontal airflow fans; new louver actuators for sidewall intake louvers; new motor/operators for ridge vents; new personnel doors; repair of approximately 15% of glazing system; removal of shading fabric; new electrical distribution and greenhouse ventilation/lighting controls; plumbing repairs (approximately 20%); cleaning and flushing of trench drains and plumbing lines to lift station; new automatic watering system with irrigation controllers; and gable mount weather station for the west greenhouse. Bid Option 1 adds grow lights and shading fabric for the west greenhouse. Bid Option 2 extends the Base Bid scope to the east greenhouse with matching improvements. Bid Option 3 includes removal and replacement of the generator system and automatic transfer switch. Bid Option 4 provides LED lighting fixtures throughout the headhouse and new HVAC equipment including a ductless split system in the growth chamber and seed cooler refrigerant system. A pre-renovation asbestos and lead-based paint inspection conducted January 7, 2025, identified no hazardous materials. The design documents include architectural, mechanical, plumbing, and electrical plans with detailed schedules and specifications prepared under A-E Contract No. 12805B23D0001, Task Order No. 12805B25F0010.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EL RENO HH/GH EC04 RENOVATION DESIGN
AGRICULTURAL RESEARCH SERVICE
U.S. DEPARTMENT OF AGRICULTURE
LOCATION MAPVICINITY MAP
A. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR
TO PERFORMING WORK OR FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND
ASSEMBLIES. ANY DEVIATIONS SHALL BE BROUGHT TO THE CONTRACTING OFFICER'S
ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION,
OR EQUIPMENT PURCHASE.
B. THE CONTRACTOR SHALL REPAIR ALL EXISTING CONSTRUCTION TO REMAIN THAT HAS BEEN
DAMAGED BY THE DEMOLITION, DECONSTRUCTION, OR NEW CONSTRUCTION AS SPECIFIED IN
SPECIFICATION SECTION 02 41 00.
BUILDING EC04
7207 WEST CHEYENNE STREET
EL RENO, OK 73036
BUILDING EC04
GENERAL NOTES
BUILDING EC04
7207 W CHEYENNE STREET
EL RENO, OK
A-E CONTRACT NO.: 12805B23D0001
A-E TASK ORDER NO.: 12805B25F0010
U
D A
S
COVER SHEET
G-101
ALTUS
GUYMON
STILLWATER
OKLAHOMA CITY
EL RENO
LOCATION
PROJECT
TULSA
HEADHOUSE
W
ES
T G
R
EE
N H
O U
SE
EA
ST
G R
EE
N
H O
U
SE
LEGEND
BASE BID
BID OPTION 1
BID OPTION 2
BID OPTION 3
BID OPTION 4
GROWTH
CHAMBER
SEED
STOR.
DRAWING NO.
DRAWING INDEX
SHEET NO. TITLE
COVER SHEET
DRAWING INDEX & PROJECT DESCRIPTION
DEMO FLOOR PLAN
DEMO REFLECTED CEILING PLAN
DEMO GREENHOUSE ELEVATIONS
DEMO HEADHOUSE ELEVATIONS
NEW FLOOR PLAN
NEW REFLECTED CEILING PLAN
NEW GREENHOUSE ELEVATIONS
NEW HEADHOUSE ELEVATIONS
DOOR DETAILS AND SCHEDULE
ABBREVIATIONS AND LEGEND
DEMO PLAN PLUMBING
PLUMBING PLAN
DETAILS
PLUMBING EQUIPMENT SCHEDULES
ABBREVIATIONS AND LEGEND
DEMO PLAN MECHANICAL
MECHANICAL PLAN
MECHANICAL GAS PIPING PLAN
DETAILS
DETAILS
DETAILS
HVAC EQUIPMENT SCHEDULES
HVAC CONTROLS
GENERAL NOTES & ABBREVIATIONS
LEGEND
POWER DEMOLITION PLAN
EQUIPMENT POWER DEMOLITION PLAN
LIGHTING DEMOLITION PLAN
OVERALL FLOOR PLAN
POWER PLAN - OVERALL
LIGHTING PLAN - PART A
LIGHTING PLAN - PART B
LIGHTING SCHEDULE & CALCULATIONS
MECHANICAL CONNECTIONS - OVERALL
MECHANICAL SCHEDULE
POWER RISER
PANEL SCHEDULES
POWER SCHEDULE
G-101
G-102
AD101
AD131
AD201
AD202
A-101
A-131
A-201
A-202
A-501
P-001
PD101
P-101
P-501
P-601
M-001
MD101
M-101
M-102
M-501
M-502
M-503
M-601
M-701
E-001
E-002
ED101
ED102
ED103
E-100
E-101
E-201
E-202
E-210
E-301
E-310
E-601
E-602
E-603
U
D A
S
DRAWING INDEX & PROJECT DESCRIPTION
G-102
PROJECT DESCRIPTION
THE WORK TO INCLUDE THE FOLLOWING, BUT NOT LIMITED TO:
BASE BID:
HEADHOUSE:
· REMOVE EXISTING AND PROVIDE OVERHEAD DOOR SEALS AND SAFETY EDGES.
· REPAIR BOLLARDS AND PROVIDE BOLLARD SLEEVE/COVERS.
· REMOVE EXISTING AND PROVIDE WATER TREATMENT SYSTEM (REVERSE OSMOSIS AND PRE-TREATMENT).
· REMOVE AND PROVIDE (2) SAFETY SHOWERS.
WEST GREENHOUSE:
· REMOVE EXISTING AND PROVIDE EVAPORATIVE COOLING PAD (ECP).
· REMOVE EXISTING AND PROVIDE SIDEWALL EXHAUST FANS (EF).
· REMOVE EXISTING AND PROVIDE GAS UNIT HEATERS (GUH) AND GALVANIZED GAS LINES.
· REMOVE AXIAL CIRCULATION FANS. PROVIDE HORIZONTAL AIRFLOW FANS (HAF).
· REMOVE EXISTING AND PROVIDE LOUVER ACTUATOR (LA) FOR SIDEWALL INTAKE LOUVERS AT
EVAPORATIVE COOLING PAD (ECP).
· REMOVE EXISTING AND PROVIDE MOTOR/OPERATORS FOR RIDGE VENTS.
· REMOVE EXISTING AND PROVIDE PERSONNEL DOORS.
· REPAIR GLAZING SYSTEM (APPROXIMATELY 15%).
· REMOVE EXISTING SHADING FABRIC FROM EXISTING (REMAINING) SHADE SYSTEM.
· REMOVE EXISTING AND PROVIDE ELECTRICAL DISTRIBUTION.
· REMOVE EXISTING AND PROVIDE GREENHOUSE VENTILATION AND LIGHTING CONTROLS.
· REPAIR PLUMBING LINES (APPROXIMATELY 20%).
· CLEAN AND FLUSH TRENCH DRAINS AND PLUMBING LINE TO LIFT STATION.
· REMOVE EMERGENCY SHOWER AND EYE WASH STATION.
· FLUSH AND WASTE STREAMS FROM REVERSE OSMOSIS SYSTEM AND WATER SOFTENERS TO BE PIPED TO
THE GREENHOUSE TRENCH DRAIN.
· PROVIDE AUTOMATIC WATERING SYSTEM WITH WATERING OPTIONS.
· PROVIDE GABLE MOUNT WEATHER STATION (WEST GREENHOUSE ONLY).
BID OPTION 1:
· REMOVE AND PROVIDE GROW LIGHTS IN WEST GREENHOUSE.
· PROVIDE SHADING FABRIC ON EXISTING SHADE SYSTEM IN WEST GREENHOUSE.
BID OPTION 2:
· REPAIR EAST GREENHOUSE (MATCH SCOPE FOR BASE BID OF WEST GREENHOUSE AND BID OPTION 1
EXCEPT FOR WEATHER STATION).
BID OPTION 3:
· REMOVE AND REPLACE GENERATOR SYSTEM AND AUTOMATIC TRANSFER SWITCH (ATS).
BID OPTION 4:
· REMOVE EXISTING AND PROVIDE LIGHTS (HEADHOUSE).
· REMOVE EXISTING AND PROVIDE DUCTLESS SPLIT SYSTEM IN GROWTH CHAMBER (HEADHOUSE).
· REMOVE EXISTING AND PROVIDE SEED COOLER REFRIGERANT SYSTEM (CONDENSER, EVAPORATOR AND
DEHUMIDIFIER) (HEADHOUSE).
A PRE-RENOVATION ASBESTOS AND
LEAD-CONTAINING PAINT INSPECTION WAS
CONDUCTED BY TERRACON ON JANUARY 7, 2025.
NO ASBESTOS OR LEAD BASED PAINT WAS
IDENTIFIED. SEE THE REPORT ATTACHED TO THE
SPECIFICATIONS.
ENVIRONMENTAL NOTE
B C E G
A
A
K M P Q
A
D F H J L N R
GROWTH
CHAMBER
PREP
ROOM
MECH
TOILET
ELEC
CORR.
FOYER
PREP
ROOM
WORK
AREA
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
114A
113C 113A 113B
112C 112A 112B
112D
111A
111C 117D
111F
115B115A
116A 116B
117A 117B
116C
117C
JAN.
5 5
AD101
AD101
AD201
AD201
AD201
AD201
AD201
AD201
8 13
30'-9" +/- WEST GREENHOUSE 30'-9" +/- EAST GREENHOUSE
8'
-4
'-9
95'-8 1/2" +/-
TYP.
TYP.
AD101
AD101
TYP.
TYP.
SEED
STOR.
WALK-IN
COOLER
114B
REMOVE EXISTING FAN
AND HOUSING. SEE
MECHANICAL AND
ELECTRICAL FOR
MORE INFORMATION.
REMOVE EXISTING
EVAPORATIVE COOLING
PAD SYSTEM. SEE
MECHANICAL AND
ELECTRICAL FOR MORE
INFORMATION.
EXISTING STRUCTURE
TO REMAIN
EXISTING STRUCTURE
TO REMAIN
EXISTING LOUVER
SYSTEM TO REMAIN.
REMOVE LOUVER
OPERATORS. SEE
MECHANICAL AND
ELECTRICAL FOR
MORE INFORMATION.
INTERIOREXTERIOR
INTERIOR EXTERIOR
SCALE:
BUILDING EC04
DEMO FLOOR PLAN
1/8" = 1'-0"
AD101
U
D A
S
DEMO FLOOR PLAN
AD101
GENERAL NOTES
GRAPHIC SCALE
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR
TO PERFORMING ANY WORK OR FABRICATION
OR PURCHASE OF EQUIPMENT, MATERIALS,
AND ASSEMBLIES. ANY DEVIATIONS SHALL BE
BROUGHT TO THE CONTRACTING OFFICER'S
ATTENTION FOR RESOLUTION BEFORE
PROCEEDING WITH ANY CONSTRUCTION,
FABRICATION, OR EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION SHALL
BE REINSTALLED IN THE WORK OR CAPPED AND
TERMINATED IN ACCORDANCE WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL EXISTING
CONSTRUCTION TO REMAIN THAT HAS BEEN
DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION AS
SPECIFIED IN SPECIFICATION SECTION 02 41 00.
08' 8'
1'-0"
4'
SCALE: 1/8" =
KEYED NOTESX
1. REMOVE ALL SEALS AND SAFETY EDGES AT
OVERHEAD DOORS (3 TOTAL). PREP DOORS FOR
NEW SEALS AND SAFETY EDGES.
2. REMOVE ALL CAULK/SEALANT AT EXTERIOR WALL
PENETRATIONS AT HEADHOUSE. PREP AND
CLEAN FOR NEW SEALANT.
3. CUT GROUT FLUSH WITH TOP OF STEEL BOLLARD.
4. CONTRACTOR MUST REMOVE/REPLACE
APPROXIMATELY 15% OF THE WEST
GREENHOUSE GLAZING SYSTEM ROOF AND
WALLS (EXTERIOR AND INTERIOR). DAMAGED
AREAS MUST BE IDENTIFIED BY CONTRACTOR
WITH APPROVAL FROM CONTRACTING OFFICER
BEFORE BEGINNING WORK. THIS REPAIR
INCLUDES ALL BROKEN OR DAMAGED GLASS TO
BE REPLACED, PANES OF GLASS THAT HAVE
SHIFTED MUST BE REMOVED AND PROPERLY
REINSTALLED. ALUMINUM COMPRESSION BARS
MUST BE REPLACED AND NEW CAULKING
PROVIDED. REPAIR THE SYSTEM WITH SIMILAR
MATERIALS AND CONSTRUCTION OF THE
EXISTING SYSTEM.
5. REMOVE ALL DOORS, FRAMES, AND HARDWARE
AT WEST GREENHOUSE (9 TOTAL).
6. REMOVE EXISTING EMERGENCY SHOWER AND
EYE WASH. SEE PLUMBING.
7. REMOVE EXISTING EXHAUST FAN FOR WEST
GREENHOUSE. SEE MECHANICAL FOR MORE
INFORMATION.
8. REMOVE EXISTING SHADING FABRIC FROM
MANUAL SHADING SYSTEM. MANUAL SHADING
SYSTEM TO REMAIN.
9. BID OPTION 2: CONTRACTOR MUST
REMOVE/REPLACE APPROXIMATELY 15% OF THE
EAST GREENHOUSE GLAZING SYSTEM ROOF AND
WALLS (EXTERIOR AND INTERIOR). DAMAGED
AREAS MUST BE IDENTIFIED BY CONTRACTOR
WITH APPROVAL FROM CONTRACTING OFFICER
BEFORE BEGINNING WORK. THIS REPAIR
INCLUDES ALL BROKEN OR DAMAGED GLASS TO
BE REPLACED, PANES OF GLASS THAT HAVE
SHIFTED MUST BE REMOVED AND PROPERLY
REINSTALLED. ALUMINUM COMPRESSION BARS
MUST BE REPLACED AND NEW CAULKING
PROVIDED. REPAIR THE SYSTEM WITH SIMILAR
MATERIALS AND CONSTRUCTION OF THE
EXISTING SYSTEM.
10. BID OPTION 2: REMOVE ALL DOORS, FRAMES, AND
HARDWARE AT EAST GREENHOUSE (9 TOTAL).
11. BID OPTION 2: REMOVE EXISTING EXHAUST FAN
FOR EAST GREENHOUSE. SEE MECHANICAL FOR
MORE INFORMATION.
12. BID OPTION 2: REMOVE EXISTING EMERGENCY
SHOWER AND EYE WASH. SEE PLUMBING.
13. BID OPTION 2: REMOVE EXISTING SHADING
FABRIC FROM MANUAL SHADING SYSTEM.
14. EXISTING TRENCH DRAINS TO REMAIN (SEE
PLUMBING).
15. EXISTING EVAPORATIVE COOLING WALL SYSTEM.
SEE MECHANICAL AND 3/AD101.
16. SEE MECHANICAL AND ELECTRICAL FOR
CONTROLS, CONTACTORS, AND PANELS.
SCALE:
GREENHOUSE
DEMO WALL SECTION
1" = 1'-0"
AD101
SCALE:
GREENHOUSE
DEMO WALL SECTION
1" = 1'-0"
AD101
01' 1'
1'-0"SCALE: 1" =
A
D F H J L N R
TYP.
1 TYP.
TYP.
TYP.
SCALE:
BUILDING EC04
DEMO REFLECTED CEILING PLAN
1/8" = 1'-0"
AD131
U
D A
S
DEMO REFLECTED CEILING PLAN
AD131
GENERAL NOTES
GRAPHIC SCALE
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
08' 8'
1'-0"
4'
SCALE: 1/8" =
KEYED NOTESX
1. BID OPTION 4: REMOVE ALL EXISTING LIGHTS
IN HEADHOUSE. SEE ELECTRICAL.
2. EXISTING UNIT HEATER TO REMAIN.
3. REMOVE EXISTING LIGHT FIXTURES IN WEST
GREENHOUSE. SEE ELECTRICAL.
4. BID OPTION 2: REMOVE EXISTING LIGHT
FIXTURES IN EAST GREENHOUSE. SEE
ELECTRICAL.
5. GROW LIGHTS NOT SHOWN FOR CLARITY.
SEE ELECTRICAL FOR WORK TO BE
PERFORMED.
6. EXISTING EXHAUST FANS TO REMAIN.
LEGEND
LIGHT FIXTURES
24" X 24" ACOUSTICAL
CEILING TILE
MECHANICAL
EQUIPMENT
2 2 2
2 2 2
3 3 3
EXISTING LOUVERS
TO REMAIN; TYP.
AP
PR
O X.
7 7EXISTING HEADHOUSE
EXISTING HEADHOUSE
5 5 56 6 6
5 5 5 EXISTING LOUVERS
TO REMAIN; TYP.
AP
PR
O X.
8 8
8 8
EXISTING HEADHOUSE
EXISTING HEADHOUSE
SCALE:
WEST GREENHOUSE
DEMO WEST ELEVATION
1/8" = 1'-0"
AD201
U
D A
S
DEMO GREENHOUSE ELEVATIONS
AD201
GENERAL NOTES
GRAPHIC SCALE
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
08' 8'
1'-0"
4'
SCALE: 1/8" =
KEYED NOTESX
1. CONTRACTOR MUST REMOVE/REPLACE
APPROXIMATELY 15% OF THE WEST
GREENHOUSE GLAZING SYSTEM ROOF AND
WALLS (EXTERIOR AND INTERIOR). THIS
REPAIR INCLUDES ALL BROKEN OR DAMAGED
GLASS TO BE REPLACED, PANES OF GLASS
THAT HAVE SHIFTED MUST BE REMOVED AND
PROPERLY REINSTALLED. ALUMINUM
COMPRESSION BARS MUST BE REPLACED
AND NEW CAULKING PROVIDED. REPAIR THE
SYSTEM WITH SIMILAR MATERIALS AND
CONSTRUCTION OF THE EXISTING SYSTEM.
2. REMOVE ALL DOORS, FRAMES, AND
HARDWARE AT WEST GREENHOUSE.
3. REMOVE EXISTING FANS. SEE MECHANICAL
FOR MORE INFORMATION.
4. BID OPTION 2: CONTRACTOR MUST
REMOVE/REPLACE APPROXIMATELY 15% OF
THE EAST GREENHOUSE GLAZING SYSTEM
ROOF AND WALLS (EXTERIOR AND INTERIOR).
THIS REPAIR INCLUDES ALL BROKEN OR
DAMAGED GLASS TO BE REPLACED, PANES
OF GLASS THAT HAVE SHIFTED MUST BE
REMOVED AND PROPERLY REINSTALLED.
ALUMINUM COMPRESSION BARS MUST BE
REPLACED AND NEW CAULKING PROVIDED.
REPAIR THE SYSTEM WITH SIMILAR
MATERIALS AND CONSTRUCTION OF THE
EXISTING SYSTEM.
5. BID OPTION 2: REMOVE ALL DOORS, FRAMES,
AND HARDWARE AT EAST GREENHOUSE.
6. BID OPTION 2: REMOVE EXISTING FANS. SEE
MECHANICAL FOR MORE INFORMATION.
7. REMOVE EXISTING UNIT HEATER FLU
STACKS. REPLACE WITH GLASS PANE TO
MATCH EXISTING.
8. BID OPTION 2: REMOVE EXISTING UNIT
HEATER FLU STACKS. REPLACE WITH GLASS
PANE TO MATCH EXISTING.
SCALE:
WEST GREENHOUSE
DEMO SOUTH ELEVATION
1/8" = 1'-0"
AD201
SCALE:
WEST GREENHOUSE
DEMO EAST ELEVATION
1/8" = 1'-0"
AD201
SCALE:
EAST GREENHOUSE
DEMO WEST ELEVATION
1/8" = 1'-0"
AD201 SCALE:
EAST GREENHOUSE
DEMO SOUTH ELEVATION
1/8" = 1'-0"
AD201
SCALE:
EAST GREENHOUSE
DEMO EAST ELEVATION
1/8" = 1'-0"
AD201
SCALE:
DEMO ELEVATIONS
NOT TO SCALE
AD202
U
D A
S
DEMO HEADHOUSE ELEVATIONS
AD202
GENERAL NOTES
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
KEYED NOTESX
SCALE:
HEADHOUSE
DEMO ELEVATIONS
NOT TO SCALE
AD202
SCALE:
HEADHOUSE
DEMO ELEVATIONS
NOT TO SCALE
AD202 SCALE:
HEADHOUSE
DEMO ELEVATIONS
NOT TO SCALE
AD202 SCALE:
HEADHOUSE
DEMO ELEVATIONS
NOT TO SCALE
AD202
1. REMOVE ALL SEALS AND SAFETY EDGES AT
OVERHEAD DOORS (3 TOTAL). PREP DOORS FOR
NEW SEALS AND SAFETY EDGES.
2. REMOVE ALL CAULK/SEALANT AT EXTERIOR
WALL PENETRATIONS AT HEADHOUSE. PREP
AND CLEAN FOR NEW SEALANT.
3. CUT GROUT FLUSH WITH TOP OF STEEL
BOLLARD.
TYP.
TYP.
TYP.
TYP.
TYP.
A
A
K M P Q
A
D F H J L N R
GROWTH
CHAMBER
PREP
ROOM
MECH
TOILET
ELEC
CORR.
FOYER
SEED
STOR.
WALK-IN
COOLER
PREP
ROOM
WORK
AREA
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
114A
113C113A 113B
112C 112A 112B
112D
111A
111C 117D
111F
115B115A
116A 116B
117A 117B
116C
117C
JAN.
30'-9" +/- WEST GREENHOUSE 30'-9" +/- EAST GREENHOUSE
5 5
A-201
A-201
A-201
A-201
A-201
A-201
A-101
A-101
8'
-4
'-9
95'-8 1/2" +/-
A-101
A-101
TYP.
TYP.
TYP.
TYP.
114B
PROVIDE EXHAUST
FAN AND HOOD. SEE
MECHANICAL AND
ELECTRICAL FOR
MORE INFORMATION.
PROVIDE EVAPORATIVE
COOLING PAD SYSTEM.
SEE MECHANICAL AND
ELECTRICAL FOR MORE
INFORMATION.
EXISTING STRUCTURE
TO REMAIN.
EXISTING STRUCTURE
TO REMAIN.
EXISTING LOUVER
SYSTEM TO REMAIN.
PROVIDE LOUVER
OPERATORS. SEE
MECHANICAL AND
ELECTRICAL FOR
MORE INFORMATION.
INTERIOREXTERIOR
INTERIOR EXTERIOR
SCALE:
BUILDING EC04
NEW FLOOR PLAN
1/8" = 1'-0"
A-101
U
D A
S
NEW FLOOR PLAN
A-101
GENERAL NOTES
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
GRAPHIC SCALE
08' 8'
1'-0"
4'
SCALE: 1/8" =
KEYED NOTESX
1. PROVIDE SEALS AND SAFETY EDGES AT
OVERHEAD DOORS (3 TOTAL).
2. PROVIDE CAULK/SEALANT AT ALL EXTERIOR
WALL PENETRATIONS AT HEADHOUSE.
3. PROVIDE FULL LENGTH HIGH-DENSITY
POLYETHYLENE BOLLARD COVER (YELLOW).
4. CONTRACTOR MUST PROVIDE GLAZING
(APPROXIMATELY 15%) FOR THE WEST
GREENHOUSE ROOF AND WALLS (EXTERIOR
AND INTERIOR). PROVIDE ALUMINUM
COMPRESSION BARS AND NEW CAULKING.
REPAIR THE SYSTEM WITH SIMILAR MATERIALS
AND CONSTRUCTION OF THE EXISTING
SYSTEM. GLAZING MUST BE MINIMUM 1/8"
THICK TEMPERED GLASS.
5. PROVIDE DOORS, FRAMES, AND HARDWARE AT
WEST GREENHOUSE (9 TOTAL).
6. PROVIDE EXHAUST FAN FOR WEST
GREENHOUSE. SEE MECHANICAL FOR MORE
INFORMATION.
7. BID OPTION 1:PROVIDE SHADING FABRIC ON
EXISTING MANUAL SHADING SYSTEM.
8. BID OPTION 2: CONTRACTOR MUST PROVIDE
GLAZING (APPROXIMATELY 15%) FOR THE EAST
GREENHOUSE ROOF AND WALLS (EXTERIOR
AND INTERIOR). PROVIDE ALUMINUM
COMPRESSION BARS AND NEW CAULKING.
REPAIR THE SYSTEM WITH SIMILAR MATERIALS
AND CONSTRUCTION OF THE EXISTING
SYSTEM. GLAZING MUST BE MINIMUM 1/8"
THICK TEMPERED GLASS.
9. BID OPTION 2: PROVIDE DOORS, FRAMES, AND
HARDWARE AT EAST GREENHOUSE (9 TOTAL).
10. BID OPTION 2: PROVIDE EXHAUST FAN FOR
EAST GREENHOUSE. SEE MECHANICAL FOR
MORE INFORMATION.
11. BID OPTION 2: PROVIDE SHADING FABRIC ON
EXISTING MANUAL SHADING SYSTEM.
12. EXISTING TRENCH DRAINS TO REMAIN (SEE
PLUMBING).
13. EXISTING EVAPORATIVE COOLING WALL
SYSTEM. SEE MECHANICAL AND 3/A-101.
14. SEE MECHANICAL AND ELECTRICAL FOR
CONTROLS, CONTACTORS, AND PANELS.
SCALE:
GREENHOUSE
WALL SECTION
1" = 1'-0"
A-101
SCALE:
GREENHOUSE
WALL SECTION
1" = 1'-0"
A-101
01' 1'
1'-0"SCALE: 1" =
A
D F H J L N R
1 1
1 1
SCALE:
BUILDING EC04
NEW REFLECTED CEILING PLAN
1/8" = 1'-0"
A-131
U
D A
S
NEW REFLECTED CEILING PLAN
A-131
GENERAL NOTES
GRAPHIC SCALE
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
08' 8'
1'-0"
4'
SCALE: 1/8" =
KEYED NOTESX
1. BID OPTION 4: PROVIDE LED LIGHT FIXTURES
IN HEADHOUSE. SEE ELECTRICAL FOR MORE
INFORMATION.
2. EXISTING UNIT HEATER TO REMAIN.
3. PROVIDE LIGHT FIXTURES IN WEST
GREENHOUSE. SEE ELECTRICAL FOR MORE
INFORMATION.
4. BID OPTION 2: PROVIDE LIGHT FIXTURES IN
EAST GREENHOUSE. SEE ELECTRICAL FOR
MORE INFORMATION.
5. GROW LIGHTS NOT SHOWN FOR CLARITY.
SEE ELECTRICAL FOR WORK TO BE
PERFORMED.
6. EXISTING EXHAUST FANS TO REMAIN.
LEGEND
LIGHT FIXTURES
24" X 24" ACOUSTICAL
CEILING TILE
MECHANICAL
EQUIPMENT
2 2 2
2 2 2
3 3 3
EXISTING LOUVERS
TO REMAIN; TYP.
AP
PR
O X.
7 7
7 7
7 7
EXISTING HEADHOUSE
EXISTING HEADHOUSE
5 5 56 6 6
5 5 5 EXISTING LOUVERS
TO REMAIN; TYP.
AP
PR
O X.
8 88
8 8
EXISTING HEADHOUSE
EXISTING HEADHOUSE
SCALE:
WEST GREENHOUSE
NEW WEST ELEVATION
1/8" = 1'-0"
A-201
U
D A
S
NEW GREENHOUSE ELEVATIONS
A-201
GENERAL NOTES
GRAPHIC SCALE
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
08' 8'
1'-0"
4'
SCALE: 1/8" =
KEYED NOTESX
1. CONTRACTOR MUST PROVIDE GLAZING
(APPROXIMATELY 15%) FOR THE WEST
GREENHOUSE ROOF AND WALLS (EXTERIOR
AND INTERIOR). PROVIDE ALUMINUM
COMPRESSION BARS AND NEW CAULKING.
REPAIR THE SYSTEM WITH SIMILAR
MATERIALS AND CONSTRUCTION OF THE
EXISTING SYSTEM. GLAZING MUST BE
MINIMUM 1/8" THICK TEMPERED GLASS.
2. PROVIDE DOORS, FRAMES, AND HARDWARE
AT WEST GREENHOUSE.
3. PROVIDE FANS. SEE MECHANICAL FOR MORE
INFORMATION.
4. BID OPTION 2: CONTRACTOR MUST PROVIDE
GLAZING (APPROXIMATELY 15%) FOR THE
EAST GREENHOUSE ROOF AND WALLS
(EXTERIOR AND INTERIOR). PROVIDE
ALUMINUM COMPRESSION BARS AND NEW
CAULKING. REPAIR THE SYSTEM WITH
SIMILAR MATERIALS AND CONSTRUCTION OF
THE EXISTING SYSTEM. GLAZING MUST BE
MINIMUM 1/8" THICK TEMPERED GLASS.
5. BID OPTION 2: PROVIDE DOORS, FRAMES,
AND HARDWARE AT EAST GREENHOUSE.
6. BID OPTION 2: PROVIDE FANS. SEE
MECHANICAL FOR MORE INFORMATION.
7. PROVIDE FLU STACK TO GAS UNIT HEATER
PER GREENHOUSE MANUFACTURER'S
WRITTEN RECOMMENDATIONS.
8. BID OPTION 2: PROVIDE FLU STACK TO GAS
UNIT HEATER PER GREENHOUSE
MANUFACTURER'S WRITTEN
RECOMMENDATIONS.
9. PROVIDE GABLE MOUNT WEATHER STATION.
SEE MECHANICAL.
SCALE:
WEST GREENHOUSE
NEW SOUTH ELEVATION
1/8" = 1'-0"
A-201
SCALE:
WEST GREENHOUSE
NEW EAST ELEVATION
1/8" = 1'-0"
A-201
SCALE:
EAST GREENHOUSE
NEW WEST ELEVATION
1/8" = 1'-0"
A-201 SCALE:
EAST GREENHOUSE
NEW SOUTH ELEVATION
1/8" = 1'-0"
A-201
SCALE:
EAST GREENHOUSE
NEW EAST ELEVATION
1/8" = 1'-0"
A-201
SCALE:
NEW ELEVATIONS
NOT TO SCALE
A-202
U
D A
S
NEW HEADHOUSE ELEVATIONS
A-202
GENERAL NOTES
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
KEYED NOTESX
SCALE:
HEADHOUSE
NEW ELEVATIONS
NOT TO SCALE
A-202
SCALE:
HEADHOUSE
NEW ELEVATIONS
NOT TO SCALE
A-202 SCALE:
HEADHOUSE
NEW ELEVATIONS
NOT TO SCALE
A-202 SCALE:
HEADHOUSE
NEW ELEVATIONS
NOT TO SCALE
A-202
1. PROVIDE SEALS AND SAFETY EDGES AT
OVERHEAD DOORS (3 TOTAL).
2. PROVIDE CAULK/SEALANT AT ALL EXTERIOR
WALL PENETRATIONS AT HEADHOUSE.
3. PROVIDE FULL LENGTH HIGH-DENSITY
POLYETHYLENE BOLLARD COVER (YELLOW).
TYP.
TYP.
TYP.
TYP.TYP.
DOOR AND FRAME SCHEDULE
DOOR FRAME HARDWARE
SET NOTES
NUMBER MARK WD HGT THK MTL FINISH MTL FINISH
111A -- 8'-0" 10'-0" -- -- -- -- -- -- PROVIDE SEALS AND
SAFETY EDGES.
111C -- 8'-0" 10'-0" -- -- -- -- -- -- PROVIDE SEALS AND
SAFETY EDGES.
111F -- 8'-0" 10'-0" -- -- -- -- -- -- PROVIDE SEALS AND
SAFETY EDGES.
112A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
112B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
112C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
112D A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
113A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
113B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
113C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
114A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
114B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --
115A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
115B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
116A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
116B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
116C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
117A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
117B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
117C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
117D A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2
MARK A
3'-4"
7' -2
2" 3'
2"
2" 7'
LEGEND
FRP FIBERGLASS REINFORCED POLYMER
HEAD
JAMB
METAL FRAME DOOR AS SCHEDULED
EDGE OF
CONCRETE
CURB BELOW
EXISTING 'C'
CHANNEL
EXISTING
DRIP EDGE
EXISTING
METAL PANEL
METAL FRAME
DOOR AS SCHEDULED
EXISTING 'C'
CHANNEL
EXISTING
METAL PANEL
DOOR AS SCHEDULED
CONCRETE CURB
EXISTING
FOUNDATION THRESHOLD SET IN
BED OF SEALANT
W/MIN. (3) 1/4" DIA.
ANCHORS
DOOR SWEEP
RAIN DRIP
SILL
SEALANT
2"
JAMB ANCHOR
U
D A
S
DOOR DETAILS AND SCHEDULE
A-501
GENERAL NOTES
A. THE CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO PERFORMING ANY WORK OR
FABRICATION OR PURCHASE OF EQUIPMENT,
MATERIALS, AND ASSEMBLIES. ANY
DEVIATIONS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S ATTENTION FOR
RESOLUTION BEFORE PROCEEDING WITH
ANY CONSTRUCTION, FABRICATION, OR
EQUIPMENT PURCHASE.
B. ALL UTILITIES AFFECTED BY DEMOLITION
SHALL BE REINSTALLED IN THE WORK OR
CAPPED AND TERMINATED IN ACCORDANCE
WITH CODES.
C. CONTRACTOR SHALL PROVIDE TEMPORARY
STRUCTURAL SUPPORTS FOR EXISTING
CONSTRUCTION DURING THE WORK.
D. THE CONTRACTOR SHALL REPAIR ALL
EXISTING CONSTRUCTION TO REMAIN THAT
HAS BEEN DAMAGED BY THE DEMOLITION,
DECONSTRUCTION, OR NEW CONSTRUCTION
AS SPECIFIED IN SPECIFICATION SECTION 02
41 00.
SCALE:
DOOR DETAILS
1-1/2" = 1'-0"
A-501
U
D A
S
ABBREVIATIONS AND LEGEND
P-001
PLUMBING LEGEND
DOMESTIC COLD WATER
PLUMBING ABBREVIATIONS
1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL DIMENSIONS
PRIOR TO FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DEVIATIONS MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION, OR EQUIPMENT
PURCHASE.
2. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS (DO NOT SCALE FOR LOCATIONS). THE CONTRACTOR WILL PROVIDE A COMPLETE AND FUNCTIONAL PLUMBING SYSTEM AS INDICATED WITH ALL NECESSARY
EQUIPMENT, APPURTENANCES AND CONTROLS AS INDICATED.
3. REMOVE AND CAP CONNECTING UTILITIES (WATER, DRAINAGE, POWER, GAS, ETCETERA) AS INDICATED OR NECESSARY FOR FUTURE
RECONNECTION.
4. THE CONTRACTOR MUST EMPLOY WORKMEN WHO ARE TRAINED AND EXPERIENCED IN NECESSARY SKILLS TO PERFORM PLUMBING AND
PLUMBING DEMOLITION WORK.
5. THE CONTRACTOR MUST USE APPROPRIATE TOOLS AND MUST NOT IMPART EXCESSIVE VIBRATIONS TO THE EXISTING STRUCTURE OR
OTHER BUILDING COMPONENTS.
6. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ANY ADDITIONAL EXPENSE TO THE OWNER. THE
CONTRACTOR WILL PROVIDE COORDINATION DRAWINGS OF TRADES.
7. ALL NEW & DEMOLISHED PIPING PENETRATIONS TO ANY BUILDING ENVELOPE MUST BE FULLY SEALED WATER TIGHT.
8. THE CONTRACTOR MUST FIELD VERIFY EXACT LOCATIONS AND POINTS OF CONNECTIONS TO THE EXISTING UTILITIES (DOMESTIC WATER
& SANITARY SEWER, NATURAL GAS, ETCETERA).
9. REFER TO SPECIFICATIONS, SHEET NOTES, DETAILS AND SCHEDULES FOR ADDITIONAL REQUIREMENTS PERTAINING TO THE PLUMBING
WORK.
10. ALL WORK (MATERIALS, EQUIPMENT, DEVICES, COMPONENTS, SYSTEMS, SUPPORTS, ETCETERA) MUST COMPLY WITH THE
REQUIREMENTS OF ALL CODES, CODE AMENDMENTS, AND ORDINANCES AS USED, ADOPTED AND/OR ENFORCED BY THE LOCAL JURISDICTION, COUNTY AND STATE IN WHICH THE PROJECT IS LOCATED. WHERE INSPECTIONS ARE REQUIRED BY COR, WORK MUST NOT BE CONCEALED UNTIL INSPECTIONS AND TESTS ARE COMPLETED AND ACCEPTED. REFER TO SPECIFICATIONS FOR APPLICABLE CODES.
11. SCHEDULES, NOTES OR SPECIFICATIONS MAY REFERENCE "BASIS OF DESIGN" INFORMATION REGARDING A SPECIFIC MANUFACTURER OR MODEL NUMBER. SUCH INFORMATION IS PROVIDED SO AS TO ESTABLISH A STANDARD OF PERFORMANCE, QUALITY, FEATURES AND OPTIONS (SEE SCHEDULES AND SPECIFICATIONS). THE INTENT IS NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT OF OTHER MANUFACTURERS MUST BE ACCEPTABLE PROVIDED SUCH EQUIPMENT EQUALS OR EXCEEDS THE BASIS OF DESIGN EQUIPMENT IN PERFORMANCE, QUALITY, FEATURES AND OPTIONS WHETHER SPECIFIED, SCHEDULED OR NOTED.
12. ALL EQUIPMENT FURNISHED FOR THIS PROJECT MUST COMPLY WITH THE "BUY AMERICAN ACT".
13. ALL WORK MUST BE FABRICATED AND/OR ERECTED USING THE CONTRACTOR'S FIELD MEASUREMENTS FOR PROPER COORDINATION
WITH WORK OF OTHER TRADES.
14. ALL CONTRACT DOCUMENTS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF
THE WORK. THEY ARE NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, OR COMPONENT. DO
NOT SCALE DRAWINGS.
15. INFORMATION AND COMPONENTS SHOWN ON DIAGRAMS OR DETAILS, BUT NOT SHOWN ON PLANS, AND VICE VERSA, MUST BE PROVIDED
AS IF EXPRESSLY REQUIRED BY BOTH.
16. EXCEPT WHERE INDICATED OTHERWISE, THE NOTATION OR DESCRIPTION OF ANY ITEM IN THE CONTRACT DOCUMENTS CARRIES WITH IT THE INSTRUCTION TO FURNISH AND INSTALL THE ITEM, WHETHER OR NOT THIS INSTRUCTION IS EXPLICITLY STATED.
17. ALL WORK MUST BE INSTALLED SO AS MAINTAIN ANY "UL" ASSEMBLY RATINGS, FIRE RATINGS OR SMOKE BARRIER CAPABILITIES OF WALLS, PARTITIONS, FLOORS AND ROOF. SEAL AROUND AND PLACE UL RATED FIRE-STOP MATERIAL AT ANY PENETRATION OR DISTURBANCE OF SUCH ASSEMBLIES. COORDINATE WITH ARCHITECTURAL PLANS AND THE CONTRACTOR.
18. COORDINATE PLACEMENT OF ALL WORK WITH OTHER TRADES. DO NOT LOCATE, POSITION OR INSTALL ANY WORK IN SUCH A WAY THAT SYSTEM COMPONENTS OR ACCESS DOORS WILL BE INACCESSIBLE, UNUSABLE OR UN-MAINTAINABLE AFTER CONSTRUCTION IS
COMPLETED. COMPLY WITH MANUFACTURER'S MINIMUM RECOMMENDED SERVICE CLEARANCES.
19. UNLESS OTHERWISE INDICATED, ALL WORK MUST BE SUPPORTED FROM STRUCTURE ABOVE, FROM WALLS, FROM COLUMNS, OR FROM THE FLOOR. DO NOT USE THE INSTALLED WORK OF OTHER TRADES, OR WORK RELATED TO ANY SUPPORT SYSTEMS FOR SUPPORT FOR
OTHER TRADES.
20. PROVIDE PIPE TRANSITIONS AT FIXTURE CONNECTIONS WHERE PIPE SIZES INDICATED DIFFER FROM THE FIXTURE CONNECTION SIZE.
21. DOMESTIC WATER PIPING MUST BE TYPE L RIGID COPPER WITH PRESS FITTINGS.
° DEGREES
Ø DIAMETER
AFF ABOVE FINISHED FLOOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BTU BRITISH THERMAL UNIT
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RECIRCULATION
DTW DOMESTIC TEPID WATER
EWH ELECTRIC WATER HEATER
F FAHRENHEIT
GPM GALLONS PER MINUTE
HWCP HOT WATER CIRCULATION PUMP
IPC INTERNATIONAL PLUMBING CODE
kW KILLOWATT
MAX MAXIMUM
MIN MINIMUM
P PLUMBING
PDI PLUMBING AND DRAINAGE INSTITUTE
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
SSEW SAFETY SHOWER EYE WASH
SV SOLENOID VALVE
TYP TYPICAL
U/G UNDERGROUND
NOTE:
UNDERLINED FIXTURE AND EQUIPMENT MARKS (SUCH AS WC) ARE
NOT ABBREVIATIONS. REFER TO THE PLUMBING SCHEDULE SHEETS
1. THE DEMOLITION PLAN AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE. ITEMS TO BE REMOVED ARE DENOTED BY NOTES AND
HATCHING.
2. DEMOLITION MUST INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS IDENTIFIED. THE CONTRACTOR MUST COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION WORK
REQUIRED.
3. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR MUST IMMEDIATELY REPORT THE CONDITION TO
THE CONTRACTING OFFICER IN WRITING.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL CONSTRUCTION ASSISTANCE DEVICES
SUCH AS SCAFFOLDING AND BARRIERS.
5. THE BUILDING ENVELOPE MUST REMAIN WATERTIGHT THROUGHOUT THE CONSTRUCTION PROCESS.
GENERAL PLUMBING NOTES:
PLUMBING DEMOLITION NOTES:
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRCULATION
PLUMBING DEMOLITION LEGEND
HATCHING INDICATED ITEMS TO BE
DISMANTLED AND REMOVED
A
A
K M P Q
A
D F H J L N R
GROWTH
CHAMBER
PREP
ROOM
MECH
TOILET
ELEC
CORR.
FOYER
SEED
STOR.
WALK-IN
COOLER
PREP
ROOM
WORK
AREA
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
JAN.
SCALE:
DEMO PLAN PLUMBING
1/8" = 1'-0"
PD101
U
D A
S
DEMO PLAN PLUMBING
PD101
GRAPHIC SCALE
KEYED NOTESX
1. DISMANTLE AND REMOVE EXISTING HOT AND COLD
DOMESTIC WATER PIPING, THERMOSTATIC MIXING
VALVE AND SAFETY SHOWER.
2. CAP EXISTING WATER LINES TO REMOVED SAFETY
SHOWER.
3. BID OPTION 2: DISMANTLE AND REMOVE EXISTING HOT
AND COLD DOMESTIC WATER PIPING, THERMOSTATIC
MIXING VALVE AND SAFETY SHOWER.
4. BID OPTION 2: CAP EXISTING WATER LINES TO
REMOVED SAFETY SHOWER.
5. BASE BID: DISMANTLE AND REMOVE EXISTING SAFETY
SHOWER/EYEWASH STATION ALONG WITH ALL
ASSOCIATED PIPING, VALVES AND MATERIALS BACK TO
ISOLATION VALVE.
6. BASE BID: DISMANTLE AND REMOVE EXISTING REVERSE
OSMOSIS SYSTEM. CAP PIPING FOR USE IN FUTURE
WORK.
BASE BID
BASE BID
BID OPTION 2
A
A
K M P Q
A
D F H J L N R
GROWTH
CHAMBER
PREP
ROOM
MECH
TOILET
ELEC
CORR.
FOYER
SEED
STOR.
WALK-IN
COOLER
PREP
ROOM
WORK
AREA
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
JAN.
SCALE:
PLUMBING PLAN
1/8" = 1'-0"
P-101
U
D A
S
PLUMBING PLAN
P-101
GRAPHIC SCALE
KEYED NOTESX
1. PROVIDE NEW IRRIGATION CONTROLLER. CONNECT TO
EXISTING OVERHEAD DOMESTIC WATER PIPING IN THE
GREENHOUSE. CONTRACTOR MUST DETERMINE THE
NUMBER OF EMITTERS AND PIPE SIZING AS
PRESCRIBED BY THE MANUFACTURER AND THE
GOVERNMENT DURING THE BIDDING PROCESS. REFER
TO DETAIL 1/P-501 AND EQUIPMENT SCHEDULE ON
P-601.
2. PROVIDE NEW EMERGENCY SHOWER/EYEWASH
STATION ALONG WITH THERMOSTATIC MIXING VALVE
AND ALL ASSOCIATED PIPING AND MATERIALS TO
ISOLATION VALVE.
3. PROVIDE REVERSE OSMOSIS SYSTEM WITH
PRE-TREATMENT AND PRESSURE STORAGE TANK.
REFER TO PLUMBING DETAILS SHEET P-501. ROUTE
OVERFLOW AND DISCHARGE PIPING TO NEAREST
FLOOR DRAIN IN GREENHOUSE. RE-USE EXISTING
PIPING FROM EXISTING RO SYSTEM TO COOLING PADS,
REFER TO M-101.
4. CONTRACTOR MUST FLUSH AND CLEAN TRENCH
DRAINS AND PIPING BETWEEN GREENHOUSE AND LIFT
STATION.
5. REPLACE EXISTING FREEZE DAMAGED EXTERIOR
SILLCOCK SPIGOTS.
6. REPLACE EXISTING FREEZE DAMAGED COPPER PIPE
JOINTS IN THIS AREA. REPLACE MISSING COPPER PIPE
TO SILLCOCK SPIGOTS.
7. REPLACE 1" AND 3/4" FREEZE DAMAGED COPPER PIPES.
8. REPLACE EXISTING CTS POLY PIPE WITH NEW COPPER
PIPE TO KEEP ALL PIPING UNIFORM.
9. REPLACE 2" SWEAT BALL VALVES IN THIS AREA.
EXISTING GAS
VALVE TO REMAIN
BASE BID
BASE BID
IC-1
SV-1
SV-1A
SV-1E
SV-1B SV-1C
SV-1D
SV-1F
IRRIGATION
SPRINKLER HEAD
(TYPICAL)
IC-2
SV-2
SV-2A
SV-2E
SV-2BSV-2C
SV-2D
SV-2F
IRRIGATION
SPRINKLER
HEAD
(TYPICAL)
BID OPTION 2
RO
NEW DRAIN LINE. PIPE TO EXISTING
TRENCH DRAIN IN GREENHOUSE.
EXISTING
EXISTING
EXISTING
LIFT STATION
5 5 55
6 6
8 8
2 2
7 7
A
S
DETAILS
P-501
24AC V
V
V
V
V
V
V
G
1COM
C 1 2 3 4 5 6 7
BACKUP BATTERY
CONNECTION BLOCK
TRANSMISSION CABLE
CONNECTION BOX
SV-1 SV-1A SV-1B SV-1C SV-1D SV-1E SV-1F
IC-1
24AC V
V
V
V
V
V
V
G
1COM
C 1 2 3 4 5 6 7
BACKUP BATTERY
CONNECTION BLOCK
TRANSMISSION CABLE
CONNECTION BOX
SV-2 SV-2A SV-2B SV-2C SV-2D SV-2E SV-2F
IC-2
SCALE:
IRRIGATION PIPING SCHEMATIC
NOT TO SCALE
P-501
SCALE:
REVERSE OSMOSIS SCHEMATIC
NOT TO SCALE
P-501
1-1/2" CW
CARBON FILTER
HE-CF-21
RO SKIDS
(2) M2-6
STORAGE TANK
(119 GALLON)
TO COOLING PADS
SOFTENER
HET-150
1-1/2" CW
BALL VALVE (TYPICAL)
FLOOR
BRINE TANK
NOTES:
1. ALL DIMENSIONS ARE GIVEN IN INCHES AND ARE APPROXIMATE.
2. THE RO INLET WATER CONNECTION IS 1/2" TUBING.
3. THE PRODICT WATER CONNECTION IS 1/2" TUBING FOR ALL UNITS.
4. THE CONCENTRATE WATER CONNECTION IS 3/8" TUBING FOR ALL UNITS.
5. AN OPTIONAL BRACKET FOR WALL MOUNTING ON 16", 18", OR 20" CENTERS IS AVAILABLE.
THE WALL MUST BE CAPABLE OF SUPPORTING AT LEAST 93 POUNDS.
6. PROVIDE A DRAIN CAPABLE OF HANDLING AT LEAST 2.3 GALLONS PER MINUTE. DO NOT
MAKE A DIRECT CONNECTION TO THE DRAIN. PROVIDE AN AIR GAP OF AT LEAST FOUR
TIMES THE DIAMETER OF THE DRAIN PIPE TO CONFORM TO SANITATION CODES AND TO
PERMIT THE OBSERVATION OF THE DRAIN FLOW. DO NOT INSTALL A VALVE IN DRAIN LINE.
7. THE POWER CORD IS 6 FEET LONG.
16" 16"
8.3 7"
7.7 8"
PRODUCT TO STORAGE
TOP VIEW
FRONT VIEW
35"
18.5"
2"
MEMBRANES
FEED
SCALE:
REVERSE OSMOSIS UNIT DETAIL - RO
NOT TO SCALE
P-501
A
S
PLUMBING EQUIPMENT SCHEDULES
P-601
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION BASIS OF DESIGN REMARKS
RO REVERSE OSMOSIS
SYSTEM
CULLIGAN
RO SKIDS: (2) M2-6
WATER SOFTENER: HET-150
CARBON FILTER: HE-CF21
STORAGE TANK: FL-40
MEMBRANE TYPE REVERSE OSMOSIS SYSTEM FOR COMMERCIAL APPLICATIONS.
SYSTEM MUST BE SIZED TO PROVIDE 10 GPM OF WATER TO THE EVAPORATIVE
COOLING UNITS. PROVIDE WATER PRE-TREATMENT SYSTEM CONSISTING OF
SOFTENER AND CARBON FILTER. PROVIDE RO SKID(S) WITH SEMIPERMEABLE
MEMBRANE. PROVIDE PRESSURE RATED STORAGE TANK.
IC-1
IC-2
IRRIGATION CONTROLLER GALCON AC-4-6-6S-9S-12S IRRIGATION CONTROLLER, 24VAC SOLENOID VALVES, 1 MASTER VALVE, 6 ZONE
VALVES. CONTRACTOR MUST PROVIDE TUBING, SOLENOID VALVES AND EMITTERS.
A
S
ABBREVIATIONS AND LEGEND
M-001
1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY. IT IS THE DESIGN BUILDER'S RESPONSIBILITY TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DEVIATIONS MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY
CONSTRUCTION, FABRICATION, OR EQUIPMENT PURCHASE.
2. INSTALLATION OF HVAC WORK MUST BE COORDINATED WITH OTHER TRADES BEFORE ANY INSTALLATION IS DONE.
DUCTWORK AND PIPING SHOWN ON PLANS IS SCHEMATIC. PROVIDE ALL TRANSITIONS, ELBOWS, REDUCERS, ETC.
REQUIRED TO AVOID CONFLICTS & MAXIMIZE CEILING HEIGHTS. EQUIPMENT, PIPING OR DUCTWORK INTERFERING WITH
OTHER TRADES MUST BE RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
3. AT START OF CONSTRUCTION, PREPARE TYPED LISTS OF EQUIPMENT THAT ARE TO BE SUPPLIED REQUIRING ELECTRICAL
WORK, AND SEND LISTS TO THE ELECTRICAL CONTRACTOR FOR REVIEW AND COORDINATION.
4. WRITTEN DIMENSIONS ON DRAWINGS MUST HAVE PRECEDENCE OVER SCALED DIMENSIONS. VERIFY DIMENSIONS ON SITE.
5. EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED CLEARANCE, UNIFIED FACILITIES
CRITERIA, AND INTERNATIONAL BUILDING CODE / INTERNATIONAL MECHANICAL CODE.
6. INSTALLATION OF EQUIPMENT MUST PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT WITHOUT
NECESSITATING REMOVAL OR MODIFICATION TO OTHER PIPING, WIRING, OR EQUIPMENT.
7. CEILING-MOUNTED EQUIPMENT MUST BE INSTALLED IN SUCH A MANNER THAT LIGHTS, PIPING, DUCTWORK, ETC. , DO NOT
BLOCK ACCESS TO EQUIPMENT AND RELATED ACCESSORIES.
8. CAULK WITH SILICONE ALL GAPS BETWEEN WALL, CEILING, AND FLOOR OPENINGS AND HVAC EQUIPMENT PENETRATIONS.
PATCH LARGE GAPS BEFORE CAULKING IS APPLIED.
9. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE THE SPECIFICATION HAS OPTIONS.
10. ALL EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED PUBLISHED LITERATURE.
11. NOT ALL MECHANICAL ABBREVIATIONS SHOWN WILL BE USED FOR THIS PROJECT.
12. ALL EQUIPMENT INSTALLED IN THIS PROJECT MUST COMPLY WITH THE "BUY AMERICAN ACT". BASIS OF DESIGN
SHOWN ON SCHEDULES IS TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT FROM ANOTHER MANUFACTURER IS ACCEPTABLE. MANUFACTURER NAME AND MODEL NUMBERS ARE BASIS OF DESIGN AND ARE SHOWN FOR INFORMATION ONLY. REFER TO SPECIFICATIONS FOR COMPLETE
REQUIREMENTS.
HVAC GENERAL NOTES:
1. THE DEMOLITION PLANS AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED. ITEMS TO
BE REMOVED ARE DENOTED BY HATCHING.
2. DEMOLITION MUST INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS IDENTIFIED. THE CONTRACTOR MUST COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE
DEMOLITION WORK REQUIRED.
3. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW
CONSTRUCTION.
4. IN THE EVENT THE CONTRACTOR ENCOUNTERS MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR MUST
IMMEDIATELY REPORT THE CONDITION TO THE CONTRACTING OFFICER IN WRITING.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL CONSTRUCTION
ASSISTANCE DEVICES SUCH AS SCAFFOLDING AND BARRIERS.
6. THE BUILDING ENVELOPE MUST REMAIN WATERTIGHT THROUGHOUT THE CONSTRUCTION PROCESS.
7. IF IT BECOMES NECESSARY DURING DEMOLITION TO TEMPORARILY REMOVE ANY EXISTING WORK NOT SPECIFICALLY NOTED TO BE REMOVED OR RELOCATED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR MUST REINSTALL SAID WORK TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS
8. CONTRACTOR MUST DEMOLISH ALL EQUIPMENT, PIPING, DUCTWORK, INSULATION, SUPPORTS, CONTROLS
THERMOSTATS, WIRING AND ALL APPURTENANCES WITH THE HVAC SYSTEM TO BE DEMOLISHED.
HVAC GENERAL DEMOLITION NOTES: ABBREVIATIONS:
ABBREVIATION DEFINITION
ACCU AIR COOLED CONDENSING UNIT
ACU AIR COOLED CONDENSING UNIT
AMPS AMPERES
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
CU CONDENSING UNIT
DH DEHUMIDIFIER
ECP EVAPORATIVE COOLING PAD
EF EXHAUST FAN
ESP EXTERNAL STATIC PRESSURE
EVAP EVAPORATOR
FLA FULL LOAD AMPS
FT FEET
GUH GAS UNIT HEATER
HAF HORIZONTAL AIRFLOW FAN
HP HORSEPOWER
IN INCHES
LB POUNDS
MCA MINIMUM CIRCUIT AMPACITY
MOCP MAXIMUM OVERCURRENT PROTECTION
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PVC POLYVINYL CHLORIDE
RLA RUNNING LOAD AMPS
RPM REVOLUTIONS PER MINUTE
RXXXX TYPE REFRIGERANT
SEER SEASONAL ENERGY EFFICIENCY RATING
SST SATURATED SUCTION TEMPERATURE
A
A
K M P Q
A
D F H J L N R
G GG G
G G
G G
GG
GG
GG
GG
GG
G GG G
G GG G
G GGG
G G
GROWTH
CHAMBER
PREP
ROOM
MECH
TOILET
ELEC
CORR.
FOYER
SEED
STOR.
WALK-IN
COOLER
PREP
ROOM
WORK
AREA
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
JAN.
SCALE:
DEMO PLAN MECHANICAL
1/8" = 1'-0"
MD101
U
D A
S
DEMO PLAN MECHANICAL
MD101
GRAPHIC SCALE
KEYED NOTESX
1. BID OPTION 4: DISMANTLE AND REMOVE EXISTING
CEILING MOUNTED DUCTLESS CASSETTE, OUTDOOR
AIR COOLED CONDENSING UNIT, REFRIGERANT PIPING
AND ALL APPURTENANCES. EXISTING OUTDOOR
CONCRETE PAD MUST REMAIN.
2. BID OPTION 4: DISMANTLE AND REMOVE EXISTING
INDOOR EVAPORATOR, OUTDOOR AIR COOLED
CONDENSER, REFRIGERANT PIPING AND ALL
APPURTENANCES. EXISTING OUTDOOR CONCRETE PAD
MUST REMAIN.
3. BID OPTION 4: DISMANTLE AND REMOVE EXISTING
DEHUMIDIFIER LOCATED ABOVE THE SEED STORAGE
COOLER ENCLOSURE.
4. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE
EXISTING OVERHEAD MOUNTED AXIAL CIRCULATION
FAN, SUPPORT STRUCTURE AND ALL APPURTENANCES.
DISCONNECT ALL CONTROLS.
5. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE
EXISTING OVERHEAD MOUNTED GAS FIRED UNIT
HEATER, MOUNTING BRACKETS AND ALL
APPURTENANCES. DISCONNECT GAS PIPING AND ALL
CONTROLS.
6. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE
EXISTING WALL MOUNTED EXHAUST FANS AND ALL
APPURTENANCES. DISCONNECT ALL CONTROLS.
7. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE
EXISTING COOLING PAD SYSTEM. DISCONNECT AND
REMOVE EXISTING DAMPER ACTUATORS. ACTUATED
LOUVERS MUST REMAIN.
8. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE
ALL EXISTING GAS PIPING IN THE GREENHOUSE AREA.
CAP GAS PIPING TO POINT SHOWN ON DRAWINGS.
9. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE
EXISTING LOUVER ACTUATORS. (36) PLACES.
EXISTING UNIT
HEATER TO REMAIN
EXISTING UNIT
HEATER TO REMAIN
45 545 5
4545 5
EXISTING GAS
VALVE TO REMAIN
BASE BID
BID OPTION 2
BID OPTION 4
EXISTING DUCTWORK
AND AIR DISTRIBUTION
DEVICES TO REMAIN (TYP)
EXISTING
EXHAUST
FANS TO
REMAIN
A
A
K M P Q
A
D F H J L N R
GROWTH
CHAMBER
PREP
ROOM
MECH
TOILET
ELEC
CORR.
FOYER
SEED
STOR.
WALK-IN
COOLER
PREP
ROOM
WORK
AREA
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
JAN.
SCALE:
MECHANICAL PLAN
1/8" = 1'-0"
M-101
U
D A
S
MECHANICAL PLAN
M-101
GRAPHIC SCALE
KEYED NOTESX
ACCU-1
EVAP-1
DH-1
ACU-1
CU-1
EF-1
HAF-1
HAF-2
HAF-3
HAF4
HAF-5
HAF-6 HAF-12
HAF-11
HAF-9
HAF-7
HAF-8
HAF-10
EF-2
EF-3
EF-4
EF-5
EF-6
EF-7
EF8
EF-9
EF-10
EF-11
EF-12
ECP-1
ECP-2
ECP-3
ECP-4
ECP-5
ECP-6
1. BID OPTION 4: PROVIDE CEILING MOUNTED DUCTLESS
CASSETTE, OUTDOOR AIR COOLED CONDENSING UNIT,
REFRIGERANT PIPING AND ALL APPURTENANCES.
2. BID OPTION 4: PROVIDE INDOOR EVAPORATOR,
OUTDOOR AIR COOLED CONDENSER, REFRIGERANT
PIPING AND ALL APPURTENANCES. SEE DETAIL 2/M-502
AND 3/M-502.
3. BID OPTION 4: PROVIDE DEHUMIDIFIER LOCATED ABOVE
THE SEED STORAGE COOLER ENCLOSURE. SEE DETAIL
1/M-502.
4. BASE BID AND BID OPTION 2: PROVIDE HEATING,
VENTILATION AND LIGHTING CONTROL SYSTEM. REFER
TO CONTROLS DRAWING M-701.
5. BASE BID AND BID OPTION 2: PROVIDE LOUVER
ACTUATOR TO REPLACE EXISTING. REFER TO DETAIL.
6. BASE BID AND BID OPTION 2: CONNECT REVERSE
OSMOSIS SYSTEM PIPING TO EVAPORATIVE COOLING
PADS. REFER TO P-101, 3/M-501.
7. BASE BID: PROVIDE WEATHER STATION. REFER TO
ARCHITECTURAL ROOF PLAN AND ELEVATIONS AND
DETAIL 1/M-503.
8. BASE BID AND BID OPTION 2: PROVIDE REMOTE
CONTACTOR PANELS FOR HEATING, VENTILATION AND
LIGHTING CONTROL SYSTEM.
BASE BID
BID OPTION 4
EXISTING
EXHAUST
FANS
EXISTING DUCTWORK
AND AIR DISTRIBUTION
DEVICES (TYP)
BID OPTION 2
LA-15
LA-25
LA-35
LA-45
LA-55
LA-65
LA-75
LA-85
LA-95
LA-105
LA-115
LA-135
LA-145
LA-155
LA-165
LA-175
LA-19 5
LA-20 5
LA-21 5
LA-22 5
LA-23 5
LA-24 5
LA-125
LA-185
LA-25 5
LA-26 5
LA-27 5
LA-28 5
LA-29 5
LA-30 5
LA-31 5
LA-32 5
LA-33 5
LA-34 5
LA-35 5
LA-36 5
6 6
GEC-W GEC-E
A
A
K M P Q
A
D F H J L N R
G GGG
G G
G G
G
G G
G
GROWTH
CHAMBER
PREP
ROOM
MECH
TOILET
ELEC
CORR.
FOYER
SEED
STOR.
WALK-IN
COOLER
PREP
ROOM
WORK
AREA
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
JAN.
SCALE:
MECHANICAL GAS PIPING PLAN
1/8" = 1'-0"
M-101
U
D A
S
MECHANICAL GAS PIPING PLAN
M-102
GRAPHIC SCALE
KEYED NOTESX
EXISTING UNIT
HEATER
EXISTING UNIT
HEATER
GUH-1
GUH-2
GUH-3
GUH-8
GUH-7
GUH-4
GUH-9
GUH-11
GUH-10
GUH-12
GUH-5
GUH-6
EXISTING GAS VALVE
1. PROVIDE GALVANIZED GAS PIPING PER ASTM A53.
HANGER MATERIAL IN GREENHOUSE MST BE STAINLESS
STEEL OR GALVANIZED. TIE-IN TO EXISTING BLACK PIPE
IN HEADHOUSE AREA. PROVIDE DI-ELECTRIC PIPE
UNIONS WHERE GALVANIZED PIPING CONNECTS TO
EXISTING BLACK PIPE. AFTER ASSEMBLY OF
GALVANIZED PIPE AND FITTINGS, BRUSH A COLD
GALVANIZING COMPOUND ON TO ALL THREADED
CONNECTIONS AND ANYWHERE FACTORY GALVANIZED
COATING IS DAMAGED. COATING SHALL BE EQUAL TO
RUST-OLEUM 7000 SYSTEM, APPLY PER
MANUFACTURER INSTRUCTIONS.
BASE BID
BID OPTION 4
BID OPTION 2
EXISTING 3"
GAS
3"Ø GAS
2-1/2"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
3"Ø GAS
2-1/2"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø GAS
1-1/4"Ø
GAS
1-1/4"Ø GAS
EXISTING 3"
GAS
A
S
DETAILS
M-501
(EF1-EF6: BASE BID) (EF-7 - EF-12 :BID OPTION 2)1
SCALE: NOT TO SCALEM-501
SLANT SIDEWALL FAN DETAIL
(GUH-1 - GUH-6 : BASE BID) (GUH-7 - GUH-12: BID OPTION 2)2
SCALE: NOT TO SCALEM-501
GAS UNIT HEATER DETAIL
· CONSTRUCTED OF HEAVY GAUGE GALVANIZED STEEL
OR ALUMINUM.
· FOR MODEL DC, DCA, FQ AND FN FANS.
· ENERGY SAVINGS – WITH INSIDE SHUTTER SAVES UP
TO 3750 BTU/HR HEAT LOSS PER FAN.
· HIGH FLOW CAPACITY – SHUTTER DIRECTS AIR TO
FAN. SELECT FAN AT .05″ SP. INSTEAD OF .10″.
· WEATHER PROTECTED – SLANT ARRANGEMENT
PROTECTS MOTOR AND DRIVES FROM ELEMENTS.
· OUTSIDE MOUNTING
· ASSEMBLED TO FAN FOR QUICK, EASY FIELD
INSTALLATION.
· INCLUDE 1″ X ½” GUARD ON OUTLET SIDE.
· SHUTTER AND INLET GUARD HELD IN PLACE WITH
QUICK RELEASE CLIPS.
· INCLUDE WIRING KNOCKOUT TO ALLOW ALL WIRING
CONNECTIONS FOR MOTOR TO BE MADE INSIDE THE
BUILDING. FOR FAN APPLICATION.
EVAPORATIVE COOLING DETAIL - (EVAP-1 : BASE BID)3
SCALE: NOT TO SCALEM-501
STANDARD-DUTY INDUSTRIAL WALL-MOUNT FANS
COOL HEAVY MANUFACTURING AREAS AND OTHER
DUSTY OR DIRTY ENVIRONMENTS WHERE FLOOR
SPACE IS LIMITED. COMPARED TO LIGHT-DUTY
INDUSTRIAL FANS, THESE STANDARD-DUTY FANS ARE
MADE OF HEAVIER-GAUGE MATERIALS, HAVE A
HIGHER-HORSEPOWER MOTOR THAT IS TOTALLY
ENCLOSED TO KEEP OUT DEBRIS, AND FEATURE
MORE-ROBUST MOTOR BEARINGS FOR A LONGER LIFE.
STANDARD-DUTY INDUSTRIAL FAN: 12 IN BLADE DIA,
3,005 CFM, 20/1V AC, 1/15 HP MOTOR
NOTES:
1. PVC COATED OSHA GUARD
2. DIRECT DRIVE
3. GALVANIZED ADJUSTABLE MOUNTING BRACKET
4. MOISTURE RESISTANT MOTOR
(HAF-1 - HAF-6 : BASE BID) (HAF-7 - HAF-12 : BID OPTION 2)6
SCALE: NOT TO SCALEM-501
HORIZONTAL AIRFLOW FAN (HAF) DETAIL
PU
M
P
1-1/2" PVC TEE
1-1/2" PVC PIPE
1-1/2" PVC PIPE
1-1/2" PVC BALL
VALVE
1-1/2" PVC PIPE
1-1/2" PVC ELBOW
1-1/2" PVC PIPE
FILTER
REPLACEMENT ELEMENT
1-1/2" PVC PIPE
1-1/2" PVC COMPRESSION
COUPLING
1-1/2" PVC PIPE
PUMP TANK
WATER VALVE NPT
PVC ELBOW
PIPE TO HOSE
ADAPTOR
3" RUBBER CAP
3" PVC PIPE
ALL PORTIONS OF THE FLUE ASSEMBLY
EXPOSED TO WEATHER MUST BE GALVANIZED
OR PAINTED WITH A HEAT RESISTANT
WEATHERPROOF PROTECTIVE PAINT. COLOR
SHALL BE SELECTED BY THE GOVERNMENT.
APPROVED
VENT CAP
SUPPORT UNIT HEATER FROM
STRUCTURE WITH FOUR-POINT
SUSPENSION. COMPLY WITH MFGR'S.
RECOMMENDATIONS.
UNION
SHUT OFF
VALVE
DIRTLEG
GLASS ROOF
GAS MAIN
EXHAUST PIPE
INTAKE PIPE
STORM COLLAR
REPLACE EXISTING GLASS PANEL
WITH METAL FLASHING WHERE FLUE
PENETRATES THROUGH ROOF.
EXHAUST PIPE
UNIT
HEATER
2.75 REF.
.06
1.63
1.38 REF.
.78 1.56
6.13
REF.
1.02
REF.
8-32 THREAD
4 PL
DRAIN HOLE
1.90 REF.
1.50 REF.
1.125±.030
1/2-14 NPSM
THREAD
RUBBER SHIELD
1.63
1.56
.61
.78
8-32 THREAD
4 PL
(LA-1 THRU LA-18 BASE BID) (LA-19 THRU LA-36 BID OPTION 2)5
SCALE: NOT TO SCALEM-501
LOUVER ACTUATOR DETAIL
LOADED SPEED @ 20 IN-LB: 2.8 RPM
LOADED CURRENT @ 20 IN-LB: 0.11/0.07 A
STALL TORQUE: 48/48 IN-LB STALL
CURRENT: 0.14/0.08 A
RATED VOLTAGE: 120/240 VAC, 60 Hz
ROTATION: CW
NO LOAD SPEED: 2.9 RPM
NO LOAD CURRENT: 0.11/0.07 A
LEADS, 1
5" FREE LENGTH
1-BLACK
1-WHITE
1-RED
1-BROWN
1-GREEN
A
S
DETAILS
M-502
DEHUMIDIFICATION UNIT DETAIL DH-11
SCALE: NOT TO SCALEM-502
FRONT VIEW RIGHT SIDE VIEW
LEFT SIDE VIEW
COOLER
PROCESS AIR
INLET
DH-1 DEHUMIDIFICATION UNIT
REINSTALL IN SAME LOCATION
AS EXISTING DEHUMIDIFIER
ACCESS TO DESICCANT WHEEL,
WHEEL DRIVE ASSY., SEALS,
ELECTRICAL CONTROLS,
PROCESS FILTERS, PROCESS
AND REACTIVATION BLOWERS
TIME METER
SELECTOR PANEL
REACTIVATION
FILTER ACCESS
(BOTTOM)
REACTIVATION AIR
INLET 2.625" x 6.25"
REACTIVATION AIR OUTLET 3.5"
O.D. (DETACHABLE FAN GUARD)
POWER
CONNECTION POINT
12.063"
2.812"
7.8
PROCESS AIR OUTLET
4.375" O.D. (DETACHABLE
FAN GUARD)
.34
4"
.56
3"
2.5
17.875" 17" TYP
9" 14.375"
3.4
PROCESS AIR
INLET 3.141" x 13.5"
EXISTING DUCTWORK AND AIR DEVICES TO REMAIN
EXISTING DUCTWORK AND AIR DEVICES TO REMAIN
RE-ACTIVATION
AIR OUTLET
EXTERIOR WALL
61.50"
14-11/16"
-3
/4"
-7
/16
-3
/4"
REFRIGERANT
CONNECTION END
ELECTRICAL
CONNECTION END
AIR FLOW
DRAIN CONNECTION
ACCEPTS 1/2" HANGER ROD
42-3/8" 30-1/4"
-1
/4"
COOLER EVAPORATOR UNIT DETAIL - EVAP-12
SCALE: NOT TO SCALEM-502
CONDENSING UNIT DETAIL - ACCU-13
SCALE: NOT TO SCALEM-502
NOTE: ANCHOR IN ACCORDANCE WITH
MANUFACTURES INSTRUCTIONS AND
APPROVED SHOP DRAWINGS
PROCESS AIR
OUTLET
TAPERED PIPE THREADS
POLYPROPYLENE PLASTIC LINER
ZINC PLATED
TAPERED PIPE THREADS
DIELECTRIC PIPE CONNECTION DETAIL4
SCALE: NOT TO SCALEM-502
A
S
DETAILS
M-503
GABLE MOUNT WEATHER STATION DETAIL1
SCALE: NOT TO SCALEM-503
SECURE
GROUND WIRE
TO GROUND ROD
GROUND ROD
COIL EXTRA CABLE LENGTH
NEAR BOTTOM OF MAST. DO NOT
CUT OFF CABLE. EXTRA LENGTH
WILL BE NEEDED TO SERVICE
WEATHER STATION.
GROUND WIRE
(1) 15/C
(1) 1 PAIR SHIELDED (FOR
LIGHT SENSOR) 100' OF
EACH PROVIDED
2" x 20'-0" OR 2" x 22'-0" SQ.
TUBE
"BY OTHERS"
8" GABLE MTG. BRKT.
24" GABLE MTG. BRKT SECURELY MOUNT TO
GREENHOUSE
STRUCTURE. (TYP. (4)
PER SIDE)
SECURELY MOUNT TO
GREENHOUSE
STRUCTURE.
2" x 10'-4" SQ.
TUBING (SWAGED
END)
GREENHOUSE
ROOF PEAK
TOP OF WEATHER
MAST SHOULD BE
APPROXIMATELY 6'-0"
ABOVE ROOF PEAK
2" x 10'-4" SQ. TUBE
24" MOUNTING BRACKET
THROUGH BOLT TO
GREENHOUSE
WIND DIRECTION
PRECIPITATION
DETECTORLIGHT
SENSORWIND
SPEED
R.H.
SENSOR TEMP.
SENSOR
TO COMPUTER
CONTROL
SYSTEM
THROUGH BOLT TO
GREENHOUSE
8" MOUNTING BRACKET
SWAGED END OF SQ. TUBE
2" x…