Attachment 2 - Drawings.pdf

PDF 20 MB Posted

Attached to
Renovate Headhouse/Greenhouse In El Reno, OK
Solicitation number
1232SA26Q0348
Issued by

About this file

This document is a comprehensive design package for the renovation of Building EC04 at the USDA Agricultural Research Service facility in El Reno, Oklahoma, located at 7207 West Cheyenne Street. The project involves renovation of a headhouse, two greenhouses (west and east), and associated infrastructure serving research facilities.

The Base Bid scope includes: removal and installation of overhead door seals and safety edges on three doors; repair of bollards with new sleeves/covers; installation of a new water treatment system (reverse osmosis with pre-treatment); installation of two new safety showers; removal and replacement of evaporative cooling pads, sidewall exhaust fans, and gas unit heaters with galvanized gas lines in the west greenhouse; replacement of axial circulation fans with horizontal airflow fans; new louver actuators for sidewall intake louvers; new motor/operators for ridge vents; new personnel doors; repair of approximately 15% of glazing system; removal of shading fabric; new electrical distribution and greenhouse ventilation/lighting controls; plumbing repairs (approximately 20%); cleaning and flushing of trench drains and plumbing lines to lift station; new automatic watering system with irrigation controllers; and gable mount weather station for the west greenhouse. Bid Option 1 adds grow lights and shading fabric for the west greenhouse. Bid Option 2 extends the Base Bid scope to the east greenhouse with matching improvements. Bid Option 3 includes removal and replacement of the generator system and automatic transfer switch. Bid Option 4 provides LED lighting fixtures throughout the headhouse and new HVAC equipment including a ductless split system in the growth chamber and seed cooler refrigerant system. A pre-renovation asbestos and lead-based paint inspection conducted January 7, 2025, identified no hazardous materials. The design documents include architectural, mechanical, plumbing, and electrical plans with detailed schedules and specifications prepared under A-E Contract No. 12805B23D0001, Task Order No. 12805B25F0010.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL RENO HH/GH EC04 RENOVATION DESIGN

AGRICULTURAL RESEARCH SERVICE

U.S. DEPARTMENT OF AGRICULTURE

LOCATION MAPVICINITY MAP

A. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR

TO PERFORMING WORK OR FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND

ASSEMBLIES. ANY DEVIATIONS SHALL BE BROUGHT TO THE CONTRACTING OFFICER'S

ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION,

OR EQUIPMENT PURCHASE.

B. THE CONTRACTOR SHALL REPAIR ALL EXISTING CONSTRUCTION TO REMAIN THAT HAS BEEN

DAMAGED BY THE DEMOLITION, DECONSTRUCTION, OR NEW CONSTRUCTION AS SPECIFIED IN

SPECIFICATION SECTION 02 41 00.

BUILDING EC04

7207 WEST CHEYENNE STREET

EL RENO, OK 73036

BUILDING EC04

GENERAL NOTES

BUILDING EC04

7207 W CHEYENNE STREET

EL RENO, OK

A-E CONTRACT NO.: 12805B23D0001

A-E TASK ORDER NO.: 12805B25F0010

U

D A

S

COVER SHEET

G-101

ALTUS

GUYMON

STILLWATER

OKLAHOMA CITY

EL RENO

LOCATION

PROJECT

TULSA

HEADHOUSE

W

ES

T G

R

EE

N H

O U

SE

EA

ST

G R

EE

N

H O

U

SE

LEGEND

BASE BID

BID OPTION 1

BID OPTION 2

BID OPTION 3

BID OPTION 4

GROWTH

CHAMBER

SEED

STOR.

DRAWING NO.

DRAWING INDEX

SHEET NO. TITLE

COVER SHEET

DRAWING INDEX & PROJECT DESCRIPTION

DEMO FLOOR PLAN

DEMO REFLECTED CEILING PLAN

DEMO GREENHOUSE ELEVATIONS

DEMO HEADHOUSE ELEVATIONS

NEW FLOOR PLAN

NEW REFLECTED CEILING PLAN

NEW GREENHOUSE ELEVATIONS

NEW HEADHOUSE ELEVATIONS

DOOR DETAILS AND SCHEDULE

ABBREVIATIONS AND LEGEND

DEMO PLAN PLUMBING

PLUMBING PLAN

DETAILS

PLUMBING EQUIPMENT SCHEDULES

ABBREVIATIONS AND LEGEND

DEMO PLAN MECHANICAL

MECHANICAL PLAN

MECHANICAL GAS PIPING PLAN

DETAILS

DETAILS

DETAILS

HVAC EQUIPMENT SCHEDULES

HVAC CONTROLS

GENERAL NOTES & ABBREVIATIONS

LEGEND

POWER DEMOLITION PLAN

EQUIPMENT POWER DEMOLITION PLAN

LIGHTING DEMOLITION PLAN

OVERALL FLOOR PLAN

POWER PLAN - OVERALL

LIGHTING PLAN - PART A

LIGHTING PLAN - PART B

LIGHTING SCHEDULE & CALCULATIONS

MECHANICAL CONNECTIONS - OVERALL

MECHANICAL SCHEDULE

POWER RISER

PANEL SCHEDULES

POWER SCHEDULE

G-101

G-102

AD101

AD131

AD201

AD202

A-101

A-131

A-201

A-202

A-501

P-001

PD101

P-101

P-501

P-601

M-001

MD101

M-101

M-102

M-501

M-502

M-503

M-601

M-701

E-001

E-002

ED101

ED102

ED103

E-100

E-101

E-201

E-202

E-210

E-301

E-310

E-601

E-602

E-603

U

D A

S

DRAWING INDEX & PROJECT DESCRIPTION

G-102

PROJECT DESCRIPTION

THE WORK TO INCLUDE THE FOLLOWING, BUT NOT LIMITED TO:

BASE BID:

HEADHOUSE:

· REMOVE EXISTING AND PROVIDE OVERHEAD DOOR SEALS AND SAFETY EDGES.

· REPAIR BOLLARDS AND PROVIDE BOLLARD SLEEVE/COVERS.

· REMOVE EXISTING AND PROVIDE WATER TREATMENT SYSTEM (REVERSE OSMOSIS AND PRE-TREATMENT).

· REMOVE AND PROVIDE (2) SAFETY SHOWERS.

WEST GREENHOUSE:

· REMOVE EXISTING AND PROVIDE EVAPORATIVE COOLING PAD (ECP).

· REMOVE EXISTING AND PROVIDE SIDEWALL EXHAUST FANS (EF).

· REMOVE EXISTING AND PROVIDE GAS UNIT HEATERS (GUH) AND GALVANIZED GAS LINES.

· REMOVE AXIAL CIRCULATION FANS. PROVIDE HORIZONTAL AIRFLOW FANS (HAF).

· REMOVE EXISTING AND PROVIDE LOUVER ACTUATOR (LA) FOR SIDEWALL INTAKE LOUVERS AT

EVAPORATIVE COOLING PAD (ECP).

· REMOVE EXISTING AND PROVIDE MOTOR/OPERATORS FOR RIDGE VENTS.

· REMOVE EXISTING AND PROVIDE PERSONNEL DOORS.

· REPAIR GLAZING SYSTEM (APPROXIMATELY 15%).

· REMOVE EXISTING SHADING FABRIC FROM EXISTING (REMAINING) SHADE SYSTEM.

· REMOVE EXISTING AND PROVIDE ELECTRICAL DISTRIBUTION.

· REMOVE EXISTING AND PROVIDE GREENHOUSE VENTILATION AND LIGHTING CONTROLS.

· REPAIR PLUMBING LINES (APPROXIMATELY 20%).

· CLEAN AND FLUSH TRENCH DRAINS AND PLUMBING LINE TO LIFT STATION.

· REMOVE EMERGENCY SHOWER AND EYE WASH STATION.

· FLUSH AND WASTE STREAMS FROM REVERSE OSMOSIS SYSTEM AND WATER SOFTENERS TO BE PIPED TO

THE GREENHOUSE TRENCH DRAIN.

· PROVIDE AUTOMATIC WATERING SYSTEM WITH WATERING OPTIONS.

· PROVIDE GABLE MOUNT WEATHER STATION (WEST GREENHOUSE ONLY).

BID OPTION 1:

· REMOVE AND PROVIDE GROW LIGHTS IN WEST GREENHOUSE.

· PROVIDE SHADING FABRIC ON EXISTING SHADE SYSTEM IN WEST GREENHOUSE.

BID OPTION 2:

· REPAIR EAST GREENHOUSE (MATCH SCOPE FOR BASE BID OF WEST GREENHOUSE AND BID OPTION 1

EXCEPT FOR WEATHER STATION).

BID OPTION 3:

· REMOVE AND REPLACE GENERATOR SYSTEM AND AUTOMATIC TRANSFER SWITCH (ATS).

BID OPTION 4:

· REMOVE EXISTING AND PROVIDE LIGHTS (HEADHOUSE).

· REMOVE EXISTING AND PROVIDE DUCTLESS SPLIT SYSTEM IN GROWTH CHAMBER (HEADHOUSE).

· REMOVE EXISTING AND PROVIDE SEED COOLER REFRIGERANT SYSTEM (CONDENSER, EVAPORATOR AND

DEHUMIDIFIER) (HEADHOUSE).

A PRE-RENOVATION ASBESTOS AND

LEAD-CONTAINING PAINT INSPECTION WAS

CONDUCTED BY TERRACON ON JANUARY 7, 2025.

NO ASBESTOS OR LEAD BASED PAINT WAS

IDENTIFIED. SEE THE REPORT ATTACHED TO THE

SPECIFICATIONS.

ENVIRONMENTAL NOTE

B C E G

A

A

K M P Q

A

D F H J L N R

GROWTH

CHAMBER

PREP

ROOM

MECH

TOILET

ELEC

CORR.

FOYER

PREP

ROOM

WORK

AREA

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

114A

113C 113A 113B

112C 112A 112B

112D

111A

111C 117D

111F

115B115A

116A 116B

117A 117B

116C

117C

JAN.

5 5

AD101

AD101

AD201

AD201

AD201

AD201

AD201

AD201

8 13

30'-9" +/- WEST GREENHOUSE 30'-9" +/- EAST GREENHOUSE

8'

-4

'-9

95'-8 1/2" +/-

TYP.

TYP.

AD101

AD101

TYP.

TYP.

SEED

STOR.

WALK-IN

COOLER

114B

REMOVE EXISTING FAN

AND HOUSING. SEE

MECHANICAL AND

ELECTRICAL FOR

MORE INFORMATION.

REMOVE EXISTING

EVAPORATIVE COOLING

PAD SYSTEM. SEE

MECHANICAL AND

ELECTRICAL FOR MORE

INFORMATION.

EXISTING STRUCTURE

TO REMAIN

EXISTING STRUCTURE

TO REMAIN

EXISTING LOUVER

SYSTEM TO REMAIN.

REMOVE LOUVER

OPERATORS. SEE

MECHANICAL AND

ELECTRICAL FOR

MORE INFORMATION.

INTERIOREXTERIOR

INTERIOR EXTERIOR

SCALE:

BUILDING EC04

DEMO FLOOR PLAN

1/8" = 1'-0"

AD101

U

D A

S

DEMO FLOOR PLAN

AD101

GENERAL NOTES

GRAPHIC SCALE

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS PRIOR

TO PERFORMING ANY WORK OR FABRICATION

OR PURCHASE OF EQUIPMENT, MATERIALS,

AND ASSEMBLIES. ANY DEVIATIONS SHALL BE

BROUGHT TO THE CONTRACTING OFFICER'S

ATTENTION FOR RESOLUTION BEFORE

PROCEEDING WITH ANY CONSTRUCTION,

FABRICATION, OR EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION SHALL

BE REINSTALLED IN THE WORK OR CAPPED AND

TERMINATED IN ACCORDANCE WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL EXISTING

CONSTRUCTION TO REMAIN THAT HAS BEEN

DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION AS

SPECIFIED IN SPECIFICATION SECTION 02 41 00.

08' 8'

1'-0"

4'

SCALE: 1/8" =

KEYED NOTESX

1. REMOVE ALL SEALS AND SAFETY EDGES AT

OVERHEAD DOORS (3 TOTAL). PREP DOORS FOR

NEW SEALS AND SAFETY EDGES.

2. REMOVE ALL CAULK/SEALANT AT EXTERIOR WALL

PENETRATIONS AT HEADHOUSE. PREP AND

CLEAN FOR NEW SEALANT.

3. CUT GROUT FLUSH WITH TOP OF STEEL BOLLARD.

4. CONTRACTOR MUST REMOVE/REPLACE

APPROXIMATELY 15% OF THE WEST

GREENHOUSE GLAZING SYSTEM ROOF AND

WALLS (EXTERIOR AND INTERIOR). DAMAGED

AREAS MUST BE IDENTIFIED BY CONTRACTOR

WITH APPROVAL FROM CONTRACTING OFFICER

BEFORE BEGINNING WORK. THIS REPAIR

INCLUDES ALL BROKEN OR DAMAGED GLASS TO

BE REPLACED, PANES OF GLASS THAT HAVE

SHIFTED MUST BE REMOVED AND PROPERLY

REINSTALLED. ALUMINUM COMPRESSION BARS

MUST BE REPLACED AND NEW CAULKING

PROVIDED. REPAIR THE SYSTEM WITH SIMILAR

MATERIALS AND CONSTRUCTION OF THE

EXISTING SYSTEM.

5. REMOVE ALL DOORS, FRAMES, AND HARDWARE

AT WEST GREENHOUSE (9 TOTAL).

6. REMOVE EXISTING EMERGENCY SHOWER AND

EYE WASH. SEE PLUMBING.

7. REMOVE EXISTING EXHAUST FAN FOR WEST

GREENHOUSE. SEE MECHANICAL FOR MORE

INFORMATION.

8. REMOVE EXISTING SHADING FABRIC FROM

MANUAL SHADING SYSTEM. MANUAL SHADING

SYSTEM TO REMAIN.

9. BID OPTION 2: CONTRACTOR MUST

REMOVE/REPLACE APPROXIMATELY 15% OF THE

EAST GREENHOUSE GLAZING SYSTEM ROOF AND

WALLS (EXTERIOR AND INTERIOR). DAMAGED

AREAS MUST BE IDENTIFIED BY CONTRACTOR

WITH APPROVAL FROM CONTRACTING OFFICER

BEFORE BEGINNING WORK. THIS REPAIR

INCLUDES ALL BROKEN OR DAMAGED GLASS TO

BE REPLACED, PANES OF GLASS THAT HAVE

SHIFTED MUST BE REMOVED AND PROPERLY

REINSTALLED. ALUMINUM COMPRESSION BARS

MUST BE REPLACED AND NEW CAULKING

PROVIDED. REPAIR THE SYSTEM WITH SIMILAR

MATERIALS AND CONSTRUCTION OF THE

EXISTING SYSTEM.

10. BID OPTION 2: REMOVE ALL DOORS, FRAMES, AND

HARDWARE AT EAST GREENHOUSE (9 TOTAL).

11. BID OPTION 2: REMOVE EXISTING EXHAUST FAN

FOR EAST GREENHOUSE. SEE MECHANICAL FOR

MORE INFORMATION.

12. BID OPTION 2: REMOVE EXISTING EMERGENCY

SHOWER AND EYE WASH. SEE PLUMBING.

13. BID OPTION 2: REMOVE EXISTING SHADING

FABRIC FROM MANUAL SHADING SYSTEM.

14. EXISTING TRENCH DRAINS TO REMAIN (SEE

PLUMBING).

15. EXISTING EVAPORATIVE COOLING WALL SYSTEM.

SEE MECHANICAL AND 3/AD101.

16. SEE MECHANICAL AND ELECTRICAL FOR

CONTROLS, CONTACTORS, AND PANELS.

SCALE:

GREENHOUSE

DEMO WALL SECTION

1" = 1'-0"

AD101

SCALE:

GREENHOUSE

DEMO WALL SECTION

1" = 1'-0"

AD101

01' 1'

1'-0"SCALE: 1" =

A

D F H J L N R

TYP.

1 TYP.

TYP.

TYP.

SCALE:

BUILDING EC04

DEMO REFLECTED CEILING PLAN

1/8" = 1'-0"

AD131

U

D A

S

DEMO REFLECTED CEILING PLAN

AD131

GENERAL NOTES

GRAPHIC SCALE

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

08' 8'

1'-0"

4'

SCALE: 1/8" =

KEYED NOTESX

1. BID OPTION 4: REMOVE ALL EXISTING LIGHTS

IN HEADHOUSE. SEE ELECTRICAL.

2. EXISTING UNIT HEATER TO REMAIN.

3. REMOVE EXISTING LIGHT FIXTURES IN WEST

GREENHOUSE. SEE ELECTRICAL.

4. BID OPTION 2: REMOVE EXISTING LIGHT

FIXTURES IN EAST GREENHOUSE. SEE

ELECTRICAL.

5. GROW LIGHTS NOT SHOWN FOR CLARITY.

SEE ELECTRICAL FOR WORK TO BE

PERFORMED.

6. EXISTING EXHAUST FANS TO REMAIN.

LEGEND

LIGHT FIXTURES

24" X 24" ACOUSTICAL

CEILING TILE

MECHANICAL

EQUIPMENT

2 2 2

2 2 2

3 3 3

EXISTING LOUVERS

TO REMAIN; TYP.

AP

PR

O X.

7 7EXISTING HEADHOUSE

EXISTING HEADHOUSE

5 5 56 6 6

5 5 5 EXISTING LOUVERS

TO REMAIN; TYP.

AP

PR

O X.

8 8

8 8

EXISTING HEADHOUSE

EXISTING HEADHOUSE

SCALE:

WEST GREENHOUSE

DEMO WEST ELEVATION

1/8" = 1'-0"

AD201

U

D A

S

DEMO GREENHOUSE ELEVATIONS

AD201

GENERAL NOTES

GRAPHIC SCALE

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

08' 8'

1'-0"

4'

SCALE: 1/8" =

KEYED NOTESX

1. CONTRACTOR MUST REMOVE/REPLACE

APPROXIMATELY 15% OF THE WEST

GREENHOUSE GLAZING SYSTEM ROOF AND

WALLS (EXTERIOR AND INTERIOR). THIS

REPAIR INCLUDES ALL BROKEN OR DAMAGED

GLASS TO BE REPLACED, PANES OF GLASS

THAT HAVE SHIFTED MUST BE REMOVED AND

PROPERLY REINSTALLED. ALUMINUM

COMPRESSION BARS MUST BE REPLACED

AND NEW CAULKING PROVIDED. REPAIR THE

SYSTEM WITH SIMILAR MATERIALS AND

CONSTRUCTION OF THE EXISTING SYSTEM.

2. REMOVE ALL DOORS, FRAMES, AND

HARDWARE AT WEST GREENHOUSE.

3. REMOVE EXISTING FANS. SEE MECHANICAL

FOR MORE INFORMATION.

4. BID OPTION 2: CONTRACTOR MUST

REMOVE/REPLACE APPROXIMATELY 15% OF

THE EAST GREENHOUSE GLAZING SYSTEM

ROOF AND WALLS (EXTERIOR AND INTERIOR).

THIS REPAIR INCLUDES ALL BROKEN OR

DAMAGED GLASS TO BE REPLACED, PANES

OF GLASS THAT HAVE SHIFTED MUST BE

REMOVED AND PROPERLY REINSTALLED.

ALUMINUM COMPRESSION BARS MUST BE

REPLACED AND NEW CAULKING PROVIDED.

REPAIR THE SYSTEM WITH SIMILAR

MATERIALS AND CONSTRUCTION OF THE

EXISTING SYSTEM.

5. BID OPTION 2: REMOVE ALL DOORS, FRAMES,

AND HARDWARE AT EAST GREENHOUSE.

6. BID OPTION 2: REMOVE EXISTING FANS. SEE

MECHANICAL FOR MORE INFORMATION.

7. REMOVE EXISTING UNIT HEATER FLU

STACKS. REPLACE WITH GLASS PANE TO

MATCH EXISTING.

8. BID OPTION 2: REMOVE EXISTING UNIT

HEATER FLU STACKS. REPLACE WITH GLASS

PANE TO MATCH EXISTING.

SCALE:

WEST GREENHOUSE

DEMO SOUTH ELEVATION

1/8" = 1'-0"

AD201

SCALE:

WEST GREENHOUSE

DEMO EAST ELEVATION

1/8" = 1'-0"

AD201

SCALE:

EAST GREENHOUSE

DEMO WEST ELEVATION

1/8" = 1'-0"

AD201 SCALE:

EAST GREENHOUSE

DEMO SOUTH ELEVATION

1/8" = 1'-0"

AD201

SCALE:

EAST GREENHOUSE

DEMO EAST ELEVATION

1/8" = 1'-0"

AD201

SCALE:

DEMO ELEVATIONS

NOT TO SCALE

AD202

U

D A

S

DEMO HEADHOUSE ELEVATIONS

AD202

GENERAL NOTES

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

KEYED NOTESX

SCALE:

HEADHOUSE

DEMO ELEVATIONS

NOT TO SCALE

AD202

SCALE:

HEADHOUSE

DEMO ELEVATIONS

NOT TO SCALE

AD202 SCALE:

HEADHOUSE

DEMO ELEVATIONS

NOT TO SCALE

AD202 SCALE:

HEADHOUSE

DEMO ELEVATIONS

NOT TO SCALE

AD202

1. REMOVE ALL SEALS AND SAFETY EDGES AT

OVERHEAD DOORS (3 TOTAL). PREP DOORS FOR

NEW SEALS AND SAFETY EDGES.

2. REMOVE ALL CAULK/SEALANT AT EXTERIOR

WALL PENETRATIONS AT HEADHOUSE. PREP

AND CLEAN FOR NEW SEALANT.

3. CUT GROUT FLUSH WITH TOP OF STEEL

BOLLARD.

TYP.

TYP.

TYP.

TYP.

TYP.

A

A

K M P Q

A

D F H J L N R

GROWTH

CHAMBER

PREP

ROOM

MECH

TOILET

ELEC

CORR.

FOYER

SEED

STOR.

WALK-IN

COOLER

PREP

ROOM

WORK

AREA

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

114A

113C113A 113B

112C 112A 112B

112D

111A

111C 117D

111F

115B115A

116A 116B

117A 117B

116C

117C

JAN.

30'-9" +/- WEST GREENHOUSE 30'-9" +/- EAST GREENHOUSE

5 5

A-201

A-201

A-201

A-201

A-201

A-201

A-101

A-101

8'

-4

'-9

95'-8 1/2" +/-

A-101

A-101

TYP.

TYP.

TYP.

TYP.

114B

PROVIDE EXHAUST

FAN AND HOOD. SEE

MECHANICAL AND

ELECTRICAL FOR

MORE INFORMATION.

PROVIDE EVAPORATIVE

COOLING PAD SYSTEM.

SEE MECHANICAL AND

ELECTRICAL FOR MORE

INFORMATION.

EXISTING STRUCTURE

TO REMAIN.

EXISTING STRUCTURE

TO REMAIN.

EXISTING LOUVER

SYSTEM TO REMAIN.

PROVIDE LOUVER

OPERATORS. SEE

MECHANICAL AND

ELECTRICAL FOR

MORE INFORMATION.

INTERIOREXTERIOR

INTERIOR EXTERIOR

SCALE:

BUILDING EC04

NEW FLOOR PLAN

1/8" = 1'-0"

A-101

U

D A

S

NEW FLOOR PLAN

A-101

GENERAL NOTES

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

GRAPHIC SCALE

08' 8'

1'-0"

4'

SCALE: 1/8" =

KEYED NOTESX

1. PROVIDE SEALS AND SAFETY EDGES AT

OVERHEAD DOORS (3 TOTAL).

2. PROVIDE CAULK/SEALANT AT ALL EXTERIOR

WALL PENETRATIONS AT HEADHOUSE.

3. PROVIDE FULL LENGTH HIGH-DENSITY

POLYETHYLENE BOLLARD COVER (YELLOW).

4. CONTRACTOR MUST PROVIDE GLAZING

(APPROXIMATELY 15%) FOR THE WEST

GREENHOUSE ROOF AND WALLS (EXTERIOR

AND INTERIOR). PROVIDE ALUMINUM

COMPRESSION BARS AND NEW CAULKING.

REPAIR THE SYSTEM WITH SIMILAR MATERIALS

AND CONSTRUCTION OF THE EXISTING

SYSTEM. GLAZING MUST BE MINIMUM 1/8"

THICK TEMPERED GLASS.

5. PROVIDE DOORS, FRAMES, AND HARDWARE AT

WEST GREENHOUSE (9 TOTAL).

6. PROVIDE EXHAUST FAN FOR WEST

GREENHOUSE. SEE MECHANICAL FOR MORE

INFORMATION.

7. BID OPTION 1:PROVIDE SHADING FABRIC ON

EXISTING MANUAL SHADING SYSTEM.

8. BID OPTION 2: CONTRACTOR MUST PROVIDE

GLAZING (APPROXIMATELY 15%) FOR THE EAST

GREENHOUSE ROOF AND WALLS (EXTERIOR

AND INTERIOR). PROVIDE ALUMINUM

COMPRESSION BARS AND NEW CAULKING.

REPAIR THE SYSTEM WITH SIMILAR MATERIALS

AND CONSTRUCTION OF THE EXISTING

SYSTEM. GLAZING MUST BE MINIMUM 1/8"

THICK TEMPERED GLASS.

9. BID OPTION 2: PROVIDE DOORS, FRAMES, AND

HARDWARE AT EAST GREENHOUSE (9 TOTAL).

10. BID OPTION 2: PROVIDE EXHAUST FAN FOR

EAST GREENHOUSE. SEE MECHANICAL FOR

MORE INFORMATION.

11. BID OPTION 2: PROVIDE SHADING FABRIC ON

EXISTING MANUAL SHADING SYSTEM.

12. EXISTING TRENCH DRAINS TO REMAIN (SEE

PLUMBING).

13. EXISTING EVAPORATIVE COOLING WALL

SYSTEM. SEE MECHANICAL AND 3/A-101.

14. SEE MECHANICAL AND ELECTRICAL FOR

CONTROLS, CONTACTORS, AND PANELS.

SCALE:

GREENHOUSE

WALL SECTION

1" = 1'-0"

A-101

SCALE:

GREENHOUSE

WALL SECTION

1" = 1'-0"

A-101

01' 1'

1'-0"SCALE: 1" =

A

D F H J L N R

1 1

1 1

SCALE:

BUILDING EC04

NEW REFLECTED CEILING PLAN

1/8" = 1'-0"

A-131

U

D A

S

NEW REFLECTED CEILING PLAN

A-131

GENERAL NOTES

GRAPHIC SCALE

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

08' 8'

1'-0"

4'

SCALE: 1/8" =

KEYED NOTESX

1. BID OPTION 4: PROVIDE LED LIGHT FIXTURES

IN HEADHOUSE. SEE ELECTRICAL FOR MORE

INFORMATION.

2. EXISTING UNIT HEATER TO REMAIN.

3. PROVIDE LIGHT FIXTURES IN WEST

GREENHOUSE. SEE ELECTRICAL FOR MORE

INFORMATION.

4. BID OPTION 2: PROVIDE LIGHT FIXTURES IN

EAST GREENHOUSE. SEE ELECTRICAL FOR

MORE INFORMATION.

5. GROW LIGHTS NOT SHOWN FOR CLARITY.

SEE ELECTRICAL FOR WORK TO BE

PERFORMED.

6. EXISTING EXHAUST FANS TO REMAIN.

LEGEND

LIGHT FIXTURES

24" X 24" ACOUSTICAL

CEILING TILE

MECHANICAL

EQUIPMENT

2 2 2

2 2 2

3 3 3

EXISTING LOUVERS

TO REMAIN; TYP.

AP

PR

O X.

7 7

7 7

7 7

EXISTING HEADHOUSE

EXISTING HEADHOUSE

5 5 56 6 6

5 5 5 EXISTING LOUVERS

TO REMAIN; TYP.

AP

PR

O X.

8 88

8 8

EXISTING HEADHOUSE

EXISTING HEADHOUSE

SCALE:

WEST GREENHOUSE

NEW WEST ELEVATION

1/8" = 1'-0"

A-201

U

D A

S

NEW GREENHOUSE ELEVATIONS

A-201

GENERAL NOTES

GRAPHIC SCALE

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

08' 8'

1'-0"

4'

SCALE: 1/8" =

KEYED NOTESX

1. CONTRACTOR MUST PROVIDE GLAZING

(APPROXIMATELY 15%) FOR THE WEST

GREENHOUSE ROOF AND WALLS (EXTERIOR

AND INTERIOR). PROVIDE ALUMINUM

COMPRESSION BARS AND NEW CAULKING.

REPAIR THE SYSTEM WITH SIMILAR

MATERIALS AND CONSTRUCTION OF THE

EXISTING SYSTEM. GLAZING MUST BE

MINIMUM 1/8" THICK TEMPERED GLASS.

2. PROVIDE DOORS, FRAMES, AND HARDWARE

AT WEST GREENHOUSE.

3. PROVIDE FANS. SEE MECHANICAL FOR MORE

INFORMATION.

4. BID OPTION 2: CONTRACTOR MUST PROVIDE

GLAZING (APPROXIMATELY 15%) FOR THE

EAST GREENHOUSE ROOF AND WALLS

(EXTERIOR AND INTERIOR). PROVIDE

ALUMINUM COMPRESSION BARS AND NEW

CAULKING. REPAIR THE SYSTEM WITH

SIMILAR MATERIALS AND CONSTRUCTION OF

THE EXISTING SYSTEM. GLAZING MUST BE

MINIMUM 1/8" THICK TEMPERED GLASS.

5. BID OPTION 2: PROVIDE DOORS, FRAMES,

AND HARDWARE AT EAST GREENHOUSE.

6. BID OPTION 2: PROVIDE FANS. SEE

MECHANICAL FOR MORE INFORMATION.

7. PROVIDE FLU STACK TO GAS UNIT HEATER

PER GREENHOUSE MANUFACTURER'S

WRITTEN RECOMMENDATIONS.

8. BID OPTION 2: PROVIDE FLU STACK TO GAS

UNIT HEATER PER GREENHOUSE

MANUFACTURER'S WRITTEN

RECOMMENDATIONS.

9. PROVIDE GABLE MOUNT WEATHER STATION.

SEE MECHANICAL.

SCALE:

WEST GREENHOUSE

NEW SOUTH ELEVATION

1/8" = 1'-0"

A-201

SCALE:

WEST GREENHOUSE

NEW EAST ELEVATION

1/8" = 1'-0"

A-201

SCALE:

EAST GREENHOUSE

NEW WEST ELEVATION

1/8" = 1'-0"

A-201 SCALE:

EAST GREENHOUSE

NEW SOUTH ELEVATION

1/8" = 1'-0"

A-201

SCALE:

EAST GREENHOUSE

NEW EAST ELEVATION

1/8" = 1'-0"

A-201

SCALE:

NEW ELEVATIONS

NOT TO SCALE

A-202

U

D A

S

NEW HEADHOUSE ELEVATIONS

A-202

GENERAL NOTES

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

KEYED NOTESX

SCALE:

HEADHOUSE

NEW ELEVATIONS

NOT TO SCALE

A-202

SCALE:

HEADHOUSE

NEW ELEVATIONS

NOT TO SCALE

A-202 SCALE:

HEADHOUSE

NEW ELEVATIONS

NOT TO SCALE

A-202 SCALE:

HEADHOUSE

NEW ELEVATIONS

NOT TO SCALE

A-202

1. PROVIDE SEALS AND SAFETY EDGES AT

OVERHEAD DOORS (3 TOTAL).

2. PROVIDE CAULK/SEALANT AT ALL EXTERIOR

WALL PENETRATIONS AT HEADHOUSE.

3. PROVIDE FULL LENGTH HIGH-DENSITY

POLYETHYLENE BOLLARD COVER (YELLOW).

TYP.

TYP.

TYP.

TYP.TYP.

DOOR AND FRAME SCHEDULE

DOOR FRAME HARDWARE

SET NOTES

NUMBER MARK WD HGT THK MTL FINISH MTL FINISH

111A -- 8'-0" 10'-0" -- -- -- -- -- -- PROVIDE SEALS AND

SAFETY EDGES.

111C -- 8'-0" 10'-0" -- -- -- -- -- -- PROVIDE SEALS AND

SAFETY EDGES.

111F -- 8'-0" 10'-0" -- -- -- -- -- -- PROVIDE SEALS AND

SAFETY EDGES.

112A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

112B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

112C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

112D A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

113A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

113B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

113C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

114A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

114B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 --

115A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

115B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

116A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

116B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

116C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

117A A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

117B A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

117C A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

117D A 3'-0" 7'-0" 1 3/4" FRP PAINT FRP PAINT HW-1 BID OPTION 2

MARK A

3'-4"

7' -2

2" 3'

2"

2" 7'

LEGEND

FRP FIBERGLASS REINFORCED POLYMER

HEAD

JAMB

METAL FRAME DOOR AS SCHEDULED

EDGE OF

CONCRETE

CURB BELOW

EXISTING 'C'

CHANNEL

EXISTING

DRIP EDGE

EXISTING

METAL PANEL

METAL FRAME

DOOR AS SCHEDULED

EXISTING 'C'

CHANNEL

EXISTING

METAL PANEL

DOOR AS SCHEDULED

CONCRETE CURB

EXISTING

FOUNDATION THRESHOLD SET IN

BED OF SEALANT

W/MIN. (3) 1/4" DIA.

ANCHORS

DOOR SWEEP

RAIN DRIP

SILL

SEALANT

2"

JAMB ANCHOR

U

D A

S

DOOR DETAILS AND SCHEDULE

A-501

GENERAL NOTES

A. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO PERFORMING ANY WORK OR

FABRICATION OR PURCHASE OF EQUIPMENT,

MATERIALS, AND ASSEMBLIES. ANY

DEVIATIONS SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION FOR

RESOLUTION BEFORE PROCEEDING WITH

ANY CONSTRUCTION, FABRICATION, OR

EQUIPMENT PURCHASE.

B. ALL UTILITIES AFFECTED BY DEMOLITION

SHALL BE REINSTALLED IN THE WORK OR

CAPPED AND TERMINATED IN ACCORDANCE

WITH CODES.

C. CONTRACTOR SHALL PROVIDE TEMPORARY

STRUCTURAL SUPPORTS FOR EXISTING

CONSTRUCTION DURING THE WORK.

D. THE CONTRACTOR SHALL REPAIR ALL

EXISTING CONSTRUCTION TO REMAIN THAT

HAS BEEN DAMAGED BY THE DEMOLITION,

DECONSTRUCTION, OR NEW CONSTRUCTION

AS SPECIFIED IN SPECIFICATION SECTION 02

41 00.

SCALE:

DOOR DETAILS

1-1/2" = 1'-0"

A-501

U

D A

S

ABBREVIATIONS AND LEGEND

P-001

PLUMBING LEGEND

DOMESTIC COLD WATER

PLUMBING ABBREVIATIONS

1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL DIMENSIONS

PRIOR TO FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DEVIATIONS MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION, OR EQUIPMENT

PURCHASE.

2. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS (DO NOT SCALE FOR LOCATIONS). THE CONTRACTOR WILL PROVIDE A COMPLETE AND FUNCTIONAL PLUMBING SYSTEM AS INDICATED WITH ALL NECESSARY

EQUIPMENT, APPURTENANCES AND CONTROLS AS INDICATED.

3. REMOVE AND CAP CONNECTING UTILITIES (WATER, DRAINAGE, POWER, GAS, ETCETERA) AS INDICATED OR NECESSARY FOR FUTURE

RECONNECTION.

4. THE CONTRACTOR MUST EMPLOY WORKMEN WHO ARE TRAINED AND EXPERIENCED IN NECESSARY SKILLS TO PERFORM PLUMBING AND

PLUMBING DEMOLITION WORK.

5. THE CONTRACTOR MUST USE APPROPRIATE TOOLS AND MUST NOT IMPART EXCESSIVE VIBRATIONS TO THE EXISTING STRUCTURE OR

OTHER BUILDING COMPONENTS.

6. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ANY ADDITIONAL EXPENSE TO THE OWNER. THE

CONTRACTOR WILL PROVIDE COORDINATION DRAWINGS OF TRADES.

7. ALL NEW & DEMOLISHED PIPING PENETRATIONS TO ANY BUILDING ENVELOPE MUST BE FULLY SEALED WATER TIGHT.

8. THE CONTRACTOR MUST FIELD VERIFY EXACT LOCATIONS AND POINTS OF CONNECTIONS TO THE EXISTING UTILITIES (DOMESTIC WATER

& SANITARY SEWER, NATURAL GAS, ETCETERA).

9. REFER TO SPECIFICATIONS, SHEET NOTES, DETAILS AND SCHEDULES FOR ADDITIONAL REQUIREMENTS PERTAINING TO THE PLUMBING

WORK.

10. ALL WORK (MATERIALS, EQUIPMENT, DEVICES, COMPONENTS, SYSTEMS, SUPPORTS, ETCETERA) MUST COMPLY WITH THE

REQUIREMENTS OF ALL CODES, CODE AMENDMENTS, AND ORDINANCES AS USED, ADOPTED AND/OR ENFORCED BY THE LOCAL JURISDICTION, COUNTY AND STATE IN WHICH THE PROJECT IS LOCATED. WHERE INSPECTIONS ARE REQUIRED BY COR, WORK MUST NOT BE CONCEALED UNTIL INSPECTIONS AND TESTS ARE COMPLETED AND ACCEPTED. REFER TO SPECIFICATIONS FOR APPLICABLE CODES.

11. SCHEDULES, NOTES OR SPECIFICATIONS MAY REFERENCE "BASIS OF DESIGN" INFORMATION REGARDING A SPECIFIC MANUFACTURER OR MODEL NUMBER. SUCH INFORMATION IS PROVIDED SO AS TO ESTABLISH A STANDARD OF PERFORMANCE, QUALITY, FEATURES AND OPTIONS (SEE SCHEDULES AND SPECIFICATIONS). THE INTENT IS NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT OF OTHER MANUFACTURERS MUST BE ACCEPTABLE PROVIDED SUCH EQUIPMENT EQUALS OR EXCEEDS THE BASIS OF DESIGN EQUIPMENT IN PERFORMANCE, QUALITY, FEATURES AND OPTIONS WHETHER SPECIFIED, SCHEDULED OR NOTED.

12. ALL EQUIPMENT FURNISHED FOR THIS PROJECT MUST COMPLY WITH THE "BUY AMERICAN ACT".

13. ALL WORK MUST BE FABRICATED AND/OR ERECTED USING THE CONTRACTOR'S FIELD MEASUREMENTS FOR PROPER COORDINATION

WITH WORK OF OTHER TRADES.

14. ALL CONTRACT DOCUMENTS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF

THE WORK. THEY ARE NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, OR COMPONENT. DO

NOT SCALE DRAWINGS.

15. INFORMATION AND COMPONENTS SHOWN ON DIAGRAMS OR DETAILS, BUT NOT SHOWN ON PLANS, AND VICE VERSA, MUST BE PROVIDED

AS IF EXPRESSLY REQUIRED BY BOTH.

16. EXCEPT WHERE INDICATED OTHERWISE, THE NOTATION OR DESCRIPTION OF ANY ITEM IN THE CONTRACT DOCUMENTS CARRIES WITH IT THE INSTRUCTION TO FURNISH AND INSTALL THE ITEM, WHETHER OR NOT THIS INSTRUCTION IS EXPLICITLY STATED.

17. ALL WORK MUST BE INSTALLED SO AS MAINTAIN ANY "UL" ASSEMBLY RATINGS, FIRE RATINGS OR SMOKE BARRIER CAPABILITIES OF WALLS, PARTITIONS, FLOORS AND ROOF. SEAL AROUND AND PLACE UL RATED FIRE-STOP MATERIAL AT ANY PENETRATION OR DISTURBANCE OF SUCH ASSEMBLIES. COORDINATE WITH ARCHITECTURAL PLANS AND THE CONTRACTOR.

18. COORDINATE PLACEMENT OF ALL WORK WITH OTHER TRADES. DO NOT LOCATE, POSITION OR INSTALL ANY WORK IN SUCH A WAY THAT SYSTEM COMPONENTS OR ACCESS DOORS WILL BE INACCESSIBLE, UNUSABLE OR UN-MAINTAINABLE AFTER CONSTRUCTION IS

COMPLETED. COMPLY WITH MANUFACTURER'S MINIMUM RECOMMENDED SERVICE CLEARANCES.

19. UNLESS OTHERWISE INDICATED, ALL WORK MUST BE SUPPORTED FROM STRUCTURE ABOVE, FROM WALLS, FROM COLUMNS, OR FROM THE FLOOR. DO NOT USE THE INSTALLED WORK OF OTHER TRADES, OR WORK RELATED TO ANY SUPPORT SYSTEMS FOR SUPPORT FOR

OTHER TRADES.

20. PROVIDE PIPE TRANSITIONS AT FIXTURE CONNECTIONS WHERE PIPE SIZES INDICATED DIFFER FROM THE FIXTURE CONNECTION SIZE.

21. DOMESTIC WATER PIPING MUST BE TYPE L RIGID COPPER WITH PRESS FITTINGS.

° DEGREES

Ø DIAMETER

AFF ABOVE FINISHED FLOOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

BTU BRITISH THERMAL UNIT

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RECIRCULATION

DTW DOMESTIC TEPID WATER

EWH ELECTRIC WATER HEATER

F FAHRENHEIT

GPM GALLONS PER MINUTE

HWCP HOT WATER CIRCULATION PUMP

IPC INTERNATIONAL PLUMBING CODE

kW KILLOWATT

MAX MAXIMUM

MIN MINIMUM

P PLUMBING

PDI PLUMBING AND DRAINAGE INSTITUTE

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

SSEW SAFETY SHOWER EYE WASH

SV SOLENOID VALVE

TYP TYPICAL

U/G UNDERGROUND

NOTE:

UNDERLINED FIXTURE AND EQUIPMENT MARKS (SUCH AS WC) ARE

NOT ABBREVIATIONS. REFER TO THE PLUMBING SCHEDULE SHEETS

1. THE DEMOLITION PLAN AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE. ITEMS TO BE REMOVED ARE DENOTED BY NOTES AND

HATCHING.

2. DEMOLITION MUST INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS IDENTIFIED. THE CONTRACTOR MUST COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION WORK

REQUIRED.

3. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR MUST IMMEDIATELY REPORT THE CONDITION TO

THE CONTRACTING OFFICER IN WRITING.

4. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL CONSTRUCTION ASSISTANCE DEVICES

SUCH AS SCAFFOLDING AND BARRIERS.

5. THE BUILDING ENVELOPE MUST REMAIN WATERTIGHT THROUGHOUT THE CONSTRUCTION PROCESS.

GENERAL PLUMBING NOTES:

PLUMBING DEMOLITION NOTES:

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRCULATION

PLUMBING DEMOLITION LEGEND

HATCHING INDICATED ITEMS TO BE

DISMANTLED AND REMOVED

A

A

K M P Q

A

D F H J L N R

GROWTH

CHAMBER

PREP

ROOM

MECH

TOILET

ELEC

CORR.

FOYER

SEED

STOR.

WALK-IN

COOLER

PREP

ROOM

WORK

AREA

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

JAN.

SCALE:

DEMO PLAN PLUMBING

1/8" = 1'-0"

PD101

U

D A

S

DEMO PLAN PLUMBING

PD101

GRAPHIC SCALE

KEYED NOTESX

1. DISMANTLE AND REMOVE EXISTING HOT AND COLD

DOMESTIC WATER PIPING, THERMOSTATIC MIXING

VALVE AND SAFETY SHOWER.

2. CAP EXISTING WATER LINES TO REMOVED SAFETY

SHOWER.

3. BID OPTION 2: DISMANTLE AND REMOVE EXISTING HOT

AND COLD DOMESTIC WATER PIPING, THERMOSTATIC

MIXING VALVE AND SAFETY SHOWER.

4. BID OPTION 2: CAP EXISTING WATER LINES TO

REMOVED SAFETY SHOWER.

5. BASE BID: DISMANTLE AND REMOVE EXISTING SAFETY

SHOWER/EYEWASH STATION ALONG WITH ALL

ASSOCIATED PIPING, VALVES AND MATERIALS BACK TO

ISOLATION VALVE.

6. BASE BID: DISMANTLE AND REMOVE EXISTING REVERSE

OSMOSIS SYSTEM. CAP PIPING FOR USE IN FUTURE

WORK.

BASE BID

BASE BID

BID OPTION 2

A

A

K M P Q

A

D F H J L N R

GROWTH

CHAMBER

PREP

ROOM

MECH

TOILET

ELEC

CORR.

FOYER

SEED

STOR.

WALK-IN

COOLER

PREP

ROOM

WORK

AREA

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

JAN.

SCALE:

PLUMBING PLAN

1/8" = 1'-0"

P-101

U

D A

S

PLUMBING PLAN

P-101

GRAPHIC SCALE

KEYED NOTESX

1. PROVIDE NEW IRRIGATION CONTROLLER. CONNECT TO

EXISTING OVERHEAD DOMESTIC WATER PIPING IN THE

GREENHOUSE. CONTRACTOR MUST DETERMINE THE

NUMBER OF EMITTERS AND PIPE SIZING AS

PRESCRIBED BY THE MANUFACTURER AND THE

GOVERNMENT DURING THE BIDDING PROCESS. REFER

TO DETAIL 1/P-501 AND EQUIPMENT SCHEDULE ON

P-601.

2. PROVIDE NEW EMERGENCY SHOWER/EYEWASH

STATION ALONG WITH THERMOSTATIC MIXING VALVE

AND ALL ASSOCIATED PIPING AND MATERIALS TO

ISOLATION VALVE.

3. PROVIDE REVERSE OSMOSIS SYSTEM WITH

PRE-TREATMENT AND PRESSURE STORAGE TANK.

REFER TO PLUMBING DETAILS SHEET P-501. ROUTE

OVERFLOW AND DISCHARGE PIPING TO NEAREST

FLOOR DRAIN IN GREENHOUSE. RE-USE EXISTING

PIPING FROM EXISTING RO SYSTEM TO COOLING PADS,

REFER TO M-101.

4. CONTRACTOR MUST FLUSH AND CLEAN TRENCH

DRAINS AND PIPING BETWEEN GREENHOUSE AND LIFT

STATION.

5. REPLACE EXISTING FREEZE DAMAGED EXTERIOR

SILLCOCK SPIGOTS.

6. REPLACE EXISTING FREEZE DAMAGED COPPER PIPE

JOINTS IN THIS AREA. REPLACE MISSING COPPER PIPE

TO SILLCOCK SPIGOTS.

7. REPLACE 1" AND 3/4" FREEZE DAMAGED COPPER PIPES.

8. REPLACE EXISTING CTS POLY PIPE WITH NEW COPPER

PIPE TO KEEP ALL PIPING UNIFORM.

9. REPLACE 2" SWEAT BALL VALVES IN THIS AREA.

EXISTING GAS

VALVE TO REMAIN

BASE BID

BASE BID

IC-1

SV-1

SV-1A

SV-1E

SV-1B SV-1C

SV-1D

SV-1F

IRRIGATION

SPRINKLER HEAD

(TYPICAL)

IC-2

SV-2

SV-2A

SV-2E

SV-2BSV-2C

SV-2D

SV-2F

IRRIGATION

SPRINKLER

HEAD

(TYPICAL)

BID OPTION 2

RO

NEW DRAIN LINE. PIPE TO EXISTING

TRENCH DRAIN IN GREENHOUSE.

EXISTING

EXISTING

EXISTING

LIFT STATION

5 5 55

6 6

8 8

2 2

7 7

A

S

DETAILS

P-501

24AC V

V

V

V

V

V

V

G

1COM

C 1 2 3 4 5 6 7

BACKUP BATTERY

CONNECTION BLOCK

TRANSMISSION CABLE

CONNECTION BOX

SV-1 SV-1A SV-1B SV-1C SV-1D SV-1E SV-1F

IC-1

24AC V

V

V

V

V

V

V

G

1COM

C 1 2 3 4 5 6 7

BACKUP BATTERY

CONNECTION BLOCK

TRANSMISSION CABLE

CONNECTION BOX

SV-2 SV-2A SV-2B SV-2C SV-2D SV-2E SV-2F

IC-2

SCALE:

IRRIGATION PIPING SCHEMATIC

NOT TO SCALE

P-501

SCALE:

REVERSE OSMOSIS SCHEMATIC

NOT TO SCALE

P-501

1-1/2" CW

CARBON FILTER

HE-CF-21

RO SKIDS

(2) M2-6

STORAGE TANK

(119 GALLON)

TO COOLING PADS

SOFTENER

HET-150

1-1/2" CW

BALL VALVE (TYPICAL)

FLOOR

BRINE TANK

NOTES:

1. ALL DIMENSIONS ARE GIVEN IN INCHES AND ARE APPROXIMATE.

2. THE RO INLET WATER CONNECTION IS 1/2" TUBING.

3. THE PRODICT WATER CONNECTION IS 1/2" TUBING FOR ALL UNITS.

4. THE CONCENTRATE WATER CONNECTION IS 3/8" TUBING FOR ALL UNITS.

5. AN OPTIONAL BRACKET FOR WALL MOUNTING ON 16", 18", OR 20" CENTERS IS AVAILABLE.

THE WALL MUST BE CAPABLE OF SUPPORTING AT LEAST 93 POUNDS.

6. PROVIDE A DRAIN CAPABLE OF HANDLING AT LEAST 2.3 GALLONS PER MINUTE. DO NOT

MAKE A DIRECT CONNECTION TO THE DRAIN. PROVIDE AN AIR GAP OF AT LEAST FOUR

TIMES THE DIAMETER OF THE DRAIN PIPE TO CONFORM TO SANITATION CODES AND TO

PERMIT THE OBSERVATION OF THE DRAIN FLOW. DO NOT INSTALL A VALVE IN DRAIN LINE.

7. THE POWER CORD IS 6 FEET LONG.

16" 16"

8.3 7"

7.7 8"

PRODUCT TO STORAGE

TOP VIEW

FRONT VIEW

35"

18.5"

2"

MEMBRANES

FEED

SCALE:

REVERSE OSMOSIS UNIT DETAIL - RO

NOT TO SCALE

P-501

A

S

PLUMBING EQUIPMENT SCHEDULES

P-601

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION BASIS OF DESIGN REMARKS

RO REVERSE OSMOSIS

SYSTEM

CULLIGAN

RO SKIDS: (2) M2-6

WATER SOFTENER: HET-150

CARBON FILTER: HE-CF21

STORAGE TANK: FL-40

MEMBRANE TYPE REVERSE OSMOSIS SYSTEM FOR COMMERCIAL APPLICATIONS.

SYSTEM MUST BE SIZED TO PROVIDE 10 GPM OF WATER TO THE EVAPORATIVE

COOLING UNITS. PROVIDE WATER PRE-TREATMENT SYSTEM CONSISTING OF

SOFTENER AND CARBON FILTER. PROVIDE RO SKID(S) WITH SEMIPERMEABLE

MEMBRANE. PROVIDE PRESSURE RATED STORAGE TANK.

IC-1

IC-2

IRRIGATION CONTROLLER GALCON AC-4-6-6S-9S-12S IRRIGATION CONTROLLER, 24VAC SOLENOID VALVES, 1 MASTER VALVE, 6 ZONE

VALVES. CONTRACTOR MUST PROVIDE TUBING, SOLENOID VALVES AND EMITTERS.

A

S

ABBREVIATIONS AND LEGEND

M-001

1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY. IT IS THE DESIGN BUILDER'S RESPONSIBILITY TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DEVIATIONS MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY

CONSTRUCTION, FABRICATION, OR EQUIPMENT PURCHASE.

2. INSTALLATION OF HVAC WORK MUST BE COORDINATED WITH OTHER TRADES BEFORE ANY INSTALLATION IS DONE.

DUCTWORK AND PIPING SHOWN ON PLANS IS SCHEMATIC. PROVIDE ALL TRANSITIONS, ELBOWS, REDUCERS, ETC.

REQUIRED TO AVOID CONFLICTS & MAXIMIZE CEILING HEIGHTS. EQUIPMENT, PIPING OR DUCTWORK INTERFERING WITH

OTHER TRADES MUST BE RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER.

3. AT START OF CONSTRUCTION, PREPARE TYPED LISTS OF EQUIPMENT THAT ARE TO BE SUPPLIED REQUIRING ELECTRICAL

WORK, AND SEND LISTS TO THE ELECTRICAL CONTRACTOR FOR REVIEW AND COORDINATION.

4. WRITTEN DIMENSIONS ON DRAWINGS MUST HAVE PRECEDENCE OVER SCALED DIMENSIONS. VERIFY DIMENSIONS ON SITE.

5. EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED CLEARANCE, UNIFIED FACILITIES

CRITERIA, AND INTERNATIONAL BUILDING CODE / INTERNATIONAL MECHANICAL CODE.

6. INSTALLATION OF EQUIPMENT MUST PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT WITHOUT

NECESSITATING REMOVAL OR MODIFICATION TO OTHER PIPING, WIRING, OR EQUIPMENT.

7. CEILING-MOUNTED EQUIPMENT MUST BE INSTALLED IN SUCH A MANNER THAT LIGHTS, PIPING, DUCTWORK, ETC. , DO NOT

BLOCK ACCESS TO EQUIPMENT AND RELATED ACCESSORIES.

8. CAULK WITH SILICONE ALL GAPS BETWEEN WALL, CEILING, AND FLOOR OPENINGS AND HVAC EQUIPMENT PENETRATIONS.

PATCH LARGE GAPS BEFORE CAULKING IS APPLIED.

9. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE THE SPECIFICATION HAS OPTIONS.

10. ALL EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED PUBLISHED LITERATURE.

11. NOT ALL MECHANICAL ABBREVIATIONS SHOWN WILL BE USED FOR THIS PROJECT.

12. ALL EQUIPMENT INSTALLED IN THIS PROJECT MUST COMPLY WITH THE "BUY AMERICAN ACT". BASIS OF DESIGN

SHOWN ON SCHEDULES IS TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT FROM ANOTHER MANUFACTURER IS ACCEPTABLE. MANUFACTURER NAME AND MODEL NUMBERS ARE BASIS OF DESIGN AND ARE SHOWN FOR INFORMATION ONLY. REFER TO SPECIFICATIONS FOR COMPLETE

REQUIREMENTS.

HVAC GENERAL NOTES:

1. THE DEMOLITION PLANS AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED. ITEMS TO

BE REMOVED ARE DENOTED BY HATCHING.

2. DEMOLITION MUST INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS IDENTIFIED. THE CONTRACTOR MUST COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE

DEMOLITION WORK REQUIRED.

3. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW

CONSTRUCTION.

4. IN THE EVENT THE CONTRACTOR ENCOUNTERS MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR MUST

IMMEDIATELY REPORT THE CONDITION TO THE CONTRACTING OFFICER IN WRITING.

5. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL CONSTRUCTION

ASSISTANCE DEVICES SUCH AS SCAFFOLDING AND BARRIERS.

6. THE BUILDING ENVELOPE MUST REMAIN WATERTIGHT THROUGHOUT THE CONSTRUCTION PROCESS.

7. IF IT BECOMES NECESSARY DURING DEMOLITION TO TEMPORARILY REMOVE ANY EXISTING WORK NOT SPECIFICALLY NOTED TO BE REMOVED OR RELOCATED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR MUST REINSTALL SAID WORK TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS

8. CONTRACTOR MUST DEMOLISH ALL EQUIPMENT, PIPING, DUCTWORK, INSULATION, SUPPORTS, CONTROLS

THERMOSTATS, WIRING AND ALL APPURTENANCES WITH THE HVAC SYSTEM TO BE DEMOLISHED.

HVAC GENERAL DEMOLITION NOTES: ABBREVIATIONS:

ABBREVIATION DEFINITION

ACCU AIR COOLED CONDENSING UNIT

ACU AIR COOLED CONDENSING UNIT

AMPS AMPERES

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CFM CUBIC FEET PER MINUTE

CU CONDENSING UNIT

DH DEHUMIDIFIER

ECP EVAPORATIVE COOLING PAD

EF EXHAUST FAN

ESP EXTERNAL STATIC PRESSURE

EVAP EVAPORATOR

FLA FULL LOAD AMPS

FT FEET

GUH GAS UNIT HEATER

HAF HORIZONTAL AIRFLOW FAN

HP HORSEPOWER

IN INCHES

LB POUNDS

MCA MINIMUM CIRCUIT AMPACITY

MOCP MAXIMUM OVERCURRENT PROTECTION

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

PVC POLYVINYL CHLORIDE

RLA RUNNING LOAD AMPS

RPM REVOLUTIONS PER MINUTE

RXXXX TYPE REFRIGERANT

SEER SEASONAL ENERGY EFFICIENCY RATING

SST SATURATED SUCTION TEMPERATURE

A

A

K M P Q

A

D F H J L N R

G GG G

G G

G G

GG

GG

GG

GG

GG

G GG G

G GG G

G GGG

G G

GROWTH

CHAMBER

PREP

ROOM

MECH

TOILET

ELEC

CORR.

FOYER

SEED

STOR.

WALK-IN

COOLER

PREP

ROOM

WORK

AREA

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

JAN.

SCALE:

DEMO PLAN MECHANICAL

1/8" = 1'-0"

MD101

U

D A

S

DEMO PLAN MECHANICAL

MD101

GRAPHIC SCALE

KEYED NOTESX

1. BID OPTION 4: DISMANTLE AND REMOVE EXISTING

CEILING MOUNTED DUCTLESS CASSETTE, OUTDOOR

AIR COOLED CONDENSING UNIT, REFRIGERANT PIPING

AND ALL APPURTENANCES. EXISTING OUTDOOR

CONCRETE PAD MUST REMAIN.

2. BID OPTION 4: DISMANTLE AND REMOVE EXISTING

INDOOR EVAPORATOR, OUTDOOR AIR COOLED

CONDENSER, REFRIGERANT PIPING AND ALL

APPURTENANCES. EXISTING OUTDOOR CONCRETE PAD

MUST REMAIN.

3. BID OPTION 4: DISMANTLE AND REMOVE EXISTING

DEHUMIDIFIER LOCATED ABOVE THE SEED STORAGE

COOLER ENCLOSURE.

4. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE

EXISTING OVERHEAD MOUNTED AXIAL CIRCULATION

FAN, SUPPORT STRUCTURE AND ALL APPURTENANCES.

DISCONNECT ALL CONTROLS.

5. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE

EXISTING OVERHEAD MOUNTED GAS FIRED UNIT

HEATER, MOUNTING BRACKETS AND ALL

APPURTENANCES. DISCONNECT GAS PIPING AND ALL

CONTROLS.

6. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE

EXISTING WALL MOUNTED EXHAUST FANS AND ALL

APPURTENANCES. DISCONNECT ALL CONTROLS.

7. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE

EXISTING COOLING PAD SYSTEM. DISCONNECT AND

REMOVE EXISTING DAMPER ACTUATORS. ACTUATED

LOUVERS MUST REMAIN.

8. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE

ALL EXISTING GAS PIPING IN THE GREENHOUSE AREA.

CAP GAS PIPING TO POINT SHOWN ON DRAWINGS.

9. BASE BID AND BID OPTION 2: DISMANTLE AND REMOVE

EXISTING LOUVER ACTUATORS. (36) PLACES.

EXISTING UNIT

HEATER TO REMAIN

EXISTING UNIT

HEATER TO REMAIN

45 545 5

4545 5

EXISTING GAS

VALVE TO REMAIN

BASE BID

BID OPTION 2

BID OPTION 4

EXISTING DUCTWORK

AND AIR DISTRIBUTION

DEVICES TO REMAIN (TYP)

EXISTING

EXHAUST

FANS TO

REMAIN

A

A

K M P Q

A

D F H J L N R

GROWTH

CHAMBER

PREP

ROOM

MECH

TOILET

ELEC

CORR.

FOYER

SEED

STOR.

WALK-IN

COOLER

PREP

ROOM

WORK

AREA

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

JAN.

SCALE:

MECHANICAL PLAN

1/8" = 1'-0"

M-101

U

D A

S

MECHANICAL PLAN

M-101

GRAPHIC SCALE

KEYED NOTESX

ACCU-1

EVAP-1

DH-1

ACU-1

CU-1

EF-1

HAF-1

HAF-2

HAF-3

HAF4

HAF-5

HAF-6 HAF-12

HAF-11

HAF-9

HAF-7

HAF-8

HAF-10

EF-2

EF-3

EF-4

EF-5

EF-6

EF-7

EF8

EF-9

EF-10

EF-11

EF-12

ECP-1

ECP-2

ECP-3

ECP-4

ECP-5

ECP-6

1. BID OPTION 4: PROVIDE CEILING MOUNTED DUCTLESS

CASSETTE, OUTDOOR AIR COOLED CONDENSING UNIT,

REFRIGERANT PIPING AND ALL APPURTENANCES.

2. BID OPTION 4: PROVIDE INDOOR EVAPORATOR,

OUTDOOR AIR COOLED CONDENSER, REFRIGERANT

PIPING AND ALL APPURTENANCES. SEE DETAIL 2/M-502

AND 3/M-502.

3. BID OPTION 4: PROVIDE DEHUMIDIFIER LOCATED ABOVE

THE SEED STORAGE COOLER ENCLOSURE. SEE DETAIL

1/M-502.

4. BASE BID AND BID OPTION 2: PROVIDE HEATING,

VENTILATION AND LIGHTING CONTROL SYSTEM. REFER

TO CONTROLS DRAWING M-701.

5. BASE BID AND BID OPTION 2: PROVIDE LOUVER

ACTUATOR TO REPLACE EXISTING. REFER TO DETAIL.

6. BASE BID AND BID OPTION 2: CONNECT REVERSE

OSMOSIS SYSTEM PIPING TO EVAPORATIVE COOLING

PADS. REFER TO P-101, 3/M-501.

7. BASE BID: PROVIDE WEATHER STATION. REFER TO

ARCHITECTURAL ROOF PLAN AND ELEVATIONS AND

DETAIL 1/M-503.

8. BASE BID AND BID OPTION 2: PROVIDE REMOTE

CONTACTOR PANELS FOR HEATING, VENTILATION AND

LIGHTING CONTROL SYSTEM.

BASE BID

BID OPTION 4

EXISTING

EXHAUST

FANS

EXISTING DUCTWORK

AND AIR DISTRIBUTION

DEVICES (TYP)

BID OPTION 2

LA-15

LA-25

LA-35

LA-45

LA-55

LA-65

LA-75

LA-85

LA-95

LA-105

LA-115

LA-135

LA-145

LA-155

LA-165

LA-175

LA-19 5

LA-20 5

LA-21 5

LA-22 5

LA-23 5

LA-24 5

LA-125

LA-185

LA-25 5

LA-26 5

LA-27 5

LA-28 5

LA-29 5

LA-30 5

LA-31 5

LA-32 5

LA-33 5

LA-34 5

LA-35 5

LA-36 5

6 6

GEC-W GEC-E

A

A

K M P Q

A

D F H J L N R

G GGG

G G

G G

G

G G

G

GROWTH

CHAMBER

PREP

ROOM

MECH

TOILET

ELEC

CORR.

FOYER

SEED

STOR.

WALK-IN

COOLER

PREP

ROOM

WORK

AREA

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

JAN.

SCALE:

MECHANICAL GAS PIPING PLAN

1/8" = 1'-0"

M-101

U

D A

S

MECHANICAL GAS PIPING PLAN

M-102

GRAPHIC SCALE

KEYED NOTESX

EXISTING UNIT

HEATER

EXISTING UNIT

HEATER

GUH-1

GUH-2

GUH-3

GUH-8

GUH-7

GUH-4

GUH-9

GUH-11

GUH-10

GUH-12

GUH-5

GUH-6

EXISTING GAS VALVE

1. PROVIDE GALVANIZED GAS PIPING PER ASTM A53.

HANGER MATERIAL IN GREENHOUSE MST BE STAINLESS

STEEL OR GALVANIZED. TIE-IN TO EXISTING BLACK PIPE

IN HEADHOUSE AREA. PROVIDE DI-ELECTRIC PIPE

UNIONS WHERE GALVANIZED PIPING CONNECTS TO

EXISTING BLACK PIPE. AFTER ASSEMBLY OF

GALVANIZED PIPE AND FITTINGS, BRUSH A COLD

GALVANIZING COMPOUND ON TO ALL THREADED

CONNECTIONS AND ANYWHERE FACTORY GALVANIZED

COATING IS DAMAGED. COATING SHALL BE EQUAL TO

RUST-OLEUM 7000 SYSTEM, APPLY PER

MANUFACTURER INSTRUCTIONS.

BASE BID

BID OPTION 4

BID OPTION 2

EXISTING 3"

GAS

3"Ø GAS

2-1/2"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

3"Ø GAS

2-1/2"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø GAS

1-1/4"Ø

GAS

1-1/4"Ø GAS

EXISTING 3"

GAS

A

S

DETAILS

M-501

(EF1-EF6: BASE BID) (EF-7 - EF-12 :BID OPTION 2)1

SCALE: NOT TO SCALEM-501

SLANT SIDEWALL FAN DETAIL

(GUH-1 - GUH-6 : BASE BID) (GUH-7 - GUH-12: BID OPTION 2)2

SCALE: NOT TO SCALEM-501

GAS UNIT HEATER DETAIL

· CONSTRUCTED OF HEAVY GAUGE GALVANIZED STEEL

OR ALUMINUM.

· FOR MODEL DC, DCA, FQ AND FN FANS.

· ENERGY SAVINGS – WITH INSIDE SHUTTER SAVES UP

TO 3750 BTU/HR HEAT LOSS PER FAN.

· HIGH FLOW CAPACITY – SHUTTER DIRECTS AIR TO

FAN. SELECT FAN AT .05″ SP. INSTEAD OF .10″.

· WEATHER PROTECTED – SLANT ARRANGEMENT

PROTECTS MOTOR AND DRIVES FROM ELEMENTS.

· OUTSIDE MOUNTING

· ASSEMBLED TO FAN FOR QUICK, EASY FIELD

INSTALLATION.

· INCLUDE 1″ X ½” GUARD ON OUTLET SIDE.

· SHUTTER AND INLET GUARD HELD IN PLACE WITH

QUICK RELEASE CLIPS.

· INCLUDE WIRING KNOCKOUT TO ALLOW ALL WIRING

CONNECTIONS FOR MOTOR TO BE MADE INSIDE THE

BUILDING. FOR FAN APPLICATION.

EVAPORATIVE COOLING DETAIL - (EVAP-1 : BASE BID)3

SCALE: NOT TO SCALEM-501

STANDARD-DUTY INDUSTRIAL WALL-MOUNT FANS

COOL HEAVY MANUFACTURING AREAS AND OTHER

DUSTY OR DIRTY ENVIRONMENTS WHERE FLOOR

SPACE IS LIMITED. COMPARED TO LIGHT-DUTY

INDUSTRIAL FANS, THESE STANDARD-DUTY FANS ARE

MADE OF HEAVIER-GAUGE MATERIALS, HAVE A

HIGHER-HORSEPOWER MOTOR THAT IS TOTALLY

ENCLOSED TO KEEP OUT DEBRIS, AND FEATURE

MORE-ROBUST MOTOR BEARINGS FOR A LONGER LIFE.

STANDARD-DUTY INDUSTRIAL FAN: 12 IN BLADE DIA,

3,005 CFM, 20/1V AC, 1/15 HP MOTOR

NOTES:

1. PVC COATED OSHA GUARD

2. DIRECT DRIVE

3. GALVANIZED ADJUSTABLE MOUNTING BRACKET

4. MOISTURE RESISTANT MOTOR

(HAF-1 - HAF-6 : BASE BID) (HAF-7 - HAF-12 : BID OPTION 2)6

SCALE: NOT TO SCALEM-501

HORIZONTAL AIRFLOW FAN (HAF) DETAIL

PU

M

P

1-1/2" PVC TEE

1-1/2" PVC PIPE

1-1/2" PVC PIPE

1-1/2" PVC BALL

VALVE

1-1/2" PVC PIPE

1-1/2" PVC ELBOW

1-1/2" PVC PIPE

FILTER

REPLACEMENT ELEMENT

1-1/2" PVC PIPE

1-1/2" PVC COMPRESSION

COUPLING

1-1/2" PVC PIPE

PUMP TANK

WATER VALVE NPT

PVC ELBOW

PIPE TO HOSE

ADAPTOR

3" RUBBER CAP

3" PVC PIPE

ALL PORTIONS OF THE FLUE ASSEMBLY

EXPOSED TO WEATHER MUST BE GALVANIZED

OR PAINTED WITH A HEAT RESISTANT

WEATHERPROOF PROTECTIVE PAINT. COLOR

SHALL BE SELECTED BY THE GOVERNMENT.

APPROVED

VENT CAP

SUPPORT UNIT HEATER FROM

STRUCTURE WITH FOUR-POINT

SUSPENSION. COMPLY WITH MFGR'S.

RECOMMENDATIONS.

UNION

SHUT OFF

VALVE

DIRTLEG

GLASS ROOF

GAS MAIN

EXHAUST PIPE

INTAKE PIPE

STORM COLLAR

REPLACE EXISTING GLASS PANEL

WITH METAL FLASHING WHERE FLUE

PENETRATES THROUGH ROOF.

EXHAUST PIPE

UNIT

HEATER

2.75 REF.

.06

1.63

1.38 REF.

.78 1.56

6.13

REF.

1.02

REF.

8-32 THREAD

4 PL

DRAIN HOLE

1.90 REF.

1.50 REF.

1.125±.030

1/2-14 NPSM

THREAD

RUBBER SHIELD

1.63

1.56

.61

.78

8-32 THREAD

4 PL

(LA-1 THRU LA-18 BASE BID) (LA-19 THRU LA-36 BID OPTION 2)5

SCALE: NOT TO SCALEM-501

LOUVER ACTUATOR DETAIL

LOADED SPEED @ 20 IN-LB: 2.8 RPM

LOADED CURRENT @ 20 IN-LB: 0.11/0.07 A

STALL TORQUE: 48/48 IN-LB STALL

CURRENT: 0.14/0.08 A

RATED VOLTAGE: 120/240 VAC, 60 Hz

ROTATION: CW

NO LOAD SPEED: 2.9 RPM

NO LOAD CURRENT: 0.11/0.07 A

LEADS, 1

5" FREE LENGTH

1-BLACK

1-WHITE

1-RED

1-BROWN

1-GREEN

A

S

DETAILS

M-502

DEHUMIDIFICATION UNIT DETAIL DH-11

SCALE: NOT TO SCALEM-502

FRONT VIEW RIGHT SIDE VIEW

LEFT SIDE VIEW

COOLER

PROCESS AIR

INLET

DH-1 DEHUMIDIFICATION UNIT

REINSTALL IN SAME LOCATION

AS EXISTING DEHUMIDIFIER

ACCESS TO DESICCANT WHEEL,

WHEEL DRIVE ASSY., SEALS,

ELECTRICAL CONTROLS,

PROCESS FILTERS, PROCESS

AND REACTIVATION BLOWERS

TIME METER

SELECTOR PANEL

REACTIVATION

FILTER ACCESS

(BOTTOM)

REACTIVATION AIR

INLET 2.625" x 6.25"

REACTIVATION AIR OUTLET 3.5"

O.D. (DETACHABLE FAN GUARD)

POWER

CONNECTION POINT

12.063"

2.812"

7.8

PROCESS AIR OUTLET

4.375" O.D. (DETACHABLE

FAN GUARD)

.34

4"

.56

3"

2.5

17.875" 17" TYP

9" 14.375"

3.4

PROCESS AIR

INLET 3.141" x 13.5"

EXISTING DUCTWORK AND AIR DEVICES TO REMAIN

EXISTING DUCTWORK AND AIR DEVICES TO REMAIN

RE-ACTIVATION

AIR OUTLET

EXTERIOR WALL

61.50"

14-11/16"

-3

/4"

-7

/16

-3

/4"

REFRIGERANT

CONNECTION END

ELECTRICAL

CONNECTION END

AIR FLOW

DRAIN CONNECTION

ACCEPTS 1/2" HANGER ROD

42-3/8" 30-1/4"

-1

/4"

COOLER EVAPORATOR UNIT DETAIL - EVAP-12

SCALE: NOT TO SCALEM-502

CONDENSING UNIT DETAIL - ACCU-13

SCALE: NOT TO SCALEM-502

NOTE: ANCHOR IN ACCORDANCE WITH

MANUFACTURES INSTRUCTIONS AND

APPROVED SHOP DRAWINGS

PROCESS AIR

OUTLET

TAPERED PIPE THREADS

POLYPROPYLENE PLASTIC LINER

ZINC PLATED

TAPERED PIPE THREADS

DIELECTRIC PIPE CONNECTION DETAIL4

SCALE: NOT TO SCALEM-502

A

S

DETAILS

M-503

GABLE MOUNT WEATHER STATION DETAIL1

SCALE: NOT TO SCALEM-503

SECURE

GROUND WIRE

TO GROUND ROD

GROUND ROD

COIL EXTRA CABLE LENGTH

NEAR BOTTOM OF MAST. DO NOT

CUT OFF CABLE. EXTRA LENGTH

WILL BE NEEDED TO SERVICE

WEATHER STATION.

GROUND WIRE

(1) 15/C

(1) 1 PAIR SHIELDED (FOR

LIGHT SENSOR) 100' OF

EACH PROVIDED

2" x 20'-0" OR 2" x 22'-0" SQ.

TUBE

"BY OTHERS"

8" GABLE MTG. BRKT.

24" GABLE MTG. BRKT SECURELY MOUNT TO

GREENHOUSE

STRUCTURE. (TYP. (4)

PER SIDE)

SECURELY MOUNT TO

GREENHOUSE

STRUCTURE.

2" x 10'-4" SQ.

TUBING (SWAGED

END)

GREENHOUSE

ROOF PEAK

TOP OF WEATHER

MAST SHOULD BE

APPROXIMATELY 6'-0"

ABOVE ROOF PEAK

2" x 10'-4" SQ. TUBE

24" MOUNTING BRACKET

THROUGH BOLT TO

GREENHOUSE

WIND DIRECTION

PRECIPITATION

DETECTORLIGHT

SENSORWIND

SPEED

R.H.

SENSOR TEMP.

SENSOR

TO COMPUTER

CONTROL

SYSTEM

THROUGH BOLT TO

GREENHOUSE

8" MOUNTING BRACKET

SWAGED END OF SQ. TUBE

2" x…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .