Attachment 2 Drawings.pdf

PDF 17 MB Posted

Attached to
Upgrade Safety Showers and Eyewash Stations - Ithaca, NY
Solicitation number
1232SA25R0027
Issued by

About this file

These architectural and engineering drawings detail a Safety Shower and Emergency Eyewash Upgrade project for the USDA Agricultural Research Service at the Robert W. Holley Center for Agriculture and Health in Ithaca, New York. The comprehensive set of plans covers multiple floors (ground, first, second, and third) and includes architectural, electrical, and plumbing designs for a phased renovation approach with four distinct contract work options: Base Contract Work and Options 1, 2, and 3.

The project involves upgrading safety showers and emergency eyewash stations across the facility, with specific sequencing of work based on available project funding. The plans detail the installation of exterior waste piping, central tempered water systems, horizontal and vertical piping, waste and vent stacks, and emergency showers with curtains and eyewashes on each floor. Each option represents a progressive approach to implementing the upgrades, starting with the base work on the third floor and potentially extending to the second, first, and ground floors. The drawings are dated April 24, 2023, with the design phase documents issued on February 11, 2025, and are prepared by LRS Federal, LLC and Page Southerland Page, Inc.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURAL SHEET INDEX

Sheet Number Sheet Name

A001 TITLE SHEET

AD100 GROUND FLOOR PLAN LAB - EXISTING CONDITION / DEMOLITION

AD101 FIRST FLOOR LAB PLAN - EXISTING CONDITION / DEMOLITION

AD102 SECOND FLOOR LAB PLAN - EXISTING CONDITION / DEMOLITION

AD103 THIRD FLOOR LAB PLAN - EXISTING CONDITION / DEMOLITION

ELECTRICAL SHEET INDEX

Sheet Number Sheet Name

E001 GENERAL NOTES, SYMBOLS AND FLOOR PLAN

PLUMBING SHEET INDEX

Sheet Number Sheet Name

P001 GENERAL NOTES, SYMBOLS AND SCHEDULES

VICINITY MAP AERIAL VIEW

STREET VIEW

SHEET INDEX

HAUL ROUTE

ROBERT W. HOLLEY CENTER FOR AGRICULTURE

AND HEALTH (RWHC)

538 Tower Road, Ithaca, New York 14853 USDA Contract No.: 12305B21D0015 TASK ORDER No.: 12305B22F0058

100% DESIGN PHASE DRAWINGS ARCHITECTURE

SAFETY SHOWER AND EMERGENCY EYEWASH UPGRADE

APRIL 24, 2023

RESEARCH, EDUCATION, AND ECONOMICS

AGRIGULTURAL RESEARCH SERVICE

Northeast Area Director's Office 10300 Baltimore Avenue Building 003, Room 223 Beltsville, Maryland 20705-2350 Phone No. (309) 681-6118 Fax No. (301) 504-5863

UNITED STATES DEPARTMENT OF AGRICULTURE

A100 GROUND FLOOR PLAN LAB

A101 FIRST FLOOR LAB PLAN

A102 SECOND FLOOR LAB PLAN

A103 THIRD FLOOR LAB PLAN

PD101 GROUND FLOOR - DEMOLITION

PD102 FIRST FLOOR - DEMOLITION

PD103 SECOND FLOOR - DEMOLITION

PD104 THIRD FLOOR - DEMOLITION

P101 GROUND FLOOR - ABOVE CEILING PLUMBING PLAN

P102 FIRST FLOOR - ABOVE CEILING PLUMBING PLAN

P103 SECOND FLOOR - ABOVE CEILING PLUMBING PLAN

P104 THIRD FLOOR - ABOVE CEILING PLUMBING PLAN

P105 GROUND FLOOR - ABOVE CEILING SANITARY PIPING

P106 FIRST FLOOR - ABOVE CEILING SANITARY PIPING

P107 SECOND FLOOR - ABOVE CEILING SANITARY PIPING

P108 THIRD FLOOR - ABOVE CEILING SANITARY PIPING

P109 DETAILS AND TEMPERED WATER RISER DIAGRAM

P110 SANITARY RISER DIAGRAMS

P111 DETAILS

The project shall be performed in the following sequencing of work based on available Project funding:

Base Project Work:

Install exterior waste piping and connect to existing waste piping, install central tempered water system and risers, install third floor horizontal tempered water piping, install vertical waste and vent stacks, install horizontal drains, waste, and vent piping on the third floor to emergency showers and drains, and install emergency showers with curtains and eyewashes on the third floor.

Option 1 Project Work:

Install second floor horizontal tempered water piping, install horizontal drains, waste, and vent piping on the second floor to emergency showers and drains, and install emergency showers with curtains and eyewashes on the second floor.

Option 2 Project Work:

Install first floor horizontal tempered water piping, install horizontal drains, waste, and vent piping on the first floor to emergency showers and drains, and install emergency showers with curtains and eyewashes on the first floor.

Option 3 Project Work:

Install ground floor horizontal tempered water piping, install emergency showers with curtains and eyewashes.

PROJECT SEQUENCING OF WORK

100% DESIGN PHASE DRAWINGS MEP FEBRUARY 11, 2025

GENERAL NOTES:

1. For Base and all Options, repair any damage caused by construction to ceilings, walls, and floors to match existing finishes.

A001

TITLE SHEET

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4/24/2023

OPTION 3 CONTRACT WORK

ARCHITECTURAL

4/24/20234/24/2023

OPTION 2 CONTRACT WORK

4/24/20234/24/2023

OPTION 1 CONTRACT WORK

BASE CONTRACT WORK

OPTION 3 CONTRACT WORK

OPTION 2 CONTRACT WORK

OPTION 1 CONTRACT WORK

BASE CONTRACT WORK

1. ALL WORK SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE (N.E.C.) LATEST

EDITION ADOPTED BY STATE AND ALL FEDERAL, STATE AND LOCAL CODES.

2. COORDINATE ALL LIGHTING FIXTURE LOCATIONS AND ARCHITECTURAL APPURTENANCES

WITH ARCHITECT.

3. ALL LIGHTING AND POWER WIRING SHALL BE #12 AWG WITH GROUND (TYPICAL) WITH

NUMBER OF CONDUCTORS AS REQUIRED.

4. CONTRACTOR TO LIMIT 20A, 120V BRANCH CIRCUITS TO A MAXIMUM 192OVALOAD AND

15A, 120V BRANCH CIRCUIT TO A MAXIMUM 144OVA LOAD. FIELD VERIFY ALL BRANCH

CIRCUITS AFFECTED BY RENOVATION.

5. WHERE WIRING CAN NOT BE ROUTED CONCEALED IN FINISHED SPACES UNLESS NOTED

OTHERWISE. UTILIZE WIREMOLD SURFACE RACEWAY TYPE 200/500/700 (WITH ALL

NECESSARY FITTINGS/HARDWARE AND ATTACHMENTS) OR APPROVED EQAUALWITH

#12AWG TYPE THHN/THWN CONDUCTOR. ALL COMPONENTS SHALL BE PAINTED IF

DIRECTED BY ARCHITECT.

6. ALL WIRING SHALL BE CONCEALED IN CONDUIT BEHIND WALLS AND ABOVE CEILING IN

FINISHED AREAS WHEREVER POSSIBLE.

7. LOCATIONS ARE APPROXIMATE AND NOT ALL ELECTRICAL DEVICES AND FIXTURES MAY

BE INDICATED (FIELD VERIFY ALL ELECTRICAL ITEMS).

8. CONDUITS, RACEWAYS AND CABLES SHALL BE PROPERLY AND SECURELY ATTACHED TO

BUILDING STRUCTURAL COMPONENTS AS REQUIRED BY N.E.C. ALL FASTENERS AND

HARDWARE SHALL BE APPROVED FOR THE INSTALLATION AND THE CONDITIONS

ENCOUNTERED.

9. EACH OUTLET OR JUNCTION IN ANY OF THE WIRING SYSTEMS SHALL BE MADE IN AN

APPROVED, METALLIC JUNCTION BOX. SUCH BOX SHALL BE SUITABLE FOR THE SIZE AND

NUMBER OF CONDUCTORS AND DEVICES TO BE INSTALLED, AS WELL AS THE CONDITION

ENCOUNTERED. ALL SPLICES SHALL BE MADE WITH APPROVED, MECHANICAL

CONNECTORS.

10. CONTRACTOR SHALL VERIFY ALL STRUCTURAL, ARCHITECTURAL AND MECHANICAL

CONDITIONS (DUCT CLEARANCES, COUNTER HEIGHTS, DOOR SWINGS, ETC.) PRIOR TO

ROUGH IN FOR ELECTRICAL WIRING EQUIPMENT.

11. ALL ELECTRICAL WORK SHALL BE CAREFULLY COORDINATED WITH THE WORK OF OTHER

TRADES AND ON-SITE CONDITIONS. WHERE CUTTING, DRILLING OR ALTERATION TO THE

WORK OF OTHERS IS NECESSARY, FOR THE PROPER INSTALLATION OF ELECTRICAL

EQUIPMENT, SUCH WORK SHALL BE PLANNED IN ADVANCE WITH THE GENERAL

CONTRACTOR AND SHALL BE CAREFULLY DONE. ANY DAMAGE TO THE BUILDINGS OR

EQUIPMENT SHALL BE REPAIRED BY PROPERLY TRAINED PERSONNEL, TO THE

SATISFACTION OF THE ARCHITECT, AT NO ADDITIONAL COST TO THE OWNER.

12. DURING ROUGH IN AND FINISHED STAGES OF CONSTRUCTION, THE ELECTRICAL

CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND KEEP CLEAN ALL ELECTRICAL

EQUIPMENT, PANELS, FIXTURES AND DEVICES.

13. THE CONTRACTOR SHALL PROVIDE ALL INFORMATION ABOUT EQUIPMENT, WHICH HE IS

FURNISHING, TO THE GENERAL CONTRACTOR FOR COORDINATION PURPOSES. THE

CONTRACTOR SHALL PROVIDE ALL INSTALLATION DETAILS AND SUPPORT COMPONENTS

TO THE GENERAL CONTRACTOR SO THAT THESE MAY BE BUILT INTO THE CONSTRUCTION

IN A TIMELY MANNER.

14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE FINAL LOCATIONS

OF MECHANICAL, HVAC AND OWNER'S EQUIPMENT AND POWER CONNECTION DETAILS SO

THAT THE ASSOCIATED ELECTRICAL WORK WILL BE PROPERLY COORDINATED AND

INSTALLED.

15. SHARED NEUTRAL FOR 120V CIRCUITS NOT PERMITTED.

16. SEAL ALL CONDUITS ENTERING COLD ROOM PER NEC 300.7.

GENERAL NOTES

DESCRIPTIONSYMBOL

ELECTRICAL SYMBOLS/LINE TYPES

CONDUIT

CONDUCTORS AND GROUND

CIRCUIT NUMBER

DISCONNECT SWITCH

EQUIPMENT

DESIGNATION

MOTOR

MS MOTOR SWITCH

EQUIPMENT SCHEDULE

HP

RCP-1 1/2 120V / 1 PHASE

ELECTRICAL

VOLTAGE

RCP-2 1/2 120V / 1 PHASE

JUNCTION BOX W/ BLANK COVER PLATE.J J

EMT CONDUIT & WIRING CONCEALED IN WALL OR CEILING SPACE.

SIZE AS INDICATED3/4"

GFI RECEPTACLE

WH-1 30kW 208V / 3 PHASE

P1A

ELECTRICAL

PANEL

P1A P2A

20AMP, SINGLE POLE

NEW BREAKER

SIZE

20AMP, SINGLE POLE

100AMP, 3 POLE

SWITCH MOUNTED AT 42" A.F.F.S

ENLARGED ELECTRICAL PLAN

SCALE: 1/4" = 1'-0" NO

RT

H

1. (E) ~ EXISTING TO REMAIN

(R) ~ EXISTING TO BE RELOCATED

(D) ~ EXISTING TO BE DEMOLISHED

2. CONTRACT DOCUMENTS ARE BASED ON LIMITED OWNER FURNISHED DRAWINGS AND LIMITED SITE OBSERVATION, NOT ALL SYSTEMS ARE SHOWN. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

EXISTING CONDITIONS AND WAYS AND MEANS OF CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE WITH FACILITIES PRIOR TO TERMINATION OF ANY SERVICES WHICH

MIGHT AFFECT SPACES OUT SIDE OF SCOPE ARE.

4. WORK AT EXISTING PANEL P1A (GE 225A, TYPE NLAB):

a. REMOVE (2) SPARE 3 POLE CIRDUIT BREAKERS AND (1) SINGLE POLE BREAKER TO PROVIDE

SPACE FOR NEW CIRCUIT BREAKERS.

b. FURNISH AND INSTALL (3) 20 AMP/ 1 POLE, GFCI AND (3) 20 AMP / 1 POLE CIRCUIT BREAKERS

TO FEED NEW PUMPS, CONTROL PANEL, LIGHT AND RECEPTACLE. MATCH EXISTING CIRCUIT

BREAKER TYPE, STYLE AND AIC RATINGS (10KAIC MIN.).

5. WORK AT EXISTING PANEL P2A (GE, 225A, TYPE NLAB);

a. REMOVE EXISTING 3 POLE SPARE CIRCUIT BREAKER TO PROVIDE SPACE FOR NEW CIRCUIT

BREAKER.

b. FURNISH AND INSTALL NEW 100 AMP / 3 POLE CIRCUIT BREAKER TO FEED NEW WATER

HEATER WH-1. MATCH EXISTING CIRCUIT BREAKER TYPE, STYLE AND AIC RATINGS (10KAIC

MIN.).

c. BEFORE INSTALLING NEW BREAKER, FIELD VERIFY LOAD ON PANEL L2A OVER A CONTINUOUS

10-DAY PERIOD AND SUBMIT DATA TO ENGINEER FOR REVIEW AND APPROVAL FOR MAKING

ADDITION.

6. PROVIDE NEW TYPE WRITTEN PANEL DIRECTORIES FOR THE EXISTING MODIFIED PANELS.

7. FURNISH AND INSTALL BLANK COVERS FOR ANY OPEN SPACES IN MODIFIED PANELS.

8. REMOVE ALL REPLACED OR UN-USED EXISTING WIRING, TO ALLOW INSTALLATION OF NEW WIRING.

GENERAL SHEET NOTES

KEY NOTES

1 FURNISH AND INSTALL 2#12, 1#12G, 3/4"C FROM EQUIPMENT

TO SPARE 15A/1P BREAKER IN INDICATED PANEL

FURNISH AND INSTALL 3#1, 1#8G, 1-1/2"C FROM EQUIPMENT

TO NEW 100A/3P BREAKER IN INDICATED PANEL

FURNISH AND INSTALL 4' LED STRIP LIGHT MOUNTER ON

CEILING EQUAL TO LITHONIA MODEL CSS L48 4000LM MVOLT

40K 80CRI

LAB

G-2A

GROWTH

CHAMBER

G-2B

CORR

A

STAIRELEV

CLOSET

G-11

CLOSET

G-10

S

LIGHT SWITCH WITH

COVERPLATE

EXISTING PANELS

GFI RECEPTACLE

EQ

U

IP

M

EN

T

BENCH

BENCH

SINK

SINK

TABLE W/

INSTRUMENT

TABLE

TABLE

ES

/E

W -1

ES

/E

W -1

ES/EW-1

P1A

100A/3P

WH-1

P1A

P1A P1A & L1A

P2A

PUMP RCP-2

PUMP RCP-1

MS

MS PANEL P2A LOCATED

HERE ON 2ND FLOOR

OFFICE

G-1

LAB

G-2A

GROWTH

CHAMBER

G-2B

CORR

A

STAIRELEV

CLOSET

G-11

CLOSET

G-10

RESTROOM

G-9

FILM ROOM

G-8

GROWTH

CHAMBER

G-3

LAB

G-5

FREEZER ROOM

G-7

MECH

G-29

MECH

G-30

MECH

G-31

DA

RK

R

OO

M G-

CORR

B

ELECT

G-21

G-22

LAB

G-23

LOADING DOCK

G-25

CHEMICAL

STORAGE

G-26

OFFICE

G-45

OFFICE

G-44

OFFICE

G-33

MIKE OFFICE

G-34

STAIR

MECH

G-42

COLD ROOM

G-41

CO

RR C

TOOL SHOP

G-35

OFFICE

G-36

STORAGE

G-40

LAB

G-37A

LAB

G-37B

MECH

G-38

BREAK ROOM

G-39

LAB

G-13

S

LIGHT SWITCH WITH

COVERPLATE

EXISTING PANELS

GFI RECEPTACLE

GROWTH

CHAMBER

EQUIPMENT

EQ

U

IP

M

EN

T

TABLE

EQ

U

IP

M

EN

T

EQUIPMENT

BE

N

C H

BE

N

C H

BE

N

C H

BENCH

BENCH

BENCH

BENCH

BE

N

C H

FU

M

E H

O O

D

LA

R

G E

SI

N

K

LARGE SINKSINK

SI

N

K

SI

N

K

SINK

SINK

SI

N

K

TABLE W/

INSTRUMENT

TABLE TABLE

SHELVING

SHELVING

SHELVING

SHELVING

REFRIG.

REFRIG.

SHLV.

DEWAR

DEWAR

FREEZER FREEZER

FREEZER FREEZER

FR

EE

ZE

R

FR

EE

ZE

R

TABLE

TABLE

TABLE

TABLE

TABLE

AUTOCLAVE

CART CHEM

STG. CAB SHELVING

CART

CABINET TRASH TRASH TRASH

C H

EM

ST

G . C

AB

SHELVING

DEWAR

C

YL

IN

D

ER

Z

O N

E

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

CHEM

STG. CAB

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

TA

BL

E

BE

N

C H

SI

N

K

TABLE W/

INSTRUMENT

TA

BL

E W

IN

ST

R

U M

EN

T

G

AS

C

YL

IN

D

ER

SHELVING

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES/EW-1

ES/EW-1

ES/EW-1

ES/EW-1

P1A

100A/3P

WH-1

P1A

P1A P1A & L1A

P2A

PUMP RCP-2

PUMP RCP-1

ELECTRICAL PLAN - GROUND FLOOR

SCALE: 1/8" = 1'-0" NO

RT

H

EXISTING PANEL G3

FAC

P

EXISTING PANELS

P1C & P1CA

FOR ENLARGE PLAN

SEE DETAIL 2/E001

MS

MS

PANEL P2A LOCATED

HERE ON 2ND FLOOR

ALL WORK SHOWN IS

BASE BID

E001

GENERAL NOTES,

SYMBOLS AND

FLOOR PLAN

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

PUMP SCHEDULE

RECIRC. PUMPRP-1 30 34 - - 120V-1ø 1.48 4300 TACO 0034eP-SF-2 -

UNIT

DESG

SERVICE GPM FT

HD

SIZE

(IN) HP VOLTAGE/

PHASE AMPS RPM MANUFACTURER'S

MODEL NO NOTES

PLUMBING FIXTURE ROUGH-IN SCHEDULE

TYPE OF FIXTUREDESIG. HWCW SAN NOTES

P-1 SAFETY SHOWER / EYEWASH

TW GAS

2" / FD1-1/4" - -

QUANTITY

FLOW

RATES

20/3 gpm

TANK PUMPRP-2 14 16 - - 1.48 4300 TACO 0034eP-SF-2 -

SITE PLAN

NOT TO SCALE

WASTE WATER CONTAINMENT

TANK LOCATION

FEDERAL NUTRITION

GREENHOUSES

ARBORETUM RD

ROBERT W. HOLLEY CENTER

FOR AGRICULTURE & HEALTH -

USDA ARS

FEDERAL NEMATODE

LABORATORY

CORNELL UNIVERSITY

HOSPITAL FOR ANIMALS

BOYCE THOMPSON INSTITUTE

PO

ST

C

IR

1 DRAWING NOTE REFERENCE (I.E., KEY NOTES)

W/O W/

WCO

V U.O.N.

UL

U/S U/G U/F

TYP

THRU

RM

RLA

RE:

RCP

QTY.

PVC

PSI

PSF

PROVIDE

PNL

PH

O/C N/O,N/C

NO.

NFPA

N/A

MIN

MCA

MAX

LRA

LB

L kW

JUNCTION BOX

INCH, INCHES

HERTZ

HORSEPOWER

HEIGHT

NATURAL GAS

ELECTRIC WATER COOLER

EQUIPMENT

TWO-WAY GRADE CLEANOUT

COPPER, CONDENSING UNIT

AIR HANDLING UNIT

ABOVE FINISHED GRADE

ABOVE FINISHED FLOOR

ABOVE COUNTERTOPACT

AFF

AFG

AHU

BS

CU

DCO

EQUIP

EWC

G

H

HP

HZ

IN.

J-BOX

°F DEGREES FAHRENHEIT

KILOWATT

LENGTH

POUNDS

LOCKED ROTOR AMPS

MAXIMUM

MINIMUM CIRCUIT AMPACITY

MINIMUM

NOT APPLICABLE

NATIONAL FIRE PROTECTION

ASSOCIATION

NUMBER

NORMALLY OPEN, NORMALLY CLOSED

ON CENTER

PHASE

PANEL

FURNISH AND INSTALL

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POLYVINYL CHLORIDE

QUANTITY

REFLECTED CEILING PLAN

REFERENCE, REFER

RUNNING LOAD AMPS

ROOM

THROUGH

TYPICAL

UNDERFLOOR

UNDERGROUND

UNDERSLAB

UNDERWRITERS LABORATORIES, INC.

UNLESS OTHERWISE NOTED

SANITARY VENT

WALL CLEANOUT

WITH

WITHOUT

RE: 2/E1.71

SHEET NUMBER

DRAWING/DETAIL NUMBER

REFER TO

SHEET WHERE SHOWN

DIAGRAM NO.

PLUMBING RISER DIAGRAM DESIGNATION

SHUT-OFF / ISOLATION VALVE

END RISE (90° ELL)

END DROP (90° ELL)

DESCRIPTION

DOMESTIC HOT WATER

DOMESTIC COLD WATER

SYMBOL

DOMESTIC HOT/TEMPERED WATER CIRCULATION

ALL WORK SHALL CONFORM TO THE INTERNATIONAL PLUMBING CODE

AS WELL AS ALL FEDERAL, STATE AND LOCAL CODES.

COORDINATE PLUMBING WORK WITH ALL EXISTING CONDITIONS.

LOCATIONS ARE APPROXIMATE AND NOT ALL M/P/FP DEVICES AND

FIXTURES MAY BE INDICATED (FIELD VERIFY ALL M/P/FP ITEMS).

PLUMBING EQUIPMENT ANDS PIPING SHALL BE PROPERLY AND

SECURELY ATTACHED TO BUILDING STRUCTURAL COMPONENTS. ALL

FASTENERS AND HARDWARE SHALL BE APPROVED FOR THE

INSTALLATION AND THE CONDITIONS ENCOUNTERED.

CONTRACTOR SHALL VERIFY ALL STRUCTURAL, ARCHITECTURAL,

MECHANICAL, PLUMBING CONDITIONS AND EXISTING KITCHEN

EQUIPMENT..

ALL PLUMBING WORK SHALL BE CAREFULLY COORDINATED WITH THE

WORK OF OTHER TRADES AND ON-SITE CONDITIONS. WHERE CUTTING,

DRILLING OR ALTERATION TO THE WORK OF OTHERS IS NECESSARY,

FOR THE PROPER INSTALLATION OF EQUIPMENT, SUCH WORK SHALL

BE PLANNED IN ADVANCE WITH THE GENERAL CONTRACTOR AND

SHALL BE CAREFULLY DONE. ANY DAMAGE TO THE BUILDINGS OR

EQUIPMENT SHALL BE REPAIRED BY PROPERLY TRAINED PERSONNEL,

TO THE SATISFACTION OF THE OWNER, AT NO ADDITIONAL COST TO

THE OWNER.

DURING ROUGH IN AND FINISHED STAGES OF CONSTRUCTION,

CONTRACTORS SHALL BE RESPONSIBLE TO PROTECT AND KEEP CLEAN

ALL PLUMBING EQUIPMENT, PIPING AND DEVICES.

THE CONTRACTOR SHALL PROVIDE ALL INFORMATION ABOUT

EQUIPMENT, WHICH HE IS FURNISHING, TO THE GENERAL

CONTRACTOR FOR COORDINATION PURPOSES. THE CONTRACTOR

SHALL PROVIDE ALL INSTALLATION DETAILS AND SUPPORT

COMPONENTS TO THE GENERAL CONTRACTOR SO THAT THESE MAY BE

BUILT INTO THE CONSTRUCTION IN A TIMELY MANNER.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE

FINAL LOCATIONS OF ALL PLUMBING DETAILS SO THAT THE

ASSOCIATED PLUMBING WORK WILL BE PROPERLY COORDINATED AND

INSTALLED.

THE CONSTRUCTION IS LOCATED IN AN OCCUPIED FACILITY;

COORDINATE WITH THE OWNER TO SCHEDULE WORK AT LEAST SEVEN

DAYS PRIOR TO THE COMMENCEMENT OF WORK.

1.

BUILDING DRAIN (BELOWBD

SD STORM DRAIN (BELOW FLOOR)

DEGREES CELSIUS°C

BUILDING SEWR (OUTSIDE

ST STORM WATER (ABOVE CEILING)

SSD SUB-SURFACE DRAIN

GREASE WASTE DRAINGD

GREASE WASTEGW

FLOOR SINKFS

DOMESTIC HOT WATERHW

DOMESTIC HOT WATERHWC

DOMECTIC COLD WATERCW

FLOOR DRAINFD

W SANITARY WASTE (ABOVE FLOOR)

DEGREESDEG

GRADE CLEANOUTGCO

PCO PLUG CLEANOUT

NFWH NON-FREEZE WALL HYDRANT

FLOOR CLEANOUTFCO

FOOT, FEETFT.

BELOW FLOORB/F

VTR SANITARY VENT THRU ROOF

TP TRAP PRIMER

RPBFP REDUCED PRESSURE PRINCIPLE

RPZ REDUCED PRESSURE ZONE

INVERT ELEVATIONIE

HOT WATER TEMPERATUREHWTM

APPROXIMATEAPPROX

ABOVE CEILINGA/C

ARCHITECT/ENGINEERA/E

EQUIPMENT DRAIND

/ AIR CONDITIONER

FLOOR)

OF BLDG)

(BELOW FLOOR)

(ABOVE CEILING)

CIRCULATION LOOP

MAINTENANCE CABLE

BACKFLOW PREVENTER

RD ROOF DRAIN

OFD ROOF OVERFLOW DRAIN

2.

3.

4.

5.

6.

7.

8.

9.

10.

EXISTING(E)

DESCRIPTIONSYMBOL

CONNECTION INTO EXISTING

VALVES AND FITTINGS

MISCELLANEOUS

ABBREVIATIONS SYMBOLS/LINE TYPES GENERAL NOTES

NOTE: ALL SYMBOLS AND ABBREVIATIONS SHOWN

ARE NOT NECESSARILY USED ON THE DRAWINGSPLUMBING SYMBOLS AND ABBREVIATIONS

DRAWING/DETAIL REFERENCE

P3.1

LIMIT OF DEMOLITION

PLUMBING GENERAL NOTES & SYMBOLS

PLUMBING DEMOLITION GROUND FLOOR

PLUMBING DEMOLITION FIRST FLOOR

DRAWING INDEX

PLUMBING DEMOLITION SECOND FLOOR

P001

PD101

PD102

PD103

PLUMBING DEMOLITION THIRD FLOORPD104

GROUND FLOOR - ABOVE CEILING PLUMBING PLAN

FIRST FLOOR - ABOVE CEILING PLUMBING PLAN

SECOND FLOOR - ABOVE CEILING PLUMBING PLAN

THIRD FLOOR - ABOVE CEILING PLUMBING PLAN

P101

P102

P103

P104

GROUND FLOOR - PLUMBING DRAINAGEP105

FIRST FLOOR - PLUMBING DRAINAGE

SECOND FLOOR - PLUMBING DRAINAGE

THIRD FLOOR - PLUMBING DRAINAGE

P106

P107

P108

DETAILS AND TEMPERED WATER RISER DIAGRAMP109

DRAINAGE RISER DIAGRAMS

DETAILS

P110

P111

T DOMESTIC TEMPERED WATER

WATER HEATER SCHEDULE

DESIG. EWT ( F) NOTES

WH-1

NOTES:

BASIS OF DESIGN - RHEEM COMMERCIAL HEAVY DUTY1.

208V, 3P45 1

DESCRIPTION

WATER HEATER

LWT ( F)

KW

ELEC. CHAR.

120V-1ø

MECHANICAL ROOM FLOOR DRAIN JOSAM FD-100S

PLUMBING EQUIPMENT BOD SCHEDULE

DESCRIPTION/CAPACITY MANUFACTURER AND

MODEL NO.

FLOOR DRAIN WITH TRAP SEAL ZURN Z415B WITH Z1072

HOT WATER STORAGE TANK RHEEM MODEL ST320A

TEMPERED WATER HEATER RHEEM MODEL ES85-24-G (WITH 85 GALLON TANK)

TEMPERED WATER INSULATION ARMACEL ARMAFLEX BLACK

WITH 1" WALL THICKNESS

CIRCUIT SETTER

BASE CONTRACT WORK

PLUMBING

BASE CONTRACT WORK

PLUMBING

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

P001

GENERAL NOTES,

SYMBOLS AND

SCHEDULES

AutoCAD SHX Text N

GROWTH

CHAMBER

EQUIPMENT

EQ

U

IP

M

EN

T

TABLE

EQ

U

IP

M

EN

T

EQUIPMENT

BE

N

C H

BE

N

C H

BE

N

C H

BENCH

BENCH

BENCH

BENCH

BE

N

C H

FU

M

E H

O O

D

LA

R

G E

SI

N

K

LARGE SINKSINK

SI

N

K

SI

N

K

SINK

SINK

SI

N

K

TABLE W/

INSTRUMENT

SH

EL

VE

S

TABLE

LOW

PARTITION

TABLE TABLE

SHELVING

SHELVING

SHELVING

SHELVING

REFRIG.

REFRIG.

SHLV.

DEWAR

DEWAR

FREEZER FREEZER

FREEZER FREEZER

FR

EE

ZE

R

FR

EE

ZE

R

TABLE

TABLE

TABLE

TABLE

TABLE

AUTOCLAVE

CART CHEM

STG. CAB SHELVING

CART

CABINET TRASH TRASH TRASH

C H

EM

ST

G . C

AB

SHELVING

DEWAR

C

YL

IN

D

ER

Z

O N

E

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

C H

EM

ST

G . C

AB

CHEM

STG. CAB

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

TA

BL

E

BE

N

C H

SI

N

K

TABLE W/

INSTRUMENT

TA

BL

E W

IN

ST

R

U M

EN

T

G

AS

C

YL

IN

D

ER

SHELVING

GROUND FLOOR - DEMOLITION

SCALE: 1/8" = 1'-0"

OFFICE

G-1

LAB

G-2A

GROWTH

CHAMBER

G-2B

CORR

A

STAIR

ELEV

CLOSET

G-11

CLOSET

G-10

RESTROOM

G-9

FILM ROOM

G-8

GROWTH

CHAMBER

G-3

LAB

G-5

FREEZER ROOM

G-7

MECH

G-29

MECH

G-30

MECH

G-31

DA

RK

R

OO

M G-

CORR

B

ELECT

G-21

G-22

LAB

G-23

LOADING DOCK

G-25

CHEMICAL

STORAGE

G-26

OFFICE

G-45

OFFICE

G-44

OFFICE

G-33

MIKE OFFICE

G-34

STAIR

MECH

G-42

COLD ROOM

G-41

CORR

C

TOOL SHOP

G-35

OFFICE

G-36

STORAGE

G-40

LAB

G-37A

LAB

G-37B

MECH

G-38

BREAK ROOM

G-39

NO

RT

H

LAB

G-13

1. (E) ~ EXISTING TO REMAIN

(R) ~ EXISTING TO BE RELOCATED

(D) ~ EXISTING TO BE DEMOLISHED

2. CONTRACT DOCUMENTS ARE BASED ON LIMITED OWNER FURNISHED DRAWINGS AND LIMITED SITE OBSERVATION, NOT ALL SYSTEMS ARE SHOWN. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

EXISTING CONDITIONS AND WAYS AND MEANS OF CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE WITH FACILITIES PRIOR TO TERMINATION OF ANY SERVICES WHICH

MIGHT AFFECT SPACES OUT SIDE OF SCOPE ARE.

GENERAL SHEET NOTES

KEY NOTES

1 REMOVE EXISTING SHOWER/EYEWASH AND CAP CW AND HW AT CEILING.

EXISTING SHOWER/EYEWASH TO REMAIN IN SERVICE.2

THE CONTRACTOR SHALL:

1. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE OWNER'S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO MINIMIZE DISRUPTION OF OWNER'S OPERATIONS. EXCESSIVE NOISE OR VIBRATION SHALL BE PRE-APPROVED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE. IN ALL

CASES, PROVISIONS SHALL BE MADE FOR USER'S SAFETY.

2. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE OWNER'S REPRESENTATIVE.

3. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE

LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS THROUGHOUT THE WORK.

4. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS AND NOTIFY THE OWNER

REPRESENTATIVE OF ANY DISCREPANCIES.

5. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS AND EQUIPMENT FROM DAMAGE DUE TO

ANY DEMOLITION OR CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS CONTRACT.

6. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT OF DEMOLITION OR CONSTRUCTION TO

MATCH EXISTING FINISH AND/OR CONDITION.

DEMOLITION GENERAL NOTES

OPTION 3 CONTRACT WORK

PLUMBING

PD101

GROUND FLOOR

DEMOLITION

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4 0

SCALE: 1/8" = 1'-0"

8 8 16

FUME HOOD FUME HOOD FUME HOOD

FUME HOODFUME HOOD

FU

M

E H

O O

D

FU

M

E H

O O

D

BE

N

C H

BENCH

TABLE

BENCH

BENCH

TABLE W/

MICROSCOPE

BENCH

BENCH

MOVABLE

BENCH

BENCH

BENCH

BENCH

MICROSCOPE

TABLE

BENCH

BENCH BENCH

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

EQUIPMENT

EQUIPMENT

DESK

FREEZER

SI

N

K SI

N K

SI

N

K

SI

N

K

SI

N

K

SI

N K

SINK SINK

SINK

R

EF

R

IG

R

EF

R

IG

D

ES

K

SHELVES

& BOXES

BE

N

C H

SHELVING

BE

N

C H

C

AB

IN

ET

TABLE W/

INSTRUMENTS

TABLE CABINET TABLE CABINET

CONSOLE

REFRIG.REFRIG.

C

AB

IN

ET

FILE

CABS.

TA

BL

E

SH

LV

C

AB

IN

ET

C

AB

IN

ET

SHELVING

REFRIG.

FILE

CABS.

BE

N

C H

SHELVINGBENCH

SH

LV

EQUIP EQUIP

BENCH BENCH

BE

N

C H

BE

N

C H

TA

BL

E

TA

BL

E

FILE

BENCH

FIRST FLOOR - DEMOLITION

SCALE: 1/8" = 1'-0"

1. (E) ~ EXISTING TO REMAIN

(R) ~ EXISTING TO BE RELOCATED

(D) ~ EXISTING TO BE DEMOLISHED

2. CONTRACT DOCUMENTS ARE BASED ON LIMITED OWNER FURNISHED DRAWINGS AND LIMITED SITE OBSERVATION, NOT ALL SYSTEMS ARE SHOWN. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

EXISTING CONDITIONS AND WAYS AND MEANS OF CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE WITH FACILITIES PRIOR TO TERMINATION OF ANY SERVICES WHICH

MIGHT AFFECT SPACES OUT SIDE OF SCOPE ARE.

GENERAL SHEET NOTES

KEY NOTES

1 REMOVE EXISTING SHOWER/EYEWASH AND CAP CW AND HW AT CEILING.

LAB

MAIL ROOM

CORR

A

STAIR

ELEV

LAB

MECH

COLD ROOM

RESTROOM

OFFICE

102A

STORAGE

OFFICE

LAB

LAB

CONF. ROOM

OFFICE

OFFICE

CORR

B

OFFICE

OFFICE

OFFICE

OFFICE

STAIR

LAB

LAB

OFFICE

OFFICE

CORR

C

MECH

MECH

COLD ROOM

RESTROOM

LAB

LAB

NO

RT

H

THE CONTRACTOR SHALL:

1. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE OWNER'S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO MINIMIZE DISRUPTION OF OWNER'S OPERATIONS. EXCESSIVE NOISE OR VIBRATION SHALL BE PRE-APPROVED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE. IN ALL

CASES, PROVISIONS SHALL BE MADE FOR USER'S SAFETY.

2. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE OWNER'S REPRESENTATIVE.

3. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE

LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS THROUGHOUT THE WORK.

4. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS AND NOTIFY THE OWNER

REPRESENTATIVE OF ANY DISCREPANCIES.

5. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS AND EQUIPMENT FROM DAMAGE DUE TO

ANY DEMOLITION OR CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS CONTRACT.

6. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT OF DEMOLITION OR CONSTRUCTION TO

MATCH EXISTING FINISH AND/OR CONDITION.

DEMOLITION GENERAL NOTES

OPTION 2 CONTRACT WORK

PLUMBING

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4 0

SCALE: 1/8" = 1'-0"

8 8 16

PD102

FIRST FLOOR

DEMOLITION

LFHBSC

BSC

LFH BSC

FUME HOODFUME HOODFUME HOODFUME HOOD

FUME HOOD

FUME HOOD FUME HOOD FUME HOOD

FU

M

E H

O O

D

FU

M E

H O

O D

REFRIG.

EQUIPMENT

SHELVES

W/ EQUIP

REFRIG.

EQ

U

IP

EQUIPMENT

BENCH

BENCH BENCH

CABINET

BENCH

BENCH

BENCHBE

N

C H

BENCH

BENCH

BENCH

BENCH

BENCH

SHELVING

BENCH

BENCH

BENCH

BENCH

BE

N

C H

BENCH BENCH

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

MOVABLE

BENCH

SI

N

K

SI

N K

SI

N

K

SI

N K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N K

SI

N

K

SI

N K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N K

SINK

SINK

SINK

BE

N C

H C

AB

IN

ET

SHELVING

R

EF

R

IG

SH

EL

VI

N G

R

EF

R

IG

EQ

U

IP

BE

N C

H

BE

N

C H

SHLV.

BE

N

C H

REFRIG.

REFRIG.

FREEZ.

SHLV.

SH

LV

SHLV.

REFRIG.

SHLV.

TOOLS

REFRIG.

REFRIG.

REFRIG. CYL.

SHLV.CABINET

BE

N

C H

BE

N

C H

CENTRIF.

DESK

TA

BL

E

BE

N

C H

BE

N

C H

SH

EL

VI

N

G

CENTRIF.

CENTRIF.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

R

EF

R

IG

REFRIG.

BE

N

C H

REFRIG.

CABINET

SH

LV

REFRIG.

SH

LV

C

AB

C

H

EM

ST

G

CABINET CABINET

REFRIG.

SH

LV

SH

LV

R

EF

R

IG

BE

N C

H BE

N

C H

R

EF

R

IG

BE

N C

H

BE

N

C H

TA

BL

E

R

EF

R

IG

REFRIG.

CABINET

C

AB

IN

ET

BE

N

C H

BE

N

C H

C

AB

IN

ET

BE

N

C H

TABLESHLV. SHLV.

M O

VA

BL

E

ST

AT

IO

N

CAGE

EQUIP

SH

EL

VI

N

G

M

IC

R O

SC

O

PE

TA

BL

E

CART

CAGE

EQUIP

MOVABLE

STATION

CAGE

EQUIP

D

ES

K

BE

N

C H

SECOND FLOOR - DEMOLITION

SCALE: 1/8" = 1'-0"

1. (E) ~ EXISTING TO REMAIN

(R) ~ EXISTING TO BE RELOCATED

(D) ~ EXISTING TO BE DEMOLISHED

2. CONTRACT DOCUMENTS ARE BASED ON LIMITED OWNER FURNISHED DRAWINGS AND

LIMITED SITE OBSERVATION, NOT ALL SYSTEMS ARE SHOWN. CONTRACTOR SHALL BE

RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS AND WAYS AND MEANS OF

CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE WITH FACILITIES PRIOR TO TERMINATION OF ANY

SERVICES WHICH MIGHT AFFECT SPACES OUT SIDE OF SCOPE ARE.

GENERAL SHEET NOTES

KEY NOTES

1 REMOVE EXISTING SHOWER/EYEWASH AND CAP CW AND HW AT CEILING.

N O

R

TH

CORR

A

STAIR

ELEV

LAB

OFFICE

LAB

LAB

OFFICE

206D

R Y

R O

O M

RESTROOM

COLD ROOM

MECH

LAB

OFFICE

OFFICE

OFFICE

OFFICE

222A

LAB

CORR

B

EQUIPMENT

ROOM

222B

FR

EE

ZE

R

R O

O M

2A

OFFICE

223B

OFFICE

LAB

OFFICE

STAIR

LAB

LAB

JC

CORR

C

COLD ROOM

RESTROOM

GENERAL

STORAGE

OFFICE

LAB

LAB

1 1

THE CONTRACTOR SHALL:

1. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE OWNER'S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO MINIMIZE DISRUPTION OF OWNER'S OPERATIONS. EXCESSIVE NOISE OR VIBRATION SHALL BE PRE-APPROVED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE. IN ALL

CASES, PROVISIONS SHALL BE MADE FOR USER'S SAFETY.

2. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE OWNER'S REPRESENTATIVE.

3. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE

LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS THROUGHOUT THE WORK.

4. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS AND NOTIFY THE OWNER

REPRESENTATIVE OF ANY DISCREPANCIES.

5. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS AND EQUIPMENT FROM DAMAGE DUE TO

ANY DEMOLITION OR CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS CONTRACT.

6. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT OF DEMOLITION OR CONSTRUCTION TO

MATCH EXISTING FINISH AND/OR CONDITION.

DEMOLITION GENERAL NOTES

OPTION 1 CONTRACT WORK

PLUMBING

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4 0

SCALE: 1/8" = 1'-0"

8 8 16

PD103

SECOND FLOOR

BSC

BSCBSC

FUME

HOOD

FUME HOOD

FUME HOOD

FUME HOOD

EQ

U

IP

REFRIG.

FR

EE

Z.

EQUIP

EQUIP EQUIP EQUIP

EQUIPEQUIPEQUIPTABLE TABLE W/

INSTRUMENT

TABLE

REFRIG.

CABINETSHELVING

BENCH

BENCH

TABLE

BENCH

BENCH

BENCH CABINET

BENCH

TABLE

BENCHSHELVING

BENCHBENCH

TABLE

BENCH

BENCH

BENCH

BENCH

DESK

TABLE W/

INSTRUMENT

CYL.

D

ES

K

TA

BL

E W

IN

ST

R

U M

EN

T

EQ

U

IP

D

ES

KD

ES

K

TA

BL

E W

IN

ST

R

U M

EN

T

D

ES

K

BE

N

C H

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SINK

SINK

SINK

SINK

SINK

SINK

CABINET

BE

N

C H

C

AB

IN

ET

TA

BL

E

C

AR

T

C

AR

T

TA

BL

E W

IN

ST

R

U M

EN

T

TA

BL

E

TABLE

DEWAR

TA

BL

E

TABLE W/

INSTRUMENT

M O

VA

BL

E

BE

N C

H

TABLE W/

INSTRUMENT

TABLE W/

INSTRUMENT

TA

BL

E W

IN

ST

R

U M

EN

T

TA

BL

E

D

ES

K

EQUIP

FREEZ.

BE

N

C H

BE

N

C H

C H

EM

ST

G . C

AB

W

AL

L

C

AB

IN

ET

S

TA

BL

E W

IN

ST

R

U M

EN

T

CABINET

EQUIP

TABLE

BE

N

C H

BE

N

C H

REFRIG.

SHELVING

CART

C

AB

IN

ET

BE

N

C H

REFRIG.

BE

N

C H

FREEZ.

BE

N

C H

BE

N

C H

FU

M

E H

O O

D

EQUIP

EQUIP

W

AL

L C

AB

IN

ET

S

TA

BL

E

SH

EL

VI

N G

SH

EL

VI

N

G

SH

EL

VI

N G

SINK

C

AB

IN

ET

SH

LV

DEWAR

DEWAR

EQUIP

CHEM

STG. CAB

BE

N

C H

BE

N

C H

FI

LE

FR

EE

Z.

BE

N C

H

BE

N

C H

EQ

U

IP

R

EF

R

IG

C

AR

T

TA

BL

E

TA

BL

E

SH

EL

VI

N

G

BO

XE

S

SH

EL

VI

N

G

M O

VA

BL

E

BE

N C

H

CART

REFRIG.

TABLE

CAGE

BO

XE

S

C H

EM

ST

G . C

AB

CABINET

DESK

BE

N

C H

THIRD FLOOR - DEMOLITION

SCALE: 1/8" = 1'-0"

1. (E) ~ EXISTING TO REMAIN

(R) ~ EXISTING TO BE RELOCATED

(D) ~ EXISTING TO BE DEMOLISHED

2. CONTRACT DOCUMENTS ARE BASED ON LIMITED OWNER FURNISHED DRAWINGS AND

LIMITED SITE OBSERVATION, NOT ALL SYSTEMS ARE SHOWN. CONTRACTOR SHALL BE

RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS AND WAYS AND MEANS OF

CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE WITH FACILITIES PRIOR TO TERMINATION OF ANY

SERVICES WHICH MIGHT AFFECT SPACES OUT SIDE OF SCOPE ARE.

GENERAL SHEET NOTES

KEY NOTES

1 REMOVE EXISTING SHOWER/EYEWASH AND CAP CW AND HW AT CEILING.

N O

R

TH

CORR

A

STAIR

ELEV

LAB

LAB

LAB

LAB

LAB

OFFICE

OFFICE

LAB EQUIPMENT

ROOM

LAB EQUIPMENT

ROOM

COLD ROOM

MECH

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORR

B

LAB

LAB

LAB

OFFICE

STAIR

LAB

LAB

OFFICE

CORR

C

MECH

PRINTER ROOM

AUTO CLAVE

ROOM

RESTROOM

OFFICE

RESTROOM

LAB

LAB

THE CONTRACTOR SHALL:

1. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE OWNER'S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO MINIMIZE DISRUPTION OF OWNER'S OPERATIONS. EXCESSIVE NOISE OR VIBRATION SHALL BE PRE-APPROVED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE. IN ALL

CASES, PROVISIONS SHALL BE MADE FOR USER'S SAFETY.

2. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE OWNER'S REPRESENTATIVE.

3. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE

LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS THROUGHOUT THE WORK.

4. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS AND NOTIFY THE OWNER

REPRESENTATIVE OF ANY DISCREPANCIES.

5. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS AND EQUIPMENT FROM DAMAGE DUE TO

ANY DEMOLITION OR CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS CONTRACT.

6. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT OF DEMOLITION OR CONSTRUCTION TO

MATCH EXISTING FINISH AND/OR CONDITION.

DEMOLITION GENERAL NOTES

BASE CONTRACT WORK

PLUMBING

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4 0

SCALE: 1/8" = 1'-0"

8 8 16

PD104

THIRD FLOOR

EQUIPMENT

EQ

U

IP

M

EN

T

TABLE

EQ

U

IP

M

EN

T

EQUIPMENT

BE

N

C H

BE

N

C H

BE

N

C H

BENCH

BENCH

BENCH

BENCH

BE

N

C H

FU

M

E H

O O

D

LA

R

G E

SI

N

K

LARGE SINKSINK

SI

N

K

SI

N

K

SINK

SINK

SI

N

K

TABLE W/

INSTRUMENT

TABLE TABLE

SHELVING

SHELVING

SHELVING

SHELVING

REFRIG.

REFRIG.

SHLV.

DEWAR

DEWAR

FREEZER FREEZER

FREEZER FREEZER

FR

EE

ZE

R

FR

EE

ZE

R

TABLE

TABLE

TABLE

TABLE

TABLE

AUTOCLAVE

CART CHEM

STG. CAB SHELVING

CART

CABINET TRASH TRASH TRASH

C H

EM

ST

G . C

AB

SHELVING

DEWAR

C

YL

IN

D

ER

Z

O N

E

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

CHEM

STG. CAB

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

C H

EM

ST

G . C

AB

C

H

EM

ST

G

. C

AB

TA

BL

E

BE

N

C H

SI

N

K

TABLE W/

INSTRUMENT

TA

BL

E W

IN

ST

R

U M

EN

T

G

AS

C

YL

IN

D

ER

SHELVING

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES/EW-1

ES/EW-1

ES/EW-1

ES/EW-1

GROUND FLOOR - ABOVE CEILING PLUMBING PLAN

SCALE: 1/8" = 1'-0"

NO

RT

H

OFFICE

G-1

LAB

G-2A

GROWTH

CHAMBER

G-2B

CORR

A

STAIR

ELEV

CLOSET

G-11

CLOSET

G-10

RESTROOM

G-9

FILM ROOM

G-8

GROWTH

CHAMBER

G-3

LAB

G-5

FREEZER ROOM

G-7

MECH

G-29

MECH

G-30

MECH

G-31

DA

RK

R

OO

M G-

CORR

B

ELECT

G-21

G-22

LAB

G-23

LOADING DOCK

G-25

CHEMICAL

STORAGE

G-26

OFFICE

G-45

OFFICE

G-44

OFFICE

G-33

MIKE OFFICE

G-34

STAIR

MECH

G-42

COLD ROOM

G-41

CO

RR C

TOOL SHOP

G-35

OFFICE

G-36

STORAGE

G-40

LAB

G-37A

LAB

G-37B

MECH

G-38

BREAK ROOM

G-39

LAB

G-13

T

T

T

T T

T

T

TT

T T

T

1"

1 1/4"

1 1 /4"

1 1 /4"

1 1 /2"

1"

1 1/4"

1 1 /2"

1"

1"

1 1/4"

1 1 /2"

1"

1 1/4"

1 1/4"

1 1 /4"

1"

1 1/4"

1"

1 1 /4"

P-1

P-1

P-1

P-1

1 1/4"

P-1

P-1

P-1

P-1

1 1 /2"

T W

U P

1 1

/2" T

W R

UP

1 1/2"

1 1/2"1 1/2" CW

CONNECT TO

EXISTING CW

T

WH-1

ST-1

1 1

/2" C

W

1 1 /2"

1"

1. ALL WORK SHALL CONFORM TO THE INTERNATIONAL PLUMBING CODE .

2. LOCATIONS ARE APPROXIMATE AND NOT ALL M/P/FP DEVICES AND FIXTURES MAY BE INDICATED (FIELD

VERIFY ALL M/P/FP ITEMS).

3. PLUMBING PIPING SHALL BE PROPERLY AND SECURELY ATTACHED TO BUILDING STRUCTURAL COMPONENTS. ALL FASTENERS AND HARDWARE SHALL BE APPROVED FOR THE INSTALLATION AND THE

CONDITIONS ENCOUNTERED.

4. DURING ROUGH IN AND FINISHED STAGES OF CONSTRUCTION, THE M/P/FP CONTRACTORS SHALL BE RESPONSIBLE TO PROTECT AND KEEP CLEAN ALL M/P/FP EQUIPMENT, DUCTWORK, PIPING AND DEVICES.

5. THE CONTRACTOR SHALL PROVIDE ALL INFORMATION ABOUT EQUIPMENT, WHICH HE IS FURNISHING, TO

THE GENERAL CONTRACTOR FOR COORDINATION PURPOSES.

6. THE CONTRACTOR SHALL PROVIDE ALL INSTALLATION DETAILS AND SUPPORT COMPONENTS TO THE GENERAL CONTRACTOR SO THAT THESE MAY BE BUILT INTO THE CONSTRUCTION IN A TIMELY MANNER.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE FINAL LOCATIONS OF PLUMBING

EQUIPMENT DETAILS SO THAT THE ASSOCIATED WORK WILL BE PROPERLY COORDINATED AND

INSTALLED.

PLUMBING GENERAL NOTES

CIRCUIT SETTER

(2.5 GPM)

CIRCUIT SETTER

(2.5 GPM)

OPTION 3 CONTRACT WORK

PLUMBING

OPTION 3 CONTRACT WORK

PLUMBING

OPTION 3 CONTRACT WORK

PLUMBING

OPTION 3 CONTRACT

WORK PLUMBING

UNLESS OTHERWISE CLOUDED, WORK

THIS FLOOR SHALL BE PART OF BASE

CONTRACT WORK - PLUMBING

NOTE:

PUMP RCP-2

PUMP RCP-1

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4 0

SCALE: 1/8" = 1'-0"

8 8 16

P101

GROUND FLOOR

ABOVE CEILING

PLUMBING PLAN

FU

M

E H

O O

D

FU

M

E H

O O

D

BE

N

C H

BENCH

TABLE

BENCH

BENCH

TABLE W/

MICROSCOPE

BENCH

BENCH

MOVABLE

BENCH

BENCH

BENCH

BENCH

MICROSCOPE

TABLE

BENCH

BENCH BENCH

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

EQUIPMENT

EQUIPMENTDESK

FREEZER

SI

N

K SI

N

K

SI

N K

SI

N

K

SI

N

K

SI

N K

SINK SINK

SINK

R

EF

R

IG

R

EF

R

IG

D

ES

K

BE

N

C H

SHELVING

BE

N

C H

C

AB

IN

ET

TABLE W/

INSTRUMENTS

TABLE CABINET TABLE

CONSOLE

REFRIG.REFRIG.

C

AB

IN

ET

FILE

CABS.

TA

BL

E

SH

LV

C

AB

IN

ET

C

AB

IN

ET

SHELVING

REFRIG.

FILE

CABS.

BE

N

C H

SHELVING

SH

LV

EQUIP

BENCH BENCH

BE

N

C H

BE

N

C H

TA

BL

E

TA

BL

E

FILE

BENCH

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES/EW-1

ES/EW-1

ES/EW-1

ES

/E

W -1

FIRST FLOOR - ABOVE CEILING PLUMBING PLAN

SCALE: 1/8" = 1'-0"

NO

RT

H

LAB

MAIL ROOM

CORR

A

STAIR

ELEV

LAB

MECH

COLD ROOM

RESTROOM

OFFICE

102A

STORAGE

OFFICE

LAB

LAB

CONF. ROOM

OFFICE

OFFICE

CORR

B

OFFICE

OFFICE

OFFICE

OFFICE

STAIR

LAB

LAB

OFFICE

OFFICE

CORR

C

MECH

MECH

COLD ROOM

RESTROOM

LAB

LAB

1 1 /2"

T W

1/2 " T

W R

UP

, 1

1/ 2"

T W

1/2

TW

R

DN

1 1 /2"

1" 1 1 /2"

1"

1"

P-1

P-1

P-1

P-1

P-1

P-1

P-1

1"

1 1/4"

1 1 /4"

1 1/2"

1 1 /4"

1 1/4"

T

T

T T

T

T T

T T

T

T

T1 1/4"

1 1 /4"

1 1/2" 1"

1 1/4" 1"

1 1 /4"

1 1 /2"

1. ALL WORK SHALL CONFORM TO THE INTERNATIONAL PLUMBING CODE .

2. LOCATIONS ARE APPROXIMATE AND NOT ALL M/P/FP DEVICES AND FIXTURES MAY BE INDICATED (FIELD

VERIFY ALL M/P/FP ITEMS).

3. PLUMBING PIPING SHALL BE PROPERLY AND SECURELY ATTACHED TO BUILDING STRUCTURAL COMPONENTS. ALL FASTENERS AND HARDWARE SHALL BE APPROVED FOR THE INSTALLATION AND THE

CONDITIONS ENCOUNTERED.

4. DURING ROUGH IN AND FINISHED STAGES OF CONSTRUCTION, THE M/P/FP CONTRACTORS SHALL BE RESPONSIBLE TO PROTECT AND KEEP CLEAN ALL M/P/FP EQUIPMENT, DUCTWORK, PIPING AND DEVICES.

5. THE CONTRACTOR SHALL PROVIDE ALL INFORMATION ABOUT EQUIPMENT, WHICH HE IS FURNISHING, TO

THE GENERAL CONTRACTOR FOR COORDINATION PURPOSES.

6. THE CONTRACTOR SHALL PROVIDE ALL INSTALLATION DETAILS AND SUPPORT COMPONENTS TO THE GENERAL CONTRACTOR SO THAT THESE MAY BE BUILT INTO THE CONSTRUCTION IN A TIMELY MANNER.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE FINAL LOCATIONS OF PLUMBING

EQUIPMENT DETAILS SO THAT THE ASSOCIATED WORK WILL BE PROPERLY COORDINATED AND

INSTALLED.

PLUMBING GENERAL NOTES

CIRCUIT SETTER

(2.5 GPM)

CIRCUIT SETTER

(2.5 GPM)

UNLESS OTHERWISE CLOUDED, WORK

THIS FLOOR SHALL BE PART OF OPTION 2

CONTRACT WORK - PLUMBING

NOTE:

BASE CONTRACT WORK

PLUMBING

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4 0

SCALE: 1/8" = 1'-0"

8 8 16

P102

FIRST FLOOR

LFH BSC

FUME HOODFUME HOODFUME HOODFUME HOOD

FUME HOOD

FUME HOOD FUME HOOD FUME HOOD

FU

M

E H

O O

D

FU

M E

H O

O D

EQUIPMENT

SHELVES

W/ EQUIP

REFRIG.

EQ

U

IP

EQUIPMENT

BENCH

BENCH BENCH

CABINET

BENCH

BENCH

BENCHBE

N

C H

BENCH

BENCH

BENCH

BENCH

BENCH

SHELVING

BENCH

BENCH

BENCH

BENCH

BE

N

C H

BENCH BENCH

BE

N

C H

BE

N

C H

BE

N

C H

BE

N

C H

SI

N

K

SI

N K

SI

N

K

SI

N K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N K

SI

N

K

SI

N K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N K

SINK

SINK

SINK

BE

N C

H

SHELVING

R

EF

R

IG

SH

EL

VI

N G

R

EF

R

IG

EQ

U

IP

BE

N C

H

BE

N

C H

SHLV.

BE

N

C H

REFRIG.

REFRIG.

FREEZ.

SHLV.

SHLV.

REFRIG.

TOOLS

REFRIG.

REFRIG.

REFRIG. CYL.

SHLV.CABINET

BE

N

C H

BE

N

C H

CENTRIF.

DESK

TA

BL

E

BE

N

C H

BE

N

C H

SH

EL

VI

N

G

CENTRIF.

CENTRIF.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

FR

EE

Z.

R

EF

R

IG

REFRIG.

BE

N

C H

REFRIG.

CABINET

REFRIG.

SH

LV

C

AB

C

H

EM

ST

G

CABINET CABINET

SH

LV

SH

LV

R

EF

R

IG

BE

N C

H BE

N

C H

R

EF

R

IG

BE

N C

H

BE

N

C H

TA

BL

E

R

EF

R

IG

NEW 6" STUD

WALL

REFRIG.

CABINET

C

AB

IN

ET

BE

N

C H

BE

N

C H

C

AB

IN

ET

BE

N

C H

TABLESHLV.

M O

VA

BL

E

ST

AT

IO

N

SH

EL

VI

N

G

M

IC

R O

SC

O

PE

TA

BL

E

CART

CAGE

EQUIP

MOVABLE

STATION

CAGE

EQUIP

BE

N

C H

ES

/E

W -2

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES/EW-1

ES/EW-1

ES/EW-1

D

ES

K

CAGE

EQUIP

ES/EW-1

SECOND FLOOR - ABOVE CEILING PLUMBING PLAN

SCALE: 1/8" = 1'-0"

NO

RT

H

CO

RR A

STAIR

ELEV

LAB

OFFICE

LAB

LAB

OFFICE

DR

Y

RO

OM

RESTROOM

COLD ROOM

MECH

LAB

OFFICE

OFFICE

OFFICE

OFFICE

222A

LAB

CORR

B

EQUIPMENT

ROOM

222B

FR

EE

ZE

R

RO

OM

2A

OFFICE

223B

OFFICE

LAB

OFFICE

STAIR

LAB

LAB

JC

CO

RR C

COLD ROOM

RESTROOM

GENERAL

STORAGE

OFFICE

LAB

LAB

1 1/2" TW & 1" TWR UP,

1 1/2" TW & 1 1/2" TWR DN

1 1 /2"

1" 1 1 /2"

1"

1"

T

T

1 1 /4"

1 1/4"

1 1/4"

1 1/4"

1 1 /4"

1 1 /2"

1"

1 1/2"

1 1 /4"

1 1/4"

1"

1 1/4"

1 1/4"

1 1 /2"

1" 1 1

/4"

1 1 /4"

1 1/2" 1"

T T

T T

T

T

T

T

P-1

P-1 P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

1 1/2"

1 1/2"

1. ALL WORK SHALL CONFORM TO THE INTERNATIONAL PLUMBING CODE .

2. LOCATIONS ARE APPROXIMATE AND NOT ALL M/P/FP DEVICES AND FIXTURES MAY BE INDICATED (FIELD

VERIFY ALL M/P/FP ITEMS).

3. PLUMBING PIPING SHALL BE PROPERLY AND SECURELY ATTACHED TO BUILDING STRUCTURAL COMPONENTS. ALL FASTENERS AND HARDWARE SHALL BE APPROVED FOR THE INSTALLATION AND THE

CONDITIONS ENCOUNTERED.

4. DURING ROUGH IN AND FINISHED STAGES OF CONSTRUCTION, THE M/P/FP CONTRACTORS SHALL BE RESPONSIBLE TO PROTECT AND KEEP CLEAN ALL M/P/FP EQUIPMENT, DUCTWORK, PIPING AND DEVICES.

5. THE CONTRACTOR SHALL PROVIDE ALL INFORMATION ABOUT EQUIPMENT, WHICH HE IS FURNISHING, TO

THE GENERAL CONTRACTOR FOR COORDINATION PURPOSES.

6. THE CONTRACTOR SHALL PROVIDE ALL INSTALLATION DETAILS AND SUPPORT COMPONENTS TO THE GENERAL CONTRACTOR SO THAT THESE MAY BE BUILT INTO THE CONSTRUCTION IN A TIMELY MANNER.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE FINAL LOCATIONS OF PLUMBING

EQUIPMENT DETAILS SO THAT THE ASSOCIATED WORK WILL BE PROPERLY COORDINATED AND

INSTALLED.

PLUMBING GENERAL NOTES

CIRCUIT SETTER

(2.5 GPM) CIRCUIT SETTER

(2.5 GPM)

BASE CONTRACT WORK

PLUMBING

UNLESS OTHERWISE CLOUDED, WORK

THIS FLOOR SHALL BE PART OF OPTION 1

CONTRACT WORK - PLUMBING

NOTE:

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M Street, NW, Suite 700 Washington, DC 20036

TEL: 202-909-4900

FAX: 202-785-7336

www.pagethink.com

12305B22F0058

10USDA.01.02

USDA ARS -

RWHC

Safety Shower and Emergency Eyewash Upgrade

A/E DRAWN BY:

ISSUED FOR

CONSTRUCTION

USDA COR:

USDA EPM.: V. EDWARDS

USDA S&H.: B. DI SALVO

USDA REAL PROP.: P. BORDELON

A/E PROJ. MGR.:

A/E DESIGNER.: PAGE - WA

A/E CHECKED BY: PAGE - MA

PAGE - DR

SHEET TITLE:

538 Tower Road, Ithaca, New York 14853

S. HOLSINGER

W. SHEKAILO

02/11/2025

Revisions

No. Date Item

4 0

SCALE: 1/8" = 1'-0"

8 8 16

P103

SECOND FLOOR

BSC

BSCBSC

FUME

HOOD

FUME HOOD

FUME HOOD

FUME HOOD

EQ

U

IP

REFRIG.

FR

EE

Z.

EQUIP

EQUIP EQUIP EQUIP

EQUIPEQUIPEQUIPTABLE TABLE W/

INSTRUMENT

TABLE

REFRIG.

CABINETSHELVING

BENCH

BENCH

TABLE

BENCH

BENCH

BENCH CABINET

BENCH

TABLE

BENCHSHELVING

BENCHBENCH

TABLE

BENCH

BENCH

BENCH

BENCH

DESK

TABLE W/

INSTRUMENT

CYL.

D

ES

K

TA

BL

E W

IN

ST

R

U M

EN

T

EQ

U

IP

D

ES

KD

ES

K

TA

BL

E W

IN

ST

R

U M

EN

T

D

ES

K

BE

N

C H

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SI

N

K

SINK

SINK

SINK

SINK

SINK

SINK

BE

N

C H

C

AB

IN

ET

TA

BL

E

C

AR

T

C

AR

T

TA

BL

E W

IN

ST

R

U M

EN

T

TA

BL

E

TABLE

DEWAR

TA

BL

E W

IN

ST

R

U M

EN

T

M O

VA

BL

E

BE

N C

H

TABLE W/

INSTRUMENT

TABLE W/

INSTRUMENT

TA

BL

E W

IN

ST

R

U M

EN

T

TA

BL

E

DESK

EQUIP

FREEZ.

BE

N

C H

BE

N

C H

C H

EM

ST

G . C

AB

W

AL

L

C

AB

IN

ET

S

TA

BL

E W

IN

ST

R

U M

EN

T

CABINET

EQUIP

TABLE

BE

N

C H

BE

N

C H

REFRIG.

SHELVING

NEW 6" STUD

WALL

CART

C

AB

IN

ET

BE

N

C H

REFRIG.

BE

N

C H

FREEZ.

BE

N

C H

BE

N

C H

FU

M

E H

O O

D

EQUIP

W

AL

L C

AB

IN

ET

S

TA

BL

E

SH

EL

VI

N G

SH

EL

VI

N

G

SH

EL

VI

N G

C

AB

IN

ET

DEWAR

DEWAR

EQUIP

CHEM

STG. CAB

BE

N

C H

BE

N

C H

FI

LE

FR

EE

Z.

BE

N C

H

BE

N

C H

EQ

U

IP

R

EF

R

IG

C

AR

T

TA

BL

E

TA

BL

E

SH

EL

VI

N

G

BO

XE

S

SH

EL

VI

N

G

M O

VA

BL

E

BE

N C

H

CART

REFRIG.

TABLE

CAGEBO

XE

S

CHEM

STG. CAB

CABINET

DESK

BE

N

C H

ES

/E

W -2

ES

/E

W -2

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES/EW-1

ES/EW-1

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

ES

/E

W -1

THIRD FLOOR - ABOVE CEILING PLUMBING PLAN

SCALE: 1/8" = 1'-0"

NO

RT

H

CO

RR A

STAIR

ELEV

LAB

LAB

LAB

LAB

LAB

OFFICE

OFFICE

LAB EQUIPMENT

ROOM

LAB EQUIPMENT

ROOM

COLD ROOM

MECH

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORR

B

LAB

LAB

LAB

OFFICE

STAIR

LAB

LAB

OFFICE

CO

RR C

MECH

PRINTER ROOM

AUTO CLAVE

ROOM

RESTROOM

OFFICE

RESTROOM

LAB

LAB

1 1/2" TW &

1" TWR DN

1 1 /2"

1" 1 1 /2"

1"

1"

T

T

1 1 /4"

1 1 /2"

1"

1 1/4"

1 1/4" 1"

1 1 /2"

1"

1 1/2" 1"

T

T T

T

T

P-1

1 1/4"

P-1

P-1

1 1/4"1 1 /4"

1 1 /4"

1 1 /4"

1 1 /4"

1 1 /4"

1 1/4"

P-1

P-1

P-1P-1

P-1

P-1

P-1

P-1

T

T

T

1 1/2" 1 1/4"

1. ALL WORK SHALL CONFORM TO THE INTERNATIONAL PLUMBING CODE .

2. LOCATIONS ARE APPROXIMATE AND NOT ALL M/P/FP DEVICES AND FIXTURES MAY BE INDICATED (FIELD

VERIFY ALL M/P/FP ITEMS).

3. PLUMBING PIPING SHALL BE PROPERLY AND SECURELY ATTACHED TO BUILDING STRUCTURAL COMPONENTS. ALL FASTENERS AND HARDWARE SHALL BE APPROVED FOR THE INSTALLATION AND THE

CONDITIONS ENCOUNTERED.

4. DURING ROUGH IN AND FINISHED STAGES OF CONSTRUCTION, THE M/P/FP CONTRACTORS SHALL BE RESPONSIBLE TO PROTECT AND KEEP CLEAN ALL M/P/FP EQUIPMENT, DUCTWORK, PIPING AND DEVICES.

5. THE CONTRACTOR SHALL PROVIDE ALL INFORMATION ABOUT EQUIPMENT, WHICH HE IS FURNISHING, TO

THE GENERAL CONTRACTOR FOR COORDINATION PURPOSES.

6. THE CONTRACTOR SHALL PROVIDE ALL INSTALLATION DETAILS AND SUPPORT COMPONENTS TO THE GENERAL CONTRACTOR SO THAT THESE MAY BE BUILT INTO THE CONSTRUCTION IN A TIMELY MANNER.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE FINAL LOCATIONS OF PLUMBING

EQUIPMENT DETAILS SO THAT THE ASSOCIATED WORK WILL BE PROPERLY COORDINATED AND

INSTALLED.

PLUMBING GENERAL NOTES

CIRCUIT SETTER

(2.5 GPM)

CIRCUIT SETTER

(2.5 GPM)

BASE CONTRACT WORK

PLUMBING

NORTHEAST AREA DIRECTOR'S OFFICE

10300 BALTIMORE AVENUE

BUILDING 003, ROOM 223

BELTSVILLE, MARYLAND 20705

PHONE NO. (309) 681-6118

FAX NO. (301) 504-5863

KEY PLAN

PROFESSIONAL CERTIFICATION. I HERE BY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,

AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE No.

EXPIRATION DATE: .

REGISTRATION / STAMP

PROJECT TITLE:

SHEET NO.

DATE:

CAD FILE NO.:

A/E PROJECT NO.:

USDA CONTRACT NO.:

LRS Federal, LLC Plumbing/FA/FP Engineers 565 Benfield Road, Suite 400 Severna Park, MD 21146

TEL: (410) 544-3570

www.lrsfederal.com

Page Southerland Page, Inc.

1615 M…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .