ATTACHMENT 2 - Drawings.pdf
PDF 25 MB Posted
- Attached to
- Y1DA--Expand SPS Minor Construction - Phoenix AZ Federal contract opportunity
- Solicitation number
- 36C77623B0032
About this file
This file is an attachment to a federal contract solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation, numbered 36C77623B0032, is for expanding minor construction at the Southern Arizona VA Health Care System campus in Phoenix, Arizona. Drawings are provided in the 25MB PDF file to specify requirements for the construction expansion project. Responses are due by the date listed on the solicitation. The award is expected to be made shortly thereafter to the successful offeror.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUTURE
DENTAL
BUILDING
FUTURE
BEHAVIORAL
HEALTH
BLDG. 13
EAST
BLDG. 13
WEST
3MC
BLDG 21
BUILDING
RESEARCH
BLDG 21B
LOADING
DOCK
LOADING
DOCK
PATIO
LOADING
DOCK
N O
PAR
KIN
G
E X
IS
T
IN
G
B U
ILD
IN
G
F F
.7
E X
IS
T
IN
G
B U
ILD
IN
G
F F
.8
BLDG 31
UNDERGROUND
CHILLED WATER
STORAGE
X
X X
X
X X
X X
FRONT
7TH STREET
MCMC
TRAFFIC
SIGNAL
3RD STREET
IN
D
IAN
SC
H O
O L R
O
AD
TRAFFIC
SIGNAL
TRAFFIC
SIGNAL
LOADING &
UNLOADING
FU
TU
R E
M V-G
EN
FU
TU
R
E M
V-G
EN
S S
S
SD SD
SD
GENERATOR
GEN #4
EMHEMH
EMH
EMH
H123
H122
CORNER OF TRACT "C"
FROM 30' TO 40' WIDE THIS SIDE.
STREET EXTENDED. ROW MAY VARY
76' 3.55" TO CENTERLINE OF THIRD
780' N 00D 03' 27" E
CORNER OF TRACT "G"
47' ROW
1,000' GRID LINES
NURSING HOME CARE FACILITY
702.67' N 45D 19' 44" E
ARIZONA STATE VETERANS
143.00' S 89D 24' 00" E
780' N 00D 03' 27" E
PL
499.23' N 00D 03' 27" E
1,336FEET 5.1589"
TO CENTER LINE OF CENTRAL AVENUE
3HC
EL EV.
RAMP
6LZ
BLDG 2
25 14
22 26
BLDG 16
T9
BLDG 10
EL
EC
T
EL
EC
T
MAIN HOSPITAL
AMBULATORY CARE CLINIC
(ACC)
REHABILITATION
BUILDING
BUILDING
PLANT
LAUNDRY
LEGAL
M&O
SHOPS
BLDG 1
MENTAL HEALTH
BUILDING
BLDG 8
LOADING
DOCK
WAREHOUSE/
STORAGE AREAS
EL
EC
T
PATIO
PATIO
PHARMACY
BLDG 34
M
V-PAR
ALLEL
SW
G
RM
V-ATS
EMH
10 10
N . 7
TH
S
T.
N . C
EN
TR
AL
A
VE
N . 7
TH
A
VE
N . 1
2T H
S T.
N . 2
4T H
S T.
N . 1
5T H
A
VE
N . 1
9T H
A
VE
N . 3
5T H
A
VE
N . 2
7T H
A
VE
E. INDIAN SCHOOL RD.
E. OSBORN RD.
THOMAS RD.
E. CAMELBACK RD.W. CAMELBACK RD.
W. MCDOWELL RD.
E. ROOSEVELT RD.
W. VAN BUREN ST.. E. VAN BUREN ST..
PROJECT SITE
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
COVER SHEET
G-001
RJFBAJ
EXPAND SUPPLY PROCESSING,
DECONTAMINATION AND DISTRIBUTION
CARL T. HAYDEN VA MEDICAL CENTER
PHOENIX, AZ
DEPARTMENT OF VETERANS AFFAIRS
CONTRACT NO. VA258-14-D-0019
PROJECT NO. 644-235
PROJECT WORK
AREA (BLDG 35)
N
TRUE
NORTH
SCOPE OF WORK:
PROJECT 644-235 IS TO PROVIDE CONSTRUCTION DOCUMENTS FOR EXPANSION OF THE SPD DEPARTMENT AREA;
SPACE FOR SUPPLY PROCESSING, DECONTAMINATION AND SPACE FOR SUPPLY DISTRIBUTION. THIS PROJECT DESIGN INTENT IS FOR A NEW TWO-STORY BUILDING TO BE LOCATED IN BETWEEN BUILDING #34 AND BUILDING #1, EXTENDING UP FROM THE ELECTRICAL VAULT FLOOR WHICH IS RECENTLY COMPLETED. THIS PROJECT WILL REQUIRE RENOVATING EXISTING ELECTRICAL VAULT SPACE FOR DEDICATED ELEVATOR(S), MECHANICAL SPACE FOR THE SPD AIR HANDLING UNITS AND THE BUILD OUT OF TWO STORIES OF NEW CONSTRUCTION ABOVE. THIS PROJECT ALSO INVOLVES THE CONSTRUCTION OF THE ELEVATOR TOWER TO EXTEND PASSED THE SECOND FLOOR ONTO THE
FUTURE THIRD FLOOR AND THE INSTALLATION OF THE ELEVATOR CABS.
LOCATION PLANVICINITY MAP
RENDERING
N
NORTH
DEDUCTIVE ALTERNATES:
DEDUCTIVE ALTERNATES ARE NOT IN ORDER OF PRIORITY. ANY ITEMS FROM THIS LIST CAN BE SELECTED REGARDLESS OF THE POSITION IN THE LIST. MUST OBTAIN COORDINATION AND APPROVAL BY VA PRIOR TO INCORPORATING ANY OF THESE OPTIONS INTO THE CONSTRUCTION.
DESIGNATED (LOW BID)
BASE BID ITEM 1: CONSTRUCTIONS COST ESTIMATE FOR THE ENTIRE SCOPE OF WORK.
BID ITEM 2: SAME AS ITEM 1 EXCEPT: REMOVE SPS CAR WASHER 1 OF 2.
BID ITEM 3: SAME AS ITEM 2 EXCEPT:SHELL OUT LOGISTICS 1ST FLOOR - LEAVING ONLY EMERGENCY LIGHTING AND FIRE SPRINKLERS.
BID ITEM 4: SAME AS ITEM 3 EXCEPT: REMOVE 1ST FLOOR'S HVAC AIR HANDLER.
BID ITEM 5: SAME AS ITEM 4 EXCEPT: REMOVE ELEVATOR CABS, RETAINING THE ELEVATOR SHAFTS AND SUPPORTING STRUCTURE.
BID ITEM 6: SAME AS ITEM 5 EXCEPT: REMOVE LED LIGHTING FROM 2ND FLOOR SPS.
BID ITEM 7: SAME AS ITEM 6 EXCEPT: REMOVE 2ND FLOOR SPS ADMIN OFFICES, TRAINING, AND CONFERENCE ROOMS.
BID ITEM 8: SAME AS ITEM 7 EXCEPT: REMOVE PIV CARD READERS AND AUTOMATIC DOOR OPENERS FROM SPS PROCESSING CENTER.
BID ITEM 9: SAME AS ITEM 8 EXCEPT: REMOVE AUTOMATIC LIGHTING CONTROLS FROM SPS PROCESSING CENTER.
BID ITEM 10: SAME AS ITEM 9 EXCEPT: REMOVE THE 2ND CART WASHER. WILL NEED AN EQUIPMENT COMMITTEE WAIVER TO PURCHASE THIS
BUILDING SYSTEM EQUIPMENT WASHER WITH LOCAL EQUIPMENT FUNDS
BID ITEM 11: SAME AS ITEM 10 EXCEPT: REMOVE THE TWO PASS-THROUGH SEALED WINDOWS FROM THE WALL SYSTEM BETWEEN
DECONTAMINATION AND STERILE PROCESSING.
BID ITEM 12: SAME AS ITEM 11 EXCEPT: REMOVE HEPA FILTERS FROM THE SPS SUITE SUPPLY CEILING MOUNTED REGISTERS.
BID ITEM 13: SAME AS ITEM 12 EXCEPT: REMOVE CERAMIC TILES FROM SPS SUITE SUPPLY CEILING MOUNTED REGISTERS.
BID ITEM 14: SAME AS ITEM 13 EXCEPT: OBTAIN A CFM WAIVER TO FOREGO PUSHING THE STREET BACK TO OBTAIN THE 50 FEET SET BACK REQUIREMENT. INSTEAD MATCH THE 25-FOOT SET BACK OF THE EXISTING MAIN HOSPITAL BUILDINGS ON EITHER SIDE OF THE NEW SPS BUILDING.
11/25/2021 4:33:34 PM
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
RJODKS
GI002
DRAWING INDEX
SHEET LIST TABLE
SHEET
NUMBER SHEET TITLE #
GENERAL
G-001 COVER SHEET 1
GI002 DRAWING INDEX 2
GL101 FIRST FLOOR LIFE SAFETY PLAN 3
GL102 SECOND FLOOR LIFE SAFETY PLAN 4
GX001 SITE PLAN LAYOUT AREA 5
CIVIL
C-001 GENERAL NOTES 6
C-002 CIVIL LEGEND AND ABBREVIATIONS 7
CD100 CIVIL DEMOLITION PLAN 8
CI100 CIVIL IMPROVEMENTS 9
C-500 CIVIL DETAILS 10
C-501 CIVIL DETAILS 11
STRUCTURAL
SE001 STRUCTURAL NOTES -1 12
SE002 STRUCTURAL NOTES - 2 13
SE003 STRUCTURAL NOTES -3 14
SE100 VAULT FRAMING PLAN 15
SE101 FIRST FLOOR FRAMING PLAN 16
SE102 SECOND FLOOR FRAMING PLAN 17
SE103 ROOF FRAMING PLAN 18
SE301 BUILDING SECTIONS 19
SE501 ELEVATOR AREA DETAILS 20
SE502 SOUTH STAIRCASE DETAILS 21
SE503 CONCRETE DETAILS 22
SE504 CMU DETAILS 23
SE505 SHEAR CONNECTION DETAILS- 1 24
SE506 SHEAR CONNECTION DETAILS- 2 25
SE507 MISCELLANEOUS CONNECTION DETAILS 26
SE508 COLUMN SPLICE DETAILS 27
SE509 MOMENT CONNECTION DETAILS 28
SE510 CLEANING STATION AREA FRAMING 29
SE511 HOLLOW CORE CONCRETE CONNECTION DETAILS 30
SE512 MACHINE ROOM PLATFORM DETAILS 31
ARCHITECTURAL
AG100 ABBREVIATIONS, LEGENDS AND NOTES 32
AD100 VAULT DEMOLITION PLAN 33
AD101 FIRST FLOOR DEMOLITION PLAN 34
AD102 SECOND FLOOR DEMOLITION PLAN 35
AD103 THIRD FLOOR DEMOLITION PLAN 36
AE100 VAULT FLOOR PLAN 37
AE101 FIRST FLOOR PLAN 38
AE102 SECOND FLOOR PLAN 39
AE103 ROOF PLAN 40
AE104 VAULT REFLECTED CEILING PLAN 41
AE105 FIRST FLOOR REFLECTED CEILING PLAN 42
AE106 SECOND FLOOR REFLECTED CEILING PLAN 43
AE107 FIRST FLOOR FINISHES PLAN 44
AE108 SECOND FLOOR FINISHES PLAN 45
AE109 FIRST FLOOR FURNITURE AND EQUIPMENT PLAN 46
AE110 SECOND FLOOR FURNITURE AND EQUIPMENT PLAN 47
AE111 FIRST FLOOR SIGNAGE PLAN 48
AE112 SECOND FLOOR SIGNAGE PLAN 49
AE201 SOUTH AND EAST ELEVATIONS 50
AE202 WEST ELEVATION - WALL DETAILS 51
AE301 PARTITION TYPES 52
AE302 BUILDING SECTIONS 53
AE303 WALL SECTIONS 54
AE304 WALL SECTIONS 55
AE305 WALL SECTIONS 56
AE306 STAIR SECTIONS 57
AE401 ENLARGED RESTROOM PLANS - INTERIOR ELEVATIONS 58
AE402 ENLARGED ELEVATOR PLANS, INTERIOR ELEVATIONS AND
DETAILS 59
AE403 ENLARGED PLANS 60
AE404 ENLARGED STAIR PLANS 61
AE501 DOOR AND WINDOW DETAILS 62
AE502 DOOR AND PLAN DETAILS 63
AE503 ROOF DETAILS 64
AE504 MISCELLANEOUS DETAILS 65
AE505 MILWORK DETAILS AND SHOWER DETAIL 66
AE601 DOOR SCHEDULE 67
AE602 ROOM FINISH SCHEDULE 68
AE603 SCHEDULE OF FINISHES 69
AE604 SIGNAGE DETAILS 70
FIRE PROTECTION
FP001 GENERAL INFORMATION FIRE SPRINKLER 71
FP100 FIRE SPRINKLER VAULT FLOOR 72
FP101 FIRST FLOOR PLAN FIRE SPRINKLER 73
FP102 SECOND FLOOR PLAN FIRE SPRINKLER 74
FP500 FIRE SPRINKLER SYSTEM DETAILS 75
FP501 FIRE SPRINKLER SYSTEM AS BUILT DRAWINGS 76
FP502 FIRE SPRINKLER BASEMENT AS-BUILT PLAN 77
FA001 GENERAL INFORMATION FIRE ALARM 78
FA100 VAULT FLOOR FIRE ALARM PLAN 79
FA101 FIRST FLOOR FIRE ALARM PLAN 80
FA102 SECOND FLOOR FIRE ALARM PLAN 81
MECHANICAL
MH001 MECHANICAL ABBREVIATIONS AND DESIGN CONDITIONS 82
MD100 VAULT FLOOR MECHANICAL DEMOLITION PLAN 83
MD110 VAULT FLOOR ROOF MECHANICAL DEMOLITION PLAN 84
MH100 VAULT FLOOR MECHANICAL PLAN 85
MH101 FIRST FLOOR MECHANICAL OVERVIEW 86
MH102 FIRST FLOOR MECHANICAL SUPPLY PLAN 87
MH103 FIRST FLOOR MECHANICAL RETURN PLAN 88
MH104 FIRST FLOOR AIR DEVICE PLAN 89
MH105 SECOND FLOOR MECHANICAL OVERVIEW 90
MH106 SECOND FLOOR MECHANICAL SUPPLY PLAN 91
MH107 SECOND FLOOR MECHANICAL RETURN AND EXHAUST PLAN 92
MH108 SECOND FLOOR AIR DEVICE PLAN 93
MH109 FIRST FLOOR PRESSURE DIFFERENTIAL 94
MH110 SECOND FLOOR PRESSURE DIFFERENTIAL 95
MP100 VAULT FLOOR MECHANICAL PIPING PLAN 96
MP101 FIRST FLOOR MECHANICAL PIPING PLAN 97
MP102 SECOND FLOOR MECHANICAL PIPING PLAN 98
MP103 ROOF MECHANICAL PIPING PLAN 99
MH500 MECHANICAL SCHEDULES SHEET 1 100
MH501 MECHANICAL SCHEDULES SHEET 2 101
MH502 MECHANICAL SCHEDULES SHEET 3 102
MH503 MECHANICAL SCHEDULES SHEET 4 103
MH601 MECHANICAL DETAILS SHEET 1 104
MH602 MECHANICAL DETAILS SHEET 2 105
MH603 MECHANICAL DETAILS SHEET 3 - ELEVATOR MACHINE ROOM 106
MP501 MECHANICAL PIPING DETAILS 107
MP502 MECHANICAL PIPING DETAILS 108
MP503 MECHANICAL PIPING DETAILS 109
MP504 MECHANICAL PIPING DETAILS 110
MP505 MECHANICAL PIPING DETAILS 111
MH701 CONTROLS DIAGRAM - CHILLER 112
MH702 CONTROLS DIAGRAM - VAV AIR HANDLING UNIT 113
MH703 CONTROLS DIAGRAM - VAV AHU (TYPICAL OF 1) 114
MH704
CONTROLS DIAGRAM - DEDICATED OUTSIDE AIR UNIT
(DOAS) - TYP OF 2 115
MH705 CONTROLS DIAGRAM - DOAS - TYPICAL OF 2 116
MH706
CONTROLS DIAGRAM - SPLIT SYSTEM AIR CONDITIONER
(TYPICAL OF 3) 117
MH707 CONTROLS DIAGRAM - VARIABLE AIR VOLUME BOXES (VAV) 118
MH708 CONTROLS DIAGRAM - EXHAUST FANS EF-1 & EF-5 119
MH709 CONTROLS DIAGRAM - EXHAUST FANS EF-2 - EF-4 120
MH710 CONTROLS DIAGRAM - STEAM TO HOT WATER HEAT
EXHANGER 121
MH711 CONTROLS DIAGRAM - CONDENSATE PUMP 122
MH712 CONTROLS DIAGRAM - HOT WATER BOOSTER PUMP 123
PLUMBING
PL001 PLUMBING ABBREVIATIONS, LEGENDS, NOTES 124
PD100 VAULT FLOOR PLUMBING DEMOLITION PLAN 125
PL099 SUB-SLAB VAULT PLUMBING WASTE AND VENT PLAN 126
PL100 VAULT FLOOR PLUMBING WASTE AND VENT PLAN 127
PL101 FIRST FLOOR PLUMBING WASTE AND VENT PLAN 128
PL102 2ND FLOOR PLUMBING WASTE AND VENT PLAN 129
PL103 ROOF STORM DRAINAGE PLAN 130
PL111 FIRST FLOOR PLUMBING ENLARGED WASTE AND VENT
PIPING PLAN 131
PL112 SECOND FLOOR PLUMBING ENLARGED WASTE AND VENT
PIPING PLAN 132
PL122 SECOND FLOOR PLUMBING ENLARGED WASTE AND VENT
PIPING PLAN 133
PL132 SECOND FLOOR PLUMBING ENLARGED WASTE AND VENT
PIPING PLAN 134
PP100 VAULT FLOOR PLAN PLUMBING SUPPLY PIPING 135
PP101 FIRST FLOOR PLAN PLUMBING SUPPLY PIPING 136
PP102 SECOND FLOOR PLAN PLUMBING SUPPLY PIPING 137
PP111 FIRST FLOOR ENLARGED PLUMBING DOMESTIC SUPPLY
PIPING PLAN 138
PP112 SECOND FLOOR ENLARGED PLUMBING SUPPLY PIPING PLAN 139
PP122 SECOND FLOOR ENLARGED PLUMBING SUPPLY PIPING PLAN 140
PP132 SECOND FLOOR ENLARGED PLUMBING SUPPLY PIPING PLAN 141
PP142 SECOND FLOOR ENLARGED PLUMBING SUPPLY PIPING PLAN 142
DP100 VAULT FLOOR PROCESS PLUMBING PIPING PLAN 143
DP101 FIRST FLOOR PROCESS PLUMBING PIPING PLAN 144
DP102 2ND FLOOR PROCESS PLUMBING PIPING PLAN 145
DP112 SECOND FLOOR ENLARGED PROCESS PIPING PLAN 146
DP122 SECOND FLOOR ENLARGED PROCESS PIPING PLAN 147
PS001 PLUMBING OVERVIEW SITE PLAN 148
PP500 PLUMBING FIXTURE DETAILS 149
PP501 PLUMBING DETAILS 150
PP502 PLUMBING DETAILS 151
PP503 PLUMBING DETAILS 152
PP504 PLUMBING DETAILS 153
PP601 PLUMBING SCHEDULES 154
PP602 PLUMBING SCHEDULES 155
PP603 PLUMBING SCHEDULES 156
ELECTRICAL
EG100 ELECTRICAL ABBREVIATIONS, LEGENDS, NOTES 157
ED100 VAULT DEMOLITION POWER PLAN 158
ED103 VAULT ROOF DEMOLITION POWER PLAN 159
EP100 VAULT POWER PLAN 160
EP101 FIRST FLOOR POWER PLAN 161
EP102 SECOND FLOOR POWER PLAN 162
EP103 ROOF PLAN POWER PLAN 163
EP104 SIGNAL ROUTING FOR ATS CONTROL 164
EP106 FIRST FLOOR LIGHTING PLAN 165
EP107 SECOND FLOOR LIGHTING PLAN 166
EP108 UPS POWER ROUTING FOR TELECOM ROOMS 167
EP109 FIRST FLOOR FOOTCANDLE PLAN (ALL ON) 168
EP110
FIRST FLOOR FOOTCANDLE PLAN (ONLY EMERGENCY
LIGHTS ON) 169
EP111 SECOND FLOOR FOOTCANDLE PLAN (ALL ON) 170
EP112
SECOND FLOOR FOOTCANDLE PLAN (ONLY EMERGENCY
LIGHTS) 171
EP401 ENLARGED POWER PLANS 172
EP402 ENLARGED ELEVATOR POWER & LIGHTING PLANS 173
EP501 ELECTRICAL DETAILS - SPD EQUIPMENT POWER
CONNECTIONS 174
EP502 ELECTRICAL DETAILS - LTG CONTROLS 175
EP503 ELECTRICAL DETAILS - INTERIOR ELEVATIONS 176
EP504 ELECTRICAL DETAILS - POWER 177
EP601 ONE LINE DIAGRAM 178
EP602 ONE LINE DIAGRAM 179
EP603 ONE LINE DIAGRAM 180
EP604 ONE LINE DIAGRAM 181
EP605 ONE LINE DIAGRAM 182
EP606 ONE LINE GROUNDING DIAGRAM 183
EP607 ONE LINE ATS CONTROL DIAGRAM 184
EP611 PANEL SCHEDULES NEW PANELS IN VAULT 185
EP612 PANEL SCHEDULES EXISTING PANEL MODIFIED 186
EP613 PANEL SCHEDULES EXISTING PANEL MODIFIED 187
EP614 PANEL SCHEDULES NEW PANELS IN LOGISTICS 188
EP615 PANEL SCHEDULES NEW PANELS IN SPD (NORMAL PWR) 189
EP616 PANEL SCHEDULES NEW PANELS IN SPD (EMERGENCY PWR) 190
EP621 ELECTRICAL SCHEDULE - LIGHTING 191
EP622 ELECTRICAL SCHEDULES - SPD EQUIPMENT, LOAD
SUMMARY, SEISMIC REQU 192
EP623 ELECTRICAL SCHEDULES - MECHANICAL EQUIPMENT
CONNECTION SHEET 1 193
EP624 ELECTRICAL SCHEDULES - MECHANICAL EQUIPMENT
CONNECTION SHEET 2 194
TELECOM
TN001 TELECOM ABBREVIATIONS SYMBOLS AND GENERAL
NOTES 195
TN100 BASEMENT TELECOM ROUTING FROM EXISTING IDF 196
TN101 FIRST FLOOR TELECOM PLAN 197
TN102 SECOND FLOOR TELECOM PLAN 198
TN103 FIRST FLOOR TELECOM ROUTING 199
TN104 SECOND FLOOR TELECOM ROUTING 200
TN401 ENLARGED TELECOM ROOMS 201
TN501 TELECOM DETAILS 202
TN502 TELECOM DETAILS 203
TN503 TELECOM DETAILS 204
TN601 TELECOM SCHEDULES 205
TN602 TELECOM SCHEMATIC RISER DIAGRAM 206
F106
OPEN OFFICE
F101
BREAKROOMF102
OFFICE
F103
TELECOM
F104
ELEC
F105
ELEC
F100
CORRIDOR
F109
MEN
F112
WATER
TREATMENT
CLEAN
ELEVATOR
SOILED
ELEVATOR
NO ACCESS
F1
C O
R R
ID
O
R
F111
VESTIBULE
F116
F114
F140
STAIR
UP
DN
LOGISTICS
STORAGE
BREAKOUT
ROOM
ELEVATOR
LOBBY (E)
EXIT
STAIR (E) MEN (E)
WOMEN (E)
H.A.C. (E)
SURGICAL
CART
ASSEMBLY
F115
EQUIPMENT
F1
C O
R R
ID
O
R
F108
WOMEN
F117
HAC
F2
C O
R R
ID
O
R
DISPATCH
F106
OPEN OFFICE
F101
BREAKROOMF102
OFFICE
F103
TELECOM
F104
ELEC
F105
ELEC
F100
CORRIDOR
F109
MEN
F112
WATER
TREATMENT
CLEAN
ELEVATOR
SOILED
ELEVATOR
NO ACCESS
F1
C O
R R
ID
O
R
F111
VESTIBULE
F116
F114
F140
STAIR
UP
DN
LOGISTICS
STORAGE
BREAKOUT
ROOM
ELEVATOR
LOBBY (E)
EXIT
STAIR (E) MEN (E)
WOMEN (E)
H.A.C. (E)
SURGICAL
CART
ASSEMBLY
F115
EQUIPMENT
F1
C O
R R
ID
O
R
F108
WOMEN
F117
HAC
F2
C O
R R
ID
O
R
DISPATCH
D
EA
D E
N D
FE
ET
COMMON
PATH = 53
FEET
TRAVEL
DISTANCE
= 134 FEET
TRAVEL
DISTANCE
= 145 FEET
FEC
FEC
FEC
DOOR
DOOR
STAIR
DOOR
CODE SUMMARY
APPLICABLE CODES & STANDARDS
2018 NFPA 101 LIFE SAFETY CODE (LSC)
2018 INTERNATIONAL BUILDING CODE (IBC)
7TH EDITION VA FIRE PROTECTION DESIGN MANUAL (VAFPDM)
OCCUPANCY CLASSIFICATION
FIRST: BUSINESS (LSC CHAPTER 38)
STORAGE (LSC CHAPTER 42)
SECOND : BUSINESS (LSC CHAPTER 38)
CONSTRUCTION TYPE
NFPA 220: TYPE II (222)
IBC: TYPE I-B
ALLOWABLE HEIGHT AND AREA (IBC)
NEW WORK IS CONSIDERED AN EXTENSION TO THE EXISTING
BUILDING AND NOT A SEPARATE STRUCTURE.
ALLOWABLE HEIGHT = 11 STORIES
ACTUAL HEIGHT = 3 STORY W/ ROOF (NEW WORK)
ALLOWABLE AREA = UNLIMITED
ACTUAL AREA = VAULT - 4,789 GSF
FIRST FLOOR - 9,848 GSF
SECOND FLOOR - 10,097 GSF
FIRE RESISTIVE SEPARATION
TWO HOUR FIRE RESISTIVE SEPARATION BETWEEN NEW WORK
(BUSINESS) AND EXISTING (HEALTHCARE) IN ACCORDANCE
WITH NFPA 101 SECTION 18.1.3.6 ON FIRST AND SECOND LEVEL.
FIRST FLOOR STORAGE AND BUSINESS OCCUPANCIES ARE
NON-SEPARATED MIXED USE.
FIRE SPRINKLER SYSTEM
PROTECTED THROUGHOUT.
PORTABLE FIRE EXTINGUISHERS
SHALL BE LOCATED AS REQUIRED BY NFPA 10.
OCCUPANT LOAD (LSC: TABLE 7.3.1.2)
FIRST FLOOR
OCCUPANT LOAD FACTOR:
BUSINESS OCCUPANCY = 150 GSF/PERSON
STORAGE OCCUPANCY = 500 GSF/PERSON
AREA (BUISNESS) = 2,858 GSF
AREA (STORAGE) = 6,990 GSF
OCCUPANT LOAD = 34 OCCUPANTS
SECOND FLOOR
OCCUPANT LOAD FACTOR:
BUSINESS OCCUPANCY = 150 GSF/PERSON
AREA (BUISNESS) = 10,294 GSF
OCCUPANT LOAD = 69 OCCUPANTS
NOTE: ACTUAL OCCUPANT LOAD OF SPACE IS LESS THAN 20.
MEANS OF EGRESS
FIRST FLOOR:
MINIMUM NUMBER OF EXITS REQUIRED = 2
ACTUAL = 2
REQUIRED CAPACITY = 34 OCCUPANTS
ACTUAL CAPACITY = 510 OCCUPANTS
MAXIMUM TRAVEL DISTANCE = 300 FEET
ACTUAL = 145 FEET
MAXIMUM COMMON PATH OF TRAVEL = 100 FEET
ACTUAL = 53 FEET
DEAD END CORRIDOR LENGTH = 50 FEET
ACTUAL = 25 FEET
SECOND FLOOR:
MINIMUM NUMBER OF EXITS REQUIRED = 2
ACTUAL = 2
REQUIRED CAPACITY = 69 OCCUPANTS
ACTUAL CAPACITY = 330 OCCUPANTS
MAXIMUM TRAVEL DISTANCE = 300 FEET
ACTUAL = 183 FEET
MAXIMUM COMMON PATH OF TRAVEL = 100 FEET
ACTUAL = 36 FEET
DEAD END CORRIDOR LENGTH = 50 FEET
ACTUAL = 25 FEET
1 HOUR FIRE
2 HOUR FIRE
WALL RATING LEGEND
LEGEND
PATH OF TRAVEL
XXX
XX
XX
XX
COMPONENT
CLEAR WIDTH
CALCULATED CAPACITY
ACTUAL USE
FEC FIRE EXTINGUISHER CABINET
EXIT SIGN
SCALE:
GL101
FIRST FLOOR LIFE SAFETY PLAN
1/8" = 1'-0"
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
FIRST FLOOR LIFE SAFETY PLAN
GL101
RDLJAM
8/27/2019
F201
OFFICE
F200
CORRIDOR
F202
OFFICE
F203
TELECOM
F204
ELEC.
F205
ELEC.
F206
BREAKROOM
F210
OFFICE
F209
TRAINING
F207
STOR.
F213
UNISEX
F217
LOCKER
F215
WOMEN
F218
MEN
F216
HAC F208
STOR.
F214
LOCKER
F219
TRANSFER
F2
C O
R R
ID
O
R
F221
VESTIBULE
F2
C O
R R
ID
O
R
F223
DETERG.
F224
DECONTAMINATION
CLEAN
ELEVATOR
SOILED
ELEVATOR
F233
VENDOR
DROP-OFF
F234
ANTE
ROOM
F235
ANTE
ROOM
F236
SCOPE
DECON
F237
SCOPE
PROCESSING
F232
ANTE
ROOM
F238
UTILITY
F231
CART
STAGING
F230
COOL DOWN
F228
OFFICE
F227
STERILE
STORAGE
F226
HAC
F225
PREPARATION
F229
STERILIZATION
F240
STAIR
F2
C O
R R
ID
O
R
F201
OFFICE
F200
CORRIDOR
F202
OFFICE
F203
TELECOM
F204
ELEC.
F205
ELEC.
F206
BREAKROOM
F210
OFFICE
F209
TRAINING
F207
STOR.
F213
UNISEX
F217
LOCKER
F215
WOMEN
F218
MEN
F216
HAC F208
STOR.
F214
LOCKER
F219
TRANSFER
F2
C O
R R
ID
O
R
F221
VESTIBULE
F2
C O
R R
ID
O
R
F223
DETERG.
F224
DECONTAMINATION
CLEAN
ELEVATOR
SOILED
ELEVATOR
F233
VENDOR
DROP-OFF
F234
ANTE
ROOM
F235
ANTE
ROOM
F236
SCOPE
DECON
F237
SCOPE
PROCESSING
F232
ANTE
ROOM
F238
UTILITY
F231
CART
STAGING
F230
COOL DOWN
F228
OFFICE
F227
STERILE
STORAGE
F226
HAC
F225
PREPARATION
F229
STERILIZATION
F240
STAIR
F2
C O
R R
ID
O
R D
EA
D
E N
D
F
EE
T
TRAVEL
DISTANCE
= 128 FEET
COMMON
PATH = 36
FEET
DOOR
STAIR
DOOR
STAIR
TRAVEL
DISTANCE
= 183 FEET
COMMON
PATH = 39
FEET
FEC
FEC
FEC
FEC
F201
OFFICE
F200CORRIDOR
F202
OFFICE
F203
TELECOM
F204
ELEC.
F205
ELEC.
F206
BREAKROOM
F210
OFFICE
F209
TRAINING
F207
STOR.
F213
UNISEX
F217
LOCKER
F215
WOMEN
F218
MEN
F216
HAC F208
STOR.
F214
LOCKER
F219
TRANSFER
F2
C O
R R
ID
O
R
F221
VESTIBULE
F2
C O
R R
ID
O
R
F223
DETERG.
F224
DECONTAMINATION
CLEAN
ELEVATOR
SOILED
ELEVATOR
F233
VENDOR
DROP-OFF
F234
ANTE
ROOM
F235
ANTE
ROOM
F236
SCOPE
DECON
F237
SCOPE
PROCESSING
F232
ANTE
ROOM
F238
UTILITY
F231
CART
STAGING
F230
COOL DOWN
F228
OFFICE
F227
STERILE
STORAGE
F226
HAC
F225
PREPARATION
F229
STERILIZATION
F240
STAIR
F2
C O
R R
ID
O
R
CODE SUMMARY
APPLICABLE CODES & STANDARDS
2018 NFPA 101 LIFE SAFETY CODE (LSC)
2018 INTERNATIONAL BUILDING CODE (IBC)
7TH EDITION VA FIRE PROTECTION DESIGN MANUAL (VAFPDM)
OCCUPANCY CLASSIFICATION
FIRST: BUSINESS (LSC CHAPTER 38)
STORAGE (LSC CHAPTER 42)
SECOND : BUSINESS (LSC CHAPTER 38)
CONSTRUCTION TYPE
NFPA 220: TYPE II (222)
IBC: TYPE I-B
ALLOWABLE HEIGHT AND AREA (IBC)
NEW WORK IS CONSIDERED AN EXTENSION TO THE EXISTING
BUILDING AND NOT A SEPARATE STRUCTURE.
ALLOWABLE HEIGHT = 11 STORIES
ACTUAL HEIGHT = 3 STORY W/ ROOF (NEW WORK)
ALLOWABLE AREA = UNLIMITED
ACTUAL AREA = VAULT - 4,789 GSF
FIRST FLOOR - 9,848 GSF
SECOND FLOOR - 10,097 GSF
FIRE RESISTIVE SEPARATION
TWO HOUR FIRE RESISTIVE SEPARATION BETWEEN NEW WORK
(BUSINESS) AND EXISTING (HEALTHCARE) IN ACCORDANCE
WITH NFPA 101 SECTION 18.1.3.6 ON FIRST AND SECOND LEVEL.
FIRST FLOOR STORAGE AND BUSINESS OCCUPANCIES ARE
NON-SEPARATED MIXED USE.
FIRE SPRINKLER SYSTEM
PROTECTED THROUGHOUT.
PORTABLE FIRE EXTINGUISHERS
SHALL BE LOCATED AS REQUIRED BY NFPA 10.
OCCUPANT LOAD (LSC: TABLE 7.3.1.2)
FIRST FLOOR
OCCUPANT LOAD FACTOR:
BUSINESS OCCUPANCY = 150 GSF/PERSON
STORAGE OCCUPANCY = 500 GSF/PERSON
AREA (BUISNESS) = 2,858 GSF
AREA (STORAGE) = 6,990 GSF
OCCUPANT LOAD = 34 OCCUPANTS
SECOND FLOOR
OCCUPANT LOAD FACTOR:
BUSINESS OCCUPANCY = 150 GSF/PERSON
AREA (BUISNESS) = 10,294 GSF
OCCUPANT LOAD = 69 OCCUPANTS
NOTE: ACTUAL OCCUPANT LOAD OF SPACE IS LESS THAN 20.
MEANS OF EGRESS
FIRST FLOOR:
MINIMUM NUMBER OF EXITS REQUIRED = 2
ACTUAL = 2
REQUIRED CAPACITY = 34 OCCUPANTS
ACTUAL CAPACITY = 510 OCCUPANTS
MAXIMUM TRAVEL DISTANCE = 300 FEET
ACTUAL = 145 FEET
MAXIMUM COMMON PATH OF TRAVEL = 100 FEET
ACTUAL = 53 FEET
DEAD END CORRIDOR LENGTH = 50 FEET
ACTUAL = 25 FEET
SECOND FLOOR:
MINIMUM NUMBER OF EXITS REQUIRED = 2
ACTUAL = 2
REQUIRED CAPACITY = 69 OCCUPANTS
ACTUAL CAPACITY = 330 OCCUPANTS
MAXIMUM TRAVEL DISTANCE = 300 FEET
ACTUAL = 183 FEET
MAXIMUM COMMON PATH OF TRAVEL = 100 FEET
ACTUAL = 36 FEET
DEAD END CORRIDOR LENGTH = 50 FEET
ACTUAL = 25 FEET
1 HOUR FIRE
2 HOUR FIRE
WALL RATING LEGEND
LEGEND
PATH OF TRAVEL
XXX
XX
XX
XX
COMPONENT
CLEAR WIDTH
CALCULATED CAPACITY
ACTUAL USE
FEC FIRE EXTINGUISHER CABINET
EXIT SIGN
SCALE:
GL102
SECOND FLOOR LIFE SAFETY PLAN
1/8" = 1'-0"
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
SECOND FLOOR LIFE SAFETY PLAN
GL102
JAMRDL
8/27/2019
3HC
CORNER OF TRACT "C"
FROM 30' TO 40' WIDE THIS SIDE.
STREET EXTENDED. ROW MAY VARY
76' 3.55" TO CENTERLINE OF THIRD
780' N 00D 03' 27" E
CORNER OF TRACT "G"
47' ROW
1,000' GRID LINES
NURSING HOME CARE FACILITY
702.67' N 45D 19' 44" E
ARIZONA STATE VETERANS
143.00' S 89D 24' 00" E
780' N 00D 03' 27" E
PL
499.23' N 00D 03' 27" E
1,336FEET 5.1589"
TO CENTER LINE OF CENTRAL AVENUE
ELEV.
H123
H122
RAMP
BLDG. 13
EAST
BLDG. 13
WEST
W
W
EMH
SD SD
SD
S S
S
EMH
G G
EMH
EMH
GENERATOR
GEN #4
X
X X
X
X X
X X
6LZ 3MC
BLDG 2
BLDG 21
25 14
22 26
FRONT
BLDG 16
7TH STREET
T9
BLDG 10
MCMC
EL
EC
T
EL
EC
T
DENTAL
BUILDING
MAIN HOSPITAL
AMBULATORY CARE CLINIC
(ACC)
COMMUNITY LIVING CENTER (CLC)
WAREHOUSE
BUILDING
BUILDING
PLANT
LAUNDRY
LEGAL
RESEARCH
CAFETERIA
M&O
SHOPS
BLDG 1
MENTAL HEALTH
BUILDING
BLDG 8
BLDG 21B
LOADING
DOCK
LOADING
DOCK
LOADING
DOCK
WAREHOUSE/
STORAGE AREAS
TRAFFIC
SIGNAL
3RD STREET
IN
D
IAN
SC
H O
O L R
O
AD
EL
EC
T
PATIO
C O
M M
U N
IT
Y
LI
VI
N G
C
EN
TE
R
(C
LC
PATIO
PATIO
PATIO
LOADING
DOCK
PHARMACY
TRAFFIC
SIGNAL
TRAFFIC
SIGNAL
LOADING &
UNLOADING
EXISTING BUILDING 1 - D WING
N O
PAR
KIN
G
EMH
UNDERGROUND
CHILLED WATER
STORAGE
BLDG 31
FUTURE
BEHAVIORAL
HEALTH
EXISTING BUILDING 8
EXISTING REHAB BUILDING
BUILDING
CONSTRUCTION
SITE
STAGING AND
MATERIALS
AU
TO
P
AT
H
AU
TO
P
AT
H EGRESS
PATH
EGRESS
PATH
EGRESS
PATH
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
GX001
SCALE: NONE
1 SITE PLAN LAYOUT AREA
GX001
SHEET NOTES
1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL,
STATE AND FEDERAL LAWS AND REGULATIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
OR VERIFYNG THAT ALL PERMITS AND APPROVALS ARE
OBTAINED FROM THE RESPECTIVE CITY COUNTY AND STATE
AGENCIES PRIOR TO STARTING CONSTRUCTION.
3. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME
APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD
AND COR PRIOR TO CONSTRUCTION SO THAT REDESIGN OR
CLARIFICATION MAY OCCUR.
4. THE ACTIVE EMERGENCY ROOM ENTRY MAY NOT BE BLOCKED
FOR ANY REASON, ER OPERATES 24/7.
KEY NOTES
1. ENTRANCE OF ANTICIPATED CONSTRUCTION.
2. SUGGESTED LAYDOWN AREA.
3. BUILDER'S LAYDOWN AREA MUST NOT EXTEND INTO THE
HOSPITAL PARAMETER ROAD. AUTO PATH MUST REMAIN
OPEN DURING WEEKDAYS.
4. EGRESS DOORS MUST HAVE CLEAR PATHWAY TO THE
STREET.
5. MAINTAIN EMERGENCY EGRESS PATHWAY THROUGHOUT
PROJECT.
SITE PLAN LAYOUT AREA
GX001
DKSRJO
AutoCAD SHX Text M
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
EXISTING BUILDING FF=1118.76
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text
AMBULATORY CARE CLINIC (ACC)
AutoCAD SHX Text
REHABILITATION BUILDING
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text E
35-SPD
GENERAL EROSION CONTROL NOTES:
1. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE RE/COR. RE/COR
RESERVES THE RIGHT TO ACCEPT OR REJECT ANY SUCH MATERIALS AND WORKMANSHIP THAT DOES NOT CONFORM TO VA, FEDERAL AND STATE OF COLORADO DEPARTMENT OF ENVIRONMENTAL QUALITY
REQUIREMENTS.
2. THE CONTRACTOR SHALL INSTALL EROSION/SEDIMENTATION CONTROLS PRIOR TO ANY SITE
PREPARATION WORK (E.G., CLEARING, GRUBBING OR EXCAVATION).
3. THE PLACEMENT OF EROSION/SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE APPROVED
PROJECT PLANS.
4. ANY VARIATION IN MATERIAL OR LOCATION OF EROSION/SEDIMENT CONTROLS FROM THE APPROVED
PLANS WILL REQUIRE WRITTEN APPROVAL FROM RE/COR.
5. AFTER THE INSTALLATION OF THE EROSION/SEDIMENT CONTROLS, THE CONTRACTOR SHALL SET UP AN ON-SITE "PRE-CONSTRUCTION" MEETING WITH THE RE/COR. THE MEETING SHALL BE SCHEDULED A MINIMUM OF FORTY EIGHT (48) HOURS AND A MAXIMUM OF NINETY SIX (96) HOURS PRIOR TO THE
ANTICIPATED START OF ANY LAND DISTURBANCE.
6. CONSTRUCTION SHALL NOT BEGIN UNTIL: (1) ALL EROSION/SEDIMENT CONTROLS ARE INSTALLED PER APPROVED PLANS, (2) A "PRE-CONSTRUCTION" MEETING HAS BEEN HELD ON SITE WITH THE RE/COR.
7. ALL AREAS (EXCEPT THOSE THAT WILL BE PAVED) ARE TO BE CONTOUR-FURROWED IMMEDIATELY FOLLOWING GRADE CERTIFICATION, BUT NO LATER THAN THREE DAYS AFTER COMPLETION OF GRADING.
8. ALL DISTURBED AREAS ARE TO BE SEEDED IN ACCORDANCE WITH SPECIFICATION SECTION 32 92 19.
9. THE CONTRACTOR(S) MUST STAY INSIDE APPROVED LIMITS OF CONSTRUCTION AT ALL TIMES. THE
RE/COR MUST APPROVE ANY WORK NECESSARY OUTSIDE THE LIMITS OF CONSTRUCTION AND, AT THE DISCRETION OF THE CO, ADDITIONAL EROSION/SEDIMENTATION CONTROLS MAY BE REQUIRED. REFER
TO CIVIL PLANS FOR LIMITS OF CONSTRUCTION.
10. ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE THROUGH THE APPROVED VEHICLE-TRACKING PAD. ADDITIONAL STABILIZED CONSTRUCTION ENTRANCES MAY BE ADDED WITH THE AUTHORIZATION
FROM THE RE/COR.
11. THE CONTRACTOR IS RESPONSIBLE FOR CLEANUP OF SEDIMENT OR CONSTRUCTION DEBRIS TRACKED ON TO AREA STREETS. STREETS ARE TO BE KEPT CLEAN THROUGHOUT BUILD-OUT AND WILL BE CLEANED, WITH A STREET CLEANER (NOT A STREET SWEEPER), AT FIRST NOTICE OF ACCIDENTAL TRACKING OR AT THE DISCRETION OF THE RE/COR. THE RE/COR RESERVES THE RIGHT TO REQUIRE
ADDITIONAL MEASURES TO ENSURE AREA STREETS ARE KEPT FREE OF SEDIMENT AND/OR
CONSTRUCTION DEBRIS.
12. APPROVED EROSION AND SEDIMENT CONTROL "BEST MANAGEMENT PRACTICES" (BMPS) SHALL BE MAINTAINED AND KEPT IN GOOD REPAIR FOR THE DURATION OF THIS PROJECT. AT A MINIMUM, THE CONTRACTOR OR HIS AGENT SHALL INSPECT ALL BMPS WEEKLY, AFTER ALL SIGNIFICANT PRECIPITATION EVENTS OR AT THE DISCRETION OF THE RE/COR. ALL NECESSARY MAINTENANCE AND REPAIR ACTIVITIES
SHALL BE COMPLETED WITHIN TWENTY-FOUR (24) HOURS AFTER DIRECTED BY THE RE/COR
ACCUMULATED SEDIMENT OR CONSTRUCTION DEBRIS SHALL BE REMOVED WEEKLY FROM ALL BMPS, OR AT ANY TIME THAT SEDIMENT OR CONSTRUCTION DEBRIS ADVERSELY IMPACTS THE FUNCTION OF THE
BMPS.
13. TOPSOIL SHALL BE STOCKPILED TO THE GREATEST EXTENT PRACTICABLE ON SITE (WITHIN "LIMITS OF CONSTRUCTION") FOR USE ON AREAS TO BE RE-VEGETATED. ANY AND ALL STOCKPILES SHALL BE PLACED IN AN APPROVED LOCATION BY RE/COR AND PROTECTED FROM EROSIVE ELEMENTS USING
MEASURES SPECIFIED IN THE EROSION CONTROL PLAN.
14. PERMANENT SOIL EROSION CONTROL MEASURES WILL INCLUDE PAVEMENT SURFACING AND PERMANENT LANDSCAPING. THE CONTRACTOR SHALL ACCEPT FULL RESPONSIBILITY FOR ANY AND ALL DAMAGE TO
OTHER PROPERTIES RELATED TO FAILURE TO CONTROL EROSION FROM THIS PROJECT.
15. THE APPROVED EROSION CONTROL PLAN MAY REQUIRE CHANGES OR ALTERATIONS AFTER APPROVAL TO MEET CHANGING SITE OR PROJECT CONDITIONS OR TO ADDRESS INEFFICIENCIES IN DESIGN OR
INSTALLATION. THE RE/COR SHALL APPROVE CHANGES PROPOSED BY THE CONTRACTOR.
16. ALL SWALES AND ROADSIDE DITCHES SHALL NOT EXCEED THREE (3) PERCENT. SLOPES GREATER THAN THREE (3) PERCENT WILL REQUIRE APPROVAL OF THE RE/COR AND WILL REQUIRE ADEQUATE EROSION
PROTECTION.
17. ALL SLOPES GREATER THAN 3:1 WILL REQUIRE ADEQUATE EROSION PROTECTION.
18. NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED WHEREVER POSSIBLE. EXPOSURE OF SOIL
TO EROSION BY REMOVAL OR DISTURBANCE OF VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
19. ANY SETTLEMENT OR SOIL ACCUMULATIONS BEYOND THE LIMITS OF CONSTRUCTION DUE TO GRADING OR EROSION SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL BE
HELD RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO ADJACENT WATERWAYS,
WETLANDS, PROPERTIES, ETC.. RESULTING FROM WORK DONE AS PART OF THIS PROJECT.
20. A WATER SOURCE WILL BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND UTILIZED AS
REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND.
21. SOILS THAT WILL BE STOCKPILED FOR MORE THAN THIRTY (30) DAYS SHALL BE MULCHED AND SEEDED
WITH A TEMPORARY OR PERMANENT GRASS COVER WITHIN FOURTEEN (14) DAYS OF STOCKPILE
CONSTRUCTION. NO STOCKPILES SHOULD BE WITHIN ONE HUNDRED (100) FEET OF ANY DRAINAGE WAY
UNLESS APPROVED BY THE RE/COR.
22. THE CONTRACTOR MUST KEEP ALL POLLUTANTS, INCLUDING SEDIMENT, CONSTRUCTION DEBRIS, AND TRENCH BACKFILL MATERIALS FROM ENTERING THE STORM SEWER SYSTEM. IN ADDITION, ALL SPILLS INCLUDING, BUT NOT LIMITED TO, PETROLEUM PRODUCTS, SOLVENTS, AND CEMENT SHALL BE CLEANED UP IMMEDIATELY. THE RE/COR SHALL BE NOTIFIED IMMEDIATELY IF POSSIBLE, BUT NO LATER THAN
WITHIN TWENTY-FOUR (24) HOURS OF ANY SPILL OF TWENTY-FIVE GALLONS OR LARGER.
23. ALL WORK ON SITE SHALL STAY A MINIMUM OF ONE HUNDRED (100) FEET AWAY FROM ANY DRAINAGE
WAY, WETLAND, ETC.. UNLESS OTHERWISE NOTED ON AN APPROVED PLAN SHEET.
24. THE GENERAL CONTRACTOR SHALL ENSURE THAT ALL LOADS OF CUT AND FILL MATERIAL IMPORTED TO OR EXPORTED FROM THE SITE SHALL BE PROPERLY COVERED TO PREVENT LOSS OF THE MATERIAL
DURING TRANSPORT ON PUBLIC RIGHT-OF-WAY.
25. THE RE/COR MUST BE NOTIFIED, A MINIMUM OF TWENTY-FOUR (24) HOURS PRIOR TO THE MATERIAL BEING EXPORTED FROM THE SITE, OF THE LOCATION AND PERMIT NUMBERS OF BOTH THE EXPORTING
AND IMPORTING SITE.
26. THE USE OF REBAR, STEEL STAKES, OR STEEL FENCE FOR STAKING DOWN STRAW OR HAY BALES OR TO
SUPPORT SILT FENCING USED AS AN EROSION CONTROL MEASURE, IS PROHIBITED.
27. MODIFICATION OR TERMINATION OF AN ACTIVE EROSION AND SEDIMENT CONTROL PERMIT UPON
COMPLETION OF THE PROJECT REQUIRES NOTIFICATION AND APPROVAL BY THE RE/COR.
28. THE CLEANING OF CONCRETE DELIVERY TRUCK CHUTES IS RESTRICTED TO APPROVED LOCATIONS ON THE JOB SITE AS APPROVED BY RE/COR. THE DISCHARGE OF WATER CONTAINING WASTE CEMENT TO THE STORM SEWER SYSTEM IS PROHIBITED. ALL CONCRETE WASTE SHALL BE PROPERLY CLEANED UP
AND DISPOSED OF AT AN APPROPRIATE LOCATION.
29. PRIOR TO ACTUAL CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING
UTILITIES.
30. ALL DE-WATERING ON SITE SHALL BE COORDINATED WITH THE RE/COR, BE FREE OF SEDIMENT, AND HAVE
ADEQUATE EROSION PROTECTION AT THE POINT OF DISCHARGE.
31. USE BEST MANAGEMENT PRACTICES (BMP) TO MINIMIZE FUGITIVE DUST. OPACITY SHALL NOT EXCEED 20
PERCENT.
32. REQUIREMENTS IN THE PROJECT STORM WATER POLLUTION PREVENTION PLAN (SWPPP) SHALL TAKE
PRECEDENCE WHEN CONFLICTS WITH THIS PLAN OCCUR.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
C-001
GENERAL NOTES
C-001
ARCRID
CO
LO
RADO REG I STERED
PROFESS I ONA L ENG I N
EE
R
R I
CH
ARD I . DAY JR.38855
16 SEP 2020
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACP ASPHALTIC CONCRETE PAVING
ADA AMERICANS WITH DISABILITIES ACT
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON & STEEL INSTITUTE
ALUM ALUMINUM
ALNMT ALIGNMENT
ALT ALTERNATE
AMT AMOUNT
APPROX APPROXIMATE
APPX APPENDIX
ARCH ARCHITECT(URAL)
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASPH ASPHALT
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AVE AVENUE
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS ASSOCIATION
B&F BELL AND FLANGE
B&S BELL AND SPIGOT
BC BACK OF CURB
BCV BUTTERFLY CHECK VALVE
BDRY BOUNDARY
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BKGD BACKGROUND
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BMP BEST MANAGEMENT PRACTICE
BN BULLNOSE
BOT BOTTOM
BRK BRICK
BV BALL VALVE
CAP CAPACITY
CB CATCH BASIN; CEMENT BASE; CIRCUIT BREAKER
CD CONSTRUCTION DOCUMENTS; CONTRACT
DOCUMENTS
CF CONTRACTOR FURNISHED
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CHFR CHAMFER
CHK CHECK
CHKV CHECK VALVE
CI CURB INLET; CAST IRON
CIP CAST IRON PIPE
CIR CIRCLE
CJ CONSTRUCTION JOINT; CONTROL JOINT
CL CENTERLINE; CLASS; CLOSE
CLL CONTRACT LIMIT LINE
CLR CLEAR(ANCE)
CM CENTIMETER
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CNCL CONCEALED
CO CLEANOUT, CONTRACTING OFFICER
COMM COMMUNICATION
CONC CONCENTRIC; CONCRETE
CONT CONTINUED; CONTINUATION; CONTROL
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRIDOR
COV COVER; CUT OFF VALVE
CPLG COUPLING
CRCMF CIRCUMFERENCE
CRN CROWN
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CRT YD COURTYARD
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSTL CAST STEEL
CTR CENTER; CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER; CUBIC
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CV CONTROL VALVE
CWA CONCRETE WASH-OUT AREA
CY CUBIC YARD
D PENNY (NAILS, ETC.)
DAT DATUM
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESCR DESCRIPTION
DET DETAIL
DEV DEVELOPMENT
DI DROP INLET
DIA(Ø) DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DIST DISTANCE
DIV DIVISION
DN DOWN
DOC DOCUMENT
DOM DOMESTIC
DOMW DOMESTIC WATER
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DS DOWNSPOUT
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
ELEV ELEVATION
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
EMER EMERGENCY
EOS EDGE OF SLAB
EPA ENVIRONMENTAL PROTECTION AGENCY
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EDGE OF SHOULDER
ESMT EASEMENT
EST ESTIMATE
EW EACH WAY
EXCL EXCLUDE
EXIST EXISTING
EXP EXPOSED; EXPANSION
EXST GR EXISTING GRADE
EXT EXTERIOR
F FAHRENHEIT; FEMALE; FIRE LINE
FF FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FIG FIGURE
FIL FILLET
FIN FINISH
FLG FLANGE
FLL FLOW LINE
FLRD FLARED
FLTR FILTER
FN FENCE
FND FOUNDATION
FOC FACE OF CONCRETE; FACE OF CURB
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FOOT; FEET
FTG FOOTING
G GROUND; NATURAL GAS
GA GAGE, GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUT
GDR GUARD RAIL
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL; GLASS; GLAZING
GOVT GOVERNMENT
GPD GALLONS PER DAY
GRND GROUND
GTV GATE VALVE
GUT GUTTER
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HANDICAP
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWL HEADWALL
HORZ HORIZONTAL
HT HEIGHT
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
ID INSIDE DIAMETER; INSIDE DIMENSION
IMH INLET MANHOLE
IN INCH; INCHES (“)
INC INCORPORATED
INCL INCLUDED
INSUL INSULATION/INSULATE(D)(ING)
INV INVERT
INV EL INVERT ELEVATION
IP IRON PIPE
IRREG IRREGULAR
ISO ISOMETRIC
IW IRRIGATION WATER
JAN JANITOR
JT JOINT
K KIP (1,000 LB.)
KWY KEYWAY
L ANGLE
LAT LATITUDE
LDR LADDER
LB POUND
LF LINEAR FEET (FOOT)
LG LENGTH / LONG
LIN LINEAR
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LPT LOW POINT
LS LUMP SUM
LW CONC LIGHTWEIGHT CONCRETE
M METER(S)
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MAIL BOX
MED MEDIUM
MER MERIDIAN
MET METAL
MFG MANUFACTURING
MFR MANUFACTURE(R)
MGT MANAGEMENT
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MM MILLIMETER
MN MAGNETIC NORTH
MO MASONRY OPENING; MOTOR OPERATED
MON MONUMENT
MTG MEETING
MULT MULTIPLE
MUNIC MUNICIPAL
MUTCD MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
N NORTH
N&D NAIL AND DISK
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
O, O2 OXYGEN
OA/FA/FA OUTSIDE AIR/FORCED AIR/FORCED AIR
OC ON CENTER
OCB OIL CIRCUIT BREAKER
OD OUTSIDE DIAMETER
OFC OFFICE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORIG ORIGINAL
OVHD OVERHEAD
OZ OUNCE
P PUMP
PA PUBLIC ADDRESS; PIPE ANCHOR
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVE
PCA PORTLAND CEMENT ASSOCIATION
PCC PORTLAND CEMENT CONCRETE; PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PED PEDESTAL
PEN PENETRATE
PERF PERFORATED
PERIM PERIMETER
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PL PLATE; PROPERTY LINE
POC POINT OF CURVE
POI POINT OF INTERSECTION
POLY POLYETHYLENE (PLASTIC)
POT POINT OF TANGENT
POW POWER LINE
PR PAIR
PRCST PRECAST
PREFMD PREFORMED
PRELIM PRELIMINARY
PREV PREVIOUS
PRKG PARKING
PROP PROPERTY
PRV PRESSURE RELIEF VALVE
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FEET
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POST TENSIONED; POTENTIAL TRANSFORMER
PV PAVED
PVC POLYVINYL CHLORIDE (PLASTIC)
PVMT PAVEMENT
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
RAD RADIUS; RADIAN
RC REINFORCED CONCRETE
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RDC REDUCER
REBAR REINFORCING STEEL BARS
REIN REINFORCE(D)(ING)
REF REFERENCE
REQD REQUIRED
ROW RIGHT OF WAY
RT RIGHT
RRB REINFORCED ROCK BERM
RW ROADWAY
S SOUTH
SAMP SAMPLE
SAN SANITARY
SB SPLASH BLOCK
SCH SCHEDULE
SD STORM DRAIN
SDL SADDLE
SDMH STORM DRAIN MANHOLE
SECT SECTION
SEW SEWER
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SQ FT SQUARE FOOT; SQUARE FEET
SS SANITARY SEWER
SSA STABILIZED STAGING AREA
STM STORM
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
T&G TONGUE AND GROOVE
TEL TELEPHONE
THRU THROUGH
TOC TOP OF CONCRETE
TOS TOP OF STEEL/TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITERS' LABORATORIES, INC.
UNO UNLESS NOTED OTHERWISE
VAC VACUUM
VCB VACUUM CIRCUIT BREAKER
VEL VELOCITY
VENT VENTILATE
VERT VERTICAL
VIT VITREOUS
VC VERTICAL CURVE
VOL VOLUME
VPT VERTICAL POINT OF TANGENT
VPI VERTICAL POINT OF INTERSECTION
VPC VERTICAL POINT OF CURVATURE
VTC VEHICLE TRACING CONTROL
W WEST / WIDTH / WIDE / WATT
W/ WITH
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
XPAN CROSS PAN
XSECT CROSS SECTION
XSTR EXTRA STRONG
YD YARD
YR YEAR
ZN ZONE
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
ARCRID
C-002
CIVIL LEGEND AND ABBREVIATIONS
CO
LO
RADO REGI STERED
PROFESS I ONA L ENG I N
EE
R
R I
CH
REMOVE CURB
AND GUTTER
45 LF
REMOVE CONCRETE
PAN
145 LF
CANOPY STRUCTURE
TO REMAIN
REMOVE AND RETAIN
SIGNAGE
5 EA
REMOVE
SIDEWALK
1800 SQ FT
REMOVE ASPHALT
PAVING
9200 SQ FT
REMOVE CURB
AND GUTTER
165 LF
REMOVE AND RETAIN
WHEEL STOPS
5 EA
REMOVE ADA RAMP
REMOVE CURB AND GUTTER
105 LF
EXISTING LIGHT TO REMAIN
EXISTING CANOPY
TO REMAIN
(NOT SHOWN)
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
RIDRID
CD100
CIVIL DEMOLITION PLAN
DEMOLITION PLAN LEGEND:
AREAS TO BE REMOVED
SHEET NOTES
1. EXISTING INFORMATION WAS DRAWN FROM MULTIPLE
SOURCES. VERIFY ALL SITE FEATURES AND UTILITY
LOCATIONS PRIOR TO STARTING WORK.
2. SUBMIT A DEMOLITION PLAN TO THE VA FOR APPROVAL
PRIOR TO STARTING WORK.
3. ESTABLISH EROSION CONTROL MEASURES PRIOR TO
STARTING WORK.
4. UNMARKED UTILITIES MAY EXIST IN AREAS INDICATED TO BE
REMOVED. A PRIVATE UTILITY LOCATE SERVICE SHALL BE
RETAINED BY THE CONTRACTOR PRIOR TO STARTING WORK.
5. ASPHALT THICKNESS IN REMOVAL AREAS HAS NOT BEEN
DETERMINED.
6. ALL TREES TO BE REMOVED TO BE VERIFIED BY VA.
7. QUANTITIES NOTED ON THIS PLAN ARE APPROXIMATE.
SCALE: 1" = 20'
0 20' 40' 60'10'
CO
LO
RADO REGI STERED
PROFESS I ONA L ENG I N
EE
R
R I
CH
ARD I . DAY JR.38855
16 SEP 2020
1 - PHYSICAL SECURITY SETBACK 01.18.21 ADDENDUM #1
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text
AMBULATORY CARE CLINIC (ACC)
AutoCAD SHX Text
REHABILITATION BUILDING
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text E
1 1
6.00 CONC WALK
FIELD LOCATE
8.00 CONC WALK
R47.18
8.00 CONC WALK
32.12
8.00
51.74 SETBACK
R2.00 R5.00
R4.50
R10.00
R132.00 R110.00
22.00
R5.00
R2.00 R10.00
55.15
58.14
54.23
5.71
143.09
6.37 1.63
4.50
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
ARCRID
KEY NOTES
1. TIE TO EXISTING CURB AND GUTTER
2. TIE TO EXISTING CONCRETE SIDEWALK
3. ABA COMPLIANT SIDEWALK RAMP
4. TIE TO EXISTING CONCRETE PAN
5. LANDSCAPE AREA. ROCK MULCH OR GRASS SEEDING - MATCH
SURROUNDING AREA. OBTAIN APPROVAL FROM THE COR OR
DESIGNATED HORTICULTURIST PRIOR TO SEEDING IF
NECCESSARY.
6. REMOVABLE BOLLARDS
7. EXTEND EXISTING ADA RAMP TO NEW CURB.
CI100
CIVIL IMPROVEMENTS
SCALE: 1" = 20'
0 20' 40' 60'10'
SHEET NOTES
1. SEE SHEETS C-500 THRU C-501 FOR CIVIL CONSTRUCTION
DETAILS.
2. ALL CURB DIMENSIONS MEASURED AT TOP BACK OF CURB
(TBC)
3. INSTALL CONCRETE PAN SLOPED CONSISTENT WITH EXISTING
DRAINAGE.
4. INSTALL CURB AND GUTTER WITH FLOW LINE AT EXISTING
PAVEMENT ELEVATION TO MATCH EXISTING DRAINAGE.
5. MATCH A STRAIGHT LINE BETWEEN THE ORIGINAL EXISTING
ROADWAY SUB-GRADE GRADE ELEVATIONS FOR THE ROADWAY
CROSS SECTION.
6. UPON COMPLETION OF CONSTRUCTION; ESTABLISH
VEGETATIVE COVER IN ALL DISTURBED AREAS.
CO
LO
RADO REGI STERED
PROFESS I ONA L ENGI N
EE
R
R I
CH
ARD I . DAY JR.38855
16 SEP 2020
1 - PHYSICAL SECURITY SETBACK 01.18.21
ADDENDUM #1
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text
AMBULATORY CARE CLINIC (ACC)
AutoCAD SHX Text
REHABILITATION BUILDING
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text E
2" LIFT
SUBGRADE
(COMPACT TO MIN. 95% OF MAX DRY
DENSITY PER ASTM D698)
GRANULAR BASEROCK
(COMPACT TO MIN 95% OF MAX DRY
DENSITY PER ASTM D698)
AC PAVEMENT
(COMPACT TO MIN 91% OF MAX DENSITY
PER RICE STANDARD METHOD)
NOTES:
1. DESIGN SUBGRADES SHALL BE COMPACTED AND PROOF-ROLLED PRIOR TO PLACEMENT OF
BASEROCK. IF SUBGRADE PASSES PROOF-ROLL BUT FAILS DENSITY TESTING, INSTALL MIN. 4.5 OZ
NON-WOVEN GEOTEXTILE FABRIC ON SUBGRADE PRIOR TO PLACEMENT OF BASEROCK. FAILURE
OF PROOF-ROLL WILL REQUIRE OVER EXCAVATION OR REPAIR AS DIRECTED BY PROJECT
GEOTECHNICAL ENGINEER OR ER/COR.
2. IF SUBGRADE FAILS THE PROOF-ROLL, SUBGRADE SHALL BE OVEREXCAVATED TO FIRM AND
UNYIELDING SOIL AND BACKFILLED WITH COMPACTED BASEROCK OVER MIN. 8.0-OZ. NON-WOVEN
FABRIC AS REQUIRED TO ALLOW COMPACTION OF UPPER (DESIGN) BASEROCK SECTION AND TO
MAINTAIN STRUCTURAL INTEGRITY OF SUBGRADE SOILS. TYPICAL MINIMUM OVEREXCAVATION
REQUIRED IS 12-INCHES. NO RUBBER TIRED EQUIPMENT ALLOWED ON SUBGRADE FOLLOWING
OVEREXCAVATION.
3. PASSING PROOF-ROLL ON BASEROCK IS ALSO REQUIRED IMMEDIATELY PRIOR TO PAVING.
4. PROVIDE TACK COAT BETWEEN ASPHALT LIFTS.
5. CONTRACTOR SHALL CONFORM TO ALL RECOMMENDATIONS IN GEOTECHNICAL REPORT.
SCALE:
C-500
AC PAVEMENT SECTION
NTS
PAVEMENT & BASEROCK SECTIONS:
2" LIFT
2 12" WEAR COVER
HEAVY DUTY PAVEMENT
5 1/2" AC PAVEMENT
6" OF AGGREGATE BASE COURSE
28" OVER EXCAVATED AND COMPACTED NATIVE MATERIAL
8" SCARIFY AND COMPACT NATIVE MATERIAL
NOTES:
1. CROSS SLOPE OF GUTTER SAME AS PAVEMENT.
2. CONCRETE SHALL BE 4000 PSI AT 28 DAYS.
3. CONTRACTION JOINTS ARE REQUIRED AT 15-FT
INTERVALS AND AT INLET STRUCTURES AND
WHEELCHAIR RAMPS. DEPTH OF JOINTS SHALL BE AT
LEAST 1-1/2".
4. CONSTRUCT EXPANSION JOINTS (MIN. 1/2" THICK
PREMOLDED BITUMINOUS MATERIAL) AT MAXIMUM 200
FEET SPACING AND AT SIDES OF DRIVEWAY
APPROACHES AND POINTS OF TANGENCY.
5. CURBS TO CURE A MINIMUM OF 7 DAYS PRIOR TO
PLACING FINAL BASEROCK AND PAVING.
24"
6"
6"
12"
1/2" R
PAVEMENT
1" R
1/2" R 1/8" R
MINIMUM 6" COMPACTED
CRUSHED ROCK
1"
6"
STABLE SUBGRADE
SCALE:
C-500
VERTICAL CURB AND GUTTER
NTS
2% (SEE NOTE 1)
4'
CONCRETE VALLEY GUTTER NOTES:
1. PCC CONSTRUCTION SHALL CONFORM TO PORTLAND CEMENT ASSOCIATION (PCA)
SPECIFICATIONS, UNLESS OTHERWISE SPECIFIED.
2. ALL CONCRETE SHALL BE 4000 PSI @ 28 DAYS.
3. CONTRACTION JOINTS SHALL BE PLACED AT 15' MIN. INTERVALS. DEPTH OF JOINT SHALL BE A
MINIMUM OF 1/3 TO MAXIMUM 1/2 THE GUTTER SECTION.
4. CONSTRUCT 12" WIDE BENCH MONOLITHICALLY WITH VALLEY GUTTER FOR PAVEMENT SUPPORT.
BENCH DEPTH TO MATCH PAVEMENT THICKNESS.
5. VALLEY GUTTER TO CURE A MINIMUM OF 7 DAYS PRIOR TO PLACING FINAL BASEROCK AND PAVING
ALLEY.
6. LONGITUDINAL GUTTER GRADE SHALL NOT BE LESS THAN 0.3%.
7. DESIGN SUBGRADES SHALL BE COMPACTED AND PROOF-ROLLED PRIOR TO PLACEMENT OF
BASEROCK. IF SUBGRADE PASSES PROOF-ROLL BUT FAILS DENSITY TESTING, INSTALL MIN. 4.5 OZ
NON-WOVEN GEOTEXTILE FABRIC ON SUBGRADE PRIOR TO PLACEMENT OF BASEROCK. FAILURE
OF PROOF-ROLL WILL REQUIRE OVEREXCAVATION OR REPAIR AS DIRECTED BY PROJECT
GEOTECHNICAL ENGINEER OR ER/COR.
8. IF SUBGRADE FAILS THE PROOF-ROLL, SUBGRADE SHALL BE OVEREXCAVATED TO FIRM AND
UNYIELDING SOIL AND BACKFILLED WITH COMPACTED BASEROCK OVER MIN. 8.0-OZ. NON-WOVEN
FABRIC AS REQUIRED TO ALLOW COMPACTION OF UPPER (DESIGN) BASEROCK SECTION AND TO
MAINTAIN STRUCTURAL INTEGRITY OF SUBGRADE SOILS. TYPICAL MINIMUM OVEREXCAVATION
REQUIRED IS 12-INCHES. NO RUBBER TIRED EQUIPMENT ALLOWED ON SUBGRADE FOLLOWING
OVEREXCAVATION.
8" M
IN
AC PAVEMENT,
SEE PLANS
SCALE:
C-500
CONCRETE VALLEY GUTTER
NTS
S=1% MIN
2" MIN OF COMPACTED
CRUSHED ROCK
COMPACTED SUBGRADE
8"
6"
6"
SLOPE TO DRAIN
* SLOPE BOTTOM OF TRENCH DRAIN
METAL TRENCH GRATE
4" CONCRETE PAVING
REINFORCED WITH 6 X 6
# 10 W.W.M.
COMPACTED EARTH
TO TIE IN WITH EXISTING DRAINAGE
1" X 1"
NOTCH
SCALE:
C-500
STANDARD TRENCH GRATE INLET
NTS
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9
Expand Supply Processing, Decontamination and Distribution Phoenix VA Health Care System
PHOENIX, ARIZONA
644-235
APPROVED: PROJECT DIRECTOR
SEPTEMBER 2019REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
100% FINAL DESIGN
FULLY
SPRINKLERED
GARY ZETTL
VA PHOENIX GENERAL ENGINEER
PHONE: (602) 277-5551 X5512
ARCRID
C-500
CIVIL DETAILS
CO
LO
RADO REG I STERED
PROFESS I ONA L ENG I N
EE
R
R I
CH
1. CONCRETE SHALL BE AIR-ENTRAINED TO RESULT IN 4
PERCENT AIR ± 1%. MAX. SLUMP 4" BEFORE ADDING
PLASTICIZER, CONSOLIDATE WITH MECHANICAL VIBRATORS.
MIN. 28-DAY COMPRESSIVE STRENGTH OF 4,000 PSI.
2. TRANSVERSE AND LONGITUDINAL CONSTRUCTION JOINTS @
12' MAX.
3. PROVIDE LOAD TRANSFER AT THE INTERFACE BETWEEN
AREAS OF CONCRETE PLACED AT DIFFERENT TIMES USING
TIED AND KEYED OR BUTT-TYPE CONSTRUCTION JOINTS.
4. BUTT-TYPE CONSTRUCTION JOINTS SHALL HAVE THE
PAVEMENT EDGES THICKENED BY APPROXIMATELY 20%.
5. CONSTRUCTION JOINTS TO BE PLACED AT PLANNED
CONSTRUCTION JOINT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .