Attachment_2_Drawings.pdf

PDF 2 MB Posted

Attached to
NEIBER BRIDGE REPAIR Federal contract opportunity
Solicitation number
140L6222R0022
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

About this file

This document includes drawings and specifications for the NEIBER BRIDGE REPAIR federal contract opportunity. The scope of work involves resurfacing the bridge deck with asphalt, modifying the east abutment bearing shoe, installing additional riprap, and installing object markers. The location of the work is on BLM 1405 Neiber Road in Washakie County, Wyoming, at a bridge located at latitude 43.850502 and longitude -107.904346. The drawings provide details on the asphalt pavement plan and sections, side dam addition, east abutment bearing shoe modifications, plan and profile views, riprap sections, and sign panel installation. The solicitation is issued by the Bureau of Land Management Wyoming Region for furnishing labor, equipment, supplies and materials to complete the repair work.

View the file

Other files for this federal contract opportunity

Other files attached to NEIBER BRIDGE REPAIR, newest first.
File Type Posted
Questions_Addressed_0001.docx DOCX document
Sol_140L6222R0022_Amd_0001.pdf PDF
Sol_140L6222R0022.pdf PDF
Attachment_5_SF_1442_Completion_Instructions.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment_6_Limitations_on_Subcontracting_Breakout.pdf PDF
Attachment_4_Pricing_Worksheet.pdf PDF
Attachment_3_Wage_Determination_WY20220043.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEIBER BRIDGE DECK AND SCOUR

406-656-6399

222 N. 32nd Street, #700 Billings, Montana 59101

March 1, 2022

Pr of es s io na l Engineer (St ruct ura l)

W Y O M I N G Date

MA

TT

HEW J . METTLER

222 N. 32nd Street, #700 Billings, Montana 59101

March 1, 2022

Driving Directions:

From Worland, WY, at the intersection of US Hwy. 20 (WY-789) & Road 13, go south for 2.7 miles to Nowater Trail (RD77), go southeast 9.4 miles on Nowater Trail to Neiber Road, go southwest 2.7 miles on Neiber Road to the project (Neiber Bridge).

VICINITY MAP

INSET MAP

NEIBER

BRIDGE

NEIBER

BRIDGE

14.8 miles to Worland

Billings, Montana 59101

March 1, 2022

POINT COORDINATE TABLE

Billings, Montana 59101

March 1, 2022

PLAN

PROFILE

DETAIL

TYPICAL RIPRAP SECTION

Billings, Montana 59101

March 1, 2022

SKEW DIAGRAM

DETAIL

SIGN PANEL &

ASSEMBLY INSTALLATION

(NOT TO SCALE)

1 SECTION

ASPHALT PAVEMENT

406-656-6399

222 N. 32nd Street, #700 Billings, Montana 59101

PLAN

1 DETAIL

SIDE DAM ADDITION

A A

PLAN

SECTION A-A

2 DETAIL

EAST ABUTMENT BEARING SHOE MODIFICATIONS

406-656-6399

222 N. 32nd Street, #700 Billings, Montana 59101

File details come from the government source that posted it. Updated .