Questions_Addressed_0001.docx

DOCX document 17 KB Posted

Attached to
NEIBER BRIDGE REPAIR Federal contract opportunity
Solicitation number
140L6222R0022
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

About this file

This document contains questions and answers regarding solicitation number 140L6222R0022 from the Department of the Interior Bureau of Land Management Wyoming Region. The solicitation is for the Neiber Bridge repair project, which involves resurfacing the bridge deck with asphalt, modifying the abutments, installing riprap, and placing object markers. The work location is provided along with a note that no estimated quantities are available for the Class 5 riprap as it is a lump sum item. An inquiry about using non-specification riprap material is answered by confirming that no changes to the specifications will be considered.

View the file

Other files for this federal contract opportunity

Other files attached to NEIBER BRIDGE REPAIR, newest first.
File Type Posted
Sol_140L6222R0022_Amd_0001.pdf PDF
Attachment_4_Pricing_Worksheet.pdf PDF
Attachment_3_Wage_Determination_WY20220043.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_5_SF_1442_Completion_Instructions.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment_6_Limitations_on_Subcontracting_Breakout.pdf PDF
Sol_140L6222R0022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L6222R0022

AMD 001

Questions Addressed Solicitation: 140L6222R0022 Neiber Bridge Repair

1. It appears that the only aggregate need I’m seeing is Class 5 rip rap? Do you know how many tons you would be needing?

a. This is a lump sum item, no estimated quantities are available.

2. We do not have any rip rap that meets this spec (all of our rip rap is sorted, so it is all non-spec material). If this is something that could be potentially approved by the engineer let me know and I could provide a material price for you based on the tonnage?

a. No changes to the specifications will be considered.