This is a system monitoring form for the Valley Park TCE Site Groundwater Extraction System, documenting inspection procedures and operational parameters for a contaminated groundwater remediation facility. The form captures real-time operational data for the extraction well, antiscalant metering system, sediment bag filters, and air stripper blower components. Inspections are conducted to verify that system components operate within established ranges, including flow rates (178-182 gpm), extraction well water levels (35-50 feet below top of casing), pressure gauges (8-15 psi), and air stripper pressure (35-42 inches of water). The form includes checkpoints for routine monthly maintenance tasks such as antiscalant level verification, air stripper tray inspection and drainage, Fernco fitting adjustments, and monitoring well gauging at designated locations (MW-55 and MW-56). System status is documented both upon arrival and departure, with operators required to record all readings, verify control panel illumination patterns, and confirm proper switch positions on automated equipment.
The monitoring form establishes operational setpoints and control parameters managed through SiteLink Controls, including water level controls, dosing pump setpoints at manual (50 percent) and automatic (200 gpm) modes, and variable frequency drive settings (37-42 Hz). Runtime hours are tracked for the SVE and fan systems, ASP-10 blower, P-10 well pump, and DP-VLS pump to monitor equipment utilization and maintenance schedules. The form includes verification checkboxes requiring operators to confirm that all indicator lights and switch positions match required configurations, with notation space for any deviations or issues encountered. This standardized inspection document was revised on March 13, 2020, and serves as both an operational record and compliance documentation for ongoing groundwater remediation activities at the site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Tour - Sign in Sheet - Pump & Treat.pdf | ||
| STATE 0000000524SL-03.docx | DOCX document | |
| STATE 0000000524SL.docx | DOCX document | |
| STATE 0000000524SL-01.docx | DOCX document | |
| Attachment 1.pdf | ||
| REVISED Attachment 1.pdf | ||
| STATE 0000000524SL-02.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Inspected: ___________________ System Status At Arrival: [ ] running [ ] stopped [ ] alarmed
Time Inspected: ___________________ [ ] running [ ] stopped [ ] alarmed
Inspected By: ______________________
Check Physical Components
Component Reading Units (typical operating range)
Extraction Well and Flow Meter
E+H Flow Meter gpm (178 to 182 gpm)
E+H Flow Meter Kgl
E+H Flow Meter gal (use the plus sign only)
Extraction Well Water Level ft below TOC (35 to 50 ft.)
Extraction Well Pressure Gauge psi (8 to 15 psi)
Antiscalant and Metering Pump
Metering Rate gal/day (~0.03 gal/day)
Pump Pressure bar (~3.5 bar)
50:50 Antiscalant Volume gal
Undiluted Antiscalant Onhand drums
Sediment Bag Filters
Pre Bag Filter Pressure psi (5 to 9 psi)
6591A-pre psi (3 to 9 psi)
6591A-post psi (2.5 to 7 psi)
6591A-pre psi (3 to 9 psi)
6591B-post psi (2.5 to 7 psi)
Post Bag Filter Pressure psi (5 to 7 psi)
Capsu-Photohelic Reading (black) (DP-10) in H2O
Capsu-Photohelic Gauge Setpoint (red) (DP-10) ~ 300 in H2O Note: 300 in H2O = 11 psi
Air Stripper Blower
Air Stripper Pressure in H2O (35 to 42 in H2O)
Air Stripper Input Flow cfm x 10 (350 - 450 cfm x10)
TECO-Westinghouse Variable Frequency Drive (VFD)
VFD Freq. Cmd Hz (37 to 42)
VALLEY PARK TCE SITE
GROUNDWATER EXTRACTION SYSTEM MONITORING
System Status When Leaving:
Form Revised 3/13/2020
Control Panel and PLC
Site Walk-Around, Well Gauging, and Other Items
Check Each Visit Check Monthly (first week of month)
[ ] Site walk-around [ ] Check antiscalant level
[ ] Check outfall in storm grate [ ] Check air stripper trays
[ ] Drain air stripper stack [ ] Tighten Fernco fittings on air stripper trays
[ ] Gauge monitoring wells
MW-55
MW-56
SiteLink Controls (https://sitelink.newterra.com/)
Flow Meter Readings
FM-10 Flowrate gpm (178 to 182 gpm)
FM-10 Total Volume gal.
Water Level (LC-10) Control
Water over LC-10 ft.
Water Level ft. below TOC
LC-10 Position ft. below TOC (58 ft)
Low Water Well (Low SP) ft. below TOC (56 ft)
Pump On Level (ON SP) ft. below TOC (50 ft)
Dosing Pump (DP-CH) Setpoints
Manual SP % (50 %)
Automatic SP gpm (200 gpm)
Runtimes
VB-SVE & FAN HRS 0 hrs
ASP-10 Blower HRS hrs
P-10 WELL HRS hrs
DP-VLS PUMP HRS 0 hrs
Notes
Depth to Water
(ft btoc)
Total Depth
(ft btoc)
Verify: Are ASP-10 BLOWER-ON and VFD P-10 ON lights illuminated red and all others are off?
[ ] yes [ ] no, explain:
Verify: Are switch positions: AUTO, OFF, OFF, OFF, AUTO [ ] yes [ ] no, explain: