Attachment_2_-_Devils_Elbow_and_Clarks_Bay_Well_Improvements_Drawings.pdf
PDF 3 MB Posted
- Attached to
- Devil's Elbow and Clark's Bay Well Improvements Federal contract opportunity
- Solicitation number
- 140L3624Q0016
About this file
This solicitation requests quotations for well improvements at two Bureau of Land Management sites in Montana. The scope of work includes drilling a new water well, trenching and installing new utility lines, replacing water system fittings, installing a new submersible pump and controls, and abandoning two existing wells. Quotations are due by March 27, 2024 with award anticipated on or around April 12, 2024. The contractor must commence work within 10 days of notice to proceed and complete the well drilling and testing within 45 days. An optional scope to complete additional site work is contingent on testing results and must be finished within 90 days of notice to proceed. The solicitation is set aside for total small business and issued under simplified acquisition procedures with a firm-fixed price purchase order contemplated.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_7_-_DEQ-3-2023_0002.pdf | ||
| Sol_140L3624Q0016_Amd_0002.pdf | ||
| Attachment_8_-_DE_CB_Well_-_Submittal_Log_03-25-2024_0002.pdf | ||
| Attachment_1_-_Devils_Elbow_and_Clarks_Bay_Well_03-25-2024_0002.pdf | ||
| Amendment_2_-_DE_and_CB_Wells_-_Issued_0002.pdf | ||
| Solicitation_-_Devils_Elbow_and_Clarks_Bay_Well_Improvements_-_Issued_0001.pdf | ||
| Attachment_3_-_General_Decision_Number__MT20240075_(01052024)_0001.pdf | ||
| Sol_140L3624Q0016_Amd_0001.pdf | ||
| Attachment_4_-_Reference_List_0001.pdf | ||
| Attachment_5_-_Standard_Form_25_-_Performance_Bond_0001.pdf | ||
| Attachment_6_-_Standard_Form_25A_-_Payment_Bond_0001.pdf | ||
| Attachment_1_-_Devils_Elbow_and_Clarks_Bay_Well_Improvements_Specifications.pdf | ||
| Sol_140L3624Q0016.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
CANADA
UNITED STATES
SASKATC
H
EW
AN
ALBERTA
B R
ITIS
H
C O
LU
M
B
IA
N O
R T
H
D
A K
O T
A
S O
U T
H
D
A K
O T
A
WYOMING
ALT
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
DEVIL'S ELBOW AND CLARK'S BAY WELL IMPROVEMENT
LEWIS AND CLARK COUNTY
BUTTE FIELD OFFICE
VICINITY MAP
(N.T.S)
ESTIMATED QUANTITIES
ITEM QUANTITY UNIT
CONSTRUCT NEW
POTABLE DRINKING
WATER WELL
450 FT
DECOMMISSION CLARK'S
BAY WELL
40 FT
DECOMMISSION DEVIL'S
ELBOW WELL
260 FT
INSTALL NEW 2"
WATERLINE
300 FT
INSTALL NEW
UNDERGROUND
ELECTRICAL
300 FT
PUMP ROOM
MODIFICATIONS
1 LS
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEQHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. TE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE
(1-800-STAE-IT) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH
DISCREPANCY.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
ENGINEER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
T I T
L E
S
H E
E T
PROJECT LOCATION
DIRECTIONS TO CLARK'S BAY AND DEVIL'S ELBOW CAMPGROUND:
FROM HELENA, DRIVE EAST ON YORK ROAD FOR 22 MILES. THE
CAMPGROUND AND DAY USE AREA WILL BE LOCATED ON THE
RIGHT-HAND SIDE OF THE ROAD.
[1]
ALL QUANTITIES ARE AN ESTIMATE OF THE
ENGINEER. THE CONTRACTOR SHALL MAKE THEIR
OWN INDEPENEDENT ESTIMATE OF QUANTITIES
AND BID THEREON.
DRAWING INDEX
Sheet Number Sheet Title
1 G1 TITLE SHEET
2 G2 LEGEND & ABBREVIATIONS
3 C1 MASTER SITE PLAN
4 C2 CLARKS BAY SITE PLAN
5 C3 DEVIL'S ELBOW SITE PLAN
6 C4 CLARK'S BAY PUMP ROOM INSET
7 C5 DEVIL'S ELBOW PUMP ROOM INSET
8 D1 DEVILS ELBOW WELL DETAILS
9 D2 CLARKS BAY WELL & DETAILS
W E
A
N D
W
T
R
Y S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
U
O
F
L
A N
D
M
A N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
I
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
Q
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
C
A
R K
B
Y
PROJECT DESCRIPTION:
WORK CONSISTS OF DRILLING A NEW PUBLIC DRINKING WATER WELL,
PERFORMING YIELD TESTING AND QUALITY SAMPLING, ABANDONING
2 EXISTING WELLS, EXCAVATING AND TRENCHING NEW WATERLINES,
REPLACING AND ADDING NEW WATER SYSTEM FITTINGS, AND
INSTALLING A NEW SUBMERISIBLE PUMP WITH APPROVED
CONTROLLER.
G1
AutoCAD SHX Text
DEVILS ELBOW CAMPGROUND AND CLARK'S BAY DAY USE AREA
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INTERSTATE HIGHWAY
AutoCAD SHX Text
U.S. HIGHWAY
AutoCAD SHX Text
STATE CAPITOL
AutoCAD SHX Text
BLM STATE OFFICE
AutoCAD SHX Text
BLM DISTRICT OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UPREPARED BY
AutoCAD SHX Text
AutoCAD SHX Text
STATE HIGHWAY
AutoCAD SHX Text CIVIL ENGINEER: GRADY ANDERSON BUREAU OF LAND MANAGEMENT'S WESTERN DISTRICT OFFICE 103 N. PAKRMONT BUTTE, MT 59701
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - NOTES.DWG
L E
G E
B
R E
V I A
T I O
N S
ABBREVIATIONS
AB AGGREGATE BASE OVHD OVERHEAD
ABC AGGREGATE BASE COURSE OVHG OVERHAND
ABUT ABUTMENT PC POINT OF CURVATURE
AC ACRE POC POINT ON CURVE
ASPH ASPHALT PROP PROPOSED
AST ABOVE GROUND STORGAGE TANK PSI POINDS PER SQUARE INCH
BLDR BOULDER PT POINT OF TANGENCY
BLM BUREAU OF LAND MANAGEMENT PVC POLYVINYL CHLORIDE
BM BENCHMARK PVI POINT OF VERTICAL INTERSECTION
BNDRY BOUNDARY PVMT PAVEMENT
BP BEGIN POINT Q PEAK DISCHARGE VOLUME
BRDGE BRIDGE R RADIUS
BTM BOTTOM RCP REINFORCED CONCRETE PIPE
C CONCRETE RDWY ROADWAY
CF CUBIC FEET RET RETAINING
CHCK CHECK POINT RGRCP RUBBER GASKETED REINFORCED CONCRETE PIPE
CL CENTERLINE RL RIDGE LINE
CMP CORRUGATED METAL PIPE ROW RIGHT OF WAY
CONC CONCRETE S SLOPE
CTRL CONTROL POINT SB SOUTHBOUND
CY CUBIC YARD SD STORM DRAIN
DEMO DEMOLITION SF SQUARE FEET
DET DETAIL SHT SHEET
DIA DIAMETER SPTC SEPTIC
DIP DUCTILE IRON PIPE SSWR SANITARY SEWER
E
EAST, EASTING
STA STATION
EB EAST BOUND STD STANDARD
ELEC ELECTRICAL STRM STORM
ELEV ELEVATION SW SIDEWALK
EOR EDGE OF ROAD SY SQUARE YARD
EP END POINT TC TOP OF CURB
ESMT EASEMENT TEMP TEMPORARY
EX EXISTING TP TURNING POINT
FES FLAIRED END SECTION TR TRAIL
FFE FINISHED FLOOR ELEVATION TS TOP SOIL
FG FINISHED GRADE TV TELEVISION
FO FIBER OPTIC TYP TYPICAL
FR FIRE RING UG UNDERGROUND
G GUTTER UST UNDERGROUND STORAGE TANK
GB GRADE BREAK VC VERTICAL CURVE
GV GAS VALVE VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLETHELYN VOL VOLUME
HP HIGH POINT W WELL
HWE HIGH WATER ELEVATION WB WEST BOUND
INV INVERT WV WATER VALVE
IP IRON PIPE YD YARD
L LENGTH
LF LINEAR FEET
LP LOW POINT
MAX MAXIMUM
MH MANHOLE
MID MID POINT
MIN MINIMUM
MP MILE POST
MPH MILES PER HOUR
N
NORTH, NORTHING
NAD NORTH AMERICA DATUM
NAVD NORTH AMERICA VERTICAL DATUM
NB NORTH BOUND
OC ON CENTER
OFF OFFSET
TOPOGRAPHY LEGEND
EXISTING PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
SLOPE ARROW
STORM DRAIN LEGEND
EXISTING PROPOSED
STORM DRAIN / CULVERT
CATCH BASIN
MANHOLE
WATER LEGEND
EXISTING PROPOSED
PIPE
FITTING
HOSE BIB
HYDRANT
REDUCER
VALVE
WELL
W
SITE LEGEND
EXISTING PROPOSED
BUILDING OUTLINE
CURB AND GUTTER
BEAR BOX
FIRE RING
PINDOWN
PICNIC TABLE
SIGN
W
1234 1234
12.34
12.34%
12.34
CALLOUT LEGEND
DEMOLITION PLAN CALLOUT
SITE PLAN CALLOUT
GRADING & DRAINAGE PLAN CALLOUT
ROADWAY PLAN CALLOUT
WATER CALLOUT PLAN
SEWER PLAN CALLOUT
REVISION
SANITARY SEWER & SEPTIC LEGEND
EXISTING PROPOSED
PIPE
MANHOLE
CLEANOUT
S
ROADWAY LEGEND
EXISTING PROPOSED
CENTERLINE
CURB AND GUTTER
PROPOSED MATERIAL LEGEND
RIPRAP (GRADE 5)
GRASS
RIPRAP (GRADE 4)
WASTE
RIPRAP (GRADE 3)
TOP SOIL
RIPRAP (GRADE 2) CONCRETE (BOAT RAMP)
RIPRAP (GRADE 1)
CONCRETE
NATIVE MATERIAL ASPHALT
REFERENCE DETAIL LEGEND
FULL SECTION
PARTIAL SECTION
PROFILE & SECTION TITLE
C#
C#
C#
C# HORZ SCALE: 1" = #'
VERT SCALE: 1" = #'
CROSS SECTION
SD
12.34%
ELECTRICAL
EXISTING PROPOSED
ELECTRIC UNDERGROUND
ELECTRIC OVERHEAD
UGE
UGE
OHE OHE
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L
A N
D
M
A N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
G2
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
U
G
E
U
G
E
W
W
W
W
W
W
W
W
W
W
CTRL 100
CTRL 200
W
O
H
E
O
H
E
O
H
E
O
H
E
W
O
H
E
O H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O H
E
O H
E
O
H
E
W
W
W
W
W
W
W
W
W
W
PRESSURE
TANK
RPBP
RPBP
R
R
PROPOSED WELL LOCATION
WELL TO PROVIDE DRINKING WATER TO
DEVIL'S ELBOW CAMPGROUND AND
CLARK'S BAY DAY USE AREA
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - PLANS & DETAILS.DWG
D E
V I L
B
A
R K
T
E
P
L A
N
CONSTRUCTION NOTES
1. WELL TO BE DRILLED IN ACCORDANCE WITH
MONTANA DEQ WELL CONSTRUCTION
SPECIFICATIONS FOR PUBLIC DRINKING WATER
SYSTEMS.
2. NEW UNDERGROUND ELECTRICAL AND WATERLINE
TO BE TRENCHED AND RUN FROM PUMPHOUSE TO
WELL PUMP
3. ALL NEW WATERLINES SHALL BE HDPE
4. PUMP ROOM TO BE CONFIGURED TO INCORPORATE
NEW WELL APPURTENANCES AND PUMP CONTROL
5. ALL PUBLIC AND PRIVATE LOCATES SHALL BE DONE
BY CONTRACTOR PRIOR TO EXCAVATION
6. 100' BUFFER ZONE FROM NEW WELL LOCATION
MUST BE FREE OF ALL POTENTIAL CONTAMINATION
SOURCES
7. THE LOCATION OF THE PROPOSED WELL SHOWN IS
APPROXIMATE. THE CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION ONSITE WITH
THE CONTRACTING OFFICER
WATER SYSTEM NOTES
1. EXISTING DEVIL'S ELBOW WELL - GWIC ID: 224253
2. SITE NAME: BUREAU OF LAND MANAGEMENT *
DEVIL'S ELBOW
3. EXISTING CLARKS BAY WELL - GWIC ID: 241609
4. SITE NAME: BUREAU OF LAND MANAGEMENT *
CLARK'S BAY
5. WELL OWNER: BUREAU OF LAND MANAGEMENT
6. WATER SYSTEM OPERATOR: GRADY ANDERSON,
OPERATOR ID: #9270
CLASSIFICATIONS: 4A, 4B
7. ALL PUBLIC AND PRIVATE LOCATES SHALL BE DONE
BY CONTRACTOR PRIOR TO EXCAVATION
8. 100' BUFFER ZONE FROM NEW WELL LOCATION
MUST BE FREE OF ALL POTENTIAL CONTAMINATION
SOURCES
9. TRANSIENT, NON-COMMUNITY WELL. PROVIDING
WATER TO APPROXIMATELY 500 PEOPLE/DAY AT
PEAK SEASON
10. 40 GPM REQUIRED FLOW RATE. WATER DEMAND IS
APPROXIMATELY 5000 GALLONS PER DAY.
N
LEGEND
NEW POTABLE WATER
CURBSTOP
VALVE/IRR BOX/DRAIN
W
FIRE RING
PICNIC TABLE
SIGN
WELL
NEW UNDERGROUND
ELECTRIC
EXISTING POTABLE WATER W
EXISTING UNDERGROUND
ELECTRIC
EXISTING BURIED WATERLINES
BURY DEPTH ≈ 6'
DEVIL'S ELBOW AND CLARK'S BAY SITE PLAN
Y
O
K
A
D
T
R
K
M
T
K
E
S
I
D
M
CLARK'S BAY
DAY USE AREA
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
Y
DEVIL'S ELBOW
CAMPGROUND
H
A
U
S
K
E
EXISTING DEVIL'S ELBOW
AND CLARK'S BAY WELLS
WATER SYSTEM ESTIMATED QUANTITIES
ITEM QUANTITY UNIT
CLARK'S BAY POTABLE
WATERLINES
700 LF
CLARK'S BAY IRRIGATION
WATERLINES
800 LF
DEVIL'S ELBOW POTABLE
WATERLINES
7500 LF
DEVIL'S ELBOW IRRIGATION
WATERLINES
5000 LF
NO SCALE
DEVIL'S ELBOW WATERLINE PROFILE
100' RADIUS
WELL ISOLATION ZONE
CONTROL POINTS
POINT NUMBER NORTHING EASTING ELEVATION
100 901645.7490' 1390078.9060' 3717.367'
200 901811.1580' 1390434.2900' 3691.830'
BASIS OF SURVEY
PROJECT SURVEYED USING RTK GPS
COORDINATIE SYSTEM
MONTANA STATE PLANE ZONE 2500
*ALL UNITS ARE INTERNATIONAL FEET
AT GROUND
C1
DEVIL'S ELBOW PUMP ROOM
AutoCAD SHX Text
EL
AutoCAD SHX Text
MH
AutoCAD SHX Text
AutoCAD SHX Text 1+00
AutoCAD SHX Text 3671.9
AutoCAD SHX Text
DATUM ELEV
AutoCAD SHX Text 3650.00
AutoCAD SHX Text
AutoCAD SHX Text 3709.6
AutoCAD SHX Text 3702.6
AutoCAD SHX Text 3695.7
AutoCAD SHX Text 3689.1
AutoCAD SHX Text 3684.2
AutoCAD SHX Text 3680.2
AutoCAD SHX Text 3678.2
AutoCAD SHX Text 3676.5
AutoCAD SHX Text 3674.8
AutoCAD SHX Text 3672.7
AutoCAD SHX Text 3670.0
AutoCAD SHX Text 3665.0
AutoCAD SHX Text 3663.6
AutoCAD SHX Text 3664.6
AutoCAD SHX Text 3668.0
AutoCAD SHX Text 3669.6
AutoCAD SHX Text 15+00
AutoCAD SHX Text 13+00
AutoCAD SHX Text 11+00
AutoCAD SHX Text 9+00
AutoCAD SHX Text 7+00
AutoCAD SHX Text 5+00
AutoCAD SHX Text 3+00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3718.1
AutoCAD SHX Text 3724.5
AutoCAD SHX Text 3734.0
AutoCAD SHX Text 3744.8
AutoCAD SHX Text 3756.1
AutoCAD SHX Text 3768.4
AutoCAD SHX Text 3770.3
AutoCAD SHX Text 3765.7
AutoCAD SHX Text 3757.0
AutoCAD SHX Text 3750.6
AutoCAD SHX Text 3744.6
AutoCAD SHX Text 3737.7
AutoCAD SHX Text 3729.5
AutoCAD SHX Text 3723.7
AutoCAD SHX Text 3716.3
AutoCAD SHX Text 31+00
AutoCAD SHX Text 29+00
AutoCAD SHX Text 27+00
AutoCAD SHX Text 25+00
AutoCAD SHX Text 23+00
AutoCAD SHX Text 21+00
AutoCAD SHX Text 19+00
17+00
W
W
W
W
W
W
W
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
W
W
W
W
W
W
W
U
G
E
W
W
W
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
W
W
W
W
W
W
W
W
W
W
W
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O H
E
O H
E
O H
E
O H
E
O
H
E
O
H
E
W
W
W
W
W
W
W
W
W
W
W
W
W
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
W
R
P
B
P
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - PLANS & DETAILS.DWG
C L A
R K
E
A
A
N D
W A
T E
R
S
Y S
T E
M
S
I T
E
P
L A
N
CONSTRUCTION NOTES
1. WELL TO BE DRILLED IN ACCORDANCE WITH
MONTANA DEQ WELL CONSTRUCTION
SPECIFICATIONS FOR PUBLIC DRINKING WATER
SYSTEMS.
2. NEW UNDERGROUND ELECTRICAL AND WATERLINE
TO BE TRENCHED AND RUN FROM PUMPHOUSE TO
WELL PUMP
3. ALL NEW WATERLINES SHALL BE HDPE
4. PUMP ROOM TO BE CONFIGURED TO INCORPORATE
NEW WELL APPURTENANCES AND PUMP CONTROL
5. ALL PUBLIC AND PRIVATE LOCATES SHALL BE DONE
BY CONTRACTOR PRIOR TO EXCAVATION
6. 100' BUFFER ZONE FROM NEW WELL LOCATION
MUST BE FREE OF ALL POTENTIAL CONTAMINATION
SOURCES
7. THE LOCATION OF THE PROPOSED WELL SHOWN IS
APPROXIMATE. THE CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION ONSITE WITH
THE CONTRACTING OFFICER
WATER SYSTEM NOTES
1. EXISTING DEVIL'S ELBOW WELL - GWIC ID: 224253
2. SITE NAME: BUREAU OF LAND MANAGEMENT *
DEVIL'S ELBOW
3. EXISTING CLARKS BAY WELL - GWIC ID: 241609
4. SITE NAME: BUREAU OF LAND MANAGEMENT *
CLARK'S BAY
5. WELL OWNER: BUREAU OF LAND MANAGEMENT
6. WATER SYSTEM OPERATOR: GRADY ANDERSON,
OPERATOR ID: #9270
CLASSIFICATIONS: 4A, 4B
7. ALL PUBLIC AND PRIVATE LOCATES SHALL BE DONE
BY CONTRACTOR PRIOR TO EXCAVATION
8. 100' BUFFER ZONE FROM NEW WELL LOCATION
MUST BE FREE OF ALL POTENTIAL CONTAMINATION
SOURCES
9. TRANSIENT, NON-COMMUNITY WELL. PROVIDING
WATER TO APP. 500 PEOPLE/DAY AT PEAK SEASON
10. 40 GPM REQUIRED FLOW RATE. WATER DEMAND IS
APPROXIMATELY 5000 GALLONS PER DAY.
N
0 20 40
FULL SCALE (22" X 34") 1 IN . = 20 FT.
HALF SCALE (11" X 17") 1 IN . = 40 FT.
LEGEND
NEW POTABLE WATER
CURBSTOP
VALVE/IRR BOX/DRAIN
W
FIRE RING
PICNIC TABLE
SIGN
WELL
NEW UNDERGROUND
ELECTRIC
EXISTING POTABLE WATER W
EXISTING UNDERGROUND
ELECTRIC
PROPOSED WATERLINES
BURIED 6' MIN
EXISTING PUMP HOUSE
(INSET PAGE C4)
CLARK'S BAY SITE PLAN
CLARK'S BAY EXISTING WELL (TO BE ABANDONED)
DEVIL'S ELBOW EXISTING WELL (TO BE ABANDONED)
Y
O
A
D
EXISTING VAULT
TIE-IN LOCATION FOR NEW WATERLINE
TO DEVIL'S ELBOW CAMPGROUND
V
I
L
B
M
P
G
R
O
U
N
D
A
R
K
E
S
I
D
C
L
A
R
K
E
A
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
Y
SCALE 1" = 20'
C2
AutoCAD SHX Text
EL
MH
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
U
G
E
U
G
E
U
G
E
T
T
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
UGE
W
W
W
W
W
W
W
W
W
W
W
W
CTRL 100
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
P
R
E
S
S
U
R
E
T
A
N
K
R
P
B
P
W
W
UGE
UGE
U
G
E
U
G
E
R
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - PLANS & DETAILS.DWG
D E
V I L
B
M
I N
I S
T R
A T
I V
E
A R
T
E
P
L A
N
N
0 20 40
FULL SCALE (22" X 34") 1 IN . = 20 FT.
HALF SCALE (11" X 17") 1 IN . = 40 FT.
ELECTRICAL UTILITY
METER AND DISTRIBUTION
PANEL
DEVIL'S ELBOW PUMP ROOM
(INSET PAGE C5)
EXISTING WATERLINE FROM WELL
AT CLARK'S BAY DAY USE
DEVIL'S ELBOW SITE PLAN
D
O
R
A
G
G
R
A
G
E
A
D
M
I
L
D
I
N
G
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
Y
EXISTING SPARE WATERLINE FROM WELL
AT CLARK'S BAY DAY USE
EXISTING CHLORINATION
CONTACT CHAMBER
CONSTRUCTION NOTES
1. WELLS TO BE DRILLED IN ACCORDANCE WITH
MONTANA WELL CONSTRUCTION SPECIFICATIONS
FOR PUBLIC DRINKING WATER SYSTEMS.
2. NEW UNDERGROUND ELECTRICAL AND WATERLINE
TO BE TRENCHED AND RUN FROM PUMPHOUSE TO
WELL PUMP
3. ALL NEW WATERLINES SHALL BE HDPE
4. PUMP ROOM TO BE CONFIGURED TO INCORPORATE
NEW WELL APPURTENANCES AND PUMP CONTROL
5. ALL PUBLIC AND PRIVATE LOCATES SHALL BE DONE
BY CONTRACTOR PRIOR TO EXCAVATION
6. 100' BUFFER ZONE FROM NEW WELL LOCATION
MUST BE FREE OF ALL POTENTIAL CONTAMINATION
SOURCES
7. THE LOCATION OF THE PROPOSED WELL SHOWN IS
APPROXIMATE. THE CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION ONSITE WITH
THE CONTRACTING OFFICER
WATER SYSTEM NOTES
1. EXISTING DEVIL'S ELBOW WELL - GWIC ID: 224253
2. SITE NAME: BUREAU OF LAND MANAGEMENT *
DEVIL'S ELBOW
3. EXISTING CLARKS BAY WELL - GWIC ID: 241609
4. SITE NAME: BUREAU OF LAND MANAGEMENT *
CLARK'S BAY
5. WELL OWNER: BUREAU OF LAND MANAGEMENT
6. WATER SYSTEM OPERATOR: GRADY ANDERSON,
OPERATOR ID: #9270
CLASSIFICATIONS: 4A, 4B
7. ALL PUBLIC AND PRIVATE LOCATES SHALL BE DONE
BY CONTRACTOR PRIOR TO EXCAVATION
8. 100' BUFFER ZONE FROM NEW WELL LOCATION
MUST BE FREE OF ALL POTENTIAL CONTAMINATION
SOURCES
9. TRANSIENT, NON-COMMUNITY WELL. PROVIDING
WATER TO APP. 200 PEOPLE/DAY AT PEAK SEASON
10. 40 GPM REQUIRED FLOW RATE. WATER DEMAND IS
APPROXIMATELY 5000 GALLONS PER DAY.
LEGEND
NEW POTABLE WATER
CURBSTOP
VALVE/IRR BOX/DRAIN
W
FIRE RING
PICNIC TABLE
SIGN
WELL
NEW UNDERGROUND
ELECTRIC
EXISTING POTABLE WATER W
EXISTING UNDERGROUND
ELECTRIC
SCALE 1" = 20'
C3
PROPOSED
WELL LOCATION
W
W
W
W
W
W
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
U
G
E
W
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W
W
W
W
W
W
W
W
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
U
G
E
W
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W
W
W
W
W
W
W
W
W
W
W
W
W
RPBP
W
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - PLANS & DETAILS.DWG
A
R K
P
M
P
R
O O
M
I M
P R
O V
E M
E N
T
EXISTING CLARK'S BAY PUMP ROOM
CONSTRUCTION NOTES
REMOVE AND DISPOSE OF ALL EXISTING WATERLINE IMPACTED DURING EXCAVATION
OF NEW WATERLINES.
TIE-IN NEW WELL LINES TO EXISTING WELL LINES APPROXIMATELY 10' FROM THE
PUMP ROOM TO ALLOW ROOM FOR EXCAVATION.
ABANDON EXISTING WELLS LOCATED AT CLARK'S BAY DAY USE AREA IN
ACCORDANCE WITH DEQ SPECIFICATIONS.
LOCATE ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO EXCAVATION
ALL FITTINGS TO BE INSTALLED BY PLUMBER LICENSED IN THE STATE OF MONTANA
EXISTING CHLORINE CONTACT CHAMBER
PROTECT IN PLACE
EXISTING UNION BALL VALVE
REMOVE AND RELOCATE
INSTALL NEW 1-1/4" HDPE
WATERLINE
EXISTING CLARK'S BAY WATERLINE
PROTECT IN PLACE
EXISTING CLARK'S BAY
WELL UNDERGROUND ELECTRICAL
PROTECT IN PLACE
EXISTING CURBSTOP
PROTECT IN PLACE
PROPOSED CLARK'S BAY PUMP ROOM
INSTALL REDUCED PRESSURE BACKFLOW
PREVENTER FOR IRRIGATION LINE. (SHEET D1)
INSTALL NEW 2" HDPE
WATERLINE. TIE-IN TO EXISTING
DEVIL'S ELBOW DISTRIBUTION
LINE
EXISTING SMOOTH NOSE SAMPLING TAP
PROTECT IN PLACE
EXISTING INJECTION LINE
REMOVE AND DISPOSE
EXISTING PRESSURE TANK
ADJUST PER NEW PUMP REQUIREMENTS
EXISTING
" COPPER SAMPLING LINE
PROTECT IN PLACE
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
Y
LEGEND
NEW POTABLE WATER
CURBSTOP
VALVE/IRR BOX/DRAIN
W
WELL
NEW UNDERGROUND
ELECTRIC
EXISTING POTABLE WATER W
EXISTING UNDERGROUND
ELECTRIC
INSTALL NEW 1-1/4"
CURBSTOPS
INSTALL NEW 1-1/4""
"Y" FITTINGS
NO SCALE
NO SCALE
C4
CONSTRUCTION LIMIT
EXISTING CHLORINATION SYSTEM
DISCONNECT AND SALVAGE
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
U
G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
W
W
W
W
U
G
E
U
G
E
U
G
E
U
G
E
W
PRESSURE
TANK
RPBP
U G
E
U G
E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
U
G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
W
W
W
W
U
G
E
U
G
E
U
G
E
U
G
E
W
PRESSURE
TANK
RPBP
U G
E
U G
E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - PLANS & DETAILS.DWG
D E
V I L
B
P
M
P
R
O O
M
I M
P R
O V
E M
E N
T
EXISTING DEVIL'S ELBOW PUMP ROOM
NO SCALE
CONSTRUCTION NOTES
1. REMOVE AND DISPOSE OF ALL EXISTING WATERLINE IMPACTED DURING EXCAVATION OF NEW
WATERLINES.
2. TIE-IN NEW WELL LINES TO EXISTING WELL LINES APPROXIMATELY 30' FROM THE PUMP ROOM TO ALLOW
ROOM FOR EXCAVATION.
3. ALL NEW WATERLINES SHALL BE PRESSURE TESTED PER SPECIFICATIONS
4. LOCATE ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO EXCAVATION
5. ALL FITTINGS TO BE INSTALLED BY PLUMBER LICENSED IN THE STATE OF MONTANA
6. INSTALL ALL NEW WATERLINES AT 6' MIN. BURY DEPTH. ( HDPE)
EXISTING CHLORINE CONTACT CHAMBER
PROTECT IN PLACE
PROPOSED DEVIL'S ELBOW PUMP ROOM
NO SCALE
INSTALL NEW 2" WATERLINE.
TIE-IN TO EXISTING DEVIL'S
ELBOW DISTRIBUTION LINE
EXISTING INJECTION LINE
REMOVE AND DISPOSE
EXISTING
" COPPER SAMPLING LINE
REMOVE AND DISPOSE
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
Y
LEGEND
NEW POTABLE WATER
CURBSTOP
VALVE/IRR BOX/DRAIN
W
WELL
NEW UNDERGROUND
ELECTRIC
EXISTING POTABLE WATER W
EXISTING UNDERGROUND
ELECTRIC
INSTALL 2" CURBSTOPS
INSTALL 2" ELBOW TO SEPARATE
SPARE WATERLINE
EXISTING DRAIN
PROTECT IN PLACE
EXISTING CURBSTOPS
PROTECT IN PLACE
EXISTING 2" "Y"
REMOVE AND DISPOSE
C5
EXISTING PRESSURE TANK. ADJUST PER NEW PUMP SETTINGS
EXISTING FLOW METER
PROTECT IN PLACE
CONSTRUCTION LIMIT
A P
P
A P
P
STATIC WATER LEVEL
@ 25'
1-1/4" PUMP
ELECTRICAL CONDUIT
EXISTING SUBMERSIBLE
VFD PUMP
2" SCH. 40
GALVANIZED STEEL
DROP PIPE
8" CASING
PITLESS ADAPTER
T O
T A
L
W
E L L
D
E P
2" CHECK VALVE
2" SCH. 40 GALVANIZED
SUPPLY LINE
A P
P
8" WATER TIGHT
WELL CAP
OPEN BOTTOM
TOPSOIL 0' TO 4'
ROCKS AND SILT 4'
TO 22'
BROKEN SHALE AND
SILT 22' TO 43'
SHALEY LIMESTONE
FRACTURES 43' TO
260'
WATER 170 TO 260'
D
L D
E
E L
C
A S
I N
G
T
O
D
L D
E
E L
C
A S
I N
G
BENTONITE CLAY TO
25'
S
C R
E E
N E
D
P
I P
E
T
O
SCREENED-CONTINUOUS
PVC WITH 0.25" OPENING
M I N
M I N
EXPECTED STATIC WATER
LEVEL @ 75'
NEW PUMP
ELECTRICAL CONDUIT
INSTALL NEW
SUBMERSIBLE PUMP
SURFACE CASING
NEW NSF APPROVED
PITLESS ADAPTER
A P
P R
O X
I M
A T
E
W
E L L
D
E P
%1
NEW 2" NSF 61 CERTIFIED
HDPE PIPE (FUTURE)
M I N
BENTONITE GROUT
(1.5" MIN. THICKNESS,
25' MIN. DEPTH)
TOPSOIL 0' TO 4'
ROCKS AND CLAY 4'
TO 20'
BROKEN SHALE AND
SILT 20' TO 40'
SHALEY LIMESTONE
FRACTURES 40' TO
450'
WATER TIGHT
WELL CAP
OPEN BOTTOM
4" CONCRETE PAD INSTALLED OVER 4" OF 34"
MINUS CRUSHED BASE 95% STANDARD
DENSITY
NEW 2" CHECK
VALVE
A P
P
W E
L D
E
E L
C
A S
I N
G
A P
P
T
O
D
L D
E
E L
C
A S
I N
G
S
C R
E E
N E
D
P
I P
E
A P
P
T
O
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - PLANS & DETAILS.DWG
W E
L L
D
E T
A I L S
WELL NOTES
1 EXISTING WELL GWIC ID: 224253
SITE NAME: BUREAU OF LAND MANAGEMENT *
DEVILS ELBOW CAMPGROUND
WELL OWNER: BUREAU OF LAND MANAGEMENT
4 WATER SYSTEM OPERATOR: GRADY ANDERSON,
OPERATOR ID: #9270
CLASSIFICATIONS: 4A, 4B
POPULATION SERVED: 25 PEOPLE PER DAY
TRANSIENT, NON CUMMUNITY WELL
ASSUMED CONSUMPTION: 250 GALLONS PER DAY
NO FIRE FLOW REQUIRED
DETAIL IS ESTIMATION ONLY AND IS SUBJECT TO
CHANGE DEPENDING ON FIELD CONDITIONS. ANY
CHANGE MUST BE COORDINATED THROUGH THE
CONTRACTING OFFICER
SOIL CLASSIFICATIONS SHOWN ARE THOSE
ANTICIPATED BASED ON EXISTING WELL LOGS FOR
THE WELL DRILLED ON SITE IN 2005
EXISTING DEVIL'S ELBOW WELL DETAIL PROPOSED WELL DETAIL
NO SCALE
NO SCALE
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
D1
A P
P
A P
P
STATIC WATER LEVEL
@ 21'
1-1/4" PUMP
ELECTRICAL CONDUIT
EXISTING SUBMERSIBLE
VFD PUMP
2" SCH. 40
GALVANIZED STEEL
DROP PIPE
8" CASING
PITLESS ADAPTER
2" CHECK VALVE
2" SCH. 40 GALVANIZED
SUPPLY LINE
A P
P
8" WATER TIGHT
WELL CAP
OPEN BOTTOM
TOPSOIL 0' TO 1'
RED-BLACK
FRACTURED SHALE
WATER BEARING
D
L
D E
D
S
T E
S
I N
G
BENTONITE CLAY TO
18'
S
C R
E E
N E
D
P
I P
E
T
O
SCREENED PIPE
TORCH OR PLASMA CUTS
8" X 6"
12.5" BOREHOLE TO 15'
FINISHED GRADE
DIRECTION OF FLOW
TO CONSUMER'S
EQUIPMENT
HORIZONTAL CLEARANCE LINE
12" MIN
36" MAX
12" 12"12
TEST COCKS TEST COCKS
INSTALLED AND MAINTAINED BY
CUSTOMER
WATER MAIN
3/4" COPPER
U-BOLT SUPPORT
24"
BROOM FINISH
SURFACE
SMOOTH NOSED
SAMPLING TAP
4" SCH. 40
GALV. PIPE
(TYP.)
FINISHED
GRADE
UNION
4" CURB STOP & WASTE
VALVE AND CURB BOX PACK 12 CY OF
WASHED DRAIN
ROCK
UNION
D2
C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\DEVIL'S ELBOW AND CLARK'S BAY WELLS\CAD - DE & CB
WELL\06_IMPROVEMENT SHEETS\DE&CB WELLS - PLANS & DETAILS.DWG
W A
T E
R
S
Y S
T E
M
D
E T
A I L S
CLARK'S BAY WELL NOTES
1 EXISTING WELL GWIC ID: 241609
SITE NAME: BUREAU OF LAND MANAGEMENT *
CLARK'S BAY
WELL OWNER: BUREAU OF LAND MANAGEMENT
4 WATER SYSTEM OPERATOR: GRADY ANDERSON,
OPERATOR ID: #9270
CLASSIFICATIONS: 4A, 4B
POPULATION SERVED: 25 PEOPLE PER DAY
TRANSIENT, NON CUMMUNITY WELL
ASSUMED CONSUMPTION: 250 GALLONS PER DAY
NO FIRE FLOW REQUIRED
DETAIL IS ESTIMATION ONLY AND IS SUBJECT TO
CHANGE DEPENDING ON FIELD CONDITIONS. ANY
CHANGE MUST BE COORDINATED THROUGH THE
CONTRACTING OFFICER
SOIL CLASSIFICATIONS SHOWN ARE THOSE
ANTICIPATED BASED ON EXISTING WELL LOGS FOR
THE WELL DRILLED ON SITE IN 1965
EXISTING CLARK'S BAY WELL DETAIL
SAMPLING TAP DETAIL
NO SCALE
W E
T
S
T E
M
I M
P R
O V
E M
E N
T S
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: CPM )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
D
V
I E
W
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
D E
V I L
B
A
R K
Y
NO SCALE
BACKFLOW PREVENTER DETAIL
NO SCALE
PUMP HOUSE MODIFICATION ESTIMATED
QUANTITIES
ITEM QUANTITY UNIT
INSTALL NEW CURB STOP
(6' BURY DEPTH)
4 EA
INSTALL NEW
SUMBERSIBLE PUMP
CONTROLS
1 EA
INSTALL NEW
SMOOTH-NOSED SAMPLING
TAP
1 EA
INSTALL NEW BACKFLOW
PREVENTER
1 EA
INSTALL NEW PRESSURE
GAUGES
2 EA
INSTALL NEW PVC PIPING 10 LF
INSTALL NEW HDPE PIPING 80 LF
INSTALL NEW ELBOW (PVC)
8 EA
INSTALL NEW "Y"
CONNECTION
8 EA
WELL ABANDONMENT NOTES
ANY WELL THAT IS TO BE PERMANENTLY ABANDONED
SHALL BE COMPLETELY FILLED IN SUCH A MANNER THAT
VERTICAL MOVEMENT OF WATER WITHIN THE WELL
BORE, INCLUDING VERTICAL MOVEMENT OF WATER
WITHIN THE ANNULAR SPACE SURROUNDING THE WELL
CASING, IS EFFECTIVELY AND PERMANENTLY
PROHIBITED. ALL FLUIDS WITHIN A WELL ARE TO BE
PERMANENTLY CONFINED TO THE SPECIFIC STRATA IN
WHICH THEY WERE ORIGINALLY ENCOUNTERED.
ABANDONED WELLS MUST BE COMPLETELY FILLED WITH
SEALING MATERIAL TO WITHIN 3 FEET OF THE SURFACE.
ANY REMAINING HOLE SHALL BE FILLED WITH
NATURALLY OCCURRING SOILS.
THE ABANDONED WELL SHALL NOT PRODUCE WATER
NOR SERVE AS A CHANNEL FOR MOVEMENT OF
GROUNDWATER.
IN NO INSTANCE SHALL ABANDONED WELLS BE USED
FOR DISPOSAL OF SEWAGE, HOUSEHOLD WATERS OR
OTHER CONTAMINATED MATERIAL.
LAND SURFACE SHALL BE RESTORED TO A LIKE
CONDITION, SAFE TO LIVESTOCK AND HUMANS.
WHERE POSSIBLE, ALL CASINGS OR LINERS SHALL BE
REMOVED. IN THE EVENT THAT THE CASING CANNOT BE
REMOVED, IT SHALL BE CUT OFF OR DRIVEN DOWNWARD
SO THAT THE TOP OF THE CASING IS AT LEAST 3 FEET
BELOW THE GROUND SURFACE.
IN-LINE CURB STOP DETAIL
NO SCALE
| Sheets and Views |
| 1 G1 TITLE SHEET |
| 2 G2 LEGEND & ABBREVIATIONS |
| 3 C1 MASTER SITE PLAN |
| 4 C2 CLARKS BAY SITE PLAN |
| 5 C3 DEVIL'S ELBOW SITE PLAN |
| 6 C4 CLARK'S BAY PUMP ROOM INSET |
| 7 C5 DEVIL'S ELBOW PUMP ROOM INSET |
| 8 D1 DEVILS ELBOW WELL DETAILS |
| 9 D2 CLARKS BAY WELL & DETAILS |
File details come from the government source that posted it. Updated .