Attachment 2 (Detailed Pricing Schedule) W911S223B8000.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Fort Drum Asphalt Requirements Contract Federal contract opportunity
- Solicitation number
- W911S223B8000
About this file
This document contains a pricing schedule attachment and description for a federal contract opportunity for asphalt requirements at Fort Drum. The contractor will be required to provide all supervision, plant, labor, equipment and materials necessary to perform construction of new and repair/replacement of existing asphalt pavement in accordance with the Statement of Work and site plans. Services include clearing, grubbing, demolition, excavation, installation of geotextiles, granular fill, aggregate base course, asphalt courses, pavement markings, culverts, storm drains, utility adjustments, sealing, landscaping and other related work items. Pricing is requested for over 150 line items with estimated quantities provided. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Drum.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911S223B80000002.pdf | ||
| Attachment 1 (SOW) W911S223B8000.pdf | ||
| Attachment 7 (RFI Responses 2) W911S223B8000.pdf | ||
| W911S223B80000001.pdf | ||
| Attachment 6 (RFI Responses) W911S223B8000.pdf | ||
| W911S223B8000.pdf | ||
| Attachment 3 (General Decision NY20230009) W911S223B8000.pdf | ||
| Attachment 1 (SOW) W911S223B8000.pdf | ||
| Attachment 4 (Endangered Species Act JAN2021) W911S223B8000.pdf | ||
| Attachment 5 (Fort Drum Excavation Permit Policy) W911S223B80000.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asphalt Requirements IDIQ
| W911S223B8000 Attachment 2 (Detailed Pricing Schedule) | |||||
| Fort Drum Asphalt Requirements | |||||
| 18 January 2023 | |||||
| ELIN | DESCRIPTION | ESTIMATED | |||
| QUANTITY | UNIT | UNIT | |||
| PRICE | AMOUNT | ||||
| 001 | General Requirements: The Contractor shall provide and implement general requirements to include, but not limited to: mobilization and demobilization, construction and removal of temporary construction entrances, progress schedules, progress documentation, submittals, temporary removal and replacement of signage, quality control for minor construction including density testing and submitted results, temporary environmental controls, environmental protection, temporary storm water pollution control (such as required Best Management Practices, and construction and demolition waste management. | 0.00 | % | $0.00 | |
| 002A | Clearing and Grubbing (LIGHT) of Vegetation, Brush, and Trees ≤ 6" DBH | ||||
| Reference Statement of Work 1.d.2. | 1 | AC | $0.00 | ||
| 002B | Clearing and Grubbing (MEDIUM) of Vegetation, Brush, and Trees > 6" to ≤ 12" DBH | ||||
| Reference Statement of Work 1.d.2. | 1 | AC | $0.00 | ||
| 002C | Clearing and Grubbing (HEAVY) of Vegetation, Brush, and Trees > 12" to ≤ 24" DBH | ||||
| Reference Statement of Work 1.d.2. | 1 | AC | $0.00 | ||
| 002D | Clearing and Grubbing Select Trees ≤ 12" DBH | ||||
| Reference Statement of Work 1.d.2. | 25 | EA | $0.00 | ||
| 002E | Clearing and Grubbing Select Trees > 12" ≤ 24" DBH | ||||
| Reference Statement of Work 1.d.2. | 25 | EA | $0.00 | ||
| 003 | Select Demolition in Accordance with the Technical Requirements and Specifications | ||||
| Reference Statement of Work 1.d.3. | 20,000 | CY | $0.00 | ||
| 004 | Excavation in Accordance with the Technical Requirements and Specifications | ||||
| Reference Statement of Work 1.d.4. | 30,000 | CY | $0.00 | ||
| 005A | Provide and Install Geotextile Soil Stabilization Fabric | ||||
| Reference Statement of Work 1.d.5. | 95,000 | SY | $0.00 | ||
| 005B | Provide and Install Geogrids | ||||
| Reference Statement of Work 1.d.5. | 100 | SY | $0.00 | ||
| 006A | Supply, Place, Grade and Compact New Select Granular Fill | ||||
| Reference Statement of Work 1.d.6. | 250 | CY | $0.00 | ||
| 006B | Supply, Place, Grade and Compact New Sand Fill | ||||
| Reference Statement of Work 1.d.6. | 250 | CY | $0.00 | ||
| 007 | Supply, Place, Roll and Compact New Crushed Stone Aggregate Base Course | ||||
| Reference Statement of Work 1.d.7. | 60,000 | CY | $0.00 | ||
| 008A | Provide & Install 1.5" Thick HMA Top Course / Reference Statement of Work 1.d.8. | ||||
| 625,000 SY = 52,031 TN = 3,225.94 TN of Asphalt Content | 625,000 | SY | $0.00 | ||
| 008B | Provide & Install 2.5" Thick HMA Binder Course / Reference Statement of Work 1.d.8. | ||||
| 150,000 SY = 20,625 TN = 1,010.63 TN of Asphalt Content | 150,000 | SY | $0.00 | ||
| 008C | Provide & Install 3" Thick HMA Base Course / Reference Statement of Work 1.d.8. | ||||
| 35,000 SY = 5,775 TN = 231.00 TN of Asphalt Content | 35,000 | SY | $0.00 | ||
| 008D | Provide & Install 6" Thick HMA Base Course / Reference Statement of Work 1.d.8. | ||||
| 60,000 SY = 19,800 TN = 792.00 TN of Asphalt Content | 60,000 | SY | $0.00 | ||
| 008E | Provide & Install HMA Shim Course (< 1") / Reference Statement of Work 1.d.8. | ||||
| 87,500 SY = 4,856 TN = 400.64 TN of Asphalt Content | 87,500 | SY | $0.00 | ||
| 008F | Provide & Install HMA Truing-Leveling Course / Reference Statement of Work 1.d.8. | ||||
| 87,500 SY = 7,284 TN = 451.63 TN of Asphalt Content | 87,500 | SY | $0.00 | ||
| 009A | White or Yellow Paint Reflectorized Pavement Stripes (one 4" wide stripe) | ||||
| Reference Statement of Work 1.d.9. | 210,000 | LF | $0.00 | ||
| 009B | Yellow Paint Reflectorized Pavement Stripes (two 4" wide stripes) | ||||
| Reference Statement of Work 1.d.9. | 100,000 | LF | $0.00 | ||
| 009C | White Paint Reflectorized Pavement Letter | ||||
| Reference Statement of Work 1.d.9. | 300 | EA | $0.00 | ||
| 009D | White Paint Reflectorized Pavement Symbols | ||||
| Reference Statement of Work 1.d.9. | 200 | EA | $0.00 | ||
| 009E | White Paint Reflectorized Pavement Type L Cross Walk (Ladder Bar) | ||||
| Reference Statement of Work 1.d.9. | 5,000 | LF | $0.00 | ||
| 009F | White Paint Reflectorized Pavement Stop Line - Type B | ||||
| Reference Statement of Work 1.d.9. | 4,000 | LF | $0.00 | ||
| 009G | White or Yellow Paint Reflectorized Pavement Hatch Lines - Type A | ||||
| Reference Statement of Work 1.d.9. | 250 | LF | $0.00 | ||
| 009H | White or Yellow Paint Reflectorized Pavement Hatch Lines - Type B | ||||
| Reference Statement of Work 1.d.9. | 20,000 | LF | $0.00 | ||
| 009I | White or Yellow Paint Reflectorized Pavement Hatch Lines - Type C | ||||
| Reference Statement of Work 1.d.9. | 7,500 | LF | $0.00 | ||
| 009J | White Paint Reflectorized Pavement Railroad Grade Crossing | ||||
| Reference Statement of Work 1.d.9. | 10 | EA | $0.00 | ||
| 009K | White Paint Reflectorized Pavement Parking Stall | ||||
| Reference Statement of Work 1.d.9. | 70,000 | LF | $0.00 | ||
| 009L | White Paint Reflectorized Pavement Parking – Handicap Symbol | ||||
| Reference Statement of Work 1.d.9. | 100 | EA | $0.00 | ||
| 009M | White Paint Reflectorized Pavement Oversize Handicap Parking Stall Hatch Lines | ||||
| Reference Statement of Work 1.d.9. | 80 | EA | $0.00 | ||
| 010 | Cold milling to a depth of 1.5" | ||||
| Reference Statement of Work 1.d.10. | 875,000 | SY | $0.00 | ||
| 011A | Smooth Interior Corrugated Polyethylene Culvert and Storm Drain Pipe (18" diameter) | ||||
| Reference Statement of Work 1.d.11. | 80 | LF | $0.00 | ||
| 011B | Corrugated Aluminum End Sections Pipe (End Section for ELIN 011A) | ||||
| Reference Statement of Work 1.d.11. | 8 | EA | $0.00 | ||
| 011C | Smooth Interior Corrugated Polyethylene Culver and Storm Drain Pipe (24" diameter) | ||||
| Reference Statement of Work 1.d.11. | 80 | LF | $0.00 | ||
| 011D | Corrugated Aluminum End Sections Pipe (End section for ELIN 011C) | ||||
| Reference Statement of Work 1.d.11. | 8 | EA | $0.00 | ||
| 011E | Smooth Interior Corrugated Polyethylene Culver and Storm Drain Pipe (30" diameter) | ||||
| Reference Statement of Work 1.d.11. | 80 | LF | $0.00 | ||
| 011F | Corrugated Aluminum End Sections Pipe (End section for ELIN 011E) | ||||
| Reference Statement of Work 1.d.11. | 6 | EA | $0.00 | ||
| 011G | Smooth Interior Corrugated Polyethylene Culvert and Storm Drain Pipe (36" diameter) | ||||
| Reference Statement of Work 1.d.11. | 25 | LF | $0.00 | ||
| 011H | Corrugated Aluminum End Sections Pipe (End section for ELIN 011G) | ||||
| Reference Statement of Work 1.d.11. | 2 | EA | $0.00 | ||
| 011I | Reinforced Concrete Pipe Class III (18" diameter) | ||||
| Reference Statement of Work 1.d.11. | 20 | LF | $0.00 | ||
| 011J | Reinforced Concrete Pipe End Sections (End section for ELIN 011I) | ||||
| Reference Statement of Work 1.d.11. | 2 | EA | $0.00 | ||
| 011K | Reinforced Concrete Pipe Class III (24" diameter) | ||||
| Reference Statement of Work 1.d.11. | 20 | LF | $0.00 | ||
| 011L | Reinforced Concrete Pipe End Sections (End section for ELIN 011K) | ||||
| Reference Statement of Work 1.d.11. | 2 | EA | $0.00 | ||
| 011M | Reinforced Concrete Pipe Class III (30" diameter) | ||||
| Reference Statement of Work 1.d.11. | 20 | LF | $0.00 | ||
| 011N | Reinforced Concrete Pipe End Sections (End section for ELIN 011M) | ||||
| Reference Statement of Work 1.d.11. | 2 | EA | $0.00 | ||
| 011O | Reinforced Concrete Pipe Class III (36" diameter) | ||||
| Reference Statement of Work 1.d.11. | 20 | LF | $0.00 | ||
| 011P | Reinforced Concrete Pipe End Sections (End section for ELIN 011P) | ||||
| Reference Statement of Work 1.d.11. | 2 | EA | $0.00 | ||
| 012A | Airfield Asphalt Pavement Crack Sealing | ||||
| Reference Statement of Work 1.d.12. | 45,000 | LF | $0.00 | ||
| 012B | Airfield Concrete Pavement Joint Repair and Sealing | ||||
| Reference Statement of Work 1.d.12. | 600,000 | LF | $0.00 | ||
| 013 | Non-Airfield Asphalt Pavement Cleaning, Sealing, Filling Joints and Cracks | ||||
| Reference Statement of Work 1.d.13. | 300,000 | LF | $0.00 | ||
| 014A | Raise/Lower Existing Utility Structures to Final Grade | ||||
| Reference Statement of Work 1.d.14. | 700 | EA | $0.00 | ||
| 014B | Install New Water Valve Box | ||||
| Reference Statement of Work 1.d.14. | 50 | EA | $0.00 | ||
| 014C | Install New Gas Valve Box | ||||
| Reference Statement of Work 1.d.14. | 25 | EA | $0.00 | ||
| 014D | Install New Storm Water Manhole Frame and Cover | ||||
| Reference Statement of Work 1.d.14. | 25 | EA | $0.00 | ||
| 014E | Install New Storm Water Drainage Structure Frame and Grate | ||||
| Reference Statement of Work 1.d.14. | 25 | EA | $0.00 | ||
| 014F | Install New Sanitary Sewer Manhole Frame and Cover | ||||
| Reference Statement of Work 1.d.14. | 25 | EA | $0.00 | ||
| 014G | Install New Electrical Manhole Frame and Cover | ||||
| Reference Statement of Work 1.d.14. | 50 | EA | $0.00 | ||
| 014H | Install New Electrical Handhole Frame and Cover | ||||
| Reference Statement of Work 1.d.14. | 25 | EA | $0.00 | ||
| 014J | Install New Electrical Pull Box Frame and Cover | ||||
| Reference Statement of Work 1.d.14. | 75 | EA | $0.00 | ||
| 014K | Install New Communications Manhole/Handhole Watertight Locking Frame and Cover | ||||
| Reference Statement of Work 1.d.14. | 50 | EA | $0.00 | ||
| 014L | Install New Tracer Wire Vault | ||||
| Reference Statement of Work 1.d.14. | 350 | EA | $0.00 | ||
| 015 | Seal Coating (Coal - Tar Emulsion) | ||||
| Reference Statement of Work 1.d.15. | 50,000 | SY | $0.00 | ||
| 016A | Topsoil and Hydroseed | ||||
| Reference Statement of Work 1.d.16. | 85,000 | SY | $0.00 | ||
| 016B | Wetland Seeding | ||||
| Reference Statement of Work 1.d.16. | 1,000 | SY | $0.00 | ||
| 016C | Gravel | ||||
| Reference Statement of Work 1.d.16. | 500 | SY | $0.00 | ||
| SUBTOTAL AMOUNT (NOT INCLUDING GENERAL REQUIREMENTS) | $0.00 | ||||
| TOTAL AMOUNT FOR ASSIGNED ELINS | $0.00 | ||||
| TOTAL PERFORMANCE AND PAYMENT BONDS | 1 | EA | $0.00 | ||
| TOTAL AMOUNT | $0.00 |
| NOTES TO BIDDERS: | |
| 1. DETAILED PRICING SCHEDULE MUST BE COMPLETED IN EXCEL FORM. MANUAL CALCULATIONS WILL NOT BE ACCEPTED | |
| 2. ENTER CONTRACTOR GENERAL REQUIREMENT RATE (%) IN THE UNIT PRICE FIELD (highlighted yellow) | |
| 3. ENTER UNIT PRICES FOR WORK LINE ITEMS (highlighted yellow) | |
| 4. ENTER CONTRACTOR BONDING RATE (%) IN THE UNIT PRICE FIELD (highlighted blue) | |
| 5. THE FOLLOWING UNIT ABBREVIATIONS ARE DEFINED AS FOLLOWS: | |
| AC: ACRE / CY: CUBIC YARD / EA: EACH / LF: LINEAR FOOT / SY: SQUARE YARD / TN: TON |
File details come from the government source that posted it. Updated .