This document provides details for a federal contract opportunity to replace environmental control units at the David Wills House in Gettysburg National Military Park. The contractor will be required to replace five programmable controllers and temperature sensors, integrate all existing equipment points into a new control system, set up scheduling, alarming, and trending, and create new equipment graphics. The contractor must also provide training and ensure the customer can fully operate the new building automation system. The related solicitation is for the Gettysburg National Military Park David Wills House Digital Controls project under Solicitation Number 140P4223Q0039 issued by the Department of the Interior National Park Service Northeast Region. Images depict the existing systems in the basement and attic that are to be replaced.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4223Q0039_Amd_0002.pdf | ||
| Sol_140P4223Q0039_Amd_0001.pdf | ||
| Attachment_5_Past_Project_Experience_Questionnaire.docx | DOCX document | |
| Sol_140P4223Q0039.pdf | ||
| Attachment_1_David_Wills_House_SOW.pdf | ||
| Attachment_3__WD_2015-4259.pdf | ||
| Attachment_4_Technical_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replacement of Environmental Control Units David Wills House Gettysburg National Military Park
Contract Tasks and Images 3/7/2023
Tasks to the Contractor
1) Replace 5 Siemens PXC programable controllers and with Niagara N4 JACE (Java
Application Control Engine) and associated input/output modules.
2) Integrate all existing equipment points into the Niagara N4 environment.
3) Change out all temperature sensors and add outdoor temperature sensor for sequence optimization.
4) Provide all necessary programming to successfully integrate all equipment into new front-end control system and ensure all points are communicating correctly.
5) Set up equipment scheduling to reflect the client need matched with the exact building occupancy.
6) Set up alarming on all necessary points to alert personnel of any issues as they may occur. All alarms can be sent out via SMS or email so that mission critical applications can be addressed immediately.
7) Set up trending on all applicable points. Trending can assist with preventative action or proactive reporting to identify and/or validate observed behavior. Trending will help with trouble shooting or verification of correct equipment control.
8) Create new equipment graphics using HTML 5 graphics for viewer friendly resolution on workstations, laptops, tablets, or mobile devices.
9) Provide customer training for daily operation tasks, such as scheduling, setpoint change, alarm reporting, trend analysis, and new user setup.
10) After training, all participants will be fully capable of using the BAS with comfort and ease.
Project Notes
• The existing environmental control units are in three locations within the David Wills House
• Basement – Two separate rooms / locations
• Attic
• All images depict existing systems in the David Wills House. These are the systems that are to be replaced
• Refer to SOW for specifics on project details