Attachment 2 - Contractor Submittal Form.pdf

PDF 142 KB Posted

Attached to
Bldg 210 Generator Protection System
Solicitation number
W50S9A26QA013
Issued by

About this file

This is a Contractor Submittal Form for RFQ# W50S9A26QA013, a federal solicitation for a Building 210 Generator Protection System. Contractors must complete all sections of this form to submit a responsive bid and must be registered in the System for Award Management (SAM) under NAICS code 332618.

Part I requires contractors to provide standard identification information including company name, SAM Unique Entity Identifier (UEI), CAGE Code, point of contact details, address, phone, email, payment terms, and any applicable GSA Contract number. Part III establishes the pricing schedule with two primary CLINs: CLIN 0001 covers System Purchase and Delivery, requiring the contractor to perform engineering, design, fabrication, and material procurement for a complete physical and visual safeguarding system, deliver all components to the specified address per SOO specifications, and submit a detailed Contractor Statement of Work (CSOW) mapping technical approach to minimum threshold and objective requirements. This CLIN includes five sub-line items for optional innovative features: Rapid Deployment Capability (000101), Camouflage (000102), Low Lifecycle Maintenance (000103), and Modularity/Repairability (000104). CLIN 0002 addresses Installation & Training, requiring the contractor to provide all labor, specialized tooling, equipment, safety controls, and training to the 151st Civil Engineering Squadron personnel on the newly installed system. Part II requires authorization by a company representative certifying that pricing and representations are current, complete, and accurate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2- Contractor Submittal Form

Solicitation RFQ# W50S9A26QA013 Project Title: Bldg 210 Generator Protection System

PART I: CONTRACTOR REPRESENTATION & IDENTIFICATION

Please complete all fields in the table below. Ensure your System for Award Management (SAM) registration is active and matches the information provided below.

Field Description Contractor Response

Contractor Name

SAM UEI

CAGE Code

Offeror must be registered in SAM under NAICS 332618 in order to be considered responsive

Point of Contact

Address

Phone Number

Email Address

Payment Terms (Net 30 unless any prompt payment discount terms are offered)

GSA Contract # (If applicable)

PART II: SIGNATURE OF AUTHORIZED REPRESENTATIVE

By signing below, the contractor certifies that the pricing and representations provided in this form are current, complete, and accurate.

Authorized Signature: ___________________________________________________

Printed Name & Title: ___________________________________________________

Date: ___________________________________________________

PART III: CLIN INFORMATION & PRICING SCHEDULE

CLIN Item / Description Qty Unit Unit Price

Extended Price ($)

0001 System Purchase and Delivery

The contractor shall perform all engineering, design, fabrication, and material procurement necessary to produce a complete physical and visual safeguarding system for the Building 210 backup generator. The contractor shall deliver all fabricated components, structural elements, and associated hardware to the listed delivery address, in strict accordance with the specifications outlined in Attachment 1 - Statement of Objectives (SOO).

Additionally, the contractor shall develop and submit a detailed Contractor Statement of Work (CSOW). The CSOW must explicitly map the contractor's technical approach and design specifications to the minimum threshold and objective requirements outlined in Attachment 1 - Statement of Objectives (SOO).

000101 Base system price that meets the minimum requirements. 1 EA

000102 Price to incorporate the ‘RAPID DEPLOYMENT CAPABILITY’ innovative feature into the proposed system.

1 EA

000103 Price to incorporate the ‘CAMOUFLAGE’ innovative feature into the proposed system.

1 EA

000104 Price to incorporate the ‘LOW LIFECYCLE MAINTENANCE’ innovative feature into the proposed system.

1 EA

000105 Price to incorporate the ‘MODULARITY/ REPAIRABILITY' innovative feature into the proposed system.

1 EA

0002 Installation & Training

The contractor shall provide all labor, specialized tooling, equipment, and safety controls necessary to install a complete, operational physical and visual safeguarding system for the Building 210 backup generator. All installation activities, site restoration, and system integration shall be executed in strict accordance with the minimum objective requirements detailed in Attachment 1 - Statement of Objectives (SOO).

Additionally, the contractor shall provide operational and maintenance training to the 151st Civil Engineering Squadron personnel on the newly installed safeguarding system.

1 EA

TOTAL PRICE:

PART I: CONTRACTOR REPRESENTATION & IDENTIFICATION
PART II: SIGNATURE OF AUTHORIZED REPRESENTATIVE
PART III: CLIN INFORMATION & PRICING SCHEDULE

File details come from the government source that posted it. Updated .