Attachment 2 - Chip Seal Table - 2020.pdf

PDF 122 KB Posted

Attached to
BITUMINOUS SEAL COATING WITH WET BOTTOM BLACK BOILER SLAG AGGREGATE
Solicitation number
20-PW13
Issued by
Wisconsin

About this file

This attachment is a project specification sheet for the City of Sun Prairie, Wisconsin's 2020 Chip Seal Project, detailing the streets designated for bituminous seal coating with wet bottom black boiler slag aggregate. The project encompasses approximately 75,265 square yards of seal coat work distributed across 25 streets within the city, each rated as a WSLR 7 priority level. The streets scheduled for treatment include Delaware Drive (32,300 SF), Pilgrim Trail (74,316 SF), White Tail Drive (93,312 SF), and 22 additional residential and local streets, with square footage ranging from 5,056 SF to 93,312 SF per street. Bidders are responsible for conducting final and complete accurate measurements of all work areas and must submit their total square yard bid based on their independent measurements rather than relying solely on the provided figures.

The project specification indicates a total scope of 675,832 square feet or 75,265 square yards to be sealed. As a local government contract opportunity in Wisconsin, this project represents routine pavement maintenance utilizing seal coating technology to extend street life and improve surface conditions. Bidders must verify all measurements independently and account for any variations from the provided documentation in their pricing submissions. The project lists specific streets with corresponding square footage allocations, enabling bidders to calculate material requirements and labor costs accordingly for the bituminous seal coating application with wet bottom black boiler slag aggregate cover.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Street Name

WSLR

Rating

Square Footage

Delaware Drive 7 32,300 Frederick Street 7 36,988 Hawthorn Drive 7 41,148

Independence Way 7 19,516 Jackson Street 7 30,432

Jenny Wren Trail 7 12,352 Leopold Way 7 10,400

List Lane 7 5,056 Mallard Drive North 7 11,040

Maynard Drive 7 28,082 McCoy Road 7 32,220

New Town Drive 7 11,520 North Pine Street 7 9,664

Pearl Lane 7 10,778 Pebble Brook Trail 7 25,732

Pilgrim Trail 7 74,316 Robert Court 7 8,018 Roland Street 7 11,816

Severson Drive 7 14,022 Stonehaven Drive 7 38,660

Success Way 7 36,630 Sunfield Street 7 30,532

Thompson Road North 7 9,284 Union Street 7 19,642

Walnut Hill Lane 7 22,372 White Tail Drive 7 93,312

Total 675,832 Square Feet 75,265 Square Yards