Attachment 2 - Brand Name Justification.pdf
PDF 3 MB Posted
- Attached to
- Dell Powerscale Storage
- Solicitation number
- F3GEGA6153A001
About this file
This document is a PDF viewer error message rather than a federal contract opportunity file. The document contains only Adobe Reader troubleshooting information and instructions for upgrading the PDF viewer software. No contract details, solicitation information, or procurement requirements are present. The file cannot be summarized for contract opportunity information as it does not contain substantive contracting content.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| F3GECA6153A001 - Combo.pdf | ||
| Attachment 1 - Item Specifications.pdf | ||
| F3GECA6153A001 - Combo.pdf | ||
| Attachment 1 - Item Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-front.jpg https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-back.jpg Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction May 2026 Page of Is this a brand-name justification?
Please provide the product title and description. [ RFO 16.507-7(a) ] Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Type of D etermination:
Fair Opportunity Exception: RFO 16.507-6(b) (Check the applicable subparagraph below.)
(1) Contracting Activity:
(2) Nature and/or description of the action being approved:
(3) Description of the supplies/services required to meet the agency's needs:
(4) Justification for restricting consideration to a brand-name item:
(4) Identification of the exception to fair opportunity and the supporting rationale, including a demonstration that the proposed contractor's unique qualifications or the nature of the acquisition requires use of the exception cited. If the contracting officer uses the logical follow-on exception, the rationale must describe why the relationship between the initial order and the follow-on is logical (e.g., in terms of scope, period of performance, or value):
(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:
(6) Other facts supporting the justification:
(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:
(7) Actions the agency may take to remove or overcome any barriers to increasing fair opportunity before any subsequent acquisition for the supplies or services:
(8) Program Manager's certification that supporting data is accurate and complete:
As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
(9) Contracting Officer's certification that the justification is accurate and complete:
As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.
(10) Approving Official's determination that RFO 16.507-7(a) applies to the order:
As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.
(10) Approving Official's determination that one of the circumstances in RFO 16.507-6(b) applies to the order.
As evidenced by my signature below, I hereby determine that the fair opportunity exception checked on page 1 applies.
NOTE: The text in the signature blocks below is editable, including the title.
Instructions for Completing the Template
(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).
(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts. (Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).
(4) Include the appropriate exception from RFO 16.507-6(b) and the supporting rationale. RFO 16.507-2(a) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding the micro-purchase threshold unless a statutory exception applies. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.
RFO 16.507-6(b)(1): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.
RFO 16.507-6(b)(2): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information. Supporting documentation may be attached to the back of the document. General statements are not acceptable.
RFO 16.507-6(b)(3): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information. General statements are not acceptable.
RFO 16.507-6(b)(4): “It is necessary to place an order to satisfy a minimum guarantee.”
RFO 16.507-6(b)(5): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”
RFO 16.507-6(b)(6): “For DoD, the order satisfies one of the exceptions permitting the use of other than full and open competition listed in part 6.103 (10 U.S.C. 3406(c)(5)). The public interest exception must not be used unless Congress is notified in accordance with 10 U.S.C. 3204(a)(7).”
Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of fair opportunity could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.
If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.
(5) Provide any other facts supporting the use of exceptions to the fair opportunity process.
(6) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.
New RFO 6.103 Exceptions for drop down 6.103-1 Only one responsible source and no other supplies or services will satisfy agency requirements 6.103-2 Unusual and compelling urgency 6.103-3 Industrial mobilization; engineering, developmental, or research capability; or expert services 6.103-5 Authorized or required by statute 6.103-6 National security 6.103-7 Public interest 9.0.0.2.20120627.2.874785
| security_markings: |
| CurrentPage: |
| PageCount: |
| Yes: |
| No: |
| Brand-Name-Title_hidden: 59 TES Powerscale Storage |
| Brand-Name-Description_hidden: Computer chassis and other components to integrate with in place Dell computers |
| Contacting-Activity: 99 Contracting Squadron |
| Purchase-Request: F3GECA6153A001 |
| Program-Name: |
| Cost-Price: |
| Individual: |
| Class: |
| Expiration_Date: [ click and select ] |
| subparagraph-A: 0 |
| subparagraph-B: 0 |
| subparagraph-C: 0 |
| subparagraph-D: 0 |
| subparagraph-E: 0 |
| subparagraph-G: 0 |
| Drop-Down_for_Exceptions: Select the applicable RFO 6.103 exception from the drop-down list below. |
| Instructions_Button: |
| A: |
| CAUTION: |
| Date: 11 Aug 2026 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-Approval-Coord: |
| anchor: |
File details come from the government source that posted it. Updated .