Attachment 2 - Bismark Lake Boardwalk Repair Phase 2 SOW.pdf
PDF 189 KB Posted
- Attached to
- GAOA Bismark Lake Boardwalk Repair Phase 2
- Solicitation number
- 1240LT23Q0090
- Issued by
-
Department of Agriculture Forest Service
About this file
This document outlines a scope of work for repairing the boardwalk at Bismarck Lake Campground in South Dakota. The work includes repairs and replacements shown on the project plans and in accordance with specifications from the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects publication. The project location is 5 miles east of Custer, SD off Highway 16A. All work must follow applicable OSHA and state regulations. The related federal contract opportunity is solicitation number 1240LT23Q0090 for Bismarck Lake Boardwalk Repair Phase 2 through the Department of Agriculture Forest Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
SECTION C – SPECIAL CONTRACT REQUIREMENTS
GENERAL
Scope of Work:
The work shall consist of what is shown on the plans, stated in the specifications:
Project Location:
The work is located at Bismarck Lake Campground, which is approximately 5 miles East of Custer, SD, off Highway 16A
Work Procedure:
All work related to this project shall be done in accordance with all applicable OSHA and State of South Dakota regulations.
Referenced Specifications:
Construction shall conform to the specifications in the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, U.S. Customary Units” publication FP-14, 2014 Edition. This publication may be obtained from:
https://flh.fhwa.dot.gov/resources/specs/
File details come from the government source that posted it. Updated .