Attachment 1 - Bismark Lake Boardwalk Repair Phase 2 SOI.xls

XLS spreadsheet 43 KB Posted

Attached to
GAOA Bismark Lake Boardwalk Repair Phase 2
Solicitation number
1240LT23Q0090
Issued by

About this file

This document contains a schedule of items for a federal solicitation from the USDA Forest Service seeking bids for the Bismark Lake Boardwalk Repair Phase 2 project. The solicitation includes base items and three optional items. Base items involve mobilization, surveying and staking, removal of structures and obstructions, aggregate subbase grading and compaction using clean gabion rock or clean rock, and treated structural timber and lumber for a boardwalk. Optional Item 1 is to remove the existing boardwalk and replace it with bridges, requiring additional surveying, removal, aggregate subbase, and treated structural timber and lumber for two bridges. Optional Item 2 is to construct a timber crib at the end of the boardwalk using treated structural timber and lumber. Optional Item 3 is to repair an existing section of the boardwalk from points 21 to 23 using treated structural timber and lumber. Bidders are to provide unit pricing for each item. The related federal contract opportunity is solicitation number 1240LT23Q0090 from the USDA Forest Service for the GAOA Bismark Lake Boardwalk Repair Phase 2 project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

USDA Forest Service
SCHEDULE OF ITEMS
Black Hills National Forest
GAOA Bismark Lake Boardwalk Repair Phase 2
ITEM #DESCRIPTIONUNITQTY.PRICETOTAL
Base Items
151(01)MobilizationLS1$ - 0$ - 0
152(05)ASurvey and StakingLS1$ - 0$ - 0
203(04)ARemoval of Structures and ObstructionsLS1$ - 0$ - 0
301(07)AAggregate subbase, Grading 4"-6" dia. Clean gabion rock , compaction (Method A)CY16$ - 0$ - 0
301(07)BAggregate subbase, Grading 2" dia. Clean rock, compaction (Method A)CY16$ - 0$ - 0
557(04)ATreated Structural Timber and Lumber, BoardwalkLS1$ - 0$ - 0
Total Base Items$ - 0
Optional Items #1 - Remove Existing Boardwalk and Replace with Bridges
152(05)BSurvey and StakingLS1$ - 0$ - 0
203(04)BRemoval of Structures and ObstructionsLS1$ - 0$ - 0
301(07)CAggregate subbase, Grading 4"-6" dia. Clean gabion rock , compaction (Method A)CY8$ - 0$ - 0
301(07)DAggregate subbase, Grading 2" dia. Clean rock, compaction (Method A)CY4$ - 0$ - 0
557(04)BTreated Structural Timber and Lumber, Bridge 2 and 3LS1$ - 0$ - 0
Total Optional Items$ - 0
Optional Item #2 Construct Timber Crib at the End of the Boardwalk
557(04)CTreated Structural Timber and Lumber, Timber CribLS1$ - 0$ - 0
Total Optional Items$ - 0
Optional Item #3 - Repair Existing Boardwalk from Points 21 - 23
557(04)DTreated Structural Timber and Lumber, Repair BoardwalkLS1$ - 0$ - 0
Total Optional Items$ - 0
Total Base and Optional Items$ - 0