This document is a detailed pricing schedule for a mini-chiller installation project. The 14-line item breakdown covers comprehensive work including site preparation, equipment supply and installation, piping modifications, electrical work, and system testing. Key technical specifications include installing a new mini-chiller with Modbus communication, high prevalence pumps, and a 60-liter inertial tank, along with specialized piping using carbon steel or multilayer materials, anti-corrosive treatments, insulation with antimicrobial protection, and electrical components like magnetothermic and GFCI devices. The project involves creating passages through walls and floors, installing piping to the fourth floor using cast iron pipes, and requires a manufacturer's authorized technician to perform the final system start-up and testing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Prospective Offerors Cover Letter - 191T7025Q0032.pdf | ||
| RFQ 191T7025Q0032.docx | DOCX document | |
| SF-1442 - 191T7025Q0032.docx | DOCX document | |
| Attachment 1 - Techincal Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. DESCRIPTION QUANTITY UNITY COST
TOTAL COST
1 Prepare construction site and protect existing premises. lump sum
2 Supply and installation of a new mini-chiller with built-in high prevalence pumps and inertial tank (60 liters). Unit shall be equipped with Modbus communication board. lump sum
3 Provide anti corrosive treatment on the external coil. lump sum
Supply and installation of new piping, manifolds, valves, strainers, thermometers (scale range: 0-90 C, Class 1), pressure gauges (scale range: 0-6 bar, Class 1), expansion tanks as per drawings. Piping shall be carbon steel or multilayer typer. In case of carbon steel, pipes shall be treated with anti-rust. In case of multilayer the system shall be full bore type. All equipment shall be PN16 lump sum
5 Supply and installation of new flexible, closed-cell insulation material with built-in Microban® antimicrobial protection to protect the piping (AF/Armaflex Class 0) lump sum
6 Supply and installation of aluminum finishing on the exposed sections. lump sum 7 Supply and installation new piping to reach fourth floor. Pipes shall be cast iron lump sum
8 Create adequate passages to host new piping and ducts by trenching walls, opening false ceilings and creating holes in floors. Passages shall be created by core drilling. lump sum
Supply and installation on the Chiller distribution panel of a Magneto thermic and GFCI serving the chiller:
4 poles, type C, In: 16A, Ith:16A, Idn: 0.30 (B type), Im: 160A, Icu/Icn: 10kA – electrical cable: FG16OR16 0,6/1 kV, Cca-s3,d1,a3, 5G2.5 lump sum
10 Magneto thermic and GFCI serving the chiller: 4 poles, type C, In: 16A, Ith:16A, Idn: 0.30 (B type), Im:
160A, Icu/Icn: 10kA – electrical cable: FG16OR16 0,6/1 kV, Cca-s3,d1,a3, 5G2.5 lump sum
11 Supply and installation of EMT conduit and pull boxes from the chiller room to the mini chiller. lump sum
12 Supply and installation of AWG22 cable from the mini-chiller to the boiler room lump sum
13 Test and balance of the system. Start-up of the unit must be performed by Manufacturer’s authorized technician. lump sum
14 Final cleaning of the premises. lump sum
Total