This document is an attachment to a federal contract solicitation, specifically the Bid Schedule for Solicitation 89503124QWA000285 for Wood Pole and Trash Removal Services. The Performance Work Statement (PWS) requires the contractor to provide services for hauling off and proper disposal of wood pole debris and general trash/hardware at various substation and construction sites in California and Arizona.

The contract will be for a base period of 12 months with four 12-month option periods. The bid schedule covers pricing for 6-yard, 20-yard, and 40-yard containers for weekly, monthly, and on-call services at 15 different locations. There is also a separate line item for emergency disposal services using WAPA-owned vehicles. Additional pricing is requested for a wood pole construction project, including haul rates, disposal rates, delivery fees, and environmental report fees. The solicitation closing date is April 15, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE

BID SCHEDULE -

Allied Waste Transportation Inc, dba Republic Services

BID SCHEDULE - Opt Year 1 - 12 MONTHS

Price for General trash/hardware containers6 yard containers6 yard containers20 yard containers40 yard containers
ATTACHMENT 2 BID SCHEDULE
SOLICITATION 89503124QWA000278BASE YEAR
Instructions: Please fill-in non-shaded (white) areas only.
Price for General trash/hardware containers6 yard containers6 yard containers20 yard containers40 yard containers
#LOCATIONService
once a weekmonthly/or as neededService on call as neededService on call as needed
PWS SECTION 2.0 SCOPE-2.3 General Disposal Sites
1PHOENIX WAREHOUSE - TRASH REMOVAL (6 YARD-Qty 4); Note: emptied weekly/or as needed
2PHOENIX WAREHOUSE - RECYCLING (6 YARD-Qty 2); Note: emptied weekly/or as needed
3PHOENIX WAREHOUSE - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (40 YARD-Qty 1 & 20 YARD-Qty 1)
4LIBERTY SUBSATION TRASH REMOVAL (20 YARD-Qty 1)
5PINNACLE PEAK SUBSTATION TRASH REMOVAL (6 YARD-Qty 1);
6GILA SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty-1)
7DAVIS DAM SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
8GLEN CANYON SUBSTATION (Page, Arizona) TRASH REMOVAL (6 YARD-Qty 1);
9COOLIDGE SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
10COOLIDGE SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
11PARKER DAM SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
12YUMA SERVICE CENTER TRASH REMOVAL (6 YARD-Qty 1);
13YUMA SERVICE CENTER TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 2 & 40 YARD-Qty 1)
14TUCSON SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
15WOOD POLE CONSTRUCTION PROJECT - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL (20 YARD-Qty 2 & 40 YARD-Qty 1); Note: emptied weekly/or as needed; PWS Section 2.0 Scope-2.3 Construction Disposal Sites
A. Total (Line Items 1-15)
Emergency Request (as needed)-PWS section 2.0 SCOPE-2.10PRICE
16WAPA OWNED DUMP TRUCKS/TRAILERS - EMERGENCY DISPOSAL SERVICE USING WAPA OWNED VEHICLES SHALL INCLUDE ANY FEES, HAUL/DISPOSAL RATE, ENVIRONMENTAL FEES
B. Total (Line Items 16)
1008SEPTEMBER
15aAdditional-WOOD POLE CONSTRUCTION PROJECT- PWS Section 2.3 Construction Disposal Sites:20 yard containers40 yard

containers

Price for weight for 1 TON of container: Throughtout California and Arizona ONLY
HAUL RATE
DISPOSAL RATE - if any
DELIVERY FEES - or other MISC fees if any (Hard to Handle)
ENVIRONMENTAL REPORT FEES
All 40 yard Disposal
All 40 yard Haul/Deliver & Fees
C. Total Line Items 15a-Additional Pricing

OPT 1

SOLICITATON 89503124QWA000278OPTION YEAR 1
Instructions: Please fill-in non-shaded (white) areas only.
Price for General trash/hardware containers6 yard containers6 yard containers20 yard containers40 yard containers
#LOCATIONService
once a weekmonthly/or as neededService on call as neededService on call as needed
PWS SECTION 2.0 SCOPE-2.3 General Disposal Sites
1PHOENIX WAREHOUSE - TRASH REMOVAL (6 YARD-Qty 4); Note: emptied weekly/or as needed
2PHOENIX WAREHOUSE - RECYCLING (6 YARD-Qty 2); Note: emptied weekly/or as needed
3PHOENIX WAREHOUSE - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (40 YARD-Qty 1 & 20 YARD-Qty 1)
4LIBERTY SUBSATION TRASH REMOVAL (20 YARD-Qty 1)
5PINNACLE PEAK SUBSTATION TRASH REMOVAL (6 YARD-Qty 1);
6GILA SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty-1)
7DAVIS DAM SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
8GLEN CANYON SUBSTATION (Page, Arizona) TRASH REMOVAL (6 YARD-Qty 1);
9COOLIDGE SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
10COOLIDGE SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
11PARKER DAM SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
12YUMA SERVICE CENTER TRASH REMOVAL (6 YARD-Qty 1);
13YUMA SERVICE CENTER TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 2 & 40 YARD-Qty 1)
14TUCSON SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
15WOOD POLE CONSTRUCTION PROJECT - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL (20 YARD-Qty 2 & 40 YARD-Qty 1); Note: emptied weekly/or as needed; PWS Section 2.0 Scope-2.3 Construction Disposal Sites
A. Total (Line Items 1-15)
Emergency Request (as needed)-PWS section 2.0 SCOPE-2.10PRICE
16WAPA OWNED DUMP TRUCKS/TRAILERS - EMERGENCY DISPOSAL SERVICE USING WAPA OWNED VEHICLES SHALL INCLUDE ANY FEES, HAUL/DISPOSAL RATE, ENVIRONMENTAL FEES
B. Total (Line Items 16)
1008SEPTEMBER
15aAdditional-WOOD POLE CONSTRUCTION PROJECT- PWS Section 2.3 Construction Disposal Sites:20 yard containers40 yard

containers

Price for weight for 1 TON of container: Throughtout California and Arizona ONLY
HAUL RATE
DISPOSAL RATE - if any
DELIVERY FEES - or other MISC fees if any (Hard to Handle)
ENVIRONMENTAL REPORT FEES
All 40 yard Disposal
All 40 yard Haul/Deliver & Fees
C. Total Line Items 15a-Additional Pricing

OPT 2

SOLICITATION 89503124QWA000278OPTION YEAR 2
Instructions: Please fill-in non-shaded (white) areas only.
Price for General trash/hardware containers6 yard containers6 yard containers20 yard containers40 yard containers
#LOCATIONService
once a weekmonthly/or as neededService on call as neededService on call as needed
PWS SECTION 2.0 SCOPE-2.3 General Disposal Sites
1PHOENIX WAREHOUSE - TRASH REMOVAL (6 YARD-Qty 4); Note: emptied weekly/or as needed
2PHOENIX WAREHOUSE - RECYCLING (6 YARD-Qty 2); Note: emptied weekly/or as needed
3PHOENIX WAREHOUSE - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (40 YARD-Qty 1 & 20 YARD-Qty 1)
4LIBERTY SUBSATION TRASH REMOVAL (20 YARD-Qty 1)
5PINNACLE PEAK SUBSTATION TRASH REMOVAL (6 YARD-Qty 1);
6GILA SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty-1)
7DAVIS DAM SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
8GLEN CANYON SUBSTATION (Page, Arizona) TRASH REMOVAL (6 YARD-Qty 1);
9COOLIDGE SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
10COOLIDGE SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
11PARKER DAM SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
12YUMA SERVICE CENTER TRASH REMOVAL (6 YARD-Qty 1);
13YUMA SERVICE CENTER TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 2 & 40 YARD-Qty 1)
14TUCSON SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
15WOOD POLE CONSTRUCTION PROJECT - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL (20 YARD-Qty 2 & 40 YARD-Qty 1); Note: emptied weekly/or as needed; PWS Section 2.0 Scope-2.3 Construction Disposal Sites
A. Total (Line Items 1-15)
Emergency Request (as needed)-PWS section 2.0 SCOPE-2.10PRICE
16WAPA OWNED DUMP TRUCKS/TRAILERS - EMERGENCY DISPOSAL SERVICE USING WAPA OWNED VEHICLES SHALL INCLUDE ANY FEES, HAUL/DISPOSAL RATE, ENVIRONMENTAL FEES
B. Total (Line Items 16)
1008SEPTEMBER
15aAdditional-WOOD POLE CONSTRUCTION PROJECT- PWS Section 2.3 Construction Disposal Sites:20 yard containers40 yard

containers

Price for weight for 1 TON of container: Throughtout California and Arizona ONLY
HAUL RATE
DISPOSAL RATE - if any
DELIVERY FEES - or other MISC fees if any (Hard to Handle)
ENVIRONMENTAL REPORT FEES
All 40 yard Disposal
All 40 yard Haul/Deliver & Fees
C. Total Line Items 15a-Additional Pricing

OPT 3

SOLICITATION 89503124QWA000278OPTION YEAR 3
Instructions: Please fill-in non-shaded (white) areas only.
Price for General trash/hardware containers6 yard containers6 yard containers20 yard containers40 yard containers
#LOCATIONService
once a weekmonthly/or as neededService on call as neededService on call as needed
PWS SECTION 2.0 SCOPE-2.3 General Disposal Sites
1PHOENIX WAREHOUSE - TRASH REMOVAL (6 YARD-Qty 4); Note: emptied weekly/or as needed
2PHOENIX WAREHOUSE - RECYCLING (6 YARD-Qty 2); Note: emptied weekly/or as needed
3PHOENIX WAREHOUSE - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (40 YARD-Qty 1 & 20 YARD-Qty 1)
4LIBERTY SUBSATION TRASH REMOVAL (20 YARD-Qty 1)
5PINNACLE PEAK SUBSTATION TRASH REMOVAL (6 YARD-Qty 1);
6GILA SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty-1)
7DAVIS DAM SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
8GLEN CANYON SUBSTATION (Page, Arizona) TRASH REMOVAL (6 YARD-Qty 1);
9COOLIDGE SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
10COOLIDGE SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
11PARKER DAM SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
12YUMA SERVICE CENTER TRASH REMOVAL (6 YARD-Qty 1);
13YUMA SERVICE CENTER TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 2 & 40 YARD-Qty 1)
14TUCSON SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
15WOOD POLE CONSTRUCTION PROJECT - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL (20 YARD-Qty 2 & 40 YARD-Qty 1); Note: emptied weekly/or as needed; PWS Section 2.0 Scope-2.3 Construction Disposal Sites
A. Total (Line Items 1-15)
Emergency Request (as needed)-PWS section 2.0 SCOPE-2.10PRICE
16WAPA OWNED DUMP TRUCKS/TRAILERS - EMERGENCY DISPOSAL SERVICE USING WAPA OWNED VEHICLES SHALL INCLUDE ANY FEES, HAUL/DISPOSAL RATE, ENVIRONMENTAL FEES
B. Total (Line Items 16)
1008SEPTEMBER
15aAdditional-WOOD POLE CONSTRUCTION PROJECT- PWS Section 2.3 Construction Disposal Sites:20 yard containers40 yard

containers

Price for weight for 1 TON of container: Throughtout California and Arizona ONLY
HAUL RATE
DISPOSAL RATE - if any
DELIVERY FEES - or other MISC fees if any (Hard to Handle)
ENVIRONMENTAL REPORT FEES
All 40 yard Disposal
All 40 yard Haul/Deliver & Fees
C. Total Line Items 15a-Additional Pricing

OPT 4

SOLICITATION 89503124QWA000278OPTION YEAR 4
Instructions: Please fill-in non-shaded (white) areas only.
Price for General trash/hardware containers6 yard containers6 yard containers20 yard containers40 yard containers
#LOCATIONService
once a weekmonthly/or as neededService on call as neededService on call as needed
PWS SECTION 2.0 SCOPE-2.3 General Disposal Sites
1PHOENIX WAREHOUSE - TRASH REMOVAL (6 YARD-Qty 4); Note: emptied weekly/or as needed
2PHOENIX WAREHOUSE - RECYCLING (6 YARD-Qty 2); Note: emptied weekly/or as needed
3PHOENIX WAREHOUSE - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (40 YARD-Qty 1 & 20 YARD-Qty 1)
4LIBERTY SUBSATION TRASH REMOVAL (20 YARD-Qty 1)
5PINNACLE PEAK SUBSTATION TRASH REMOVAL (6 YARD-Qty 1);
6GILA SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty-1)
7DAVIS DAM SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
8GLEN CANYON SUBSTATION (Page, Arizona) TRASH REMOVAL (6 YARD-Qty 1);
9COOLIDGE SUBSTATION TRASH REMOVAL (6 YARD-Qty 1)
10COOLIDGE SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
11PARKER DAM SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
12YUMA SERVICE CENTER TRASH REMOVAL (6 YARD-Qty 1);
13YUMA SERVICE CENTER TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 2 & 40 YARD-Qty 1)
14TUCSON SUBSTATION TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL REMOVAL (20 YARD-Qty 1 & 40 YARD-Qty 1)
15WOOD POLE CONSTRUCTION PROJECT - TRASH, TREATED WOOD POLE, CONSTRUCTION MATERIAL (20 YARD-Qty 2 & 40 YARD-Qty 1); Note: emptied weekly/or as needed; PWS Section 2.0 Scope-2.3 Construction Disposal Sites
A. Total (Line Items 1-15)
Emergency Request (as needed)-PWS section 2.0 SCOPE-2.10PRICE
16WAPA OWNED DUMP TRUCKS/TRAILERS - EMERGENCY DISPOSAL SERVICE USING WAPA OWNED VEHICLES SHALL INCLUDE ANY FEES, HAUL/DISPOSAL RATE, ENVIRONMENTAL FEES
B. Total (Line Items 16)
1008SEPTEMBER
15aAdditional-WOOD POLE CONSTRUCTION PROJECT- PWS Section 2.3 Construction Disposal Sites:20 yard containers40 yard

containers

Price for weight for 1 TON of container: Throughtout California and Arizona ONLY
HAUL RATE
DISPOSAL RATE - if any
DELIVERY FEES - or other MISC fees if any (Hard to Handle)
ENVIRONMENTAL REPORT FEES
All 40 yard Disposal
All 40 yard Haul/Deliver & Fees
C. Total Line Items 15a-Additional Pricing

File details come from the government source that posted it. Updated .