This document is a Performance Work Statement (PWS) for wood pole debris removal and waste disposal services required by the Department of Energy (DOE) Western Area Power Administration (WAPA), Desert Southwest (DSW) Region.
The PWS describes the services needed for hauling off and properly disposing of wood pole debris accumulated at various work sites in the following counties in Arizona and California: Imperial, Riverside, San Bernardino, Cochise, La Paz, Yuma, Penal, Mohave, and Maricopa. The Contractor shall provide containers, schedule collection routes, and ensure timely pickup and disposal of the waste materials in compliance with all applicable environmental regulations. The contract will be for a base period of 12 months with four 12-month option periods. WAPA will not provide any equipment or materials, and the Contractor must furnish all necessary resources. The Contractor shall comply with OSHA safety requirements and immediately report any accidents or incidents. Electronic invoicing through IPP.gov is required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 SF1449 89503124QWA000285.pdf | ||
| Attachment 2 Bid Schedule SOL 89503124QWA000285_Base plus Option Years.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
ATTACHMENT A
Services for Wood Pole Trash
Removal and Waste Disposal
WAPA DSW
Performance Work Statement
12/11/23
U.S. DEPARTMENT OF ENERGY
WESTERN AREA POWER ADMINISTRATION
PERFORMANCE WORK STATEMENT
FOR REFUSE AND RECYCLE PICK-UP SERVICES
1.0 INTRODUCTION/BACKGROUND
1.1 Introduction
The Western Area Power Administration (WAPA), Desert Southwest (DSW) Region, requires the services of a qualified contractor to provide services of hauling off and proper disposal of wood pole debris accumulated at various work sites. This Performance Work Statement (PWS) describes the services required by DSW at various rural locations along our designated power system within Arizona and California States. The contract will be performed on these counties only: California – Imperial, Riverside and San Bernardino counties; Arizona –Cochise, La Paz, Yuma, Penal, Mohave, and Maricopa counties (Maps reference pages 9 to 21).
1.2 Background
WAPA is a federal power marketing administration that markets and delivers reliable, cost-based hydroelectric power and related services to wholesale customers in 17 states. DSW is one of four regions within WAPA and is responsible for the maintenance and operation of high-voltage power transmission systems, marketing and transmission of Federal electric power generated at
Federal projects to customers in Arizona, Nevada and California.
1.3 Government Personnel
The Contracting Officer (CO) is the individual executing this contract on behalf of the
Government and is responsible for the overall administration of the contract. He/she is the only person authorized to make any changes in the prices, terms or other conditions of the contract.
The Contracting Officer’s Representative (COR) is responsible for giving the Contractor any special technical instructions or guidance necessary to ensure contract execution. The COR has no authority to alter the terms of conditions of the contract.
1.4 Contractor Personnel
The contractor shall have a competent on-site representative authorized to act on behalf of the contractor, available to the CO or COR to receive instructions or information regarding work under the contract. The on-site representative must be able to fluently speak and understand the
English language. The on-site representative shall provide a phone number where he/she can be contacted if/when necessary.
12/11/23
The contractor shall furnish adequate equipment and drivers to the location to ensure that service is performed in a satisfactory manner. It is the responsibility of the contractor to maintain close surveillance over personnel employed to perform work on the contract.
1.5 Materials, Equipment and Storage
1.5.1 The contractor shall furnish all materials and supplies required for the performance of work under this contract.
1.5.2 The contractor shall determine and furnish all equipment required for the performance of the work under this contract. All equipment shall comply with applicable OSHA guidelines and shall be in good operating condition. The contractor shall operate the equipment in accordance with the original manufacturer’s recommendation and applicable laws and regulations.
1.5.3 The Contractor shall furnish a cell phone, email address, GPS unit and an emergency
GPS tracking device for the purpose of communication with WAPA and during any of emergency services. Areas having no cell phone service will require a satellite phone, furnished by the Contractor.
1.6 Government Furnished Property, Equipment, Materials and Utilities
1.6.1. The Government will not furnish any property, equipment or materials for use under this contract.
1.6.2. Electrical power is available for contractor use at most sites; however, if contractor requires electrical power at sites without it, contractor shall furnish and provide its own generator.
1.7 Pre-Performance Meeting
The CO will schedule a meeting with the contractor within 7 business days following contract award to discuss the requirements of the contract and other administrative matters.
1.8 Protective Clothing
The Contractor shall determine the necessary personnel protective equipment and ensure contract employees use the personnel protective equipment while performing tasks under this contract.
1.9 Licenses and Permits
The Contractor shall obtain and maintain, at its sole expense, all necessary licenses and permits required to meet the requirements of the contract. In performing the work required by this
Contract, the contractor shall comply with all applicable Federal, State and local laws and regulations. Copy of documents must be submitted within 7 business days after award.
12/11/23
1.10. Environmental Requirements
1.10.1. The contractor shall comply with all applicable Federal, State, and local environmental laws and regulations, and current WAPA policies and procedures.
1.10.2. The contractor shall dispose of or recycle hazardous, universal, and non-hazardous waste material that may be used in the course of this contract in accordance with all applicable Federal, State and local laws, regulations and ordinances and current policies and procedures identified by
Government. Wastes shall be reduced by recycling, reusing, or reprocessing to the maximum extent practicable.
1.10.3. Hazardous, Universal, and Non-Hazardous Wastes. The contractor shall manage any hazardous, universal, and non-hazardous wastes in accordance with all applicable State, Federal and Local regulations, and existing policies and procedures identified by Government.
1.10.4. Contractor’s Liability for Regulated Material Incidents. The contractor is solely liable for all expenses related to spills, mishandling, or incidents of regulated material (such as, but not limited to petroleum products and pesticides) attributable to its employees’ actions or the actions of its subcontractors. This includes all response, investigation, cleanup, disposal, permitting, reporting, and requirements from applicable environmental regulation agencies.
1.11 Interference with Business
1.11.1 The Government may undertake or award other contracts for additional work, and the
Contractor shall fully cooperate with such other contractors and Government employees and carefully schedule its own work to such additional work as may be directed by the
WAPA technical representative or COR. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by
Government employees.
1.11.2 The services under this contract shall be performed in such a way that there will be no interruption to or interference with the normal operation of Government business on the premises. Persons employed by the contractor shall, while on the premises, comply with all applicable regulations.
1.11.3 Hours for Substation Collection: General business hours are from 7:00 a.m. to 3:00 p.m., Monday through Thursday, except for federal holidays. Contractor may utilize this schedule on a case-by-case basis with the COR’s and CO’s prior approval.
1.11.4 Hours for Construction Wood Pole Collection: General business hours are from 7:00 a.m. to 3:00 p.m., Monday through Friday, except for federal holidays. Contractor may utilize this schedule on a case-by-case basis with the COR’s and CO’s prior approval.
12/11/23
1.12 Safety and Reporting Requirements
1.12.1. The contractor shall take all reasonable precautions in the performance of the work under this contract to protect the safety and health of employees and members of the public. The contractor shall comply with the latest effective standards promulgated by the Department of
Labor, Occupational Safety and Health Administration, Safety and Health Standards, 29 CFR
1904, 29 CFR 1910 and 29 CFR 1925. Contractor shall keep a copy of these OSHA standards at the jobsite. Certain standards have been referenced for emphasis. All OSHA standards shall apply, whether referenced or not. If there is a conflict between the requirements of this PWS and applicable Federal, State, or local safety, health, or industrial regulations or code, the more stringent requirements shall prevail.
1.12.2. Failure to implement, monitor, and enforce the safety and health program submitted to and approved by Government as well as the requirements of this PWS may result in the Contracting
Officer’s direct removal of the job superintendent or may result in the suspension of all or part of the work. Government’s failure to order discontinuance of the contractor’s operations shall not relieve the contractor of responsibility for the safety and health of personnel and property.
1.12.3. Contractor shall be responsible for determining the safety of Contractor’s employees before starting a work. It will be the contractor’s responsibility to assess the safety of the surroundings. A Government representative is authorized to stop work if safe practices are not being used. The failure of the COR to spot an unsafe condition shall not incur liability to the
United States Government.
1.12.4. The contractor shall maintain an accurate record of, and report work-related fatalities, injuries and illnesses in accordance with the requirements of 29 CFR 1904.
1.12.5. Contractor shall immediately report, verbally and in writing, to the CO and COR, all cases of death, occupational disease, or traumatic injury to employees or the public, and any property damage as a result of performance under this contract. Written reports are required within 48 hours in the form and manner prescribed by 29 CFR 1904.
1.12.6. Contractor shall report worksite equipment and motor vehicle accidents, regardless of extent of injury or cost, to the CO and COR.
1.12.7. Contractor shall report property damage or loss in excess of $1,000 resulting from any accident to the CO and COR. Damage to Government or public property, regardless of cost, shall be reported to the CO and COR.
1.12.8. When requested by the Government, Contractor shall participate in any investigation of accidents or incidents.
1.12.9. The Contractor shall ensure that its employees have been appropriately instructed and trained in the proper use of any equipment, vehicles, and/or personal protective equipment and where required, have the necessary exams, certification, skills and knowledge necessary to safely perform their assigned duties.
12/11/23
1.12.10. Contractor shall ensure each employee receives initial work site safety orientation and continued safety and health training addressing the hazards associated with the work and the measures necessary to control or eliminate hazards. Employees shall be physically qualified to perform their assigned duties. Employees shall not work while their ability or alertness is impaired because of fatigue, illness, medications, drugs or alcohol, or any other reason that may expose them or others to injury. The Government has a zero-tolerance policy on drugs and alcohol.
1.12.11. The contractor shall be responsible for identifying and providing its employees the personal protective equipment (PPE) as necessary in accordance with established OSHA and other applicable Federal, State, and local regulations.
1.12.12. Equipment utilized under this contract shall be designed, manufactured, maintained, and operated as required by OSHA 29 CFR 1926 and 1910 requirements. All of the manufacturer’s safety restrictions, warning, and advisements shall be adhered to.
1.13 Supervision and Authorization
1.13.1 No work shall be performed in or near an energized facility that is under the operational control of WAPA until authorization to proceed, and all applicable authorization(s) are obtained from WAPA's COR.
1.13.2 The contractor shall be responsible for obtaining protection and permission before performing any work on or near any electrical facility under the operational control of a non-
WAPA agency or utility. The contractor shall notify the COR upon completion of all coordination with the non- WAPA agency or utility.
2.0 SCOPE
2.1 The Contractor shall develop a plan to include collection routes and collection schedules for all services called out under this contract.
2.2 The Contractor shall notify COR of any conditions that may interrupt the schedule of performance such as, delays due to disposal site availability, security measures, vehicle breakdowns, blocked containers, etc. Collection as a result of these delays shall be performed by the next workday.
2.3 The Contractor shall provide containers as following:
General Disposal Sites:
Coolidge Substation –
(1) 6 - yard container to be emptied weekly
(1) 20 – yard container to be emptied as needed
(1) 40 – yard container to be emptied as needed
12/11/23
Gila Substation –
(1) 20 – yard container to be emptied as needed
(1) 40 – yard container to be emptied as needed
Parker Dam Substation –
(1) 20 – yard container to be emptied as needed
(1) 40 – yard container to be emptied as needed
Davis Dam Substation –
(1) 6 – yard container to be emptied weekly
Glen Canyon Substation –
(1) 6 – yard container to be emptied weekly
Pinnacle Peak Substation –
(1) 6 – yard container to be emptied monthly/or as needed
Liberty Substation –
(1) 20 – yard container to be emptied as needed
Yuma Service Center –
(1) 6 – yard container to be emptied weekly
(2) 20 – yard container to be emptied as needed
(1) 40 – yard container to be emptied as needed
Tucson Substation –
(1) 20 – yard container to be emptied as needed
(1) 40 – yard container to be emptied as needed
Phoenix Facility –
(1) 20 – yard container to be emptied as needed
(1) 40 – yard container to be emptied as needed
(2) 6 – yard recycling containers to be emptied weekly/or as needed
(4) 6 – yard containers to be emptied weekly/or as needed
Construction Disposal Sites:
Construction disposal sites will vary. Contractor shall coordinate locations with COR during construction projects. Construction containers shall be disposed of weekly or as needed per COR at no more than one (1) 40-yard container and two (2) 20-yard containers to collect, remove and dispose of all wooden poles, refuse, garbage, and other waste products identified herein and at locations. Most of service locations will be at various remote sites along the WAPA transmission line near the work site. The locations to be provided by WAPA’s COR. If containers are 80% full, or more, then the container shall be emptied completely. COR will contact the Contractor, and Contractor shall pick up containers within 48 hours. The contractor will be on an on-call basis to collect / remove the dumpster and/or replace the dumpster as needed.
2.4 Containers should be positioned in a manner that minimizes interference with adjacent parking areas, roadways, overhead utilities, trees, and other potential obstructions. Refuse from dumpsters shall be collected and removed in a manner that will not allow for any containers to overflow at any time.
Attachment
12/11/23
2.5 The contractor shall return all containers to their original location after servicing. The contractor will also be responsible for immediately cleaning up any spill, debris, etc., which may occur during servicing of containers. The contractor is responsible for keeping all collection areas free of refuse and debris.
2.6 Containers will be free of unpleasant odor, dirt, grease, stains, debris, visible holes and damage. The contractor shall furnish replacement containers for any container that is removed for more than 2 hours due to maintenance or repair. All containers must remain in good, working condition. Contractor shall not conduct maintenance, repairs or cleaning of any bulk container on the government served property.
2.7 All Contractor Equipment, trailers and other vehicles used for refuse collection shall be maintained as required to ensure they are free of odor, dirt, debris and pests. If the contractor’s vehicle should break down, it must be removed by the end of that work day.
Contractor shall not conduct maintenance, painting, repairs and/or cleaning of any contractor vehicle, trailer, etc. on government property.
2.8 Weighing of Vehicles. All vehicles used in the collection of refuse materials shall be weighed on state certified vehicle scales before arriving at the base and on state-certified scales at the landfill. Incoming and outgoing vehicle weights shall be recorded on weight tickets provided by the operator to determine the amount of refuse tonnage collected on the base.
2.9 INVOICING: Copy of disposal fees at the county landfill will be attached to
Contractor’s invoice. Refuse disposal shall be in accordance with existing local, state, and federal regulations. The contractor shall be responsible for any additional amounts associated with permits, licenses, fees (charges), etc. which may be necessary for the performance of the required services. All Contractor invoices shall include all associated fees for container movement/relocation, labor, container weight, and all other costs associated with collection and disposal service. The Contractor shall submit copies of weight ticket receipts from the landfill and signed consumer information sheets to the
COR prior to submittal of final invoice. Electronic invoicing in IPP.gov is payment platform required.
2.10 EMERGENCY DISPOSAL (WAPA OWNED VEHICLES): If an emergency or urgent request is needed at a construction site, WAPA will use its own dump trucks to dispose and transport all waste (treated wood poles, regular trash, construction materials) to the correct disposal facility provided by the Contractor. The Contractor will provide
WAPA with any special waste profile forms needed to dispose treated wood poles at the nearest disposal facility to the construction site.
Desert Southwest Region
This map and data are the property of WAPA/DOE and are intended for planning and analysis only. No reproduction or copying of this product is allowed without the sole consent of WAPA/DOE. To contact
WAPA about this map, please call 1-800-336-7288.
Scale 1:4,000 3/27/2018 2:53 P.M.
X
COOLIDGE (COL)
PHONE EXT: 2310/2311
Address: 2288 N Arizona Blvd
City / State: Coolidge, AZ
Zip Code: 85128
County: Pinal County
Latitude: 33 00 28.748 N
Longitude: 111 31 34.871 W
LOCATION
Emergency: 911 or 520-421-8700
Police: 520-723-5311 Coolidge
Fire: 520-723-5361 Coolidge
Hospital: 520-723-5475 Clinic
Poison: 1-800-222-1222
Dispatch: 1-800-973-7583
CONTACT NUMBERS
DIRECTIONS: Located north of the town of Coolidge, just north of the junction of
Arizona State Routes 87 and 287. From north: I-10 to exit 185, take Route 387 to
287 and head to Coolidge. From south: I-10 to exit 210, take Route 87 north to
Coolidge.
N
AIR
RESCUE
Name: Native Air
Phone: 1-800-806-7106
WARN ABOUT T-LINES
DISPATCH BY POLICE
OFFICIAL USE ONLY
May be exempt from public release under Freedom of Information
Act (5 U.S.C. 552), exemption number and category name: Exemption 2 – Circumvention of statue
WAPA review required before public release
Name/Org: Stan Spencer G5200 Date: _5-9-05
UPDATED: 9/15/05
N
(OUO)
DAVIS DAM POWER PLANT (DAD)
PHONE EXT: 73-3628 (office)
Address:
State:AZ Zip Code:86429 County:Mohave County Upper 230kV Switchyard Latitude:35 11 41 N Longitude:-114 33 56 W Lower 230kv Switchyard Latitude:35 11 41 N Longitude:-114 33 56 W 69kV Switchyard Latitude:35 11 41 N Longitude:-114 33 56 W
L O
C
AT
IO
Emergency:
Police: 928-763-1999 Bullhead Fire: 928-763-1999 Bullhead Hospital: 928-758-3931 Bullhead Poison: 1-800-362-0101 Dispatch: 1-800-973-7583
CONTACT NUMBERS
DIRECTIONS: In the Bullhead City/Laughlin, NV area on the Arizona side of the Colorado River.
Follow the signs to Davis Dam. Obtain the key to the switchyards from the Bureau Office at the dam.
From SR 68, drive North on Mohave County Rd 68 for 0.7 miles and turn Left on dirt road (N 35 11
13.4, W 114 33 5.1). Look for sign “Stop. Do Not Enter.” Follow the dirt road to the control house.
N
AIR
RESCUE
Name: DPS Kingman Phone: 602-223-2000
WARN ABOUT T-LINES
DISPATCH BY POLICE
OFFICIAL USE ONLY
May be exempt from public release under Freedom of Information Act (5 U.S.C. 552), exemption number and category name: Exemption 2 – Circumvention of statue WAPA review required before public release
UPDATED: 8/9/12
GILA (GLA)
PHONE EXT: 2101 or 2102
Address: 9600 E Araby-Blaisdale Rd
State: AZ
Zip Code: 85365
County: Yuma County
Latitude: 32 41 05 N
Longitude: 114 28 09 W
LOCATION
Emergency: 911 or 520-782-4757
Police: 520-783-4421
Fire: 520-782-1831
Hospital: 520-344-2000
Poison: 1-800-222-1222
Dispatch: 1-800-973-7583
CONTACT NUMBERS
DIRECTIONS: (180 miles from Phoenix) I-8 to Yuma, take Fortuna Rd. (Exit 12).
Take frontage road around curve, over the railroad tracks, then the first dirt road on the right. Travel approx 1 mile, substation is on the left
N
AIR
RESCUE
Name: Sun Care Air Ambulance
Phone: 1-800-327-0906
WARN ABOUT T-LINES
DISPATCH BY POLICE
OFFICIAL USE ONLY
May be exempt from public release under Freedom of Information
Act (5 U.S.C. 552), exemption number and category name: Exemption 2 – Circumvention of statue
WAPA review required before public release
GLEN CANYON SWITCHYARD (GC)
PHONE EXT: 2228 or 8-928-645-2481 (office)
Address:
State: AZ
Zip Code: 86040
County: Coconino County
Latitude: 36 56 3.25
Longitude: 111 29 6.52 W
LOCATION
Emergency: 911
Police: 928-645-4355 Page
Fire: 928-645-4340 Page
Hospital: 928-645-2424 Page
Poison: 1-800-222-1222
Dispatch: 1-800-973-7583
CONTACT NUMBERS
DIRECTIONS: (288 miles from Phoenix) North on I-17 to Flagstaff, then Highway
89 to Page. Continue on Highway 89 to and across the Colorado River bridge.
Sub is on the left (west) side of the highway, immediately after the bridge and opposite from the Glen Canyon Dam Visitor’s Center.
N
AIR
RESCUE
Name: Classic Lifeguard
Phone: 1-800-444-9223
WARN ABOUT T-LINES
DISPATCH BY POLICE
OFFICIAL USE ONLY
May be exempt from public release under Freedom of Information
Act (5 U.S.C. 552), exemption number and category name: Exemption 2 – Circumvention of statue
MEAD (MED)
PHONE EXT: 70-2680 (office)
Address: 2051 Buchanan Blvd State: NV Zip Code: 89005 County: Clark County Latitude: 35 54 41 N Longitude: 114 49 57 W
LOCATION
Emergency: 702-293-9224 Police: 702-293-9224 Boulder Fire: 702-293-9228 Boulder Hospital: 702-293-4111 Boulder Poison: 1-800-362-0101 Dispatch: 1-800-973-7583
CONTACT NUMBERS
DIRECTIONS: In Boulder City, take Boulder Highway (Highway 95) and travel south to Buchanan Road. Exit onto Buchanan and go south for about 3 miles to the former Boulder City Area Office. The substation is at the end of the pavement around the curve.
N
AIR
RESCUE
Name: Mercy Air Phone: 1-800-222-3456
WARN ABOUT T-LINES
DISPATCH BY POLICE
OFFICIAL USE ONLY
May be exempt from public release under Freedom of Information Act (5 U.S.C. 552), exemption number and category name: Exemption 2 – Circumvention of statue
State: AZ
Zip Code: 85344
County: La Paz County
230kV Switchyard
Latitude: 34 17 27 N
Longitude: 114 08 26 W
Upper 161kv Switchyard
Latitude: 34 17 38 N
Longitude: 114 08 26 W
Lower 161kV Switchyard
Latitude: 34 17 41 N
Longitude: 114 08 26 W
69kV Switchyard
Latitude: 34 17 37 N
Longitude: 114 08 27 W
L O
C A
T
IO
N
N
AIR
RESCUE
Name: DPS Kingman
Phone: 602-223-2000
WARN ABOUT T-LINES
DISPATCH BY POLICE
DIRECTIONS: The dam and switchyards are 18 miles north of the town of Parker on Highway 95 on the California side of the Colorado River. Just follow the signs to the dam.
Emergency: 911 or 928-669-2281
Police: 928-669-2264 Parker
Fire: 928-667-2206 Parker
Hospital: 928-669-2225 Parker
Poison: 1-800-362-0101
Dispatch: 1-800-973-7583
CONTACT NUMBERS
PARKER DAM (PAD)
PHONE EXT: 74-211 (office)
OFFICIAL USE ONLY
May be exempt from public release under Freedom of Information
Act (5 U.S.C. 552), exemption number and category name: Exemption 2 – Circumvention of statue
| PWS_ Map_ Phoenix Office2.pdf |
| 2018&t_stamp=%202:53%20P.M.&layers=facilities+tlines+proposed_tlines+usa_sat+states+counties+google_aps |
| PWS_PARKER DAM.pdf |
| Slide 1 |
| Slide 2 |
| PWS_MEAD.pdf |
| Slide Number 1 |
| Slide Number 2 |
| PWS_GRANDCANYON.pdf |
| Slide 1 |
| Slide 2 |
| PWS_GILA.pdf |
| Slide 1 |
| Slide 2 |
| PWS_DAVIS DAM_DAD.pdf |
| Slide Number 1 |
| Slide Number 2 |
| PWS_COOLIDGE.pdf |
| Slide 1 |
| Slide 2 |
| PWS_ PHOENIX.pdf |
| 2018&t_stamp=%202:53%20P.M.&layers=facilities+tlines+proposed_tlines+usa_sat+states+counties+google_aps |
File details come from the government source that posted it. Updated .