This document is a product requirements section for Contract A - Design/Build Sprinkler NHFG Region 3, a state and local contract opportunity. The contract requires the furnishing of products by qualified manufacturers suitable for the intended use, with all materials and equipment being new. The contractor must transport and handle the products in accordance with the manufacturer's instructions, promptly inspect shipments, and provide proper storage and handling to prevent damage. The contract prohibits the use of asbestos containing materials.

The contract does not provide any details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information beyond the product requirements. The document outlines the general product and delivery requirements but does not contain information about the overall contract opportunity or solicitation process.

View the file

Other files

File Type Posted
attachment_3_bid_2948_25.pdf PDF
Addendum_1_bid_2948_25.pdf PDF
attachment_1_bid_2948_25.pdf PDF
attachment_4_bid_2948_25.pdf PDF
bid_2948_25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

81351R, Contract A – Design/Build Sprinkler NHFG Region 3 December 15, 2022

Product Requirements

01600 - 1

SECTION 01600

PRODUCT REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Products.

B. Product delivery requirements.

C. Product storage and handling requirements.

1.2 PRODUCTS

A. Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise.

B. All materials and equipment shall be new, except as specifically permitted by Contract

Documents.

C. Furnish interchangeable components from same manufacturer for components being replaced.

D. The use of asbestos containing materials shall be prohibited.

1.3 PRODUCT DELIVERY REQUIREMENTS

A. Transport and handle products in accordance with manufacturer's instructions.

B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.

C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.

1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. Store and protect products in accordance with manufacturers' instructions.

B. Store with seals and labels intact and legible.

C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.

D. For exterior storage of fabricated products, place on sloped supports above ground.

81351R, Contract A – Design/Build Sprinkler NHFG Region 3 December 15, 2022

Product Requirements

01600 - 2

E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection only with prior approval from the Contract Administrator.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.

H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

PART 2 PRODUCT

Not Used.

PART 3 EXECUTION

Not Used.

END OF SECTION