Attachment 2 - ARMAG Refurb - Price Schedule.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Refurbishing ARMAG
- Solicitation number
- FA557520QMD06
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ktor
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REFURBISHING ARMAG | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| WO#20XX1 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ARCHITECTURAL WORKS | ||||||||||
| TRABAJOS DE ARQUITECTURA |
| Demolition works | ||||
| Trabajos de demolición | ||||
| 1 | Demolish paneling, insulations and timber wall/ceiling | |||
| Demoler paneles, aislamient, tablazón paredes/techo | Sm | |||
| 2 | Scrape paint from interior & exterior metal surfaces | |||
| Rascar pintura de superfices metál.interiores y exteriores | Sm | |||
| 3 | Remove bug screen mesh and frame from vent grilles | |||
| Eliminar mosquitera y marco de rejillas de ventilación | Ea | |||
| 4 | Disassembly outlets, conduit and wiring for subsequent | . | ||
| Desmontar eliminar luminarias interiores | Job | LS | ||
| 5 | Remove luminaries | |||
| Desmontar eliminar luminarias interiores | Ea | |||
| 6 | Separate, treat and delivery waste to authorized dump | |||
| Separar, tratar y enviar restos a vertedero autorizado | JOB | LS | ||
| Total Demolition works | ||||
| Toital Trabajos de demolición |
| Interior finish works | |||
| Trabajos de acabados interiores | |||
| 7 | Apply protection, primer and coating to metal surface | ||
| Proteger, imprimar y pintar superficies metalicas | Sm | ||
| 8 | Install wall covering of insulation, timber and paneling | ||
| Cubrición de pared con aislam, tablazón y panel | Sm | ||
| 9 | Install floor covering of timber, plywood and vinyl | ||
| Cubrición suelo con tablazón, panel contrach y vinilo | Sm | ||
| 10 | Replace armory container lighting fixtures and acc. | ||
| Reemplazar luminarias y acc. De contenedor de armas. | JOB | LS | |
| 11 | Install new alumin mesh and frame bug screem | ||
| Instalar nueva mosquitera marco y malla de aluminio | Ea | ||
| 12 | Reinstall outlets and replace wiring & conduit as nedeed | ||
| Reinstalar enchufes y reponer cables y conductos precisos | JOB | ||
| Total Interior finish works | |||
| Total Trabajos de acabados interiores |
| ARCHITECTURAL WORK |
| RESUMEN TRABAJOS DE ARQUITECTURA |
| Total Demolition works |
| Toital Trabajos de demolición |
| Total Interior finish works |
| Total Trabajos de acabados interiores |
| TOTAL ARCHITECTURAL |
| TOTAL TRABAJOS DE ARQUITECTURA |
| SUMMARY |
| RESUMEN |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS ARQUITECTURA |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .