Attachment 2 APH Const Plans Sept 2 25.pdf
PDF 12 MB Posted
- Attached to
- APH ACEP Easement Restoration Structural Measures Monroe County, Illinois Federal contract opportunity
- Solicitation number
- 12FPC326Q0012
About this file
This document is a set of construction plans for a wetland restoration project funded through the Agricultural Conservation Easement Program (ACEP) by the USDA Natural Resources Conservation Service. The project is located in Monroe County, Illinois, in Sections 27 and 34, Township 4 South, Range 10 West, and is being implemented by producer APH.
The project encompasses three primary wetland cells with associated berms, spillways, and water control structures. Cell #1 requires 1,920 cubic yards of embankment earthfill, 19 cubic yards of cutoff trench earthfill, a 10-inch diameter PVC pipe (75 linear feet, SDR 21 or Schedule 40), an in-line control structure with 10-inch diameter and 14-inch weir length, two anti-seep collars (5 feet × 5 feet PVC or rubber), and one trash rack with animal guard. Cell #2 requires 4,150 cubic yards of embankment earthfill, 130 cubic yards of cutoff trench earthfill, a 10-inch diameter PVC pipe (96 linear feet), and similar control structures. Cell #3 requires 3,450 cubic yards of berm excavation, 3,730 cubic yards of rework berm fill, and 375 cubic yards of cutoff trench earthfill, with an 18-inch diameter helical aluminum pipe (70 linear feet) and in-line control structure. All cells include seeding requirements utilizing tall fescue, redtop, and alsike clover with 120 pounds per acre each of nitrogen, phosphate, and potash fertilizer, plus 2 tons per acre of lime. Straw mulch at 2,600 pounds per acre with straight disk anchoring is specified. Construction specifications and operation & maintenance procedures are detailed throughout the 41-sheet plan set, which includes the JULIE utility notification form and PCC (Private Contractor Clearance) documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01 12FPC326Q0012 Monroe County Illinois Solicitation.pdf | ||
| Attachment 3 Bid Schedule.pdf | ||
| Attachment 4 Wage Determiniation.pdf | ||
| Attachment 1 APH - ACEP Const Mat Specs Sept 15-25.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corynn 4/1/2025
1 41
IV
APH
Wetland Restoration- ACEP
Sec 27 & 34 - T4S R 10W
Monroe
X
Index of Sheets
1. Cover Sheet
2. Cell #1 Plan Map 3-6 Cell #1 Details 7-11 Cell #1 Seed & Mulch
12. Cell #2 Plan Map 13-16 Cell #2 Details 17.-21 Cell #2 Seed & Mulch 22 - Cell #1 & #2 Seep Collar 23-25. Cell #3 Berm Repair 26-28 Cell #3 STR replace.
29-33 Cell #3 Seed & Mulch 34-39. Const. Spec / O&M
40. JULIE Form
41. PCC form
John Grab Ag. Eng 5-25 z1319 382.20--...._ tbm bndry pin
Borrow Ar.=_a ! ft Max Cut - _ 10:!
Side Slopes -and Structure '------Pipe
Cell ! Wetland Berm Elev. = 380. 0 0 ft Top Width = _!_ 6 . !
Front Slope -=_ i· !
Back Slope - .
! o ___ _
Scale in Feet
""O (I)
(I) >
C ~ t'.
;;: (I) Q_ 0 _c Q_ o u <r:
_J _J w u 2~
:r: n:::: ~ o_W~ <t: m :.:s z :s 1-w s
II) 0
B~f J9 QJ ::::, u, E ~ "C ~ ::::, a, IU -~ .... C. I..
·- QJ C'l 5c<C
0..:
J.
G ra b
5-
35 ft
_2_6.ft_
Top of Settled Berm El 380.0
Auxiliary Spillway El _37JUL
Trash Rack toplog Maximum El]ZZ:Q
Inlet El.
Trash Rack
INLET ALTERNATIVE
TABLE OF QUANTITIES
llEM UNIT QUANTITY
Embankment Earthfill Cu. Yd. 1920 Cutoff Trench Earth fill Cu. Yd. 19
PVC Pipe-1.1L" Dia, SDR 21 Or Sch 40 L.F. 75
Control Structure J.Q__" Dia x 4 ft ' High, _ll" Weir Length Ea n
Ea
Ea
Ea 1
Antiseep Collar (Specify Material)
PVC or Rubber 6560 " X
PVC Pipe Elbow __ " Dia Trash Rack
Animal Ea 1
,-+-...-+-- Anti Seep Collars -----..
...c u ...c s:::::-+--' Cl) CL .._ Cl)
I- 0
::::: s::::: o·
El17..5..75
12 ft
10 ft __ 2._Q_ft_
,----+--Top Of Constructed Fill El.1§.<2..:!.
Allow lQ.% For Settlement
Earth fill ..,3__
8 ft
TYPICAL BERM CROSS SECTION
LOCATION PLAN
Sec. ____ . T. ____ . R. ___ _
B.M. Elevation 382•20
B.M. Description_B.o.undacy_Ein NW Property Line Along Rd
IN-LINE CONTROL
STRUCTURE
�-----1- _!Q�Dia PVC Pipe (See Note 2)
-- Animal Guard
Outlet Channel El ___ _
NOTES:
1. This drawing is valid for In-Line Control
Structures with an 18" pipe diameter and smaller .
2. Place structure and pipe couplers on a stable base. A stable base may be compacted earth, compacted fill sand, or a concrete pad. Extend the stable base no less than 1 foot around structure.
3. PVC Pipe must conform to ASTM Standard D 2241 or D 1785. Pipe material must be PVC 1120 or PVC 1220.
4. Excavated material placed around structure, spillway pipe and anti-seep collar must be hand compacted in 4 inch lifts to same density requirements specified for the adjacent embankment.
Fie No.
0::::
w
CD
z
_J � w- 3: l) 0::::
LL
z
_J a..
IL-ENG-156
�No.
Sheet of
Strip Vegetation to a minimum depth of 6" before placing earthfill Stripping Volume = 1615 cu. yd
3 ft
60 60
J.
Gr ab
Corynn.Henrichs Polygon
Corynn.Henrichs Line
John.Grab Line
~ Auxiliary Spillway A Sta 10+50 ----. I
Sta ___ _
A
Level Control Section
Outlet
Flow
Principal Spillway Pipe With lnline Control Structure enterline Berm
AUXILIARY SPILLWAY PLAN
lnket Grade 1-10 %
Auxiliary Spillway Level Control Section
Flow
PROFILE ON AUXILARY
SPILLWAY CENTERLINE
~ Auxiliary Spillway
\Existing Ground Line -
'rn' "mf"Tr.:;:;" I II h ~ m 11,,m,,,11w 1
__ li)_Q_
SECTION A-A
Outlet Grade _.1-=-1.0_%
Wetland Berm
Id I
Fie No.
0:::
w rn z _J J- ~ W- 3: ~ u 0:::
LL
z _J
IL-ENG-156
~No.
Page 2 af 2
Sheet of
J.
G ra b
::::i
380 380 u ,_ --- ~ - - - -- -c ""O --- - - - - - - ... - -- - (L) ""O (L)
C
(L) >
0, C ~ 0 ,: (.) I.... 'iii 0 (L) Q_
378 378 (L) I.... _c Q_
0 0 u <t:
0+30 0+60 0+90 1 +20 1 +50 1 +80 2+10 2+40 2+70 3+00
Cell 1 PROFILE -6 (3 (I) e C:
380 380 .-
_J _J
378 378 w 3+30 3+60 3+90 4+20 4+50 4+80 5+10 5+40 5+70 6+00 u V) c::i
Cell 1 PROFILE 2~ :r: n:::: ~ o_Wc::i <t: m ~ ~ 1-... L,_j
0~ I z:::s I 380 ... ... ,- _,.__ ,... - ,.._
380 - ~ ,_.,.,._ :s Cl::: ~- ----- .... - -- _,.. ... ,_ - ... < - - - - - ,- -...-- - I- I 378 378 w I
6+30 6+60 6+90 7+20 7+50 7+80 8+10 8+40 8+70 9+00 ~ 1-...
I
Cell 1 PROFILE l)
I I
II) 0
380 - 380 cu .... cu -- - _ ,_ , __ ,_ ,. ... ~ - ,._,Cf u - -- -- _.,,, I'\ -,-- - ,~ ~ - J9 cu ::::, u,"i:: ' / u, E..., I\. I/ "C ~ "5 CUCU
378 378 ~ &·~ ~U) C CU C'l ::Jc:
9+30 9+60 9+90 10+20 10+50 10+80 11+10 11 +40 11 +70 12+ae2+10 ::::> C <C ~o cu·-
;1 c:::1o Cell 1 PROFILE -i::
~cu ::::,U>
.a-,C:
= Original Ground ttJO z:u = Settled Elevations rile NO.
4PH Wetland. dWf uraw1ng No.
9 '.J. '24 4:53 PM
Shell##of
STR @ STA 3+80Cut Off Trench
J.
G ra b
5-
John.Grab Line
John.Grab Line
John.Grab Line
::::i
= Original Ground
= Settled Elevations
~ u ""O ""O -c
(L) (L)
C
(L) >
390 390 0, C ~ 0 ,: (.) I
390 390 'iii 0 (L) Q_
(L) I.... _c Q_
0 0 u <t:
-6
380 380 , ,... (3 380 380 ,,, .... ,,, I,' r-. -- (I) --- -·-- ' e I'- C:
370 370 _J 370 370 _J w u 2 360 360 :r: n:::: ~ 360 360 0+00 0+40 0+80 1 +20 1+60
0+00 0+40 0+80 1 +20 o_Wg:
Cell 1 Cross Section PROFILE <t: m ~
CEIi 1 @ Structure PROFILE 0 z
390 390 :s I-w
380 380
370 370 II) 0
cu .... cu ,._,Cf u J9 cu ::::, u,"i:: u, E..., "C ~ "5 CUCU
~ &·~ ~U) C CU C'l ::Jc:
360 360 ::::> C <C ~o cu·-
0+00 0+40 0+80 1 +20 1 +60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 ;1 c:::1o -i::
~cu
Cell 1 Borrow Area PROFILE ::::,U> .a-,C:
ttJO z:u rile NO.
4PH Wetland. dWf uraw1ng No.
9 '.J. '24 4:53 PM
Shell##of .
J.
G ra b
Max Normal Pool Elev. = 376.5
Cell 2 Wetland Berm £/ev. = 379.5 Top Width = JO ft Front Slope = 6: J Back Sia e = 3:1
TOW Area 2 Cut = 1ft
Side Slopes--~
Borrow Area J Max Cut = J ft J 0: J Side Slopes
Pipe and Structure
Cell 2 Wetland Berm Elev. = 379.5 Top Width = JO ft Front Slope = 6: J Back Slope = 3: 1
200 0 200
~~Fti Scale in Feet
400 600
~ u -0 -0 (L) (L)
C
(L) > C ~ 0 0, ,: (.) I.... "iii 0 (L) Q_
(L) I.... ..c Q_ 0 0 u <t:
-6 (3 (I) e C:
N ~
_J _J w u
~ 2 'S:
:r: 0:::: ~ o_w c5:
<t: m l'\j
---I
0~ z _J
I-w s
4 '2 '25 4:44 PM
Shell##of .
J.
G ra b
379.5
377.5
376.5
375.0
375.0
374.5
10 ft
10 21 40
26 ft
23 ft
60 ft
3 ft 1410 1
PVC or Rubber 72 72
379.8
375.256 3
8 ft
12 ft
382.20
Boundary Pin NW Property Line Along Rd
Strip a minimum of 6 inches of vegetation before placing earthfill.
Stripping Volume = 1936 cu. yd
3 ft
C el l #
25 ft total length
Ft
10 J.
G ra b
5-
John.Grab Line
John.Grab Line
5 5
1-10 1-10
Auxiliary Spillway Located along North Edge of field See Plan Map for Location Details
J.
G ra b
J.
G ra b
::::i
~ u ""O ""O -c
(L) (L)
C
(L) >
0, C ~ 0
390 390 ,: (.) I.... 'iii 0 (L) Q_
(L) I.... _c Q_
0 0 u <t:
(/) -6 380 380 0 §
(I) (3 L
<( (I) - - - ,- ---- - ,----- - ,----- - ... ---- - ---- - ---- - - - --- ,- -- e C:
3: ~ 370 370 0
L L m
360 360 N 0+00 0+40 0+80 1 +20 1 +60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 Yl
:r:_J ~
Borrow Area 1 PROFILE o..._J ('-J
<( w--.J u~
390 390 L O'.'.:
w m
380 380 0 z
-- - - ---- ----- - ----- - -- _ ,_ ---- ... -- :5 I-
370 370 w s
II) 0
cu ..... cu ...., C CU ru cu I- u
360 360 ti, E _a u,"c:
,::, ~ "'5 cu cu
0+00 0+40 0+80 1 +20 1 +60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 ~ :g_ .g ~l/) C CU C, ::::,c
::::> C <C ~o Borrow Area 2 Profile PROFILE a,·-
;1 c=:1t;
-c: n:, cu
L.. U)
.ac = Original Ground n:,o z:u = Settled Elevations rile NO.
APH Wetland Cell 2
4 ?- ?&; ,-/um uraw1ng No.
4 '2 '25 4:44 PM
Shell##of
J.
G ra b
Wood Lumber Frame
Or Boards May Have 45· Cut Corner
OPTIONAL
Landowner APH w
_l!L_Dia.
1"x 4" Or 2"x 2'' Lumber Frame
A7
Pipe
ELEVATION
Location f l j
N
N
½" Minimum Width Stainless Steel Clamp And Connector
}f5" Thick Sheet Of Non-Reinforced Butyl Or Gum Rubber Membrane
SECTION A-A
Cells 1 & 2
NOTES:
1. Coat pipe at collar location with but� roof patch sealer or other butyl rubber sealer. (Do not use asphalt roof patch).
2. Completed installation must be water tight.
3. Cut a circular hole ( centered) in butyl rubber sheet approximately 1 /3 smaller in diameter than the pipe diameter. For example-cut a 4 inch hole in sheet with 6 inch diameter pipe, cut a 7 inch hole in sheet with 10 inch diameter pipe. Force but� rubber sheet over upstream end of pipe over butyl roof sealer.
4. Install a 1 /2 inch minimum width stainless steel clamp. Clamp around pipe over butyl rubber sheet and tighten until sealer is forced out.
5. Staple but� rubber sheet to lumber frame.
6. Wood frame shall be rigid enough to withstand backfill operations.
Flow
TABLE OF QUANTITIES
w Rubber Stainless Steel FEET Sq. Ft. Clamp
2 4 1
3 9 1
4 16 1
5 25 1
6 36 1
Totals
2-5 ft x 5 ft Anti-Seep Collars needed for Cell I 2 -6 ft x 6 ft Collars needed for Cell 2 Space Collars 15 feet apart
Lumber Lin. Ft.
No. Of Collars
Adapted From Wisconsin Standard Drawing Wl-244
I r<>I
I �I I :::1
I I
I vi I I �I I �I I :::ii I I I I I I I I
HI l
0::::
w a...
<C a..._J
_J _J 0 _J
(_) <C a... 3:
w
Iw (/) I-
I- 0
:z:
<C w :z: <C <C Cl 0::::
(D = � c.o w --
�o 0:::: I-w ..
(D� (D :::::> 0::::
0:::: 0
LL..
Fie No.
IL-ENG-214
Dra�No.
Sheet 1 of 1
Sheet of
J.
Gr ab l
USDA United States
APH
Department of
Agriculture
Natural Resources Conservation Service
Wetland Berm from Cell tf 2 to Railraod Track fill.
Reshope per plans sheet.
390 linear feet of berm.
Wetalnd Cell #2
Weta Ind Berm Designed JOG
Reshape Drown
Checked Sec __ , T __ N, R __ E/W, Approved Monroe County, IL
Dote File Nome
7-25 APH Wetland 7-25.dw
Drawing Nome
'30/25 1:14 A She#/#tfot
C)
C) N Cl <C u
Top Of Settled Berm Elev.= 379.5� 1 • 10· • I
TABLE OF CONTENTS
ITEM
Rework Berm Stripping Rework Berm Fill l_ ,,-- - - ----------= /Allow 10% -/ .---------.... "'- For Settlement / � / � 1 1 � 3 6 l_=::::; �:-� -----Top of Const, Berr-i Allow for 10% Settlement/4 �
I
.. .. I
TYPICAL CROSS SECTION OF WETLAND BERM
UNIT QUANTITY
Cu. Yd 280 Cu. Yd 185
Notes:
J. Strip existing vegetation prior to earth/;1/I placement.
2. Earth/;1/I shall be placed 1n 6" lifts and compacted by a mm1mum of
2 possess from equipment tires.
3. Take borrow from areas designatd by engineer at least 50 ft away from toe of berm.
• I I � I I I I I I I I I I
JD
G
I I I I I LI l
V) I
I <))J i FIIINo.
Drawqi No.
;-7
Rewo rk of
NW
Berm
Betw een Cell
#2 a nd R
R 7-
John.Grab Cross-Out
John.Grab Rectangle
John.Grab Rectangle
Rectangle
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Drawn
AutoCAD SHX Text
CSH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text APH Wetland 7-25.dwg
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Sheet of
AutoCAD SHX Text File No.
AutoCAD SHX Text
7/30/25 1:14 PM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
APH
AutoCAD SHX Text Rework Berm between cell #2 & RR
AutoCAD SHX Text Profile
AutoCAD SHX Text Monroe County, IL County, ILIL
AutoCAD SHX Text Final reworked top of berm - Elev = 379.5
AutoCAD SHX Text Existing CL of berm
Illinois NRCS August 2022
342� Critical Area Planting Implementation Requirements
Project or Contract: Cell 1, 2 & berm rework E of RR Producer: APH
Location: ACEPWetland
Farm Name: Click here to enter text.
County: Monroe
Tract Number: Click here to enter text.
NRCS Review Only Designed By:
ESJAA Level:
Corynn Henrichs Date 9/3/2024
Checked By:
ESJAA Level:
Date
Approved By:
ESJAA Level:
Corynn Henrichs Date
The Practice Purpose(s): (check all that apply) Stabilize areas with existing or expected high rates of soil erosion by wind or water.
Stabilize stream and channel banks, pond and other shorelines, earthen features of structural conservation practices.
Stabilize areas such as sand dunes and riparian areas
Index
Cover Sheet
Specifications
Drawings
Operation & Maintenance
Utility Safety/ One Call System Information
Click here to enter text.
Practice Location Map (showing detailed aerial view of where practice is to be installed on farm/site, showing all major components, stationing, relative location to any landmarks, and survey benchmarks)
See Eng. Plans � Plan Map This seeding covers the below listed areas:
Berm #1 Berm #2 Rework of Berm between RR and Cell#2
JDG 5-25
342 � Critical Area Planting Implementation Requirements
Site Conditions
Slope range pH range (If known)
Soil type/soil texture Soil drainage class Current vegetation or site condition slope range pH range soil type & texture drainage class vegetation/site condition
Permanent Seed and/or Plant Requirements
Site preparation earthmoving (if applicable), etc.:
Seedbed preparation:
Top soiling requirements (if applicable):
Click here to enter text.
Seeding time:
August 1st - Septemeber 15th (Dormant Nov 15 to March 1)
Double click on the spreadsheet below. Type in species, seed rate, and acres. Totals will be calculated automatically.
Species PLS lbs./ac Acres Total Tall Fescue 12 5.0 60 Redtop 2.5 5.0 12.5
Amendments Fertilizer requirements) Source Lbs/acre Total Notes Nitrogen source 120 600 lbs notes Phosphate (P2O5) source 120 600 lbs notes Potash (K2O) source 120 600 lbs notes Lime source 2 ton / Ac 4.0ton notes
Mulch requirements (type, rate/ac) enter mulch requirements
Other notes (e.g., inoculants, irrigating, management, plant protection, etc.)
Companion Crop : Cereal Rye or Wheat @ 20 lbs/ac. = 100 lbs
�Temporary Cover Establishment� Seed and/or Plant Requirements (If Applicable) Site preparation earthmoving (if applicable), etc.:
enter site prep
Seedbed preparation: enter seedbed prep
Top soiling requirements (if applicable): enter top soil requirements
Seeding time:
Alsike 8 5.0
Smooth out berm after placement of earthfill.
Firm and smooth seed bed prior to seeding.
NRCS, Illinois May 2022
Illinois 484� Mulching Implementation Requirements
Project or Contract: Producer: APH
Location: Wetland Berm
Farm Name: Click here to enter text.
County: Monroe
Tract Number: Click here to enter text.
Description of work:
Click here to enter text.
NRCS Review Only
Designed By: Corynn Henrichs Date 9/3/2024
Checked By: Date
Approved By: Corynn Henrichs Date Click here to enter a date.
Index
Cover Sheet
Specifications
Operation & Maintenance
Utility Safety/ One Call System Information
Click here to enter text.
Practice Location Map (showing detailed aerial view of where practice is to be installed on farm/site, showing all major components, stationing, relative location to any landmarks, and survey benchmarks)
Mulching for Wetland Berm See Plan Map in Eng. Plans
This mulching covers the below listed areas:
Berm #1 Berm #2 Rework of Berm between RR and Cell#2
Cell 1, 2 & berm rework E of RR
484 � Mulching Implementation Requirements
The Practice Purpose(s): (check all that apply) Improve the efficiency of moisture management.
Reduce energy use associated with irrigation.
Improve the efficient use of irrigation water Prevent excessive bank erosion from water conveyance channels.
Reduce concentrated flow erosion.
Reduce sheet, rill, and wind erosion.
Improve plant productivity and health Maintain or increase organic matter content Reduce emissions of particulate matter
Field Number(s) field numbers
Planned Applied
1. Mulch material/type Straw mulch
2. Amount of mulch per 1,000 sq. feet per acre lbs lbs
2600 lbs lbs or ton/acre
3. Method of applying mulch application method application method
4. Type of anchoring Straight disk punch anchor type
5. Anchor application rate anchor rate anchor rate
Site preparation: preparation
Application timing: timing
Fencing required: Yes No
Additional comments: comments
Operation and Maintenance:
Inspect areas periodically and reinstall mulch or repair as needed to accomplish the intended purpose.
Evaluate the effectiveness of mulch application and adjust management when needed.
Removal or incorporation of mulch materials will be consistent with the intended purposes and conditions.
Operation of equipment that compromises the intended purpose of the practice should be avoided.
Prevent or repair any fire damaged mulch material.
Properly collect and dispose of artificial mulch material after intended use.
Monitor and control undesirable weeds in the mulched areas.
Excavate Cross Berm to elevation 376.0 for 150 ft on each end �t--------�Spread spoil to the north or use to rebw1/d berm according to plans
�---Replace See Pia
�---Cell 3 Wetland Berm Excavate Berm and Rebw1/d according to Plans Windrow Berm Material into Wetland Pool Dig Cutoff Trench and make stable base Rebw1/d Berm. Obtain fill from inside wetland minimum 50 ft from toe of berms. Maximum borrow area cut of 1 foot
300 0
��Fti
Scale in Feet
N i
600 900
� u -0 -0
(L) (L)
C
(L) >
0, C � 0 ,: (.) I
'iii 0 (L) Q_
(L) I.... _c Q_
0 0 u <t:
I"") �
_J _J w u
2 '::;:
:r: 0::::
o_w
<(IT) ")
---I
0 (;:j
_J w s
3, '3! '25 4:54 PM
Shell##of
Grade Wetland to drain from location of existing structure
Repair two beaver tunnels in berm in this approx. location.
Earthwork quantities included with berm #3 totals
J.
G ra b
5-
C) N Cl <C u
Top Of Settled Berm Elev.= 378.5� I.. 10' -1
TABLE OF CONTENTS
ITEM
Cell 3 Rework Berm Excavation Cell 3 Rework Berm Fill Cell 3 Rework Berm Cutoff trench l_ � - - � � Allow 10%
For Settlement
/�1 1[::S� ,.,.---:::: 3 6 �::--
------Top of Const, Berrv1 - 378,8 /4 �
S- 8.0ft �7 Cutoff Trench Side Slope 1: 1
TYPICAL CROSS SECTION OF WETLAND BERM
UNIT QUANTITY
Cu. Yd 3450 Cu. Yd 3730 Cu. Yd 375
Notes:
1. Strip existing vegetation prior to earthfl!I placement.
2. Earthfl!I shall be placed in 6" lifts and compacted by a m1mmum of
2 possess from equipment tires.
3. Take borrow from areas designatd by engineer at least 50 ft away from toe of berm.
a I I
I I I I
I I I I
� I di- I � I '1 I
I I
I � I
Cl) U o_ w
Eu L <( Cl) rn:r � Q_
L <( 0:s:
Cl)
0:::::
Fie No.
Drawing No.
I
I I
I
I I I I I I
I
J.
G ra b
= Original Ground
= Settled Elevations
� u ""O ""O
-c
(L) (L) C (L) > 0, C � 0 ,: (.) I
'iii 0 (L) Q_
(L) I.... _c Q_
0 0 u <t:
-6 r<)
390 390 Q) u 380 380 [J
:r: E� 370 ' ' - T 370 0... � a: ,, .. ' �'t..;_ <.( (I) � �-.. ,,. _,;#-tr:! �, ,i 7,i-. C -\- -•·
--.J L,_j
;i.1-1 � i�en �'l�i 0
360 -0 � I
0+00 0+40 0+801+201+60 2+00 2+40 2+803+203+60 4+0o 4+40 4+8o5+2os+60 6+00 6+40 6+807+207+60 8+oo 8+40 8+8o9+209+6rno+oao+4o C I
0 Cl::: - Berm Excavation Cell 3 PROFILE
Q)
I
� I
1--...
390 390
I
380 380 1 I I
370 370 II) 0
cu ..... cu
...., C CU
ru cu I.. u
360 360 ti, E _a u,"c:
0+00 0+40 0+80 1+201 +60
,::, � "5 Cl) cu � :g_ .g �l/) C CU C, ::::,c ::::> C <C �o
XS Berm Excavation PROFILE Cl)"-
;1 c=:1t;
- c:n:, cu
L.. U) .ac n:,o z:u rile NO.
APH Wetland
Cell 2 4 ?. ?&; ,-/um uraw1ng No.
4 '.J, '25 !!:2! AM
Shell##of
Excavation Volume for Berm between pools = 735 cu. yd
J.
G ra b
379.5
378.0
375.0
374.7
20 ft
35 ft
30 ft
15 ft
4 ft 2418 1
25 5
380.1
6 3
8 ft
12 ft
382.20
Boundary Pin NW Property Line Along Rd
X
Helical Aluminum Strip a minimum of 6 inches of vegetation before placing earthfill
C el l #
- R ep la ce m en t o f P ip e an d St ru ct ur e
J.
G ra b
5-
AL
John.Grab Line
Pencil
2-5 ft x 5 ft Anti-Seep Collars needed for Cell 3 Space Collars 12 feet apart
J.
G ra b
5-
Highlight
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re J.
G ra b 5-
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Drawn
AutoCAD SHX Text
CSH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text APH Wetland.dwg
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Sheet of
AutoCAD SHX Text File No.
AutoCAD SHX Text
4/8/25 12:02 PM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
APH
AutoCAD SHX Text
WETLAND STRUCTURE & PIPE REPLACEMENT
AutoCAD SHX Text Monroe County, IL County, ILIL
AutoCAD SHX Text = Original GroundOriginal Ground
AutoCAD SHX Text 18" Water Control Structure
AutoCAD SHX Text 18" Aluminum Pipe
AutoCAD SHX Text Settled Earthfill
AutoCAD SHX Text Excavate to allow positive drainage to pipe
AutoCAD SHX Text Two Seep Collars Spaced 12 ft from STR & 12 ft between collars
342� Critical Area Planting Implementation Requirements
Project or Contract: Wetland Cell 3Producer: APH
Location: ACEPWetland
Farm Name: Click here to enter text.
County: Monroe
Tract Number: Click here to enter text.
NRCS Review Only Designed By:
ESJAA Level:
Corynn Henrichs Date 9/3/2024
Checked By:
ESJAA Level:
Date
Approved By:
ESJAA Level:
Corynn Henrichs Date
The Practice Purpose(s): (check all that apply) Stabilize areas with existing or expected high rates of soil erosion by wind or water.
Stabilize stream and channel banks, pond and other shorelines, earthen features of structural conservation practices.
Stabilize areas such as sand dunes and riparian areas
Index
Cover Sheet
Specifications
Drawings
Operation & Maintenance
Utility Safety/ One Call System Information
Click here to enter text.
Practice Location Map (showing detailed aerial view of where practice is to be installed on farm/site, showing all major components, stationing, relative location to any landmarks, and survey benchmarks)
See Eng. Plans � Plan Map
J. Grab 5-25
Corynn.Henrichs Cross-Out
342 � Critical Area Planting Implementation Requirements
Site Conditions
Slope range pH range (If known)
Soil type/soil texture Soil drainage class Current vegetation or site condition slope range pH range soil type & texture drainage class vegetation/site condition
Permanent Seed and/or Plant Requirements
Site preparation earthmoving (if applicable), etc.:
Smooth out berm after placement of earthfill.
Seedbed preparation:
Firm and smooth seed bed prior to seeding.
Top soiling requirements (if applicable):
Click here to enter text.
Seeding time:
Early Spring - June 1 (Dormant Nov 15 to March 1)
Double click on the spreadsheet below. Type in species, seed rate, and acres. Totals will be calculated automatically.
Species PLS lbs./ac Acres Total Switchgrass 12 24
Amendments Fertilizer requirements) Source Lbs/acre Total Notes Nitrogen source 0 notes Phosphate (P2O5) source 0 notes Potash (K2O) source 0 notes Lime source 0 notes
Mulch requirements (type, rate/ac) None
Other notes (e.g., inoculants, irrigating, management, plant protection, etc.)
Companion Crop : Cereal Rye or Wheat @ 20 lbs/ac. = 40 lbs (PLS)
�Temporary Cover Establishment� Seed and/or Plant Requirements (If Applicable) Site preparation earthmoving (if applicable), etc.:
Seedbed preparation:
Top soiling requirements (if applicable): enter top soil requirements
Seeding time:
2.0"Cave-in-Rock"
Temporary cover - 90 lbs/ac. Cereal Rye or Wheat (PLS)
Smooth out berm after placement of earthfill.
Illinois 484� Mulching Implementation Requirements
Project or Contract: Wetland Berms-West of RRProducer: APH
Location: Wetland Berm
Farm Name: Click here to enter text.
County: Monroe
Tract Number: Click here to enter text.
Description of work:
Click here to enter text.
NRCS Review Only
Designed By: Corynn Henrichs Date 9/3/2024
Checked By: Date
Approved By: Corynn Henrichs Date Click here to enter a date.
Index
Cover Sheet
Specifications
Operation & Maintenance
Utility Safety/ One Call System Information
Click here to enter text.
Practice Location Map (showing detailed aerial view of where practice is to be installed on farm/site, showing all major components, stationing, relative location to any landmarks, and survey benchmarks)
Mulching for Wetland Berm See Plan Map in Eng. Plans
J. Grab 5-25
Mulching for berms west of RR
484 � Mulching Implementation Requirements
The Practice Purpose(s): (check all that apply) Improve the efficiency of moisture management.
Reduce energy use associated with irrigation.
Improve the efficient use of irrigation water Prevent excessive bank erosion from water conveyance channels.
Reduce concentrated flow erosion.
Reduce sheet, rill, and wind erosion.
Improve plant productivity and health Maintain or increase organic matter content Reduce emissions of particulate matter
Field Number(s) field numbers
Planned Applied
1. Mulch material/type Straw mulch
2. Amount of mulch per 1,000 sq. feet per acre lbs lbs
2600 lbs lbs or ton/acre
3. Method of applying mulch application method application method
4. Type of anchoring Straight disk punch anchor type
5. Anchor application rate anchor rate anchor rate
Site preparation: preparation
Application timing: timing
Fencing required: Yes No
Additional comments: comments
Operation and Maintenance:
Inspect areas periodically and reinstall mulch or repair as needed to accomplish the intended purpose.
Evaluate the effectiveness of mulch application and adjust management when needed.
Removal or incorporation of mulch materials will be consistent with the intended purposes and conditions.
Operation of equipment that compromises the intended purpose of the practice should be avoided.
Prevent or repair any fire damaged mulch material.
Properly collect and dispose of artificial mulch material after intended use.
Monitor and control undesirable weeds in the mulched areas.
| x-section STR replacement.pdf |
| Sheets and Views |
| Cell 2 XS |
| Blank Page |
| APH rework berm profile.pdf |
| Sheets and Views |
| Profiles (2) |
Blank Page
File details come from the government source that posted it. Updated .