This document consists of architectural floor plans for a maintenance hangar renovation project, specifically Ground Floor Plan - North (A2.1) and Ground Floor Plan - South (A2.2), drawn at 1/8" = 1'-0" scale.
The plans depict a comprehensive interior reconfiguration of an existing facility with multiple functional zones including QA commons, storage areas, break rooms, kitchens, vestibules, lockers, fabrication shops, wheel and tire shops, electrical rooms, and administrative offices. Key construction specifications include: new concrete floor slabs installed over vapor barriers and 6" crushed aggregate base compacted to 100% modified density; STC 50 rated wall construction extending and sealed to the second floor slab above; new CMU walls and metal framing walls as detailed in wall type plans; patching and filling of openings in existing masonry walls scheduled to remain; new downspouts matching existing size and profiles; and new concrete sidewalks and chain link fencing. The plans incorporate specific coordination requirements with the Contracting Officer Representative on site for marking painted lines (6" wide solid and dashed red lines, 6" wide solid yellow lines, 36" x 12" yellow stop bars, and 6" wide green boxes 24" x 24" centered on emergency fixtures). Multiple room identifications with square footage notations and slope specifications (1.5% and 0.005%) are indicated throughout both floor plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFREF
UP
UP
DW
LEGEND:
EXISTING WALL ASSEMBLY TO REMAIN
DOOR - SEE DOOR SCHEDULE
NEW CMU WALLS
(SEE WALL TYPE PLAN)
NEW METAL FRAMING WALLS
(SEE WALL TYPE PLAN)
DOOR TAG - SEE
DOOR SCHEDULE
WINDOW / STOREFRONT
A101
SIM
DETAIL SECTION
1i
202A
## SPECIFIC NOTE TAG
NEW CONCRETE FLOOR SLAB. INSTALL
NEW SLAB ON TOP OF VAPOR BARRIER
(SEE 03 3000) OVER 6" OF CRUSHED
AGGREGATE BASE COMPACTED TO
100% MODIFIED DENSITY - REFER TO
STRUCTURAL FOR REINFORCING AND
OTHER REQUIREMENTS
STC 50 RATED WALL
CONSTRUCTION. WALLS TO
EXTEND AND BE SEALED TIGHT TO
SECOND FLOOR SLAB ABOVE.
PATCH AND FILL ALL OPENINGS IN
EXISTING MASONRY WALLS
SCHEDULED TO REMAIN.
NEW DOWNSPOUT
N.D.S.
A
A
B
B
C
C
D
D
6 6
5 5
4 4
3 3
2 2
1A 1A
1 1
E
E
F
F
G
G
H
H
K
K
L
L
METAL TECH
SUPER OFFICE
FAB SUPER
OFFICE
METALS TECH
SHOP
ELEV
113EQ.
TFI STORAGE
ALIS
QA CHIEF
QA COMMONS
COMM
FABRICATIONS
SHOP
BOILER
VEST
ENTRY
109CSTAIR
STAIR
1 2
FIRE
PROTECTION
MAINTENANCE
HANGAR
A4.1
A4.2 2
102 114A
115B
A7.1
4 2
J
J
LOCKERS
105 114
103 105
103A
105A
MATCH LINE
78 SF
VEST
BREAK ROOM
108A
KITCHEN
108B
ENTRY
109D
ENTRY
109B
44 SF
VEST
109A
LO SUPER
OFFICE
A7.26
109A
M
M
2' - 6"
SLOPE 1.5%
SLOPE 1.5% SLOPE .005%
A5.1
7' - 6"
4' - 0"
KEYCARD ACCESS
D.S.N.D.S.
D.S.
NEW MOISTURE MANAGEMENT SYSTEM
A3.6
A3.6
A3.6
A3.6
A3.6
N.D.S.
N.D.S.
N.D.S.N.D.S.N.D.S.N.D.S.N.D.S.N.D.S.
A5.2
N.D.S.
115A
NEW CONCRETE SIDEWALK
NEW CHAIN LINK FENCE
3 12
VESTIBULE
115A
A4.1
VESTIBULE
105A A7.2 7A7.27
Si m
5 5
66A1.2
A0.1
NEW PERFORATED
UNDERDRAIN - SEE A5.1
KEY PLAN
MATCH LINE
SPECIFIC NOTES:
1 SOLID 6" WIDE PAINTED RED LINE. COORDINATE EXACT LOCATION
WITH CONTRACTING OFFICER REPRESENTATIVE ON SITE.
2 DASHED 6" WIDE PAINTED RED LINE. COORDINATE EXACT LOCATION
WITH CONTRACTING OFFICER REPRESENTATIVE ON SITE.
3 NEW DOWNSPOUT. MATCH EXISTING SIZE PROFILE AND CONNECT
TO EXISTING GUTTER.
PATCH AND PAINT CMU IN THIS LOCATION. PROVIDE NEW 4" CMU
TO INFILL VOID AT ELECTRICAL PANEL SCHEDULED TO BE
REMOVED.
5 6" WIDE SOLID YELLOW PAINTED LINE - COORDINATE EXACT
LOCATION/EXTENTS WITH CONTRACTING OFFICER REPRESENTATIVE
ON SITE
6 PAINTED YELLOW STOP BAR. 36" X 12". COORDINATE EXACT
LOCATION WITH CONTRACTING OFFICER REPRESENTATIVE ON SITE.
PAINTED GREEN BOX . 6" WIDE LINE, 24" X 24" SQUARE
CENTERED ON EMERGENCY FIXTURE
Sheet Number
Sheet Title
A2.1
FIRST FLOOR PLAN
NORTH
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
1/8" = 1'-0"A2.1
1 Ground Floor Plan - North
0' 4' 8' 16' 32'
R
EF
UP
DW
10 10
9 9
A B C D
7 7
6 6
E F G H K L
11 11
10B 10B
METAL TECH
SUPER OFFICE
FAB SUPER
OFFICE
VESTIBULE
ELECTRICAL
LO HAZMAT
STORAGE
125WHEEL AND TIRE
SHOP
ALIS ADMIN
LEAD
ELEC
OFFICE
CONFERENCE
ROOM
LO SHOP
BASE SITE
MANAGER
MENS
132 WOMENS
FABRICATIONS
SHOP
BOILER
8'
- 1
/4
PANEL STORAGE
8'
- 2
/8
STAIR
STAIR
VESTIBULE
FIRE
PROTECTION
JAN
MAINTENANCE
HANGAR
SUPPORT
SECTION
HIT
126WHEEL
STORAGE
A4.2 2
A4.21
FSE
COLLATERAL
STORAGE
133A
141A
129A
134 133A
128B
A7.2
J
140A
A5.1
MATCH LINE
LO SUPER
OFFICE
43 SF
VEST
140A
A6.1
136A
WORK BENCH
(OFOI)
TIRE CAGE
(OFOI) TIRE RACKS
(OFOI)
PARTS WASHER
(OFOI)
WORKSTATION (OFOI)
1 1
M
8 8
2' - 6"
SLOPE 1.5%
SLOPE 1.5%
SLOPE 1.5% SLOPE .005%
A5.1
122A122
D.S.N.D.S.
D.S.
NEW MOISTURE MANAGEMENT SYSTEM
D.S.
NEW MOISTURE
MANAGEMENT SYSTEM
N.D.S.
N.D.S.
N.D.S.
N.D.S.N.D.S.N.D.S.N.D.S.N.D.S.N.D.S.
N.D.S.
A4.1
VESTIBULE
136A
5 5
5 5
6 6
A1.2
NEW PERFORATED
UNDERDRAIN - SEE A5.1
NEW SOLID 4" PVC - CONNECT
TO EXISTING CURB INLET
STRUCTURE CI#5
APPROXIMATE LOCATION OF
CURB INLET #5 - FIELD VERIFY
LOCATION
KEY PLAN
MATCH LINE
SPECIFIC NOTES:
1 SOLID 6" WIDE PAINTED RED LINE. COORDINATE EXACT LOCATION
WITH CONTRACTING OFFICER REPRESENTATIVE ON SITE.
2 DASHED 6" WIDE PAINTED RED LINE. COORDINATE EXACT LOCATION
WITH CONTRACTING OFFICER REPRESENTATIVE ON SITE.
3 NEW DOWNSPOUT. MATCH EXISTING SIZE PROFILE AND CONNECT
TO EXISTING GUTTER.
PATCH AND PAINT CMU IN THIS LOCATION. PROVIDE NEW 4" CMU
TO INFILL VOID AT ELECTRICAL PANEL SCHEDULED TO BE
REMOVED.
5 6" WIDE SOLID YELLOW PAINTED LINE - COORDINATE EXACT
LOCATION/EXTENTS WITH CONTRACTING OFFICER REPRESENTATIVE
ON SITE
6 PAINTED YELLOW STOP BAR. 36" X 12". COORDINATE EXACT
LOCATION WITH CONTRACTING OFFICER REPRESENTATIVE ON SITE.
PAINTED GREEN BOX . 6" WIDE LINE, 24" X 24" SQUARE
CENTERED ON EMERGENCY FIXTURE
LEGEND:
EXISTING WALL ASSEMBLY TO REMAIN
DOOR - SEE DOOR SCHEDULE
NEW CMU WALLS
(SEE WALL TYPE PLAN)
NEW METAL FRAMING WALLS
(SEE WALL TYPE PLAN)
DOOR TAG - SEE
DOOR SCHEDULE
WINDOW / STOREFRONT
A101
SIM
DETAIL SECTION
1i
202A
## SPECIFIC NOTE TAG
NEW CONCRETE FLOOR SLAB. INSTALL
NEW SLAB ON TOP OF VAPOR BARRIER
(SEE 03 3000) OVER 6" OF CRUSHED
AGGREGATE BASE COMPACTED TO
100% MODIFIED DENSITY - REFER TO
STRUCTURAL FOR REINFORCING AND
OTHER REQUIREMENTS
STC 50 RATED WALL
CONSTRUCTION. WALLS TO
EXTEND AND BE SEALED TIGHT TO
SECOND FLOOR SLAB ABOVE.
PATCH AND FILL ALL OPENINGS IN
EXISTING MASONRY WALLS
SCHEDULED TO REMAIN.
NEW DOWNSPOUT
N.D.S.
Sheet Number
Sheet Title
A2.2
FIRST FLOOR PLAN
SOUTH
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
1/8" = 1'-0"A2.2
1 Ground Floor Plan - South
0' 4' 8' 16' 32'
File details come from the government source that posted it. Updated .