Attachment 2 - 9 MUNS Mold Abatement - ROM excel.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
9 MUNS B1358 Mold Abatement and Restoration (Beale AFB)
Solicitation number
FA468626SMOLD
Issued by

About this file

This is a Rough Order of Magnitude (ROM) pricing template for mold abatement and restoration services at the 9 MUNS Facility B1358 located at Beale Air Force Base. The spreadsheet contains two primary Contract Line Items (CLINs): CLIN 1 covers site preparation and containment work, including setup of negative pressure HEPA air scrubbers, physical dust barriers, and safety containment for a 443 square foot footprint on a job basis; CLIN 2 encompasses mold remediation, demolition, and disposal activities, including removal of 1,670 square feet of contaminated drywall and insulation, disassembly and disposal of restroom fixtures and water heater, capping of plumbing lines, antimicrobial sanitization application, and off-base waste transport, also priced on a job basis. The template requires contractors to input unit costs and estimated total costs for ROM purposes to support market research activities.

This pricing template supports a pre-solicitation Sources Sought notice issued by the Department of the Air Force Air Combat Command for anticipated contract action FA468626SMOLD. The proposed contract will be awarded as Firm Fixed Price (FFP) and is anticipated to utilize NAICS code 562910 (Remediation Services) and PSC code F108 (Environmental Remediation/Hazardous Substance Removal). Interested contractors should submit responses including their company UEI and CAGE code, capabilities statements, and relevant past performance documentation related to mold abatement, contaminated material disposal, and facility restoration to the identified Air Force points of contact. No reimbursement will be provided for costs associated with responding to this market research request.

View the file

Other files

File Type Posted
Draft - Mold - 9 MUNS - PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CLINTask DescriptionQtyUnit of MeasureUnit CostEstimated Total Cost (ROM)
1Site Prep & Containment (Set up negative pressure HEPA air scrubbers, physical dust barriers, and safety containment for the 443 sq ft footprint)1Job
2Mold Remediation, Demolition, & Disposal (Tear out 1,670 sq ft of contaminated drywall/insulation, disassemble and dispose of all restroom fixtures and water heater, cap all plumbing lines, apply antimicrobial sanitization, and transport all waste off-base)1Job
Total Estimated ROM